ADU open-plan living and kitchen with loft over

In Weston the safety clock
now starts at twenty-five years,
not forty.

Licensed general contracting, construction and remodeling in the City of Weston — where Broward’s inspection programme was revised to begin at twenty-five years of age, and where a project runs either entirely through the City or entirely through a private provider.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

A-00Architectural
SHEET A-00 / SOUTH FLORIDA REFERENCE SET · 12 FRAMES

Recent work

Work on buildings that already exist.

Accessory space, lofts, kitchens and flooring built by Elbaz Construction across South Florida — the work a city of maturing houses tends to need. None of the properties shown is in Weston. Select any frame to open it full size.

G-01General
SHEET G-01 / CITY OF WESTON
01

The city, defined

A city whose buildings just got fifteen years older.

For decades the Broward safety inspection was a forty-year milestone, and it felt like somebody else’s problem in a city built largely in the 1990s. That changed. The Broward County Board of Rules and Appeals revised the programme to be consistent with Florida law, and the City states the major change plainly: buildings are now required to have that initial inspection at twenty-five years of age instead of forty. A great deal of Weston crossed that line without moving.

That reframes what a renovation here is for. When a building is going to be looked at formally, the work you were planning anyway — the roof, the openings, the balcony, the electrical service — stops being discretionary improvement and starts being preparation. The sensible order is to know what the inspection will ask before deciding what the project should include.

The second thing Weston publishes is a genuine choice about who does the reviewing. Under the state private-provider statute the City will discount its building department fees by twenty-five per cent if you use private inspections, and by fifty per cent if you use private plan review and inspections together. It then closes the obvious loophole: a project goes City or private, not both, and additional permits at a property with an open private-provider permit follow the same track — in the City’s words, to avoid gaps or conflicts in responsibility.

Two-storey ADU interior with loft balustrade above the kitchen
REFTwo-storey accessory interior with a loft balustrade above the kitchen, South Florida project by Elbaz Construction.

We work across Miami-Dade, Broward and Palm Beach, so a Broward inspection programme and a private-provider election are decisions we have made with clients before rather than researched on their job.

What is included

Initial safety inspection
At 25 years of age, revised from 40
Authority
Broward County Board of Rules and Appeals
Statutory basis
F.S. 553.899
Private inspections only
Building department fees discounted 25%
Private review and inspections
Discounted 50%
The rule on mixing
City or private — not both
A-01Architectural
SHEET A-01 / SCOPE OF WORKS · 9 ITEMS
02

Scope index

What we build here

Grouped by how each category relates to the two things Weston publishes: the twenty-five year inspection and the private-provider election. What a particular scope requires is the Building Official’s determination — this is the structure, not a determination.

ADU living area with stair to a loft level above
REFAccessory living area with a stair to a loft level above, South Florida project by Elbaz Construction.
01 / Inspection-relevant work

Roof replacement

On a building approaching or past twenty-five years, the roof is among the first things a structural review looks at. Doing it ahead of the inspection rather than after a report is the cheaper order.

A-02Architectural
SHEET A-02 / REFERENCE 01 · ADDED SPACE, FINISHED · 09 FRAMES
REFERENCE 01 · ADDED SPACE, FINISHED

What accessory and loft work looks like completed

Nine frames, separate South Florida projects

Adding usable space to an existing property is the scope that most often brings structure, services and egress together — and on a building near its safety milestone, it is the scope worth planning around that milestone.

These nine frames are separate South Florida projects by Elbaz Construction, not one project and not a Weston property. Select any frame to open it full size.

A-03Architectural
SHEET A-03 / REVIEW ROUTE AND SAFETY PROGRAMME · CITY OF WESTON
03

Specification

The two decisions that shape a Weston project

Read from the City’s Building Code Services, Private Provider Program and 25-Year or Older Building Inspection Safety Program pages on 2026-08-16.

The Broward County Board of Rules and Appeals
Adopted the revised Building Inspections regulations, formerly the 40-Year Inspection Program, to be consistent with F.S. 553.899.
The twenty-five year milestone
The City states the major change is that buildings are now required to have that initial inspection at 25 years of age instead of 40.
The City Building Department
The default route: City plan review and City inspections, with no discount and no election required.
A private provider, inspections only
Under 553.791(2b) F.S., building department fees discounted by 25%. Other city department fees are not discounted.
A private provider, review and inspections
Under 553.791(2)(a), electing private plan review requires private provider inspections as well. Building department fees discounted by 50%.
The all-or-nothing rule
A project can go City review and inspections, or private review and inspections, but not both. Any other arrangement must be requested in writing by the property owner and approved by the Building Official.
The other departments, and the clock
The statutory 5 or 10-business day review period does not include plan review time required by City Utility, Flood Plain Ordinance, Planning, Streets & Storm Water, R.O.W. or site grade/fill review. The private route shortens one queue, not all of them.
Pre-registration
Private providers must pre-register with the City with their licence, firm details and insurance, together with the documents required by the statute and the Notice to Building Official.
ADU loft level looking down over the living area
REFLoft level looking down over the living area, South Florida project by Elbaz Construction.
A-04Architectural
SHEET A-04 / MATERIAL AND DESIGN LANGUAGE
04

Design and material language

The decisions that follow from the two rules

Five choices shaped by the twenty-five year programme and the private-provider election.

ADU kitchen with timber-fronted cabinets and subway tile
DETAccessory kitchen with timber-fronted cabinets and subway tile, South Florida project by Elbaz Construction.
Dark plank flooring with sample boards staged against a wall
DETDark plank flooring with sample boards staged against a wall, South Florida project by Elbaz Construction.
M-01

The review route

A once-per-project decision

Shaped by what Weston publishes City or private, elected before the first application and carried by every additional permit at that property while one is open.

Other options. Decide on programme certainty and cost together. The 50% discount is real, but so is the cost of the provider you are hiring.

M-02

Structural elements

What the programme looks at

Shaped by what Weston publishes Railings, balconies, and anything carrying load are the subject of a safety inspection rather than an aesthetic choice.

Other options. If the building is near twenty-five years, get the structural picture before you fix the finishes budget.

M-03

Electrical service and distribution

The other half of the programme

Shaped by what Weston publishes Electrical is the second discipline the inspection covers, and older service equipment is where reports commonly land.

Other options. Scope electrical honestly rather than minimally on a building of this age.

M-04

Envelope and openings

Documentation as much as product

Shaped by what Weston publishes Product approvals for rated assemblies matter more when a building is under formal review.

Other options. Keep the approvals with the project record, not just with the installer.

M-05

Finishes and joinery

Last, deliberately

Shaped by what Weston publishes On a building being prepared for inspection, finishes are the trade that should not start until the structural and services picture is settled.

Other options. Sequence them last. Redoing finishes because a structural report arrived late is the most avoidable cost on this kind of job.

On what is shown. Nothing here is a determination. The Building Official decides what a scope requires and whether an alternative arrangement is approved, and the safety programme is administered by Broward County — so this page describes the decisions, not their outcomes.

G-02General
SHEET G-02 / PROCESS · 11 STAGES
05

Process

How we run a project here

Eleven steps. The route election comes early because it governs every permit that follows.

01
Consultation

The scope, the address, and the age of the building.

02
Age check

We establish where the property sits against the twenty-five year milestone, because it changes what a sensible scope includes.

03
Route election

City or private provider, decided on cost and programme together and settled before the first application.

04
Provider registration

Where the private route is chosen, pre-registration with the City and the Notice to Building Official.

05
Design

Drawn as one coordinated set, with structural and services scope resolved before finishes.

06
Other departments

Utility, flood plain, planning, streets and storm water, right of way and site grade reviews identified early, because the statutory clock excludes them.

07
Submission

Through the City’s ePermits portal on the elected track.

08
Permit

Issued, with the programme rebuilt around the real dates.

09
Inspections

On the elected track, City or private, consistently.

10
Construction

Sequenced so each trade is genuinely ready for its inspection.

11
Completion

Final inspections, certification, and the documents handed over in a form you can produce again when the property is sold or inspected.

P-01Permitting
SHEET P-01 / PERMITTING, PRIVATE PROVIDERS AND SAFETY INSPECTIONS · CITY OF WESTON
06

Technical brief

What the City publishes, and what it says exactly

Nine references, each read off an official City source on 2026-08-16.

ADU kitchen and dining bar with timber cabinet fronts
PAccessory kitchen and dining bar with timber cabinet fronts, South Florida project by Elbaz Construction.
Herringbone flooring detail at a panelled door reveal
PHerringbone flooring detail at a panelled door reveal, South Florida project by Elbaz Construction.
R-01

Forty years became twenty-five

"The Broward County Board of Rules and Appeals (BORA) adopted new regulations for Building Inspections (formerly known as the 40-Year Inspection Program). Per BORA, the Program was revised to be consistent with the requirements of Florida law, F.S.553.899. The major change to the program is that buildings will now be required to have that initial inspection at 25 years of age instead of 40."

R-02

Private inspections: 25% off

"In accordance with 553.791(2b),f.s. owners who have selected to use private providers for inspection services will have building department fees discounted by 25%. All fees will be listed, and the 25% discount will be subtracted from the total of building fees (other city department fees are not discounted)."

R-03

Private review and inspections: 50% off

"In accordance with 553.791(2)(a), owners who have selected to use private plan review will also need to select private provider inspections. If private review is selected, the Building Department fees will be discounted by 50%."

R-04

City or private, not both

"a project can either go city review/inspections or can choose private review/inspections but not both. A project is defined as all work proposed, including any accessory permits required in addition to the main (new or addition/alteration) permit. Any other arrangement must be requested in writing by the property owner and approved by the Building Official."

R-05

And the reason the City gives

Additional permit applications at a property with an open private provider review/inspection permit "will be issued with private provider review/inspection, to avoid gaps or conflicts in responsibility."

R-06

What the statutory clock excludes

"The 5 or 10-business day review period required by 553.791(8b) f.s. shall not include plan review time required by other departments for local ordinance compliance. These include City Utility Department Plan Review, City Flood Plain Ordinance Plan Review, City Planning Department Review, City Streets & Storm Water Department Review, and City R.O.W. Plan Review, and City site grade/fill review."

R-07

Providers register before they act

"Private Providers shall pre-register with the City by emailing… their name, license, firm, address, phone and email. Attach the supporting documents required by FS 553.791 and the Notice to Building Official of Use of a Private Provider," including qualifications and proof of required professional liability insurance, kept current.

R-08

Where permits and inspections happen

Permit applications are submitted through the City of Weston’s ePermit Portal, and inspections along the construction process are scheduled through the same portal.

R-09

A Quick Permit programme exists

The City publishes a Quick Permit route with its own application and requirements packet. We have not read the eligibility list, so this page says only that it exists — ask the Building Department whether your scope qualifies.

Disclaimer. Nothing on this sheet is a determination about a specific property. The Building Official decides what a scope requires.

S-01Structural
SHEET S-01 / ELECTION AND PROGRAMME · INDICATIVE
07

Assembly

One fork you choose, one clock you do not.

An indicative diagram of the City’s published structure, not a determination. The Building Official decides what a scope requires and whether any other arrangement is approved.

Indicative diagram of the Weston review electionA project is scoped, then the owner elects a review route. The City route uses City plan review and City inspections. The private route uses a pre-registered private provider for both plan review and inspections, discounting building department fees by fifty per cent, or twenty-five per cent where only inspections are private. A project cannot mix the two. Either way, other City department reviews run separately and are excluded from the statutory review clock. Separately and independently, buildings reaching twenty-five years of age require an initial safety inspection under the revised Broward programme.Scope, then theowner electsCity review andCity inspectionsPrivate review andprivate inspectionsOther departmentreviews run separatelyPermit, inspections,certification50% off building department fees; 25% if inspections only

Key

01
Scope defined
02
Review route elected — City or private
03
Private provider pre-registered, if elected
04
Other department reviews run in parallel
05
Permit issued
06
Inspections on the elected track
07
Certification, and the 25-year programme thereafter
N-01

Elect before the first application

Additional permits at a property with an open private-provider permit are issued the same way, so the first decision sets the rest of the project.

N-02

You cannot buy only the fast half

Electing private plan review requires private provider inspections too. The City states the reason: to avoid gaps or conflicts in responsibility.

N-03

The discount is on building department fees only

Both the 25% and the 50% apply to building department fees. Other city department fees are not discounted.

N-04

The statutory clock is narrower than it looks

The 5 or 10-business day period excludes utility, flood plain, planning, streets and storm water, right of way and site grade or fill review. Those queues are unchanged by the election.

N-05

The provider registers before the project does

Pre-registration with licence, firm details, qualifications and professional liability insurance comes first, and the information has to be kept current.

N-06

Twenty-five years arrives without warning

The milestone is a property fact, not a project one. It is worth knowing your building’s age before you decide what a renovation should cover.

REFERENCE 02 · WORK ON A BUILDING THAT IS BEING LOOKED AT

Preparation, not decoration

Where a safety inspection is due, the useful work is structural, envelope and services. South Florida projects by Elbaz Construction; neither property is in Weston.

01Services and appliances built in beneath a stair.
02A loft bedroom with balustrade to the space below.
Q-01Quality
SHEET Q-01 / PERFORMANCE AND QUALITY
08

Performance and quality

How we work

Eight commitments, each one a direct consequence of something this City publishes.

Completed bathroom remodel in a South Florida home
QBath and shower with a sliding glass screen and a black rail, South Florida project by Elbaz Construction.
ADU living area with stair to a loft level above
QAccessory living area with a stair to a loft level above, South Florida project by Elbaz Construction.
We check the building’s age first
Twenty-five years is now the milestone, and it changes what a sensible renovation should include.
The route is elected deliberately, once
City or private, decided on cost and programme together and settled before the first application — because every later permit follows it.
We present the discount honestly
25% or 50% on building department fees only, against the cost of the provider you are engaging. It is a calculation, not a saving.
We map the other reviews early
Utility, flood plain, planning, streets and storm water, right of way and site grade sit outside the statutory clock, so they are identified at the start.
Structure and services before finishes
On a building facing a safety inspection, that order is the difference between one project and two.
Product approvals stay with the record
A building under formal review benefits from documentation that is findable years later.
Broward practice
This is a Broward city under BORA, and submissions are prepared to that practice.
One licensed contract
Design coordination, City submittals, permitting and construction under CBC1265280, so no approval falls between two parties.
C-01Cost
SHEET C-01 / COST AND SCHEDULE VARIABLES · 9
09

Cost and timeline

What moves the number

The only percentages here are the City’s published private-provider discounts. No fee schedule was opened, and the figure that matters is current on the day you file. These are the variables that move a price.

ADU loft level looking down over the living area
CLoft level looking down over the living area, South Florida project by Elbaz Construction.
Plank flooring in a room mid fit-out with furniture staged
CPlank flooring in a room mid fit-out with furniture staged, South Florida project by Elbaz Construction.
#VariableWhy it moves the number
01Which review route you elect25% or 50% off building department fees, against the cost of the private provider. The net can go either way depending on the project.
02Whether the building is at or past twenty-five yearsIt changes what the sensible scope includes, and sometimes what the sequence has to be.
03What a safety inspection turns upStructural and electrical findings are the ones that move a budget, and they arrive as a report rather than as a choice.
04How many other department reviews applyUtility, flood plain, planning, streets and storm water, right of way and site grade each run on their own time outside the statutory clock.
05Number of tradesEach brings its own application and its own inspections, whichever track you are on.
06Structural interventionRemoving or altering structure brings engineering, and engineering brings its own review and inspection sequence.
07Product approvalsRated assemblies for openings carry their own documentation and lead times in Broward County.
08Existing conditionsWhat is behind the finishes on a house of this age is the largest genuine unknown on most renovation projects here.
09Specification levelFinishes, joinery and fittings move a renovation budget more than square footage does, once the shell is settled.
I-01Information
SHEET I-01 / QUESTION INDEX · 11
10

Question index

Questions we are asked here

Answered from the City’s own published material.

01 / Safety inspections

Is it still a forty-year inspection?

No. The City publishes the change directly: the Broward County Board of Rules and Appeals adopted new regulations for Building Inspections, formerly known as the 40-Year Inspection Program, revised to be consistent with Florida law F.S. 553.899, and "the major change to the program is that buildings will now be required to have that initial inspection at 25 years of age instead of 40."

A-06Architectural
SHEET A-06 / CONSTRUCTION STUDY
Construction study

What to establish first

Two-storey ADU interior with loft balustrade above the kitchen
STUDYTwo-storey accessory interior with a loft balustrade above the kitchen, South Florida project by Elbaz Construction.

Four questions worth answering before a drawing is commissioned. All four are answered by the City or the County, not by a contractor.

Observations

01
How old the building is
Twenty-five years is now the initial safety inspection milestone, and it changes what a sensible scope includes.
02
Which review route you want
City or private, and it has to be settled before the first application because every later permit follows it.
03
Which other department reviews apply
Utility, flood plain, planning, streets and storm water, right of way and site grade sit outside the statutory clock.
04
Whether any permit is already open at the property
An open private-provider permit determines how the next one is issued.
G-03General
SHEET G-03 / DELIVERY AND CREDENTIALS
11

Credentials and delivery

Why Elbaz Construction

Six things that are verifiable rather than asserted.

ADU open-plan living and kitchen with loft over
REFAccessory open-plan living and kitchen with a loft over, South Florida project by Elbaz Construction.
01

Licensed general contractor

CBC1265280 — certified building contractor, bonded and insured. Verifiable in the Florida DBPR licence register.

02

We cost both review routes

The discount against the provider’s fee, and the honest programme once the other department reviews are counted.

03

We check the age before the scope

On a city of 1990s houses, the twenty-five year milestone is the fact that should shape the brief.

04

We read the City’s own material

Every regulatory statement here was taken from an official City source and is attributed to it.

05

We say what we do not know

No fee schedule, no Quick Permit eligibility list and no staff names appear here, because we did not establish them from a primary source.

06

Honest photography

Every image here is a real Elbaz Construction project in South Florida, captioned for what it actually shows. None is claimed as a Weston property.

I-02Information
SHEET I-02 / CLIENT RECORD
12

Google reviews

In their words, unedited.

Reproduced verbatim from the connected Google Business Profile, including original spelling. No review schema is emitted from this page.

★★★★★

“Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.”

Mia Zafrani · Google review

★★★★★

Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze.

Lee Morali

★★★★★

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!

Shir Partush

★★★★★

From start to end- personal kind treatment, always respectful. Value for money 10/10.

roni yonani

★★★★★

Amazing job Did a total renovation of my house with them

Elie Elancry

G-04General
SHEET G-04 / ENQUIRY
13

Start here

Start a Weston project

Tell us the scope, the address and the age of the building. We will tell you what the twenty-five year programme means for it, and cost both review routes so the election is a decision rather than a default.

ADU kitchen with timber-fronted cabinets and subway tile
REFAccessory kitchen with timber-fronted cabinets and subway tile, South Florida project by Elbaz Construction.

What happens next

01
We call or email within one business day, Sunday to Friday.
02
An age and route check: where the building sits against the twenty-five year milestone, and what each review route would cost and take.
03
A site visit, then a written scope and a proposal against it — with the review path stated in it, not assumed.
Useful to have
The year the building was completed, any previous City permits, and any safety inspection correspondence you have received.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

G-05General
SHEET G-05 / END OF SET

Know the age.
Then choose the route.

Design coordination, City submittals, permitting and construction under one licensed general contractor — in the City of Weston and across Miami-Dade, Broward and Palm Beach counties.

ADU loft bedroom with balustrade to the space below
ENDLoft bedroom with balustrade to the space below, South Florida project by Elbaz Construction.