The one opening
that has to hold
and look like this.

Impact-rated entry doors installed across Miami-Dade, Broward and Palm Beach by a licensed general contractor. The door is the easy part — what decides whether it performs is the buck, the anchors, the sill pan and the seal, and those are ours.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Impact-rated products with their approval paperwork

Miami-Dade · Broward & Palm Beach Counties

Scroll

Step one

Send us the opening.

A photo of the door from outside and one from inside, and a rough width and height. That is enough for a first conversation.

  • Licensed, bonded and insured · CBC1265280
  • Permit submission and inspection handled by us
  • 104 municipalities across three counties

What to have ready

Photos from both sides, rough opening dimensions, and whether you know if the wall is block or frame.

What happens next

We arrange a site visit and measure the structural opening — not the door. Those are different numbers and only one of them matters for ordering.

What the consultation covers

Whether the existing frame and buck can stay, product and configuration options, the approval documentation your municipality will want, and lead times.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with us. A licensed general contractor will come back to you to arrange a site walk. If it is urgent, call (754) 236-0675.

Photo sequence — impact entry doors installed by Elbaz across South Florida

What we install

A rated door is a rated assembly.

An impact door is approved as a system: the leaf, the frame, the anchors, the spacing between them and the substrate they go into. Change any one of those on site and the assembly is no longer the thing that was tested. That is why the parts of this job that matter are invisible afterwards — the buck fixed properly to the block, the anchors at the spacing the approval calls for, a sill pan that drains outward, and a continuous perimeter seal. Buy any door you like; it is the installation that has to be right.

  • 01

    The opening prepared first

    Old frame out, substrate checked, and a buck fixed to structure before anything is ordered as final.

  • 02

    Anchored to the approval

    Anchor type and spacing taken from the product approval for that specific door, not from habit.

  • 03

    Water managed, not just wind

    A sloped sill pan with a back dam, so anything that gets past the seal drains outward instead of into the floor.

  • 04

    Documentation that survives inspection

    The product approval paperwork submitted with the permit, so the assembly can be signed off rather than argued about.

  • 05

    One contractor

    Removal, structural work, installation, sealing, permitting and inspection under one licence.

See installed doors, frame by frame

Elbaz installation: the same style of impact entry door seen from inside the hallway
The same door style seen from the hallway side

Elbaz project photograph

Portfolio

Impact entry doors across South Florida

Separate installations at different properties

Important: unlike the project galleries on our other pages, this is a PORTFOLIO. Each frame is a different property and a different installation — they are not one job shot from several angles. Every image is an Elbaz Construction photograph.

Elbaz installation: double impact entry doors with a full-height transom above
Pair with transom. A pair of impact entry doors with a full-height transom above. The transom is glazed and rated too, not an infill panel.
Elbaz installation: impact entry set into an arched portico with flanking impact windows
Arched portico. An impact entry set into an arched portico, with impact windows either side of it in the same finish.
Elbaz installation: double impact entry doors with a geometric glazing pattern and arched transom
Geometric glazing. A pair with a geometric bar pattern in the glazing and an arched transom over. The bars are decorative; the laminate is what performs.
Elbaz installation: the same style of impact entry door seen from inside the hallway
From inside. The hallway side of a similar pair. How a door reads from indoors is half the reason people choose the glazing pattern they choose.
Elbaz installation: impact entry door with horizontal glazed bars, set in a stucco surround
Horizontal bars. A single leaf with horizontal glazed bars, in a stucco surround under a covered entry.
Elbaz installation: impact entry doors under an arched head, seen from the hall
Arched head. A pair set under an arched head, seen from the hall. Arched openings are where the buck detailing gets interesting.
Elbaz installation: impact entry doors in an arched opening, seen from the porch
From the porch. The same kind of arrangement from outside, showing how the frame meets the arch.
Elbaz installation: entry portico with the impact door and adjacent window openings
Entry and windows. A portico with the door and its adjacent window openings treated as one set — matched frames and glazing across all three.
Elbaz installation: impact entry door on a modern two-storey elevation
Modern elevation. A single impact entry on a flat-roofed contemporary elevation, where the door is the only interruption in the wall.
Detail of the same frame: Elbaz installation: double impact entry doors with a full-height transom above
Detail of the same frame: Elbaz installation: impact entry set into an arched portico with flanking impact windows
Detail of the same frame: Elbaz installation: double impact entry doors with a geometric glazing pattern and arched transom
Detail of the same frame: Elbaz installation: the same style of impact entry door seen from inside the hallway
Detail of the same frame: Elbaz installation: impact entry door with horizontal glazed bars, set in a stucco surround
Detail of the same frame: Elbaz installation: impact entry doors under an arched head, seen from the hall
Detail of the same frame: Elbaz installation: impact entry doors in an arched opening, seen from the porch
Detail of the same frame: Elbaz installation: entry portico with the impact door and adjacent window openings
Detail of the same frame: Elbaz installation: impact entry door on a modern two-storey elevation
Detail


Configurations

Single leaves, pairs, and pairs with transoms above, set into square and arched openings.

Glazing

Laminated glass in patterns from full-height clear panels to narrow geometric bars, some with privacy glass.

Frames

Aluminium frames in dark bronze and black, fixed into masonry openings behind a treated buck.

Context

Stucco surrounds, arched porticos and covered entries — the openings South Florida houses actually have.

How it runs

Eleven stages, and the door arrives at stage seven.

Most of an impact door installation happens before the door is on site and after it is in the hole. Below is the order we run it in.

Photo sequence — illustrative installation stages followed by completed Elbaz installations

  1. Opening measurement

    The structural opening measured, not the old door. A door ordered off the leaf size is a door that will not fit.

  2. Substrate check

    Block or frame, and what condition the jambs and header are actually in behind the render.

  3. System selection

    Configuration, swing, glazing and finish — and a product whose approval covers the size and the wall type you have.

  4. Approval documentation

    The product approval assembled for the permit submission. This is what the inspector reads.

  5. Permit

    Submitted and tracked by us. Review durations are set by the building department.

  6. Removal

    Old door and frame out, buck removed where it has failed, and the opening cleaned back to sound substrate.

  7. Buck and preparation

    New treated buck fixed to structure, opening checked for square and plumb, and the sill prepared.

  8. Sill pan

    A sloped pan with a back dam and sealed corners, so water that gets past the seal leaves the building instead of entering it.

  9. Set and anchor

    Frame set plumb on shims, then anchored at the type and spacing the approval specifies — this is the step that makes it a rated assembly.

  10. Seal and finish

    Continuous perimeter sealant, stucco or trim made good, and the interior reveal finished.

  11. Hardware and inspection

    Locks, thresholds and weatherstrip adjusted, then the inspection called and attended.

Permit requirements, approval documentation and inspection timelines are set by each municipality and vary across the tri-county area. Impact ratings and approval numbers belong to the specific product installed and appear on its documentation.

Everything that makes an impact door perform is buried by the time the job looks finished. These six stages are where it is either done properly or not: the opening cleaned back to sound substrate, a treated buck anchored to structure, the frame set plumb on shims, anchors driven at the specified type and spacing, a sill pan that drains outward, and a continuous perimeter seal. An installer who skips the sill pan will produce a door that passes a wind test and leaks in the first storm.

Showcase 02

What happens inside the opening

Illustrative sequence — not photographs of an Elbaz project

These six frames are AI-generated illustrations, not photographs of our work. No Elbaz installation has been photographed mid-sequence, and rather than borrow pictures of somebody else's job we have illustrated the stages that matter. Each caption says so, and so does each image's alt text.

Illustrative - AI-generated

Specification

Choosing the door, and the things that outrank it.

Six decisions, in the order they actually matter. Switch between the three questions to see each from a different angle.

Illustrative, AI-generated: a treated timber buck anchored around a masonry door opening, ready to receive the frame

The buck and the anchors

The treated timber or masonry buck lining the opening, and the anchors that fix the frame through it into structure.

Illustrative - AI-generated

Illustrative, AI-generated: a sloped sill pan and back dam sealed before the threshold is set

Sill pan and drainage

A sloped pan under the threshold with a back dam and sealed end dams, so water is directed back outside.

Illustrative - AI-generated

Elbaz installation: double impact entry doors with a geometric glazing pattern and arched transom

Glazing pattern and privacy

How much glass, in what arrangement, and whether it is clear, obscured or patterned.

Elbaz project photograph

Elbaz installation: double impact entry doors with a full-height transom above

Configuration

Single leaf, a pair, a leaf with sidelights, or any of those with a transom above.

Elbaz project photograph

Elbaz installation: impact entry doors under an arched head, seen from the hall

Arched and non-standard openings

Openings that are not a simple rectangle: arched heads, raked heads and out-of-square masonry.

Elbaz project photograph

Elbaz installation: impact entry door with horizontal glazed bars, set in a stucco surround

Finish and hardware

Frame finish, and the lock, handle and threshold that go with it.

Elbaz project photograph

Living with it

Tracks and weeps

Rinse the sill and clear the weep holes with fresh water, especially before the wet season. Blocked weeps are the commonest cause of a "leaking" door.

Frames near salt

Fresh-water rinse every few months within a few miles of the coast. Salt film is what starts finish failure.

Weatherstrip

Check the seal compresses evenly all round once a year; a flattened section is a five-minute adjustment.

Hardware

Lubricate the lock cylinder and hinges annually. Multi-point locks need the keeps checked for alignment as the building settles.

Showcase 03

The paperwork is part of the installation.

An impact door that cannot be documented is an impact door that cannot be signed off. This is the approval trail, in the order it happens, illustrated with a mix of Elbaz photographs and clearly labelled illustrations.

Illustrative, AI-generated: a masonry door opening with the old door removed, showing bare block jambs and a poured header

01

Opening survey

Illustrative, AI-generated. The structural opening is measured and the wall type established, because the product approval you can use depends on what you are fixing into.

Mixed — see each caption

Elbaz installation: double impact entry doors with a full-height transom above

02

Product approval

Elbaz photograph. A product is selected whose approval covers that size, that configuration and that substrate. The approval documentation goes in with the permit application.

Mixed — see each caption

Elbaz installation: impact entry set into an arched portico with flanking impact windows

03

Permit submission

Elbaz photograph. Submitted and tracked by us, with corrections answered by us. How long review takes belongs to the building department.

Mixed — see each caption

Illustrative, AI-generated: a structural anchor driven through the frame jamb into the buck behind it

04

Anchoring to spec

Illustrative, AI-generated. Anchors of the specified type at the specified spacing. This is the single detail an inspector is most likely to check.

Mixed — see each caption

Illustrative, AI-generated: a sloped sill pan and back dam sealed before the threshold is set

05

Water management

Illustrative, AI-generated. Sill pan, back dam and sealed corners, then a continuous perimeter seal once the frame is fixed.

Mixed — see each caption

Elbaz installation: impact entry doors in an arched opening, seen from the porch

06

Inspection and close-out

Elbaz photograph. The inspection is called and attended, and you are left with the approval documentation for your records and for the next buyer of the house.

Mixed — see each caption

Where an impact door frame meets the wall

Buck, anchor, shim, sill pan and seal

Schematic horizontal section through an impact door jamb in a masonry wall From outside inward: stucco finish, concrete block, a treated buck fixed to the block, a shim space, the aluminium door frame anchored through the buck into the block, a continuous perimeter sealant joint at the outside face, and the interior reveal finish. Below, a separate detail shows the sill pan sloping outward with a back dam behind the threshold. 1 STUCCO AND PERIMETER SEALANT 2 CONCRETE BLOCK 3 TREATED BUCK FIXED TO STRUCTURE 4 SHIM SPACE 5 DOOR FRAME, ANCHORED THROUGH THE BUCK 6 ANCHORS AT THE APPROVAL'S SPACING 7 SILL PAN FALLS OUTWARD 8 BACK DAM BEHIND THE THRESHOLD 123 456

Schematic. Anchor type, spacing and edge distances are set by the approval documentation for the specific product installed — this shows the relationships only.

Answers

Impact door questions.

Not the glass alone. It is an assembly — leaf, frame, glazing, anchors and anchor spacing — tested together and approved as a unit for particular sizes and substrates. Install the same door with the wrong anchors and it is no longer the assembly that was approved. That is why we treat the installation detail as the product rather than the door.

Verified

What clients wrote on Google.

Reproduced exactly as published on the company's Google Business Profile. Read them on Google

Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same!

roni yonani

Google review

Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended!

Adir Davidov

Google review

Amazing job Did a total renovation of my house with them

Elie Elancry

Google review

I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work!

Omri B

Google review

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!

Shir Partush

Google review

Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend

Sophie Brito

Google review

Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.

Mia Zafrani

Google review

They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them!

Lee Morali

Google review

Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need.

Itzick Manasherov

Google review

After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!!

carmit cohen

Google review

Project files

Doors that have to hold, and look right.

One collection of double entry doors and one of glass doors to patios and yards. Both are drawn from several jobs, so treat them as references, not as a single house.

2Projects shown
10Photos
PROJECT 01

Three double entry doors, three different jobs

A collection of three double entry doors from separate jobs, not one house. One has a geometric frosted glass design in a white-gray frame, one has horizontal glass slats beside a stone wall, and one is bronze iron with a geometric glass pattern.

Scope of work

  • Opening measured for a matched pair of leaves
  • Old door and frame removed back to the wall opening
  • Frame anchored through the jamb to the approved pattern
  • Sill set and sealed so water drains outward
  • Hardware and multipoint lock adjusted until both leaves close flush
  • Permit and inspection closed with the approval on file

Materials & finishes

Double door leavesFrosted geometric glassHorizontal glass slatsBronze iron finishWhite-gray frameMultipoint lock

What to look for in the photos

Compare the glass patterns in the three photos. The design is the visible choice, but the frame, glass and hardware beneath it carry the rating.

Collection: photos from several Elbaz Construction jobs · 3 photos

PROJECT 02

Sliding doors, patios and an ADU entry door

Seven photos from several jobs where a glass door is one part of a larger space. Kitchens open to the yard through sliding doors, covered patios and a pergola sit beside sliders, and one stucco ADU has a black awning over its entry door.

Scope of work

  • Sliding door openings measured at the slab and the head
  • Frames anchored and sealed to the approved pattern
  • Thresholds set to meet tile, pavers or plank flooring
  • Door finish chosen to match the room and the exterior
  • Patio covers and awnings detailed to shed water away from the door
  • Permit and inspection for each door

Materials & finishes

Aluminum door framesLaminated glassStuccoTravertine and paversPlank flooringQuartz and shaker cabinets

What to look for in the photos

In the kitchen photos, look at where the sliding door meets the floor. The threshold has to be level and drained, and the flooring is finished around it.

Collection: photos from several Elbaz Construction jobs · 3 photos

Budget and schedule

Where an impact door spends.

A typical split of the budget, and the order the work runs in. The door is built to order, so the wait comes before the install.

Where a typical impact door budget goes

100%OF BUDGET
  • Door unit and rated glass48%
  • Installation labor18%
  • Frame, sill and opening repair12%
  • Hardware and lock set8%
  • Finish, paint and trim6%
  • Permit and inspections8%

Typical shares only. Double doors, sidelights and custom glass move the door share up.

A typical impact door project, week by week

Measure and choose the door
Permit and approval
Door built to order
Fabrication
Opening prepared
Door set and sealed
Hardware and inspection
Week 0Week 6Week 12

Weeks are indicative. The door is ordered after the opening is measured and the glass design is chosen.

Drawn out

Types, glass and pressure.

Three diagrams behind the photos: the door types you can choose, what the glass is made of, and what the rating is measured against.

SLIDINGFRENCHENTRYGARAGEFOUR DOOR TYPES, FOUR APPROVALS

Four door types

Sliding, French, entry and garage doors all work differently. Each has its own approval, anchoring pattern and weak points to check.

GLASSPVB / SGPINTERLAYERGLASSLAMINATED: CRACKS BUT STAYS IN THE FRAME

Layers inside the glass

A plastic interlayer sits between two lites. Frosted or patterned designs are chosen from the glass options the product approval allows.

WIND+DP–DPDESIGN PRESSURE RATED BOTH WAYS

Wind load on a door

A door faces pressure from outside and suction from inside during a storm. The rating must match the opening where the door is installed.

Scope planner

Plan your door in four steps.

Pick what applies. You get an indicative time on site and the trades involved.

What kind of door is it?
What is the opening like?
What is around the door?
Is any electrical involved?

Closer in

Awnings, covers and thresholds.

Four views of what sits around a rated door: an awning over an ADU entry, a pergola, a pantry beside glass, and a covered patio.

ADU entry under black awning
Pergola beside a slider
Pantry beside glass door
Patio cover and glass door

More questions

Details people ask about last.

Practical questions on ratings, hardware and what is around the door.

Ask us directly
Do patio and sliding doors need the same rating as the front door?

Any exterior door in a wind-borne debris region needs an approved product with the right design pressure and, in the high-velocity hurricane zone, a Miami-Dade Notice of Acceptance. Ratings differ by door type and size, so a slider is judged on its own approval. It is not covered by a front door approval.

Can an impact door have a low threshold?

Yes, within limits. Rated doors use a sill built to the approval, and the exterior side has to shed water, so a completely flat threshold is not always possible. Low-profile sills exist that meet accessibility needs and the water test. Tell us at the survey if step height or a wheelchair matters, and we will check the options.

Are the lock and hinges part of the rating?

Yes. The tested assembly includes the hinges, the locking points and the strike plates. A multipoint lock holds the door at several places along its height. Swapping in different hardware after installation can void the approval, so choose the lock set before ordering and keep to what the approval lists.

Does a covered porch mean I can use a lighter door?

Not on its own. A covered porch changes how much rain reaches the door, but the wind load rating is set by the building and the location, and the building department decides what applies. Some covered areas are treated differently, so the permit review is the place to confirm it, not guesswork.

Should I order the door before the permit comes back?

Usually the permit and the order move together. The product approval has to be attached to the permit application, so the door is chosen first. Some manufacturers will build before the permit clears, but if a plan reviewer asks for changes, a door that is already built may need to be reworked. We sequence it to limit that risk.

Will an impact door feel heavier to use?

Yes, somewhat. Laminated glass and a reinforced frame add weight, so hinges and closers are larger than on a basic door. In daily use a well-hung door swings easily. If you have small children or reduced strength, ask about the weight of the leaf, the closer setting, and a lever handle that is easier to use.

What happens to the stucco and trim around the door?

Removal of an old frame usually damages the stucco at the edges, so a patch is part of the job. We match texture as closely as practical and prime the repair, but a full repaint of the wall is the only way to hide it completely. Interior trim is replaced where it was disturbed.

Can I have blinds between the glass?

Some manufacturers offer rated doors with blinds sealed inside an insulated glass unit, which keeps them clean and out of the way. They add cost and lead time, and not every approved door offers them. Ask at the selection stage, because the glass type is fixed once the order is placed.

Schedule a Consultation (754) 236-0675

Start here

Send us the door.

Two photographs and a rough size. We will tell you what the opening will take, what the approval trail looks like in your municipality, and what the realistic timeline is once lead time and review are counted.

What happens after you send this

We read it and come back to arrange a site visit — usually within one working day.

What to have ready

A photo from outside and one from inside, rough dimensions, and the wall type if you know it.

What we will cover

Opening condition, configuration and glazing options, the approval and permit path, and lead times.

Prefer to talk it through first?

(754) 236-0675
  • Licensed, bonded and insured · CBC1265280
  • Permit submission and inspection in-house
  • Sun–Fri 7am–7pm · Sat closed

Photo sequence — illustrative installation stages followed by completed Elbaz installations

Illustrative and Elbaz photography — see captions

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with us. A licensed general contractor will come back to you to arrange a site walk. If it is urgent, call (754) 236-0675.