Asher was the best choice I have made. We love the outcome of the ADU . They showed up on time and did a great job, were friendly. No issues at all during the whole process. Very organized team . I would recommend them to everyone I know !
Renovation, remodel, addition or new construction?
The short answer
A renovation updates what is already there without changing the layout or the structure (new countertops, flooring, paint). A remodel changes the layout, the structure or a building system (moving a wall, adding a bathroom, relocating plumbing). An addition adds new square footage. New construction is an entirely new structure. The Florida Building Code, Existing Building volume uses its own categories – repair, alteration and addition – and the permit, inspection and (for a flood-zone property) elevation requirements follow the code category, not the marketing word on the contract.
Renovation
Cosmetic update, same layout and systems. Often no permit, or a simple one.
Remodel
Layout, structural or systems change. A permit is almost always required.
Addition
New square footage. Always permitted; may trigger flood-elevation rules.
New construction
An entirely new structure, built to the current code from the ground up.
From a repair to new construction
Where each term sits on the code
The Florida Building Code, Existing Building volume (8th edition, 2023) does not use the words “renovation” or “remodel” at all. It sorts work on an existing structure into repairs (chapter 4), alterations (chapter 7, covering both a cosmetic renovation and a structural remodel) and additions (chapter 5). The chapter that applies, not the word used to describe the project, decides what the building department requires.

Layout and systems are the test
Renovation vs. remodel: the practical difference
Usually a renovation
- New countertops, cabinet fronts or flooring
- Repainting or refinishing surfaces
- Replacing fixtures in the same location
- The layout and plumbing/electrical stay where they are
Usually a remodel
- Moving or removing a wall
- Adding a bathroom or relocating plumbing or wiring
- Reconfiguring a kitchen or bathroom layout
- Converting a space to a new use (garage to living area)
The test is not the price or how much demolition happens – it is whether the layout, structure or building systems change. A full gut-and-replace of a kitchen that keeps the same footprint and plumbing runs is, by this test, a (large) renovation. Moving a sink six feet is a remodel, even if the rest of the job is small. See our kitchen planning guide and bathroom planning guide for how that distinction plays out room by room.

Adding on, or starting over
Addition vs. new construction
An addition adds new conditioned square footage to an existing structure – a bump-out, a second storey, or a detached suite connected to the main house by a breezeway. It always needs a permit, and chapter 5 of the Existing Building code (section 502.2) requires the existing structure to be brought into compliance too if the combined project crosses the substantial-improvement threshold below. New construction is a structure built from the ground up: it is designed to the current code in full from the first drawing, with no existing building to reconcile.

See our new home construction cost guide for the flood, wind and energy-code rules that apply to a ground-up build.
FEMA’s 50% rule
The cost of the work can outrank the label
None of these labels change what happens if a property sits in a Special Flood Hazard Area and the job is expensive enough. Under 44 CFR 59.1, a “substantial improvement” is “any reconstruction, rehabilitation, addition, or other improvement of a structure” whose cost equals or exceeds 50 percent of the structure’s market value before the work starts. Once that threshold is crossed, the Florida Building Code’s flood provisions require the whole structure – not just the new work – to meet current flood-elevation and other code requirements. A project called a “renovation” on the contract gets no exception.
See our FEMA 50% rule guide for how the 50% threshold is calculated, what counts toward the cost, and what the whole-structure compliance requirement involves.
The building department decides, by scope
Does it need a permit?
Florida law requires a permit for work that affects structure, electrical, plumbing, mechanical systems, fire protection or (in most cases) a change of occupancy; the exact list of what is exempt is set locally under section 553.79, Florida Statutes, and varies by city and county. In practice: a cosmetic renovation that touches only finishes often needs no permit, or a minor one; a remodel that moves plumbing, wiring or a wall needs one; an addition always needs one. We confirm the requirement with the building department before pricing a project, rather than guessing from the label a homeowner used to describe it.

Interactive checklist
Figuring out which one your project is
Our process
How we scope a project before we price it
We start by confirming what the work actually involves – layout, systems, square footage and flood zone – because that, not the word a homeowner uses, decides the permit path and the code requirements. From there we scope it as a kitchen remodel, a bathroom remodel, a whole-home renovation, or new home construction.

Tell us what you are considering and we will tell you which category it falls into and what permit it needs, before we talk about price.










