View all servicesCommercial flooring is decided by two things nobody puts in the brochure: what the concrete slab underneath is doing, and how the building keeps operating while the floor is replaced. Get those right and the material choice is comparatively simple. We install commercial flooring across Miami-Dade, Broward and Palm Beach, phased around your hours.
Miami-Dade · Broward & Palm Beach Counties
ScrollRecent projects
Twelve images. Six are genuine Elbaz flooring photographs from our library, all residential interiors, and six are illustrations drawn for this guide. Tap any image to see it larger - each caption says which it is.
PHOTOGRAPH, residential: herringbone across a large open span.
ILLUSTRATION: moisture-testing a concrete slab.
PHOTOGRAPH, residential: wide plank through a large open interior.
ILLUSTRATION: self-levelling compound over a prepared subfloor.
PHOTOGRAPH, residential: a long uninterrupted run of wide plank.
ILLUSTRATION: resilient plank laid along a corridor.
PHOTOGRAPH, residential: wide plank with sample boards on display.
ILLUSTRATION: carpet tile in a quarter-turn pattern.
PHOTOGRAPH, residential: stair treads finished to match the floor.
ILLUSTRATION: polished concrete with exposed aggregate.
PHOTOGRAPH, residential: the grain and joints of a dark plank floor.
ILLUSTRATION: a transition strip between plank and carpet tile.
This is an explainer combined with genuine photography, not a commercial project gallery. The photographs are real Elbaz Construction flooring work in residential interiors and are captioned as such - we have not relabelled them as commercial installations. The illustrations are created for this guide and are labelled as illustrations in their captions, their alt text and the media library.
The journey
Commercial flooring fails in two predictable ways: it is bonded to a slab that was never tested and lifts within a year, or the programme ignores how the building is actually used and the work stops every morning at opening time. Both are decided long before anyone chooses a colour. This page walks the sequence in order, starting underneath.
Use the stage markers to jump straight to what you care about. Nothing here is a sales pitch - it is the sequence we actually follow.
Stage 01 · Survey
Four reasons, and they lead to genuinely different specifications. Which one is yours changes the material, the programme and the tolerance for disruption.
The most common brief. The useful question is not what to replace it with but why it wore where it did - a floor that failed early at entrances and pinch points is telling you something about traffic that the replacement specification should answer.

Flooring from our library: the grain and joints of a dark wide-plank floor.
When a bonded floor lifts, curls at the edges or smells, the cause is very often moisture coming up through the slab rather than a defective product. On grade-level slabs in South Florida this is a live issue, and it is testable before the next floor goes down rather than discoverable after it fails.

Illustration: relative-humidity probes set into a slab for moisture testing.
In a fit-out the floor is one trade among many and its position in the sequence matters more than its specification. Going down too early means it gets damaged by everyone after you; too late and it holds up handover. It also has to work with what the partitions and the furniture plan are going to do.

Flooring from our library: wide-plank running through a large open interior.
A floor is the largest single surface in most commercial interiors, so it does more to change how a space reads than anything else at the same cost. The constraint is that it also has to survive commercial traffic, and the finishes that photograph best are not always the ones that last in a corridor.

Flooring from our library: herringbone laid across a large open span.
Stage 02 · Specify
These decide the cost, the programme and whether the floor is still performing in five years.
Before any material decision, the slab is tested for moisture and assessed for flatness. Bonded floors have manufacturer limits for slab relative humidity, and exceeding them voids warranties and causes the failures people blame on the product. Where readings are high, a mitigation coating goes down first.

Illustration: moisture testing a slab before anything is bonded to it.
Removing the old covering and its adhesive, grinding the slab back and levelling it is frequently a bigger line than the new floor. It is also the part that decides whether the finished floor looks flat under raking light. Skipping it is the most common false economy in this trade.

Illustration: self-levelling compound over a prepared subfloor.
Resilient plank is hard-wearing, quiet enough and repairable. Carpet tile is replaceable one tile at a time, which matters where spills happen. Polished concrete has effectively no covering to fail. Resin suits back-of-house and wet areas. The right answer follows the traffic and the cleaning regime, not the mood board.

Illustration: resilient plank laid in a staggered pattern along a corridor.
Almost no commercial floor can be replaced in one go with the building closed. The work is split into areas, done out of hours where necessary, and each area is protected and handed back before the next opens up. That phasing is designed at the start, because it drives both the cost and the programme.

Illustration: a phased installation with one area finished and protected.
The photographs on this page are genuine Elbaz Construction flooring photography, and they are residential interiors - we have said so in every caption rather than implying they are commercial installations. The commercial-specific images are illustrations drawn for this guide and are labelled as illustrations.
Project gallery 01
Ten images. Six are genuine Elbaz flooring photographs from our library - all residential interiors, and captioned as such - and four are illustrations drawn for this guide to show the commercial-specific stages. Every caption says which it is.
Project 01, guided tour










Testing the slab
ILLUSTRATION. Relative-humidity probes set into a concrete slab. Bonded floors have manufacturer limits for slab moisture, and exceeding them is the most common cause of early failure.
How a floor is built up from the slab, and what our flooring work actually looks like. This is an explainer combined with genuine photography, not a commercial project gallery.
Six genuine photographs from our own flooring library - herringbone across a large open span, long uninterrupted plank runs, stair treads matched to the floor, and the grain of a finished dark plank floor.
Our verified flooring photography is residential. We have not relabelled it as commercial work, because it is not. What it does show honestly is the standard of setting-out, the handling of level changes, and the finish quality - which carry across.
Four images drawn for this guide to show the commercial-specific stages: slab moisture testing, subfloor levelling, resilient plank in a corridor, carpet tile, polished concrete and resin. None is a photograph and none represents a specific job.
No cost, timeline, address, client or permit history appears anywhere on this page, and no image here is presented as a completed Elbaz commercial installation.
Stage 03 · Programme
On a commercial floor the programme is usually harder than the specification, because the building has other people in it.
We measure the areas, test the slab for moisture, assess flatness and identify what the existing covering and adhesive actually are. Everything after this depends on it.
Removal method depends on what is down. Older adhesives in particular need identifying before anyone starts grinding, and where there is any doubt that is established properly rather than assumed.
The covering is specified against the traffic, the cleaning regime and the slip-resistance requirement for the space, and against the moisture readings we took.
The floor area is divided into phases with a sequence, and out-of-hours working is priced where it is needed. This is agreed before anything starts.
Loading, lifts, protection of routes, and where a skip can stand. In an occupied building this frequently constrains the programme more than the work itself.
Tenancies and managed buildings often specify permitted working hours, acoustic requirements between floors, and approved methods. These are confirmed before the programme is fixed.
Adhesives, levelling compounds and coatings all have cure times before foot traffic and before furniture. These are built into the programme rather than hoped past.
Flooring alone frequently does not require a permit, but where it is part of a wider fit-out, or where fire-rated or acoustic assemblies are affected, it does. We confirm it for your scope.
Completed areas are protected until handover, particularly where other trades are still working. This is scoped and priced rather than improvised.
You get the product documentation, the warranty conditions and the manufacturer cleaning regime - the last of which is what actually determines how long the floor lasts.
Requirements, review times and inspection sequences are set by your local building department, and they differ across Miami-Dade, Broward and Palm Beach and between the municipalities inside them. Nothing here is a guaranteed timeline or an assurance of approval - we confirm what your address actually requires once we know it.
Stage 04 · Install
Everything below the covering happens first and most of it is invisible in the finished floor. That is exactly why it is where the job is won or lost.
Before anything comes up
Routes protected, the working area separated from the part of the building still in use, and dust containment set up. Grinding a slab indoors is a serious dust operation.
Quality check · Containment up before any grinding starts

The old covering and its adhesive
The existing floor comes up and the residual adhesive is removed. This is dirtier and slower than most people expect, and it is what the next floor bonds to.
Quality check · Slab taken back to a sound bonding surface

Confirming what we surveyed
Moisture readings are taken again on the exposed slab. A reading taken through an old covering is indicative; a reading on the bare slab is the one that governs.
Quality check · Readings confirmed on the exposed slab

Only where it is needed
Where readings exceed the manufacturer limit, a mitigation coating is applied and allowed to cure before anything is bonded over it.
Quality check · Mitigation applied and cured before bonding

Making the slab flat
Levelling compound is applied and allowed to cure. Thin resilient finishes telegraph every defect underneath, so this stage decides how the finished floor reads.
Quality check · Flatness achieved before the covering

Where the first row goes
The layout is set out from the space rather than from a wall, so that plank direction, pattern and cut sizes at the perimeter all land deliberately.
Quality check · Layout agreed before the first plank is bonded

The covering goes down
The covering is installed to the manufacturer method for the material - staggered plank, quarter-turn tile, or a poured and cured finish - working area by area to the agreed phasing.
Quality check · Installed to the manufacturer method

Where finishes meet
Thresholds, transition strips, coved edges and skirtings are formed so the two finishes sit at the same level. This is the detail a commercial floor is judged on.
Quality check · Transitions level and mechanically fixed

Before traffic returns
Completed areas are protected and left to cure for the required period before furniture and foot traffic come back. Rushing this is how a new floor gets damaged in its first week.
Quality check · Cure times observed before handback

Handed back area by area
Each area is cleaned to the manufacturer initial-clean specification and handed back, and at completion you get the documentation and the maintenance regime.
Quality check · Initial clean done to the manufacturer specification

Stage 05 · Inspect
Balanced both ways. What is right depends on the traffic, the slab and how much the building can be disrupted.
Hard-wearing and cleanable

Quiet and replaceable

Which oneFollow the traffic and the spill risk. Corridors, entrances, food areas and anywhere wet want resilient plank. Open-plan offices and meeting spaces are where carpet tile earns its place - and there is no reason not to use both, provided the transitions are detailed properly.
Fix the cause

Work with the condition

Which oneIf the space needs a specific finish, treat the slab - it is a known cost and it protects the warranty. If the aesthetic is open, letting the slab condition steer you toward polished concrete or a loose-lay system is a legitimate and often cheaper answer.
Stay open

Faster and cheaper

Which oneCount the real cost of losing the space against the premium for out-of-hours work. Closing an area is almost always cheaper and produces a better floor, so it wins wherever the space can genuinely be spared - and phasing lets you close part of it rather than all of it.
Tick whatever applies. This will not produce a price - what is under the existing floor decides too much of it - but it will show which parts carry the cost and the calendar.
We do not publish figures for this work, because the same scope can differ several-fold once the existing conditions are visible. You get a real, itemised number after a site visit, in writing.
Stage 06 · Operate
A short sequence from our flooring photography, plus what the work actually involves on an occupied site. The disruption is real and it is worth planning rather than absorbing.
It depends far more on the phasing than on the area. The same floor replaced in one closed run can take a fraction of the calendar it takes replaced area by area out of hours - and we will give you both numbers.
Removing the old covering and grinding the slab. It is contained, but it is the stage that most affects the rest of the building, and it is worth scheduling deliberately.
Grinding is loud and it carries through a structure to floors above and below. In a managed building this frequently drives the working hours more than anything else.
Adhesives and coatings have an odour while curing. Low-odour products exist and are specified where the space is sensitive, but ventilation is planned either way.
Levelling compound, adhesive and coatings all need time before traffic. This is the part clients most often want to compress, and the part where compressing it costs the most.
It has to move, and moving it is a real line in the programme. Who does it - us or you - is agreed at the start rather than on the day.
Finished areas are covered until handover if other trades are still on site. An unprotected new floor gets damaged in its first week, reliably.
Each area is cleaned to the manufacturer initial-clean specification and handed back. You get the maintenance regime, which genuinely determines how long the floor lasts.
Only claims we can stand behind. Everything below is either a matter of public record or visible in the work shown on this page.
Elbaz Construction is a licensed general contractor, CBC1265280. Where flooring forms part of a wider permitted fit-out, permits are pulled in the company name.
Moisture readings are taken on the bare slab and checked against the manufacturer limit, because that is the difference between a warranty that holds and one that does not.
Adhesive removal and levelling are quoted as the real work they are, not buried and then raised as a variation once the old floor is up.
The sequence, the out-of-hours element and the handback of each area are agreed before anything starts.
We will not hand an area back early because it would be convenient. It is the fastest way to ruin a new floor.
Every junction between finishes is designed and mechanically fixed, not covered with a strip at the end.
Where flooring sits inside a wider fit-out, the same company coordinates it with everything else on the programme.
Product data, warranty conditions and the manufacturer cleaning regime, handed to whoever maintains the building.
Filter to the part of the job you are thinking about.
Nine times out of ten it is moisture in the slab rather than a defective product. Bonded floors have manufacturer limits for slab relative humidity, and when those are exceeded the adhesive fails. It is testable in a day, and testing it before the next floor goes down is the whole point.
Usually, yes. The new covering bonds to what is underneath, so the old adhesive has to come off and the slab has to be sound. Laying over an existing floor is occasionally possible but it inherits every problem below it.
Yes - most commercial flooring is done that way. The area is split into phases, work runs out of hours where it has to, and each area is protected and handed back before you open. It costs more per hour and disrupts far less.
For most spaces, resilient plank or polished concrete. Polished concrete has no covering to lift and no adhesive to fail, which removes the most common failure mode entirely. Resilient plank is more forgiving underfoot and individual planks can be replaced.
Tile, in almost every commercial case. A stained or damaged tile is swapped individually instead of replacing a room, and holding attic stock means later repairs actually match.
Yes, and it is a specification requirement rather than a preference, particularly at entrances, in wet areas and anywhere food is handled. It is confirmed against the use of each space rather than applied uniformly.
Probes are set into small drilled holes in the slab and left to equilibrate before relative humidity is read. It is done on the bare slab, because a reading taken through an existing covering is only indicative.
Either a mitigation coating goes down first, or the specification moves to something that tolerates the condition - polished concrete or a loose-lay system with no bonded adhesive. Both are legitimate; we will price both.
Flooring on its own frequently does not. Where it forms part of a wider fit-out, or affects fire-rated or acoustic assemblies, it does. We confirm it for your specific scope rather than assume either way.
Usually working hours, noise, the acoustic build-up between floors, protection of common parts, and how waste leaves the building. It is worth getting the fit-out conditions from them early - they frequently drive the programme.
It depends on the material and the adhesive, and again before furniture goes back. Those cure times are built into the programme, and they are the one part we will not compress.
Either of us, but it is agreed and priced at the start rather than discovered on the morning. It is a real line in the programme, not an afterthought.
Removal and grinding are genuinely dusty. Containment goes up first and extraction is used at the machine, but in an occupied building this stage is scheduled deliberately rather than just started.
Because it is a big part of the work. Removing old adhesive, grinding and levelling a slab is slow, and it is what the finished floor depends on. A quote that looks cheap has usually assumed the slab is perfect.
In rough order: adhesive removal, moisture mitigation, levelling a poor slab, out-of-hours working, heavy phasing, and stairs. The covering itself is often not the largest line.
The product documentation, the warranty conditions and the manufacturer cleaning regime, plus any attic stock. The cleaning regime is the one that matters - most premature commercial floor failure is a maintenance problem.
Follow the manufacturer regime for the specific material, and put proper matting at entrances. Entrance matting extends the life of everything past it more than any other single measure.
With modular materials, yes - that is a large part of why they are specified. Individual planks or tiles are replaced, which is why holding attic stock from the original batch is worth doing.
Nothing in that stage yet — try “All”.
Client experience
Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.
Adir Davidov2022-12-27 Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended! Lee Morali2022-12-27 They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them! Shir Partush2022-12-27 We hired them to renovate our investment property and they provided exceptional quality service for an affordable price! Mia Zafrani2022-10-25 Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction. carmit cohen2022-10-25 After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!! Omri B2022-10-20 I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work! roni yonani2022-10-19 Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same! Itzick Manasherov2022-10-19 Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need. Sophie Brito2022-10-19 Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend Elie Elancry2022-10-19 Amazing job Did a total renovation of my house with themGoogle rating score: 5.0 of 5, based on 12 reviews
Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Next steps
Grouped by what you are trying to do, not by category.
The wider flooring scope
Other flooring specifications
Where flooring sits in a bigger project
Start here
Tell us the approximate area, what is down now and how the space is used. That is enough for a genuinely useful first conversation.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Almost every commercial floor that fails early failed underneath. One day of testing decides the specification and protects the warranty.