The service

There is no statewide
right to build one.

Florida Statutes section 163.31771 permits local governments to allow accessory dwelling units. It does not require them to. Bills that would have created a statewide requirement — CS/CS/SB 48 and its House companion CS/HB 313 — did not become law; the House companion died in subcommittee on 13 March 2026.

So the answer is local, and it varies considerably. Miami-Dade County adopted its own accessory dwelling unit ordinance in 2022 under County Code section 33-22, applying inside the Urban Development Boundary in specified zoning districts, with minimum lot sizes and a lower threshold for garage conversions than for new detached units. Broward and Palm Beach municipalities each set their own rules.

  • Zoning decides first

    District, lot size, setbacks and coverage determine whether a unit is possible at all.

  • Local, not statewide

    What your municipality permits is the only answer that matters.

  • Feasibility before design

    Establishing the constraints first is what stops a design being drawn twice.

Talk through your parcel

Scope

What the permitting service covers

From an address to an approved permit, with the feasibility question answered honestly at the start.

A variance is a different process

If the parcel misses a dimensional requirement, a variance or administrative adjustment may be possible — but it is a discretionary public process with its own timetable and no guaranteed outcome. It is worth knowing that at feasibility rather than after drawings exist.

01

Feasibility

  • Zoning district, permitted use and whether an accessory unit is allowed
  • Minimum lot size, setbacks, separation and height limits
  • Lot coverage, floor area and parking requirements
  • Whether the parcel sits inside any applicable development boundary
02

Constraints and services

  • Utility capacity and whether separate connections or meters are required
  • Septic or sewer capacity where applicable
  • Flood mapping and required finished floor elevation
  • Easements, association restrictions and deed limitations
03

Documentation

  • Survey coordination where a current one does not exist
  • Site plan showing setbacks, coverage, parking and separation
  • Construction drawings for the proposed unit
  • Engineering coordination where structure or new construction requires it
04

Submission and review

  • Zoning review and any variance or administrative adjustment application
  • Building permit submission to the authority having jurisdiction
  • Correction responses handled by us rather than passed to you
  • Coordination of utility and, where relevant, environmental applications
Compact ADU kitchen with wood-grain slab cabinet fronts, white subway tile, open timber shelving on black brackets and a stainless range
Project 01: a full kitchen on one wall — plumbing and ventilation kept in one place, which is what makes a compact plan work.

Stills from the two completed units on this page. They illustrate the stages; they are not photographs of the stage named beside them.

How it runs

Six stages,
feasibility first

The order matters: nothing should be drawn until the parcel has been checked.

  1. 01

    Address and zoning check

    District, permitted use, and whether an accessory dwelling unit is allowed at all.

  2. 02

    Dimensional review

    Lot size, setbacks, separation, height, coverage and parking against what is proposed.

  3. 03

    Services and constraints

    Utilities, septic or sewer, flood elevation, easements and association restrictions.

  4. 04

    Feasibility report

    A written answer: permitted as of right, permitted with a discretionary approval, or not permitted.

  5. 05

    Drawings

    Site plan and construction drawings prepared for submission, with engineering where required.

  6. 06

    Submission and corrections

    Filed by us, with correction responses handled through to permit issue.

Approvals

What review actually
looks at.

Zoning review comes first and asks whether the unit is allowed and whether it fits: use, lot size, setbacks, separation from the principal dwelling, height, lot coverage and parking.

Building review follows and asks whether what you have drawn complies: structure, egress, life safety, energy, and — in Miami-Dade and Broward, both inside the High-Velocity Hurricane Zone — product approval for windows, doors and roofing. Palm Beach County is not in the HVHZ and uses the statewide Florida Product Approval framework instead.

Utility and, where applicable, septic capacity run alongside on their own timetables.

INFILLED VEHICLE OPENINGBATHKITCHENLIVING / SLEEPINGENTRY

Simplified sketch, for explanation only. It is not a permit drawing and not a plan of either project shown on this page.

From first call to closeout

  • Zoning verification

    Whether the use is permitted at the address.

  • Dimensional compliance

    Setbacks, separation, height, coverage and parking.

  • Survey

    A current boundary survey, which most submissions require.

  • Site plan

    Showing compliance with each dimensional requirement.

  • Construction drawings

    For building review.

  • Engineering

    Where structure or new construction requires it.

  • Discretionary approval

    Variance or administrative adjustment where needed.

  • Building permit

    Submission and correction responses.

  • Utility applications

    Each provider on its own timetable.

  • Inspections

    Through construction to final.

Miami-Dade has a real ordinance; the state does not have a mandate

County Code section 33-22 is genuine and applies inside the Urban Development Boundary in specified districts. What does not exist is a statewide requirement obliging every municipality to allow accessory dwelling units — that legislation failed in 2026.

Nothing here is legal advice, and no approval outcome or review duration is promised. Requirements vary by municipality and by property.

Cost and schedule

What moves the number

Permitting cost is driven by how far your parcel sits from a straightforward as-of-right approval.

01

What moves the cost

  • As of right, or not

    A parcel that meets every requirement is the cheapest path. One needing a variance adds a discretionary process.

  • Whether a survey exists

    Most submissions require a current boundary survey, and many owners do not have one.

  • Conversion or new construction

    Converting existing space is a smaller documentation exercise than a new detached structure.

  • Engineering requirement

    New structures and structural alterations need engineered drawings.

  • Utility separation

    Whether separate meters or connections are required, which can be a significant line.

  • Correction cycles

    Complete first submissions cost less overall than cheap ones that attract corrections.

02

What moves the schedule

  • Feasibility

    Days rather than weeks, and worth doing before anything else.

  • Survey

    Scheduled with a surveyor; everything downstream waits on it.

  • Drawings

    Proportional to whether it is a conversion or new construction.

  • Zoning and building review

    Set by the authority having jurisdiction.

  • Discretionary approvals

    Variances run on published hearing calendars.

  • Utility applications

    Independent of the construction schedule.

Illustrative diagram · not a photograph of a project

AS FOUND · GARAGEopen vehicle opening · bare slab · no envelopeCONVERTED · HABITABLEinfill wall · windows · entry · egress · insulated envelope · treated slab010203040506

Six questions that
decide feasibility.

Before design, before budget, before anything. These six answers determine whether an accessory dwelling unit is possible at your address.

01

Is the use permitted?

Does the zoning district allow an accessory dwelling unit at all? This is the first question and sometimes the last.

02

Is the lot big enough?

Minimum lot size is common, and thresholds often differ between a conversion and a new detached unit.

03

Do the setbacks work?

Distance to boundaries, and required separation from the principal dwelling, constrain where a unit can physically sit.

04

Is there coverage left?

Lot coverage and floor-area limits may already be largely used by the existing house.

05

Where does parking go?

Many ordinances require parking for the unit, and it has to be shown on the site plan.

06

Can services reach it?

Water, sewer or septic capacity, and electrical service — sometimes requiring separate connections.

Open-plan studio ADU with the kitchen at one end, a grey sectional, bed and a doorway to the bathroom, under a vaulted ceiling
Elbaz Construction accessory dwelling unit, photographed on completion — the kind of unit these approvals lead to.

What to expect

Permitting is
mostly waiting.

The work is front-loaded and the waiting is unavoidable. What we control is that nothing waits for us.

  • Feasibility first

    You get a written answer before spending on design.

  • Survey early

    Most submissions need one, and it gates the site plan.

  • Complete submissions

    A thorough first submission attracts fewer corrections than a fast one.

  • Corrections are ours

    We answer plans examiners; you do not.

  • Discretionary hearings

    Where a variance is needed, expect a published calendar and a public process.

  • No promised outcomes

    We do not guarantee approval, and anyone who does is telling you something useful.

Questions

Ask the
awkward ones.

Six categories. Pick one and the answers change.

Not answered here?

(754) 236-0675

Sun-Fri 7am-7pm · Sat closed

No. Florida Statutes section 163.31771 permits local governments to allow accessory dwelling units; it does not compel them. Bills that would have created a statewide requirement did not pass — the House companion died in subcommittee on 13 March 2026. Whether you can build one depends entirely on your municipality and your parcel.

Miami-Dade County adopted an accessory dwelling unit ordinance in 2022, County Code section 33-22. It applies inside the Urban Development Boundary in specified zoning districts and sets minimum lot sizes, with a lower threshold for garage conversions than for new detached units. We verify the current requirements against your address rather than quoting a figure here.

Double-height ADU living room with a white entry door, skylight, wall-mounted television and a railed loft above
Project 02: living and sleeping sharing one volume.

Why Elbaz

What we will actually
put our name to

  • Licensed general contractor

    Licensed, bonded and insured · CBC1265280.

  • Feasibility before design

    A written answer on your parcel before you spend on drawings.

  • Regulatory claims checked

    We describe the law as it is — no statewide mandate, and a real Miami-Dade ordinance — rather than repeating what circulates online.

  • Corrections handled here

    Submission and correction responses are ours to make.

  • Design-build continuity

    The same contractor that permitted it can build it, so nothing is lost between the two.

  • Honest about variances

    We tell you when an approval is discretionary and outcome is not guaranteed.

Every claim in this column is something we can evidence. We have deliberately left out award badges, membership logos and project counts.

Reviews

I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work!

Omri B

Genuine Google reviews of Elbaz Construction, shown as written. None of these reviewers describes an ADU permitting engagement specifically, so none is presented as one.

Read them on Google

Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended!

Adir Davidov

They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them!

Lee Morali

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!

Shir Partush

Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.

Mia Zafrani

After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!!

carmit cohen

Project files

Where a zoning review ends up.

Three finished results: a gray stucco garage conversion, a detached backyard studio and the inside of a converted garage unit. Whether a parcel can hold a unit like these is the first question, and the answer depends on the municipality.

3Projects shown
7Photos
PROJECT 01

Gray stucco garage conversion with a craftsman door

The outside of a converted garage in gray stucco, with a gray craftsman entry door with a glass lite, a white-framed window and a wall sconce. A concrete step leads up to the door, and a side wall shows a white vinyl window with green vertical blinds.

Scope of work

  • Gray stucco finish on the former garage wall
  • Craftsman entry door with a glass lite
  • White-framed vinyl window
  • Wall sconce at the entry
  • Concrete step at the door
  • Side wall with a second window

Materials & finishes

Gray stuccoCraftsman doorVinyl windowsWall sconceConcrete stepGray paint

What to look for in the photos

Look at the entry door and the step. A garage conversion needs a real front door and a landing, and reviewers commonly check for the entry on the plans.

Elbaz Construction project photo · 3 photos

PROJECT 02

Detached backyard studio in white stucco

A detached backyard studio in white stucco with a brown roof, a row of columnar cypress along the lawn and a wood deck. A side view shows a large window, a stepping-stone path, a hedge and a dark roof overhang. It is a separate building on the lot.

Scope of work

  • White stucco finish over the exterior
  • Shingle roof with a dark overhang
  • Large window on the side wall
  • Stepping-stone path along the wall
  • Wood deck corner at the lawn
  • Hedge and cypress planting around the unit

Materials & finishes

White stuccoShingle roofVinyl windowStepping stonesWood deckCypress

What to look for in the photos

Look at the space around the building: the lawn, the path and the planting. A detached unit has to fit the lot's setbacks and keep that space clear, and that is drawn on the site plan before anything else.

Elbaz Construction project photo · 2 photos

PROJECT 03

Converted garage unit: entry, living area and kitchen

The inside of a converted garage unit: an entry area with a front door and an interior door, an empty living area with a mini-split and a view into a bath, and a white shaker kitchen at the back. LVP flooring and recessed lights run through all three.

Scope of work

  • Front door and interior door at the entry
  • LVP flooring throughout
  • Recessed lighting across the ceiling
  • Wall-mounted mini-split in the living area
  • White shaker kitchen at the back
  • Bath with toile wallpaper visible from the entry

Materials & finishes

LVP flooringWhite shaker doorsMini-splitRecessed lightsWhite wallsToile wallpaper

What to look for in the photos

Follow the line from the front door to the bath and the kitchen. Reviewers commonly want a plan where the entry, the kitchen and the bath all open from within the unit itself.

Elbaz Construction project photo · 2 photos

Budget and schedule

What the paperwork stage takes.

Permitting is mostly drawings, surveys and waiting. These charts show where the effort of the pre-construction phase goes.

Where a typical permitting-stage budget goes

100%OF BUDGET
  • Architectural drawings28%
  • Survey and site plan16%
  • Zoning feasibility research14%
  • Structural and MEP engineering14%
  • Review comments and revisions12%
  • Application and fees10%
  • Inspection coordination6%

These are typical shares of the permitting stage only, not of construction. The parcel and the municipality move them.

A typical permitting sequence, in weeks

Feasibility review
Survey and site plan
Drawings and engineering
Drawings
Submission
Plan review
Plan review
Comments and permit issue
Comments
Week 0Week 13Week 26

Municipal review times vary widely, so these bars show order, not a promise.

How it works

The three drawings a reviewer opens first.

Setbacks, utilities and unit type decide most of a permit review. Each diagram shows the idea, and your municipality sets the numbers.

MAIN HOUSEADUSIDE + REAR SETBACKSLOT LINE

Setbacks on the lot plan

A lot plan shows the house, the unit and the setbacks. Required distances vary by municipality and are confirmed at zoning review.

MAIN HOUSEADUSEWERWATERELECTRICUTILITY RUNS DRIVE THE BUDGET

Utility runs to the unit

Sewer, water and power run from the house to the unit. The reviewer checks that each can serve a second dwelling.

DETACHEDATTACHEDGARAGE2-STORYFOUR WAYS TO ADD AN ADU

Which ADU type fits

Detached, attached, garage and two-story units are reviewed differently. Which are allowed depends on the municipality and the parcel.

Scope planner

Plan what the permit is for.

Pick what you plan to build to see an indicative range of weeks on site once the permit is issued.

What do you plan to build?
How many levels?
How is sewage handled?

More questions

Paperwork questions, answered.

The process questions that come after feasibility, once the drawings begin.

Ask us directly
What is the difference between zoning approval and a building permit?

Zoning asks whether the use and the location are allowed: setbacks, lot coverage, height, parking and use. The building permit asks whether the construction meets the Florida Building Code: structure, plumbing, electrical, energy and wind. A municipality may review them together or separately, so the order and the timeline depend on where the parcel is.

What drawings go into an ADU permit set?

Usually a site plan from a current survey, floor plans, elevations, a wall section, a foundation and structural plan, and plumbing, electrical and mechanical layouts. There are also energy calculations and product approval numbers for windows, doors and roofing. Some municipalities add landscape or drainage sheets. Your reviewer lists the exact set.

Does a flood zone change what can be permitted?

It can. In a FEMA flood zone, the reviewer checks the lowest floor against the base flood elevation, and may require an elevation certificate, flood vents or a raised slab. These affect the design and the structure. We check the flood map during feasibility, since a lot in a high-risk zone needs a different approach.

What happens when the reviewer sends comments?

Comments are normal, not a sign of failure. Reviewers in zoning, structure, plumbing, electrical and fire may each write corrections. We respond with revised sheets and a short letter that answers each one, then resubmit. Each round adds time, which is why clean, complete drawings at the first submission matter more than speed.

Are there fees besides the permit fee?

Often. Depending on the municipality, there can be plan review fees, impact fees, utility connection charges and inspection fees. Some are due at submission and some at permit issue. We list the fees you should expect from your municipality's published schedule, so you can plan the cash flow before the permit is ready.

How does a hurricane zone affect the drawings?

In Miami-Dade and Broward, the High-Velocity Hurricane Zone sets stricter rules. Every window, door, roofing product and garage door must show a valid product approval on the plans, with a design pressure that fits the building's exposure. The structural engineer also sizes the connections for wind load, so the drawings are more detailed.

Will my neighbors be notified?

It depends on the municipality and on whether your project needs a variance or special exception. A project that meets the standard rules usually does not trigger notice. One that asks for relief from a setback or height limit often does, with a public hearing. We tell you which path applies before you commit to design.

Can a permit expire before the work is done?

Yes. Permits generally lapse if no inspection passes within a set period, and some also have a final deadline. Extensions are possible but not automatic. We keep inspections on a schedule, so the permit stays active, and ask for an extension in writing if a delay, such as a long product lead time, would put it at risk.

Start here

Tell us the address

What helps on the first call

The address or folio number, whether you have a survey, whether you are thinking conversion or new build, and whether an association is involved.

What happens next

We check zoning and the dimensional requirements against your parcel before anything is drawn.

What you will not get

A design produced before anyone has confirmed you are allowed to build it.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Find out whether