Tamarac.
The City permits the work.
Your association still has to.

Licensed general contracting and renovation in Tamarac — where the permit package now carries an Association Affidavit of Awareness, and the City says in writing that its permit does not mean your association has approved anything.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll
Start here

Tell us the scope
and the address.

We will tell you what the City needs, and — just as important here — what your association will need to have agreed before any of it matters.

Why we ask about the association first

A permit is not permission from the people who can stop the work.

Tamarac has put this in writing rather than leaving it as advice. Its permit package includes an Association Affidavit of Awareness, and the City states that issuing a building permit does not guarantee the work is allowed by your association — you are responsible for obtaining that approval separately. So the sequence that works here starts with the association documents, not with the drawings.

Prefer to talk now(754) 236-0675

Sun–Fri 7am–7pm · Saturday closed. Licensed, bonded and insured · CBC1265280.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Tamarac · Broward County

Two approvals,
one of which
the City will not give you.

Most of this City lives under an association of some kind, and the Building Department has stopped pretending that is somebody else’s problem. It asks you to acknowledge, on a form, that a building permit and an association’s consent are different things — then publishes an unusually plain brochure telling you how much ordinary home improvement needs the permit half of that pair.

Handleless kitchen by Elbaz Construction with a marble-veined island and stools, walnut wall cabinetry and a run of tall units beyond
What we build

Kitchens, bathrooms, conversions and whole-home renovation

Interiors and the electrical, plumbing and mechanical work behind them, plus the garage, carport and patio conversions this City names specifically as permitted work — run by one licensed general contractor, and submitted with the association paperwork already in hand.

Start your project
The form that says it out loud

Association Affidavit of Awareness

The City’s permit package now includes it, alongside this statement: issuance of a building permit by the City of Tamarac does not guarantee that the work permitted is allowed by your association — you are responsible for obtaining their approval separately.

Dated, and worth checking

The application changed in March 2026

The City states that as of 9 March 2026 it no longer accepts the previous version of the Broward County Uniform Application, and that the Notary Jurat form is no longer needed with the new version. An application downloaded last year is now the wrong form.

Before anyone is selected

Contractors register first

A contractor must be registered with the City before they can be selected on a permit application, and the City states there is no fee to register. It is a short step that stops an application dead if it has not been done.

Where the plans go

Electronic plan review

Submission, review and approval run through the City’s ePermits system, which lets staff review concurrently rather than in sequence — the City says that cuts plan review turnaround time in half. That is the City’s own claim about its system, and we quote it as such rather than promising it.

How the process actually runs

Narrow windows,
and a Thursday
afternoon.

Five things about building in Tamarac that are not true of the city next door.

01 · When you can actually speak to a reviewer

Two half-hour-ish windows a day, four days a week.

Plan reviewers are available Monday through Thursday, for walk-in customers and by appointment, in two windows only: 7:30 to 8:00 in the morning and 2:30 to 4:00 in the afternoon. If a correction needs a conversation rather than a resubmission, those windows are the whole opportunity — and they are the reason we would rather ask a question early than discover a comment late.

02 · The fast lane has a timetable

Fast Trac, Thursdays only

The City runs its Fast Trac Permit service on Thursdays from 1:30 to 3:30 p.m. We do not publish what qualifies for it, because the City’s eligibility detail is a separate document we have not read — but the window itself is fixed and worth planning around.

03 · The lobby closes before the office

And Fridays are shorter

Lobby hours run Monday to Thursday 7:30 a.m. to 4:00 p.m. and Friday 7:30 a.m. to 3:00 p.m., while the office runs to 4:30 p.m. Monday to Thursday and 3:30 p.m. on Friday. They are two different things, and the counter is the one that shuts first. The City also publishes a live average lobby wait time, which is worth a look before driving over.

04 · Virtual inspections, but only one kind

Roof permits

The City currently offers virtual inspections for roof permits only, booked by phone or email with the permit number in hand. Everything else is a site visit, so do not plan a programme around remote sign-off for anything but the roof.

05 · The City publishes its own outages

Including planned downtime

The electronic plan review system and the permits and inspections portal are listed with live operational status, any active outages and scheduled maintenance windows. Very few municipalities publish planned downtime at all. If a submittal deadline matters, that page is worth checking first.

06 · Who you hire, and under whose licence

Broward County or the State

The City’s brochure puts it in capitals: it is very important that anyone you hire and pay is properly licensed by either Broward County or the State of Florida for the type and scope of work covered by your permit. Ours is CBC1265280, and it is worth checking.

Conversions

Turning space
into a room
the City recognises.

A completed studio annexe from an Elbaz Construction project, shown as one property rather than several.

Why this is on the list

Converting to living space is named work

The City’s brochure names carport, garage or open patio enclosures with a roof, to convert it into a living space as requiring a permit — and a conversion pulls in nearly every discipline at once: structural, electrical, mechanical for the ventilation and air conditioning, and plumbing wherever a kitchenette or shower room lands.

Detached studio annexe finished in white stucco, with a black door under a steel canopy and a paved path running up to it

The annexe from outside, finished and with its path laid.

The studio interior under a vaulted ceiling, with a wall-mounted air conditioning unit, a sofa, a bed and a door through to the shower room

Inside, under the vaulted ceiling, with the air conditioning fitted.

The same room from the kitchenette end, with the cooker and worktop in the foreground and the living and sleeping area beyond

The same room from the kitchenette end.

The kitchenette run with white shaker units, a dark tiled splashback, an over-range microwave and a fridge

The kitchenette run, with its splashback and appliances in.

The studio shower room, with a glazed shower enclosure, a WC and a compact vanity under a blinded window

The shower room, where the plumbing and the ventilation both landed.

The brochure, in detail

Anything from
a new sink to
replacing cabinets.

The City’s own permit brochure is unusually plain about how much ordinary home improvement needs a permit. These are its examples, not ours.

The City’s framing

The reason it gives is resale, not just safety

The brochure opens by saying that state and local statutes require a building permit for many of the most common home improvement projects — anything from adding a new sink to replacing your kitchen cabinets; adding a fence to building a utility shed — and gives two reasons: the safety of you and your household, and avoiding problems when you go to sell your home in the future. Then it says, plainly: when in doubt, call. Unpermitted work is a problem you inherit and then hand on.

Kitchens

Itemised further than most

The brochure lists kitchen remodelling as including replacing cabinets, installing or replacing any type of sink, in-sink-erators, water heaters, tank or tank-less, and any electrical upgrades — new outlets, upgraded outlets, new light fittings, exhaust systems.

Bathrooms

Down to the wall tiles

And bathroom remodelling as including cabinets, any type of sink, bath tub, shower stall or toilet, any addition or alteration to the plumbing system, sewer or water service, replacement of wall tiles, and the same electrical upgrades.

The ones people never expect

Cameras, dryer ducts, hot tubs

Any low voltage wiring or outlets, such as those used for TV surveillance cameras. Dryer exhaust duct work, alongside heating, ventilation and air conditioning duct. Hot tubs and landscape lighting, unless they plug into an existing outlet. And wiring installed now for a generator you intend to hook up later.

Outside as well

Ground, structures and openings

Driveways and walkways in asphalt, pavers or concrete; slabs, patio slabs and pool decks; all fencing, new or repaired; gazebos, trellises, greenhouses or any structure in the yard; windows, swing doors, garage doors and hurricane shutters; skylights and solar tubes; decks; stucco and siding; and screen enclosures. A shed needs a product approval or engineered drawings.

Owner’s guide

Five things worth
settling first.

Specific to this city, and in the order they actually bite.

01

Start with the association, not the drawings

The City will permit work your association can still refuse, and it now asks you to acknowledge that in the application package. Their approval process is usually the longer of the two.

02

Download the application today, not from an old folder

The previous Broward County Uniform Application has not been accepted since 9 March 2026, and the new version no longer needs the Notary Jurat form.

03

Make sure your contractor is registered with the City

Registration is required before a contractor can be selected on the application, and it is free. It is a common reason an otherwise complete application stalls.

04

Plan questions around the reviewer windows

Monday to Thursday, 7:30 to 8:00 a.m. and 2:30 to 4:00 p.m., walk-in or by appointment. Outside those, a correction is a resubmission rather than a conversation.

05

Assume the small jobs count

A sink, a cabinet run, a dryer duct, a camera cable, a fence repair, a slab. The City lists all of them, and adds that its list is not exhaustive.

And one caution

We publish no fees and no durations

The City links a permit fee schedule and we have not turned it into numbers here, because the figure that matters is the one current on the day you file. The one fee statement on this page — that contractor registration is free — is the City’s own. The line about concurrent review cutting plan review turnaround in half is likewise the City’s claim about its own system, not a promise from us. Confirm current requirements with the Building Department before filing.

Common questions

Before you file.

What owners in Tamarac ask first, answered from the City’s own permit brochure and ePermits guidance rather than from what is usually true elsewhere in Broward.

No, and Tamarac now asks you to acknowledge that in writing. Its permit package includes an Association Affidavit of Awareness, and the City states that issuance of a building permit does not guarantee that the work permitted is allowed by your association — you are responsible for obtaining their approval separately. The City’s own brochure repeats the advice twice: check with your association for restrictions before you apply. In practice the association is usually the longer of the two approvals, so it is the one to start first.

Probably not. The City states that as of 9 March 2026 it no longer accepts the previous version of the Broward County Uniform Application, and that the Notary Jurat form is no longer needed with the new version. Download the current Building Permit Application and Association Affidavit of Awareness package rather than reusing an older copy.

Yes. The City’s brochure opens with exactly that example — a permit is required for many common home improvements, anything from adding a new sink to replacing your kitchen cabinets. It lists kitchen remodelling as including replacing cabinets, installing or replacing any type of sink, in-sink-erators, water heaters tank or tank-less, and any electrical upgrades. Bathroom remodelling is itemised the same way, down to replacement of wall tiles.

Several things, and they are the City’s examples rather than ours. Any low voltage wiring or outlets, such as those used for TV surveillance cameras. Dryer exhaust duct work, alongside heating, ventilation and air conditioning duct. Hot tubs and landscape lighting, unless they simply plug into an existing outlet. Wiring installed now for a generator you intend to connect later. Electrical panel repair or replacement. And outside: driveways and walkways, slabs and pool decks, all fencing including repairs, sheds, gazebos, decks, stucco, siding, screen enclosures, windows, doors, shutters, skylights and solar tubes.

In two windows a day, four days a week. Plan reviewers are available Monday through Thursday for walk-in customers and by appointment, from 7:30 to 8:00 a.m. and from 2:30 to 4:00 p.m. Outside those, a correction tends to become another submission rather than a conversation — which is the main reason we would rather raise a question before filing than after the first review comes back.

Yes, and the lobby and the office differ too. Lobby hours are Monday to Thursday 7:30 a.m. to 4:00 p.m. and Friday 7:30 a.m. to 3:00 p.m., while the office runs to 4:30 p.m. Monday to Thursday and 3:30 p.m. on Friday. The City also publishes a live average lobby wait time on its Building page, which is worth checking before making the trip.

Only for roofs, at present. The City states it is currently offering virtual inspections for roof permits only, booked by phone or email with the permit number in hand. Everything else is a site inspection, so a programme should not assume remote sign-off for anything other than the roof.

Through the City’s ePermits system, which handles construction plan submission, review and approval online. The City says electronic submission lets staff review plans concurrently, cutting plan review turnaround time in half — that is the City’s claim about its own system, and we repeat it as such rather than promising you a timeline. The City also publishes live status for its plan review and permits portals, including any outages and scheduled maintenance.

Yes. A contractor must be registered with the City of Tamarac before they can be selected on a permit application, and the City states there is no fee to register. Separately, the brochure stresses in capitals that it is very important that whoever you hire and pay is properly licensed by Broward County or the State of Florida for the type and scope of work your permit covers.

The City publishes what an owner/builder permit requires: the permit application, proof of residence such as a phone or utility bill, a current Florida driver’s licence or state ID, the owner/builder affidavit, and plans or documents identifying the work to be completed. Whether your particular situation qualifies is the City’s determination, not ours — and the association approval question is unchanged either way.

Yes, and the City names it directly: carport, garage or open patio enclosures with a roof, to convert it into a living space. In practice a conversion touches nearly every discipline at once — structural for the openings and the enclosure, electrical for the circuits and lighting, mechanical for ventilation and air conditioning, and plumbing wherever a kitchenette or shower room lands. That is a good reason to have one contractor sequencing all of it rather than four trades booking inspections independently.

Not from a page. We do not publish Tamarac’s permit fees, and we will not quote a programme without drawings. What we can do first is establish which association governs the property and what it will want to see, confirm the current application package, and map the work against the reviewer windows and inspection requirements. Then we price against drawings.

Google reviews

What clients say.

4.8 across 343 Google reviews. Text reproduced verbatim, including original spelling.

Licensed and accountable

CBC1265280

Florida certified building contractor. Licensed, bonded and insured, working across Miami-Dade, Broward and Palm Beach.

Start your project
“If you are planning to remodel your kitchen or bathroom or do any other construction project, call Sean from Elbaz Construction . He has a lot of experience and will recommend the best options/ suggestions to your project. He did high quality job !”
Kameron Allison · Google
“Elbaz Construction provided excellent service and outstanding craftsmanship. The team was professional and attentive to our needs. We’re extremely satisfied with the results!”
Damian Nunez · Google
“Asher was knowledgeable and gave us cool ideas that we didn’t even know before. Nice beautiful color and design. We appreciate the price !”
Sierra Bernabeo · Google

No review schema is emitted from this page. Aggregate ratings marked up on a business’s own service pages are self-serving under Google’s structured-data policy, so the rating above is presented as visible content only.

Start your project

Tell us what you
are planning.

Send the scope and the address. We will come back with what the City needs and what your association is likely to ask for.

What happens next

Three steps, and no showroom appointment

  • 01We call you back, go through the scope and ask which association governs the property
  • 02We walk the property, read the association’s requirements with you and work out what has to be approved before we file
  • 03You get a written scope priced against drawings, not against a description
What to expect

A straight read, including about the association

If your association is likely to refuse something, or to want it detailed differently, we would rather find that out before the permit than after the work has started.

Prefer to talk now(754) 236-0675

Sun–Fri 7am–7pm · Saturday closed. Licensed, bonded and insured · CBC1265280.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Start your Tamarac project

Ready when you are

Get both approvals moving at once.

Send us the scope and the address. We will tell you what the City’s package now has to carry, what the association will want to see, and how the reviewer windows shape the programme. Licensed, bonded and insured, CBC1265280.

Detached studio annexe finished in white stucco, with a black door under a steel canopy and a paved path running up to it