Attached ADUs.
One shared wall.
Two separate homes.

An accessory dwelling unit built onto the house you already own — its own entrance, its own kitchen and bathroom, its own sense of being somewhere else — while sharing a wall, a foundation edge and a utility run with the main home. Cheaper to service than a detached unit, and stricter about the one thing that separates them.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll
Attached ADU additions · South Florida

A second home that
shares one wall.

An attached ADU is a complete, independent dwelling — sleeping space, bathroom, kitchen and its own front door — joined to the primary house rather than standing apart from it. That single decision makes the utilities shorter and cheaper, and makes the separation between the two homes the most heavily inspected thing you will build.

Open-plan ADU living and kitchen area with a black steel stair rising to a loft
What we build

Independent living space, joined to the house and permitted as a dwelling

Zoning verification, design, structural tie-in to the existing building, fire-rated separation between the two units, kitchen and bathroom rough-in, service upgrades where the existing panel or water service cannot carry the load, and the permit closed in our name at handover.

Start with the zoning check
Who it suits

Households adding a second home without adding a second lot

Almost every attached ADU we are asked about is driven by a person rather than a return: a parent who should not be far away, an adult child who cannot yet buy, or a household that wants the option of rental income later without moving now.

  • Multi-generational households keeping independence on both sides
  • Owners with side or rear yard depth but not enough for a detached unit
  • Homes where a garage or utility wing is already the obvious footprint
Track record1,000+

Completed projects

  • Experience30+ combined years
  • Coverage104 cities across three counties
  • LicenceCBC1265280 · bonded & insured
Why here is different

Zoning decides this before design does

There is no statewide right to build an ADU in Florida. Whether you may add one, how large it can be, whether it needs its own parking space, and whether the owner must live on site are all set by your municipality — and they genuinely differ between neighbouring cities. That check comes first, because it can change the entire brief.

What is included

Five things in every attached ADU scope

  • 01Zoning and lot verification before any design work begins
  • 02Structural design for the tie-in to the existing house
  • 03A fire-rated separation assembly between the two dwellings
  • 04Utility capacity review — electrical service, water, and sewer or septic
  • 05Permit filed with your building department and closed at handover
Four routes

Four ways an attached
ADU gets built.

Which one fits depends on what your lot allows and what the existing house already gives you. The cheapest is almost always the one that reuses structure you have already paid for.

Private entrance to a completed accessory dwelling unit, with its own door, steel awning, lantern and paved approach
Most requested

New attached addition

A purpose-built unit added to a side or rear elevation, with its own entrance and its own services. Everything is designed for the use, so nothing is a compromise — and it is the option zoning scrutinises hardest, because it adds footprint.

ADU kitchen with timber-fronted cabinetry, white subway tile and a stainless range and refrigerator
Option

Attached garage conversion

The footprint, foundation and roof already exist. What has to be added is habitable-standard insulation, egress-compliant windows, moisture detailing at the slab, and the separation assembly — plus wherever your parking requirement now goes.

View down from an ADU loft gallery over the living area below
Option

Second-storey attached unit

Where the lot has no width to give, the unit goes up. This is a structural project first: the existing foundations and walls have to be verified for the new load before the plan is worth drawing.

Also

Internal conversion

Carving an independent unit out of space the house already encloses. The least external change, and often the most complex separation and egress problem to solve.

Two-level ADU living space with the kitchen beyond and a loft gallery above
Also

Kitchen & bath first

These two rooms carry nearly all the plumbing, ventilation and inspection load in an ADU. Their position, more than the layout, decides what the unit costs to service.

Compact ADU kitchen with white shaker cabinetry, dark subway tile and a full-height range
Also

Loft & volume

Where head height allows, a sleeping loft buys a bedroom without buying footprint — subject to ceiling height, guarding and stair rules that apply to it as a habitable space.

ADU sleeping loft under a vaulted ceiling with an exposed beam
What the photographs show

Read the unit,
not the brochure.

Six observations drawn only from the project photography on this page.

01 · Unit overview

A studio that is genuinely independent

The first set of frames shows one room containing a full kitchen, a full bathroom, a sleeping area and a private external door. That combination — not the floor area — is what makes it a dwelling rather than a converted room.

Described from the photographs. Two separate completed units are shown and are not presented as one project. No location, cost, date or schedule is claimed.

02 · Visible design features

The ceiling is doing the work the plan cannot

Both units are vaulted to the underside of the roof with the beam left exposed. In a small footprint the only dimension left to spend is the vertical one, and spending it removes the boxed-in feeling a flat ceiling at standard height would give.

Studio accessory dwelling unit with a vaulted ceiling on an exposed beam, living area and sleeping area in one open room
03 · Materials and systems

Observable specification

  • CeilingsVaulted to the roof line with the structural beam left exposed
  • ConditioningWall-mounted mini-split heads — independent of the main house
  • FloorsContinuous plank flooring, no thresholds between zones
  • KitchensFull-height range, tiled splashback, run against one wall
  • BathroomsGlazed enclosures, recessed niches, wall-hung fittings
  • LaundryStacked washer and dryer built into the stair void
04 · Functional decisions

Laundry inside the unit, not shared

The two-level unit puts a stacked washer and dryer under its own stair. A shared laundry in the main house would have been cheaper and would have quietly undone the independence the whole project exists to create.

05 · Craftsmanship details

Services planned, not chased in

Mini-split heads sit high on clear wall sections, the skylight lands between structure, and the stair void was sized to take appliances. None of those positions survive being decided after the framing is closed.

06 · Where it stands

Photographed complete

Both units are shown finished and furnished rather than mid-construction — fittings in, floors down, appliances connected. What is not visible in any photograph is the separation assembly between the ADU and the main house, which is the part inspectors care about most.

Behind the finish

Six things that make
two homes, not one.

An attached ADU is legally a second dwelling sharing a building with the first. Six systems have to establish that separation. Select one to see what it does.

Zoning
Structure
Fire separation
Sound
Services
Entry & egress
Attachment options

New attached addition

Purpose-built, nothing compromised, and the most zoning scrutiny because it adds footprint and lot coverage.

Most control
Attachment options

Garage conversion

Reuses foundation, walls and roof. Cost moves to insulation, egress glazing, moisture detailing and replacing the parking.

Usually least cost
Attachment options

Second-storey unit

No footprint added, so it can work where nothing else does. Structural verification of what is already there comes first.

Lot-constrained sites
About the imagery on this page

Which photographs are Elbaz projects

  • Every photograph on this page is genuine Elbaz Construction work — two separate completed accessory dwelling units, labelled as two separate projects, not one.
  • The separation diagram above is a drawing, not a photograph — an educational illustration of how two attached dwellings are separated, not a specific job.
  • No manufacturer imagery, stock photography or AI-generated imagery appears anywhere on this page, and no product brand is named.
Selection reality

The separation is not a finish decision

Owners arrive with a layout and a look. The two things that actually decide whether an attached ADU is buildable are what your zoning permits and whether the existing services can carry a second home. We check both before drawing, because finding out later invalidates the design rather than adjusting it.

Planning & permitting

The zoning answer
comes first.

Requirements are set by the authority having jurisdiction for your municipality and genuinely differ between them. What follows is how the stage runs, not a promise about what your city permits or how long it will take.

The sequence

Eight stages, and you always know which one you are in

  • 01Consultation — what the unit is for, and who will live in it
  • 02Zoning verification — whether a second dwelling is permitted, and at what size
  • 03Survey & existing conditions — setbacks, coverage, services, structure
  • 04Design & engineering — layout, tie-in, separation assembly, egress
  • 05Proposal & scope — written, priced against drawings, exclusions stated
  • 06Permitting — filed directly with your building department
  • 07Construction — structure, separation, services, fit-out, inspections
  • 08Handover — final inspection passed and the permit closed
Permit requirements

What an attached ADU submittal involves

An ADU is reviewed as a new dwelling unit, not as an extension. Expect at minimum:

  • Zoning review for use, size, setbacks, lot coverage and parking
  • Structural review of the tie-in and any new foundations
  • Fire-separation detailing between the two dwelling units
  • Egress compliance for every sleeping area
  • Separate plumbing, electrical and mechanical sub-permits
Documentation

What a submittal typically carries

  • SurveyCurrent survey showing the existing building and the proposed unit
  • PlansSite plan, floor plans, elevations and sections
  • StructuralEngineered drawings for the tie-in, sealed for this address
  • SeparationThe rated assembly detail and its firestopping at penetrations
  • ServicesElectrical load calculation, and sewer or septic capacity evidence
Coordination

Who has to agree

Zoning and building are two different reviews and can reach different conclusions. Where the property is on septic, the health department becomes a third party with a real veto.

Inspection

Why the wall gets looked at twice

The rated separation is inspected before it is closed, and every later trade that penetrates it can undo it. That is why electrical and mechanical rough-in are sequenced against the separation rather than around it.

Please read

This varies, genuinely

Whether an ADU is permitted at all, its maximum size, parking, and any owner-occupancy or rental restriction are local rules that change. Nothing here is a legal opinion. We establish what applies at your address before you commit to anything.

Cost, timeline & decisions

What actually moves
an ADU number.

We do not publish a price per square foot for ADUs, because a small dwelling contains a kitchen, a bathroom and a full set of services regardless of its size — which is exactly why the rate is misleading. These are the twelve factors that decide it.

Factor

What zoning allows

Maximum size, setbacks and parking can reshape the brief entirely, and occasionally end it. This is checked first for that reason.

Highest
Factor

Existing service capacity

Whether the electrical service and water supply can carry a second dwelling. A service upgrade is a real line item, not a rounding error.

Highest
Factor

Sewer or septic

On septic, drainfield sizing follows bedroom count — so one extra bedroom can force a system upgrade costing more than the room.

Highest
Factor

New build or conversion

Reusing an existing foundation, walls and roof removes the most expensive third of the work.

High
Factor

The separation assembly

The rated wall and its firestopping, plus any acoustic work done while the wall is open.

High
Factor

Kitchen & bathroom

Two rooms carrying almost all the plumbing, ventilation and inspection load in the unit.

High
Factor

Structural tie-in

Joining new to old, and verifying the existing structure if the unit is going above it.

High
Factor

Egress & glazing

Sleeping areas need compliant escape openings, which often means new or enlarged windows.

Moderate
Factor

Permitting

Which reviews your scope triggers, and your jurisdiction’s current turnaround.

Moderate
Factor

Finish level

Cabinetry, tile and appliances — the part owners control most directly.

Moderate
Factor

Site access

Working alongside an occupied home, with limited laydown space and a shared driveway.

Low–mod
Factor

Occupied-home logistics

Building against a house people are living in means dust control, noise windows and keeping the main dwelling’s services on. It is a real cost and it is worth pricing honestly.

Moderate
On pricing

How we quote instead

After a site visit and the zoning check you get a written scope priced against drawings — stating what is included, what is not, and where a contingency is likely. We will also tell you which of the twelve factors above is the one driving your number, and whether a detached unit would serve you better than an attached one.

Request an estimate
Common questions

Before you draw a plan.

Filter by what you are trying to work out. Every answer stays on the page.

That is a local question with a local answer, and it is the first thing we establish. Florida has no statewide right to build an accessory dwelling unit — whether one is permitted, how big it may be, and what parking it needs are set by your municipality, and neighbouring cities frequently answer differently.

We check your specific parcel before any design work starts, because the answer can change the project rather than merely delay it.

An attached unit shares at least one wall with the main house. That shortens every utility run and reuses a foundation edge, which usually makes it cheaper to service.

In exchange it introduces a requirement a detached unit does not have: a fire-rated separation assembly between the two dwellings, built exactly as tested and firestopped at every penetration. Zoning also treats the two differently, sometimes markedly.

Often, yes. A second dwelling adds a full set of loads — cooking, water heating, air conditioning, laundry — and many older South Florida services have no headroom for that. A load calculation answers it properly, and it is done during design rather than discovered during rough-in.

Significantly. Drainfield capacity is sized by bedroom count, so adding bedrooms can require a septic upgrade — and that upgrade sometimes costs more than the room creating the need for it. On septic properties this gets checked before the layout is settled, not after.

Frequently the best value, because the foundation, walls and roof already exist. The work moves to bringing it to habitable standard: insulation, compliant egress glazing, moisture detailing at the slab, conditioning, and the separation assembly.

The question that catches people is parking — if your zoning required those spaces, they have to go somewhere else on the lot.

Because an ADU is the worst possible use of that number. A small dwelling still needs a complete kitchen, a complete bathroom and a complete set of services, so the fixed content is spread over very little area. Two ADUs of the same size can differ enormously depending on service capacity, septic and whether you are converting or building new.

Sometimes, and sometimes only on certain terms. Some jurisdictions require the owner to live on the property, some restrict short-term letting, and some place no restriction at all. Because it is a local rule and it changes, we confirm what applies to your address rather than telling you what is generally true.

A wall — and where the unit is above or below, a floor-ceiling — built as a tested assembly that holds back fire for a defined period, so the two homes do not function as one building in an emergency.

The detail that decides whether it works is the penetrations. Every duct, pipe, cable and recessed box through that assembly has to be firestopped, or the rating is gone. It is the most common inspection failure on attached ADUs.

Yes — independent access that does not require passing through the primary dwelling is part of what makes it a separate unit rather than a bedroom suite. Every sleeping area also needs compliant emergency egress, which is usually what sets window sizes in a converted garage.

Yes, and an ADU is an unusually good opportunity to do it, because you are designing from scratch rather than retrofitting. Level thresholds, a wider door set, blocking in the walls for future grab rails and a curbless shower cost very little at design stage and a great deal afterwards.

Service capacity discovered late. An electrical upgrade or a septic problem found during construction lands as a large unplanned cost at the worst moment. Both are knowable during design, which is where we deal with them.

Yes. We work with four financing partners — Service Finance, Synchrony, Ygrene and Renew Financial — so you can compare options before you finalise the scope. Terms and eligibility are set by each lender and differ by programme. Which is appropriate depends on the scope and on whether the unit is intended to generate income.

How it goes together

A whole dwelling,
in one room.

A completed studio ADU, shown as a still rather than a film — there is no cleared footage of this service, and we would rather show you a real photograph than borrow a clip from another trade.

Studio ADU interior showing living, dining and sleeping zones in a single volume
During construction

What the phases look like

Zoning and design, then structure and tie-in, then the separation assembly, then services rough-in and inspections, then fit-out. The separation is built early and protected by every trade that follows it.

How to prepare

Four things worth doing early

  • Establish what your zoning permits before paying for a design
  • Have the electrical service and water supply assessed for a second dwelling
  • If you are on septic, get the drainfield capacity checked against bedroom count
  • Decide honestly whether this is for family, for income, or for both
Quality control

What gets checked, and when

The separation assembly before it is closed, and again after every trade that penetrates it. Egress openings against the requirement rather than against the drawing. Service capacity against the load calculation before rough-in starts.

Common mistakes

Four we are asked to fix

  • Designing the unit before confirming the parcel allows one
  • Assuming the existing electrical service can carry a second home
  • Adding bedrooms on septic without checking drainfield capacity
  • Firestopping the separation assembly as an afterthought
Why Elbaz

Claims you can
check yourself.

Everything here is either a licence number, a figure Elbaz publishes company-wide, or a description of how we work. No awards, memberships or certifications are listed, because inventing them is the easiest lie in this industry to tell.

LicenceCBC1265280

Certified building contractor, bonded and insured. Verifiable with the State of Florida.

Completed projects1,000+

Across residential and commercial work in Miami-Dade, Broward and Palm Beach counties.

Experience30+

Combined years across the team, in this market and this climate.

Coverage104

Cities served across the three counties.

PermitsOur name

We file with your building department directly, and we close the permit at handover.

Product approvalVerified

Specified products are checked against their Notice of Acceptance or Florida Product Approval before ordering.

Financing4 lenders

Service Finance, Synchrony, Ygrene and Renew Financial. $0 down and 100% financing available on qualifying PACE work, subject to lender approval. Compare all four.

Zoning first

We check whether it is allowed before we design it

The zoning verification happens before drawings, because an ADU that your parcel does not permit is not a design problem to be solved later — it is a different project, and you should know that before paying for a set.

Accountability

One person, first walkthrough to closed permit

A family-run, locally owned business. The same point of contact stays with your project through every stage, and the phone is answered in month six as well as week one.

Google reviews

What clients said,
word for word.

Shown verbatim from the connected Google Business Profile — not rewritten, not combined, not re-attributed.

Featured · working alongside an occupied home
“We had a good time dealing with Asher and the crew, he went over and above all our expectations and made every effort to ensure that the end result was up to their high standards. Thank you !!”
Emmett Giffin · Google
“If you are planning to remodel your kitchen or bathroom or do any other construction project, call Sean from Elbaz Construction . He has a lot of experience and will recommend the best options/ suggestions to your project. He did high quality job !”
Kameron Allison · Google
“Elbaz Construction provided excellent service and great customer service. also provide the right team to get the job done. Any project or style that’s needed it. Elbaz Construction is the place to call. Thank you!”
Jaee Rodriguez · Google
“The team was amazing. Did a fabulous job with the landscaping, roofing and backyard renovation. The best contractors I have worked with! Will definitely use this company in the future.”
Derpy Day · Google

No review schema is emitted on this page. Aggregate ratings marked up on a business’s own service pages are self-serving under Google’s structured-data policy, so the rating above is presented as visible content only.

Project files

One addition, one bath, one converted garage.

A room addition with a vaulted ceiling, a black-and-white tiled bathroom and a converted garage bedroom. They are separate project files, shown for the rooms and finishes of a second home.

3Projects shown
13Photos
PROJECT 01

Room addition with a kitchenette and green walls

The interior of a room addition with green walls, a vaulted ceiling with an exposed beam and wood-look flooring. A white shaker kitchenette runs along one wall with a patterned backsplash and stainless appliances. Sliding glass doors and a hall at the entry complete the plan.

Scope of work

  • Vaulted ceiling with an exposed beam
  • White shaker kitchenette along one wall
  • Patterned tile backsplash behind the range
  • Stainless range and appliances
  • Wood-look LVP flooring throughout
  • Sliding glass doors and an entry hall

Materials & finishes

White shaker doorsPatterned tileWood-look LVPExposed beamStainless appliancesGreen paint

What to look for in the photos

Follow the exposed beam across the ceiling, then look at the entry door and hall. A second home needs its own way in and its own circulation, and this plan shows both.

Elbaz Construction project photo · 3 photos

PROJECT 02

Bath with black-and-white patterned shower tile

A bathroom with black-and-white cement-style tile on the shower walls and floor, a light wood vanity with a white top and industrial sconces. The shower has black fixtures, floating shelves and a window. A green wall shows beyond the doorway.

Scope of work

  • Patterned cement-style tile on shower walls and floor
  • Walk-in shower with black valve and fixtures
  • Floating shelves and a towel bar
  • Window set into the shower wall
  • Light wood vanity with a white top
  • Industrial wall sconces

Materials & finishes

Patterned tileBlack fixturesLight wood vanityWhite topBlack shelvesIndustrial sconces

What to look for in the photos

Check where the patterned tile meets the window and the shelves. Keeping that pattern aligned around openings is the detail that makes a bold tile look deliberate.

Elbaz Construction project photo · 3 photos

PROJECT 03

Converted garage bedroom with sliding closet

Two views of a converted garage bedroom: an empty room with a vinyl-blind window, wood-look LVP flooring and recessed lights, and a finished room with a mirrored sliding closet and a bath visible through the doorway. This is a garage conversion, not a new addition.

Scope of work

  • Wood-look LVP flooring through the room
  • Recessed lighting across the ceiling
  • Window with vinyl blinds
  • Sliding closet with mirrored doors
  • Entry door into the room
  • Doorway opening to the bath

Materials & finishes

Wood-look LVPVinyl blindsMirrored closetRecessed lightsWhite paint

What to look for in the photos

A garage conversion is one way an attached unit gets built. Look at the floor and ceiling: it reads as a bedroom, with no sign that it was ever a garage.

Elbaz Construction project photo · 3 photos

Budget and schedule

Where an attached build spends.

An attached unit shares a wall and a roof line with the house, so the tie-in work takes real budget, alongside the systems and finishes.

Where a typical attached ADU budget goes

100%OF BUDGET
  • Plumbing, electrical, cooling22%
  • Bath and kitchen finishes20%
  • Framing, roof tie-in, envelope18%
  • Foundation and structure15%
  • Windows and doors9%
  • Fire and sound separation8%
  • Permits and inspections8%

These are typical shares only. How the unit attaches and the finish level move them.

A typical attached ADU sequence, in weeks

Design and selections
Permit review
Permit review
Foundation and tie-in
Framing, roof, openings
Rough-in and separation
Finishes and final
Week 0Week 17.5Week 35

Permit review varies by municipality, so treat these bars as a sequence, not a promise.

How it works

Shared wall, drawn three ways.

Three diagrams show the types of ADU, how loads travel on a build that connects to a house, and how services reach the unit.

DETACHEDATTACHEDGARAGE2-STORYFOUR WAYS TO ADD AN ADU

Four ADU types compared

Detached, attached, garage and two-story units each use a different relationship to the main house. An attached unit shares one wall.

NEW 2ND FLOOREXISTINGLOAD PATH CHECKED TO FOOTING

Loads down to the footing

Weight travels from roof to walls to footing. On an attached unit, the new structure has to be designed with the existing house in mind.

MAIN HOUSEADUSEWERWATERELECTRICUTILITY RUNS DRIVE THE BUDGET

Services from the house

Sewer, water and power run from the main house to the unit. An attached unit is usually a shorter run than a detached one.

Scope planner

Scope your attached unit.

Pick how it attaches, the shared wall, the bath and the entry to see an indicative range of weeks on site.

How does the unit attach?
What separates it from the house?
What does the bath include?
How do you enter?

Finish details

Tile that does the decorating.

The addition is white and green. The pattern comes from tile, and these close-ups show where it sits.

Black-white backsplash, range
Shelves, towel bar, valve
Cement-style tile close-up
Floating shelves, window

More questions

Where the old house and new unit meet.

The tie-in questions that only an attached build raises.

Ask us directly
How does the new roof tie into my existing roof?

The new roof is framed to meet the old one at a valley or a flashed wall line, with underlayment lapped and metal flashing set before the final roof covering. In Miami-Dade and Broward the roofing product needs a current approval. A roof tie-in is the most common leak point, so it gets a closer inspection than the field of the roof.

Will the new foundation match the old one?

Not exactly, and it does not have to. The new footing is designed for its own load and for the soil, then detailed so the two buildings can move slightly differently without cracking the joint. An engineer sizes it. We also expose the existing footing where the new work connects, rather than guessing its depth.

Does the whole house have to be brought up to current code?

Generally the new work must meet the current code, and the existing house is evaluated only where the work touches it. That can include the wall you open, the electrical panel or smoke alarms, depending on the municipality. The reviewer decides, so we ask at the pre-application stage instead of finding out during inspection.

Will the existing air conditioner cover the addition?

Usually not without a check. A cooling load calculation compares the house's system with what the new space needs. Often the unit gets its own mini-split or small air handler, which keeps the temperature independent and avoids overworking the old system. Adding a duct run to an undersized system rarely works.

Can I stay in the house while the shared wall is opened?

Usually yes. We hang a dust barrier, set a protected entry and schedule shutoffs of water or power in short blocks, typically a few hours at a time. Opening a wall is the loudest and dustiest stage. We tell you the day before, and the house stays closed up at night.

Do the new windows and doors need to be impact rated?

New openings in an addition need hurricane protection. In Miami-Dade and Broward that means products with High-Velocity Hurricane Zone approvals, or shutters, and the approval numbers appear on the plans. Elsewhere in South Florida impact products are the usual choice. Matching them to the existing house is a design choice, not a code requirement.

How is a tiled shower made watertight?

Tile alone is not waterproof. A membrane or waterproof board goes behind the tile, with sealed seams, corners and a pitched floor to the drain, and it is flood-tested before tile goes up. In humid South Florida, a failed shower hides mold behind the wall. This is the work you cannot see after the tile is set.

Will an addition change my homeowners insurance?

Usually yes. The new square footage raises the replacement value, and many insurers want to know before construction, not after. Wind-resistant windows, a new roof and a current roof tie-in can help at inspection. A flood zone may add requirements. Call your agent before work starts and again at completion.

Start your project

Tell us about
the property.

The address is the useful part — it lets us check what your parcel actually permits before anyone talks about layouts. If you know whether you are on sewer or septic, say so.

What happens next

Three steps, no sales visit

  • 01We call you back and talk through who the unit is for
  • 02We check the zoning for your parcel and walk the property
  • 03You get a written scope priced against drawings
What to expect

An honest read, including when the answer is no

If your parcel will not carry an ADU, or a detached unit would serve you better, or the septic makes the plan uneconomic, we will tell you on the first call rather than after you have paid for a design.

Prefer to talk now(754) 236-0675

Sun–Fri 7am–7pm · Saturday closed. Licensed, bonded and insured · CBC1265280.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Start your attached ADU project

Ready when you are

Start with what
the parcel allows.

Zoning, service capacity and septic decide what an attached ADU can be long before anyone chooses a finish. Start with a conversation — no obligation, and no brochure.

Private entrance to a completed accessory dwelling unit, with its own door, steel awning, lantern and paved approach