Permitting in Miami-Dade, Broward & Palm Beach: What’s Different

Building permit rules share a statewide foundation but differ in real, practical ways county to county. Here’s what actually changes.

General educational information, current as of 2026 — not legal advice. Permit requirements, fees, and processes change; confirm current requirements directly with the relevant county or city building department before relying on this guide for a specific project.

What’s the Same Statewide

Some rules apply identically across all three counties because they come from Florida Statutes, not local ordinance: a Notice of Commencement is required statewide once a direct contract exceeds $5,000 (with a $15,000 carve-out for HVAC repair/replacement); homeowners may act as their own owner-builder on a 1-2 family residence they occupy, up to $75,000 for commercial structures built for their own use, provided they personally supervise the work; and condo/co-op buildings statewide face the same Milestone Inspection framework once they turn 30 years old (see our glossary for details).

How long does permit review take — is it different by county?

The decision deadline itself is also statewide, not set by each county: under Florida Statute 553.792, once your application is complete the local government must give you a written completeness notice within 5 business days (553.792(1)(c)), then approve, approve with conditions, or deny most residential permits (under 7,500 sq ft) within 30 business days of that complete submission (553.792(1)(a)(2)) — the same floor in Miami-Dade, Broward and Palm Beach alike. In practice, the two clocks do not always line up: Miami-Dade’s own building department publishes an initial plan-review window of just 24 hours to 10 business days before the statutory clock even starts (Homeowners General Permit Info), with a paid “Concierge Plan Review” option guaranteeing 5 business days. So the honest answer is a legal ceiling, not one typical wait — how close you get to it depends on how complete your first submission is and how backed up that department is that month, as much as which county you’re in.

Miami-Dade County

HVHZ county — 175 mph design wind speed for most residential construction. Roofing, window, door, and shutter products need a Miami-Dade NOA. Permit fees were revised effective October 1, 2025 — the county’s first fee increase in more than 17 years, per an official Miami-Dade press release. Historic building-safety recertification track dates back to 1975, now run on a hybrid schedule alongside the statewide Milestone Inspection law.

Broward County

HVHZ county — 170 mph design wind speed for most residential construction. Roofing, window, door, and shutter products need either a Broward NOA or an accepted Miami-Dade NOA. Broward’s own building-safety recertification program (BSIP) dates to January 2006, also now running a hybrid schedule alongside the statewide Milestone Inspection law.

Palm Beach County

Not an HVHZ county — falls under the statewide Wind-Borne Debris Region / Florida Product Approval system instead of county-issued NOAs, which is generally a lighter product-approval process than Miami-Dade or Broward’s. We could not confirm a standalone Palm Beach building-safety recertification ordinance separate from the statewide Milestone Inspection framework — if your building needs one, confirm directly with Palm Beach County’s Building Division.

What This Means for Your Project

If you’re in Miami-Dade or Broward, your roofing, window, and door products need HVHZ-rated NOAs — this is a real cost and product-selection factor, not just paperwork. Palm Beach homeowners have more product flexibility but still need permits and, in most cases, impact-resistant or protected openings in wind-borne debris areas. Processing time depends more on project complexity and the specific city’s current workload than on which county you’re in — a straightforward remodel permit might clear review in a few weeks, while structural changes or flood-zone requirements can take considerably longer. We handle permitting as part of every project, so you’re not navigating county-specific requirements alone.

Permit Questions, Answered

1 Is Palm Beach County an HVHZ county like Miami-Dade and Broward?

No -- Palm Beach County is not in the High-Velocity Hurricane Zone. It falls under the statewide Wind-Borne Debris Region / Florida Product Approval system instead of the county-issued NOA system that Miami-Dade and Broward use.

2 Can I use a Miami-Dade NOA for a project in Broward County?

Yes -- Broward accepts either its own Broward NOA or an accepted Miami-Dade NOA for HVHZ product approval.

3 Does the Notice of Commencement threshold differ by county?

No -- the $5,000 threshold (with a $15,000 HVAC repair/replacement exemption) is set by Florida Statutes and applies statewide, not on a county-by-county basis.

4 Does a kitchen remodel need a permit in Miami-Dade, Broward, or Palm Beach County?

Yes, if the work touches structure, electrical, plumbing, gas, or mechanical systems -- that trigger is set statewide by Florida Building Code §105.1, not by county. Swapping cabinet fronts, countertops in place, or like-for-like flooring is typically exempt under §105.2. Removing or altering a load-bearing wall requires engineer-sealed structural plans and a full plan review rather than an over-the-counter permit, so the timeline follows the same statutory clock described above -- there is no separate, faster kitchen-specific track.