Chapter 01 — The two tracks
Retail runs on two approvals.
The building department, and the landlord.
Retail space falls under Mercantile Group M occupancy in the Florida Building Code, and almost every project in the category is second-generation space — a vanilla shell or a previous tenant’s built-out store — rather than ground-up construction. That distinction changes both the code path and the schedule, because existing restrooms, HVAC and storefront glazing may be reusable or may have to come out to bare shell.
Whether it is a strip-centre unit, a boutique in a retail corridor or an anchor space in a mall, the job runs on two tracks that have to close together: the building department’s permit, and the landlord’s own Tenant Design Criteria manual governing storefront depth, signage, flooring transitions at the lease line and allocated HVAC tonnage. Miss either and the store does not open on schedule, regardless of which one was actually finished first.
Retail also carries more public-facing scrutiny per square foot than most commercial categories. A small footprint holding customers, fitting rooms, a checkout counter and a public entrance means accessibility and egress get examined closely relative to the size of the space.

- Exposed structure and servicesvisible in this frame
- New stud partitionsvisible in this frame
- Storefront openingvisible in this frame
- Bare slab, ready for build-upvisible in this frame
- Utility capacity to verifyvisible in this frame
Mercantile occupancy
Retail sits in Group M in the Florida Building Code, which sets the egress, occupant load and accessibility framework the fit-out has to satisfy.
Approvals, one date
The county permit and the landlord’s design-criteria review are separate processes on separate calendars. Both have to close before you open.
Licensed general contractor
Licensed, bonded and insured, with one company coordinating both approval tracks.