An early start,
and a short Friday.

South Bay publishes administrative hours of half past seven to four, Monday to Thursday, and half past seven to one on a Friday. That is the constraint a project here actually runs into, and it is worth planning around properly. What the City does not publish is a long permitting procedure — so rather than filling this page with somebody else’s rules, we have written down what is genuinely verifiable and how we handle the rest.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll

Start here

Send us the address and the rooms. We will tell you what it needs.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team. We will call you back to arrange the site visit and the scope conversation. If it is urgent, call us on (754) 236-0675.

What decides a South Bay programme

The week is the constraint.

In a small city with a small administration, the hours the counter is open shape a project more than any published checklist would.

The City publishes its administrative hours as “7:30am- 4:00pm Monday-Thursday...Friday 7:30am-1pm”, introduced as a pilot. Read that as a programme fact rather than a piece of trivia: anything needing a person at City Hall wants to happen early in the day and early in the week, and a Friday afternoon question is a Monday morning answer. Alongside it the City runs a Permitting, Code and Business Tax Receipts portal, which is where the routine parts of a file live. Both of those are things we can build a schedule around. Neither is a review procedure, and we are not going to invent one.

7:30the published opening time
1pmthe published Friday close
4full days in the published week
Half past seven, four days

Monday to Thursday, the City publishes administrative hours of 7:30am to 4:00pm.

One in the afternoon on Friday

The published Friday is 7:30am to 1pm. It is the single most useful scheduling fact this City publishes.

A portal for the routine parts

The City runs a Permitting, Code and Business Tax Receipts portal through its online system.

City Hall, with an address and a number

335 SW 2nd Ave, South Bay, FL 33493, and a published telephone number on (561) 996-6751.

  • Licensed & insuredState-licensed GC, bonded and insured
  • Design-buildDrawings, permitting and construction in-house
  • Sourced, not borrowedEvery City fact traced to the City
  • 104 municipalitiesSouth Bay is one of them
  • CBC1265280Verifiable with the Florida DBPR

What we build

Kitchens, bathrooms, additions and accessory units.

Ordinary residential work, planned around a small administration and a long drive from most of the county.

We would rather publish four facts
than forty borrowed ones.

Search for South Bay permitting and most of what comes back belongs to a different municipality with a similar name. That is not a curiosity, it is a trap: a homeowner planning against another town’s contractor registration rules or work-hours ordinance is planning against nothing. So this page carries what the City itself publishes, says plainly where the published record stops, and treats the rest as a question to be asked rather than an answer to be assumed.

  • Kitchen and bathroom remodelling, inside the house as it stands
  • Home additions, where the footprint and the site come into it
  • Accessory and in-law units, which are small buildings of their own
  • Whole-home renovation, where the programme matters more than the paperwork

What is verifiable

The published hours, the portal, City Hall and its telephone number, the Comprehensive Plan and the Code of Ordinances.

What is asked

Everything else. We contact the City rather than reproducing procedure from a source that is not the City.

Kitchenette with tiled splashback in a completed accessory unit
Finished kitchen cabinetry and appliance housing, on a South Florida project by Elbaz Construction. Not photographed in South Bay.

An accessory unit kitchenette, completed

A kitchenette with tiled splashback in a completed accessory unit, on a South Florida project by Elbaz Construction. A self-contained space is the residential scope that raises the most questions in any small municipality.

Want a straight answer about what applies here?

Then the useful thing is a phone call to the City, made by somebody who files for a living. That is part of the job, not an extra.

The work itself

Finished rooms, and the drawings behind them.

Three frames from South Florida projects by Elbaz Construction. The third is what most of a project looks like before it looks like anything.

Completed timber-fronted vanity with a black tapDark plank flooring laid across a large open roomRolled construction drawings and a tape measure on a work table on site
01

A completed timber-fronted vanity with a black tap. Timber in a wet room is a specification decision that has to be made properly or not at all.

Every photograph on this page is of a South Florida project by Elbaz Construction. None is presented as being in South Bay, and no pictured property is said to have been permitted by the City.

Dark plank flooring laid across a large open room
Dark plank flooring laid across a large open room. A dark floor shows every level error, which is why the subfloor takes longer than the finish.
Rolled construction drawings and a tape measure on a work table on site
Rolled construction drawings and a tape measure on a work table on site. Most of a project exists here before it exists anywhere else.

How we work

One contractor, from the first sketch to the last inspection.

What design-build changes in South Bay

Sourcing
Every City fact checked against the City itself
Drawings
Produced in-house, to a complete and conventional standard
Scheduling
Counter business planned around the published week
Construction
Built by the team that filed the application
Closeout
Inspections run against the set that was approved
01

Verify the source, every time

A city with a similar name to another one is a research hazard. Anything we tell you about South Bay came from South Bay.

02

Ask, rather than assume

Where the published record stops, the next step is a phone call to City Hall, not a guess dressed up as local knowledge.

03

Plan around the week

An early start and a short Friday change when things can happen, so the programme is built to fit rather than to hope.

04

Build to the approved set

What was approved is what gets built, and the inspections are run against that same set rather than a later revision nobody filed.

Want the questions asked before the drawings start?

That conversation is free, and in a city that publishes little it is worth more than usual.

Three ways a South Bay project runs

Pick the one that matches how much has to be confirmed first.

None of these is better than the others. They differ in how many questions have to be put to the City before a design is fixed.

A

Inside the house

Kitchens, bathrooms, finishes and services within the walls that are already there. The most predictable kind of file anywhere.

  • The fewest open questions
  • A conventional, complete residential package
  • Counter business scheduled inside the published week
  • Right when the house has the space and not the layout

B

Changing the structure

Openings, load paths and relocated services. Engineered content joins the set and the sequence on site starts to matter.

  • Structural content in the drawings
  • An engineer engaged early rather than late
  • More reason to confirm requirements before design is fixed
  • Right when the layout is wrong rather than the size

C

Changing the footprint

Additions and accessory units. The site, the setbacks and the services all become live, and the questions worth asking multiply.

  • The most to confirm with the City first
  • Setbacks and coverage become live questions
  • New foundations and new services
  • Right for more floor area, not better floor area

Things worth confirming with the City first

  • Any change to the footprint of the house
  • An accessory structure or a separate living space
  • A change in how the property is used
  • New or relocated drainage, which makes the site part of the file
  • A driveway or anything meeting the public street
  • Work on a property with a history of unpermitted alterations
  • Anything that reads as development rather than remodelling
  • Whether a business will be run from the property, which is a licensing question

Everything on this page about south bay is traced to the city published material. South Bay publishes little about permitting, and we would rather say so than borrow: the list above is a list of things to confirm rather than a set of published requirements.

The sequence

From an idea to an issued South Bay permit.

The City publishes when it is open and where its portal is. The rest of this sequence is ours, and the first step is the one that keeps the page honest.

Completed double entry door installation
01

Confirm with the City

A call to City Hall on the published number, inside the published week, to establish what this specific project will be asked for.

Living area with seating in a completed accessory unit
02

Scope and brief

What the house has to do, and how much of the property has to change for it to do it.

Ledger board and flashing detail where a wood deck meets the house wall
03

Drawings and written specification

Produced to a complete and conventional standard, with the specification written rather than assumed and allowances stated as allowances.

Close detail of a ramp handrail returning and extending past the end of the slope
04

Submission

Through the City Permitting, Code and Business Tax Receipts portal, or at City Hall inside the hours it publishes.

Plank flooring in a completed living room installation
05

Comments answered as one response

Whatever comes back is reconciled across the whole set before anything is resubmitted, so one cycle does the work of two.

Renovated kitchen with island, tall units and stainless appliances
06

Build and inspect

Construction against the approved set, with inspections run in the order the trades actually finish.

No duration is stated anywhere in this sequence. South Bay publishes no review duration, and neither do we.

What we do, step by step

Ten things that happen on a South Bay project.

Written plainly, because most of the value of a design-build contractor sits in the parts a homeowner never sees.

First conversation

The brief, the property, the budget shape

QC · Free
What to expect

What you want the house to do, and what is actually in the way.

Your decision

A scope direction and an honest view of what has to be confirmed

Site visit

Measure, photograph, look at what is there

QC · Free
What to expect

Existing conditions establish what is possible before anything is drawn.

Your decision

A record of the property as it actually is

The City call

On the published number, inside the published week

QC · Free
What to expect

We ask the City what this project needs rather than reproducing procedure from a source that is not the City.

Your decision

An answer that came from South Bay

Scope and constraints

What changes, and what stays

QC · Free
What to expect

Footprint, structure and services settled before drawings, because those are what generate the questions.

Your decision

A written scope, and the questions that go with it

Concept drawings

Layout, and the decisions that drive cost

QC · Agreed up front
What to expect

Enough to decide with, before anything is engineered.

Your decision

Drawings you can react to

Specification

Written, not assumed

QC · Agreed up front
What to expect

We price against a drawn scope and a written specification, with allowances stated as allowances.

Your decision

A specification that a price can stand on

Permit set

Complete and conventional

QC · Agreed up front
What to expect

A package that answers the obvious questions in advance, which matters more in a small administration than a large one.

Your decision

A set that does not generate avoidable comments

Submission

Portal, or City Hall inside the hours

QC · Included
What to expect

Scheduled around a week that ends at one on a Friday, so nothing waits a weekend for the sake of an afternoon.

Your decision

A file lodged when it can actually be looked at

Comments

Answered as one set

QC · Included
What to expect

Reconciled across the drawings before anything is resubmitted, so a second look is a shorter look.

Your decision

One coherent response instead of several partial ones

Build and close out

Construction, inspection, certificate

QC · The contract
What to expect

Built to the approved set by the people who drew it.

Your decision

A finished project and a closed permit

Nothing here is a review-time promise. South Bay publishes no review duration, and neither do we.

What the City publishes

South Bay, in the City’s own words.

Everything in this section is published City of South Bay material, read on 20 August 2026. Where the City publishes nothing, this section says so instead of filling the gap.

The paperwork sequence, in order

  1. Monday to ThursdayAdministrative hours of “7:30am- 4:00pm”.
  2. Friday“7:30am-1pm”.
  3. How it is describedThe hours are introduced as a pilot.
  4. The portalA “Permitting, Code, Business Tax Receipts Portal” through the City online system.
  5. City Hall335 SW 2nd Ave, South Bay, FL 33493.
  6. Telephone(561) 996-6751.
  7. The Comprehensive PlanPublished through the municipal code library.
  8. The Code of OrdinancesPublished there as well.
  9. Village by the LakeA conceptual plan the City is promoting, for eco-tourism development along Lake Okeechobee.
  10. Review procedureNot published. We ask rather than assume.
  11. Submission checklistNot published. We ask rather than assume.
  12. Review durationNot published. We do not invent one.

Four things worth knowing before you file in South Bay

The Friday finishes at one

A question raised on a Friday afternoon is a Monday morning question. That is worth a line in a programme, not a shrug.

The day starts early

Half past seven is an unusually early published opening, and it is useful if you plan for it.

The portal handles the routine

Permitting, code and business tax receipts sit in one online system, which is where the repeatable parts of a file live.

The published record is short, and that is the finding

A city that publishes little has not hidden anything. It means the answer comes from a conversation, and the conversation is part of the work.

What we will not tell you

We will not reproduce permitting procedure that we cannot trace to this City. There is a real hazard here and it is worth naming: south bay and south palm beach are different municipalities with different rules, and a general web search for permits in South Bay returns the other one, with its own contractor registration, its own work-hours ordinance and its own site requirements. None of that is reproduced here. Everything on this page about south bay is traced to the city published material. South Bay publishes little about permitting, and we would rather say so than borrow. Requirements change: confirm the current position with City Hall, or ask us to. We do it on every file.

What moves the number

What actually drives a South Bay budget.

We do not publish prices, because a price without a drawn scope is a guess dressed as a number. What can be published honestly is what moves it.

Whether the footprint changes

It is the decision that turns a contained remodel into a project with a site, setbacks and services all in play.

Whether load-bearing structure moves

A wall that carries brings an engineer into the set and a sequence into the programme.

The condition of what is already there

What is behind the wall decides more of the price than what goes on it, and in older housing stock it decides it more emphatically.

How far the services move

Plumbing and electrical are cheap to extend and expensive to relocate.

Distance and logistics

South Bay sits well inland from most of the county, and deliveries, plant hire and trade travel all reflect that.

Specification level

Allowances are stated as allowances so the price does not quietly become somebody else’s decision later.

Site work and drainage

Once the ground is part of the scope, the site is part of the file.

How the programme fits the week

An early start and a one o clock Friday reward a schedule that plans a day ahead rather than reacting.

Earlier unpermitted work

It surfaces eventually, and it is cheaper to find in week one than in month four.

How complete the first submission is

The one variable entirely within your control, and the one that matters most where a small administration is doing the reading.

Low Moderate High Very high

Every driver above changes either the drawings, the file or the build — and most change two of the three.

What a realistic programme looks like

  • The City call, made before anything is designed
  • Scope and concept, agreed before anything is engineered
  • Permit set drawn complete rather than minimal
  • Submission scheduled inside a week that ends at one on a Friday
  • Construction against the approved set, inspected as the trades finish

Seven questions worth asking any contractor here

  • Have you spoken to South Bay City Hall about this project?
  • Where did your information about this City actually come from?
  • How does the published week affect the programme you are proposing?
  • Are you drawing the permit set, or subcontracting it?
  • What is in the specification, and what is an allowance?
  • Who is on site when an inspector arrives?
  • What is your licence number, and can I verify it?

Useful to have ready

  • The property address
  • Any survey you hold, and how old it is
  • Any permits pulled on the property, and roughly when
  • Whether the footprint needs to change
  • What you want the house to do, rather than a solution
  • A budget range you are comfortable saying out loud

We price against a drawn scope

We price against a drawn scope and a written specification, with allowances stated as allowances. That is what makes a proposal comparable to anyone else’s.

The same thing, drawn

Four full days, and a short one.

A schedule fact rather than a permitting rule, and on a project here it is the one that changes most decisions.

The published South Bay weekA drawn diagram, not a photograph. Six bands showing the administrative hours the City publishes, day by day, and the weekend that follows them.MONDAY7:30-4:00TUESDAY7:30-4:00WEDNESDAY7:30-4:00THURSDAY7:30-4:00FRIDAY7:30-1:00WEEKENDclosedThe week, as the City publishes it

Drawn from the administrative hours the City publishes, described there as a pilot. The diagram is ours; the hours are the City’s, and nothing in it is a statement about review times.

What the City publishes, and where

  • City Hall. 335 SW 2nd Ave, South Bay, FL 33493
  • The published number. (561) 996-6751
  • The portal. Permitting, Code and Business Tax Receipts, online
  • The Comprehensive Plan. Through the municipal code library
  • The Code of Ordinances. Published in the same place
  • Village by the Lake. A conceptual plan for eco-tourism on Lake Okeechobee
A short published record is a finding, not a gap

It tells you where the real answers live: in a conversation with the City, had by somebody who does this every week.

Decisions worth making early

The choices that change a South Bay project most.

Facts traced to the City, or borrowed from a similar name

Compared on the specific research hazard this City has. It is the reason most of what you can find online about permits here is about somewhere else.
FactorTraced to South BayFound in a search
Where it came fromThe City own site and CodeOften the Town of South Palm Beach
Is it the same municipalityYesNo, and it is a different coast
Contractor registrationConfirmed with the CityA rule belonging to another town
Work-hours rulesConfirmed with the CityAnother town ordinance entirely
What it costs to be wrongNothing, because it was checkedA programme built on the wrong rules
How long checking takesOne phone callLess, which is the temptation
Our adviceCheck every fact against the CityThere is no argument for this column

Working with the published week, or against it

The hours are the clearest verified constraint the City publishes, and they reward a programme that respects them.
FactorPlan around the weekPlan around a wish
Friday afternoonNothing needed from the counterA question that waits until Monday
Early morningsUsed, because the day starts at half past sevenMissed, along with the best hours of the week
SubmissionsLodged when they can be looked atLodged when they happen to be finished
Best whenAlwaysNever, but it is the default

Eight things that cost South Bay projects time

  1. Reading about the wrong municipalityA similar name on the coast produces most of the search results, and none of its rules apply here.
  2. Treating a short published record as no requirementsIt means the answer comes from a conversation, not that there is nothing to answer.
  3. Leaving counter business to Friday afternoonThe published Friday ends at one.
  4. Missing the early startHalf past seven is a genuine advantage if the programme uses it.
  5. Filing a minimal packageA complete, conventional set generates fewer comments anywhere, and especially where a small team is doing the reading.
  6. Underestimating the distanceSouth Bay is a long way inland from most of the county, and logistics reflect that.
  7. Skipping the written specificationAn allowance that is not stated as an allowance becomes an argument later.
  8. Changing the set after approvalWhat was approved is what is inspected. A later change is a revision, not an adjustment.

What a good South Bay submission looks like

Sourced honestly

Complete rather than minimal

Timed to the week

Tick these off as you go — nothing is stored or sent, the list is here purely so you can use it while you compare contractors.

More of the work

Rooms, decks and the details in between.

Bathroom mirror and tap detail in a completed remodel
South Florida projects by Elbaz Construction. None is presented as being in South Bay.

Kitchens

Full remodels including layout changes, relocated services and appliance runs that need their own attention at rough-in.

Bathrooms

Plumbing, electrical and ventilation in the smallest room in the house, where the waterproofing detail matters most.

Additions

Where the footprint, the setbacks and the services all become live questions at the same time.

Decks and outdoor work

Framing, flashing and the junction where a deck meets a wall, which is where water goes wrong if it is going to.

Questions we are actually asked

South Bay, answered.

  • The City publishes administrative hours of "7:30am- 4:00pm Monday-Thursday...Friday 7:30am-1pm", introduced as a pilot. An early start and a short Friday is a real scheduling constraint and it is worth planning around.

  • Because the City publishes few, and we would rather say so than borrow. The alternative is reproducing procedure from somewhere that is not this City, which is worse than saying nothing.

  • Check whose they are. A general search for building permits in South Bay returns the Town of South Palm Beach, which is a different municipality on the coast with its own contractor registration, its own work-hours ordinance and its own requirements. None of it applies here.

  • Yes. The City runs a "Permitting, Code, Business Tax Receipts Portal" through its online system, which is where the routine parts of a file live.

  • 335 SW 2nd Ave, South Bay, FL 33493. The City publishes a telephone number as well, on (561) 996-6751.

  • Its Comprehensive Plan and its Code of Ordinances, through the municipal code library, and a Village by the Lake conceptual plan promoting eco-tourism development along Lake Okeechobee.

  • South Bay publishes no review duration, and neither do we. In a city with a short published record, an invented number would be the least defensible thing on the page.

  • Almost certainly. Moving plumbing, altering circuits or changing ventilation is permitted work everywhere in Florida. The specific submission requirements are something we confirm with the City rather than assume.

  • Yes, and it is part of the work rather than an extra. Where the published record is short, the conversation is the record.

  • Practically, yes. South Bay sits a long way from most of the county, so deliveries, plant hire and trade travel all show up in a programme and in a price. It is an honest cost rather than a hidden one.

  • You can, and the question is whether they make a complete package. In a small administration a complete, conventional set is the fastest thing to process.

  • The people who called the City are the people who drew the set, filed it, answered the comments and stood on site when the inspector arrived. Nothing is lost in a handover, because there is no handover.

  • Against a drawn scope and a written specification, with allowances stated as allowances. We do not give a number before there is a scope for it to stand on.

  • Elbaz Construction is a Certified Building Contractor, licence CBC1265280, licensed, bonded and insured, and verifiable with the Florida Department of Business and Professional Regulation.

  • Yes. We file in 104 municipalities across Miami-Dade, Broward and Palm Beach, and South Bay is one of them. Filing widely is how we know the difference between a city that publishes little and a city that expects little.

  • No. Everything attributed to the City on this page is its own published material, read on 20 August 2026, and requirements change. We do not publish review-time promises or approval odds, because neither is ours to give.

Why Elbaz

One contractor, and sources you can check.

  • Design-build, genuinelyDrawings, permitting and construction under one contract. The person who decided the scope is the person on site.
  • We trace every City factA similarly named municipality on the coast produces most of the search results here, and none of its rules are reproduced on this page.
  • We say what is not publishedA short published record is a finding worth stating, not a gap to be filled with confident-sounding procedure.
  • We plan around the published weekHalf past seven to four, and a Friday that ends at one.
  • CBC1265280Certified Building Contractor, licensed, bonded and insured, verifiable with the Florida DBPR.
  • 104 municipalities, three countiesMiami-Dade, Broward and Palm Beach. Every one files differently.
  • We price against a drawn scopeAnd a written specification, with allowances stated as allowances.
  • We quote the City, not ourselvesEvery fact attributed to the City on this page is published South Bay material.

What homeowners say

Reviews, unedited.

Published on Google, quoted here word for word. We do not shorten, merge or rewrite a review.

4.8Average across 343 Google reviews
Read all 343 reviews on Google
Very satisfied with my bathroom and the way it looks now they crew was very professional, The service was quick, and the staff was friendly , The customer service staff went above and beyond , The customer support was fantastic! They quickly resolved my bathroom issues and were very friendly , highly recommended!!
Leynol CarvajalGoogle review
If you are planning to remodel your kitchen or bathroom or do any other construction project, call Sean from Elbaz Construction . He has a lot of experience and will recommend the best options/ suggestions to your project. He did high quality job !
Kameron AllisonGoogle review
Elbaz Construction provided excellent service and outstanding craftsmanship. The team was professional and attentive to our needs. We’re extremely satisfied with the results!
Damian NunezGoogle review
Highly recommended for any bathroom or kitchen projects! Raz is very knowledgeable at this field and gave us wonderful ideas for the design. It was done in a timely manner. Thank you !!
Valerie CisnerosGoogle review

Related reading and services

Schedule a Consultation (754) 236-0675

Start here

Tell us the address. We will ask the City the rest.

Most of what determines a South Bay project is knowable before anything is drawn, and the part that is not published is a phone call away. What matters is that the call is made to the right city.

What happens after you send this

  1. A call back within one business day
  2. A site visit to see what is actually there
  3. A written scope, and answers that came from the City itself
  4. A price against that scope, with allowances stated

Useful to have ready

  • The property address
  • Any survey you hold
  • Any permits pulled on the property
  • Whether the footprint needs to change
  • What you want the house to do

Licensed, bonded and insured

Certified Building Contractor CBC1265280

Design-build: drawings, permitting and construction in-house

104 municipalities across three counties

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team. We will call you back to arrange the site visit and the scope conversation. If it is urgent, call us on (754) 236-0675.