View all servicesPrivate approval and public approval are separate tracks. Your association's architectural committee answers to a recorded covenant; the building department answers to the code; a historic board answers to a preservation ordinance. None of them grants the others. We prepare and run the submissions across Miami-Dade, Broward and Palm Beach so both tracks move at once.
Miami-Dade · Broward & Palm Beach Counties
ScrollRecent projects
Twelve illustrations drawn for this guide covering the documents, the evidence, the review cycle and what to keep afterwards. Tap any image to see it larger.
ILLUSTRATION: a complete submission package.
ILLUSTRATION: the governing documents, pages shown blank.
ILLUSTRATION: existing and proposed elevations side by side.
ILLUSTRATION: a site plan with boundary and setback lines.
ILLUSTRATION: a board of mounted material samples.
ILLUSTRATION: muted heritage colour swatches.
ILLUSTRATION: a historic residential streetscape.
ILLUSTRATION: traditional and modern window profiles compared.
ILLUSTRATION: a block plan showing adjoining properties.
ILLUSTRATION: the submission and comment cycle.
ILLUSTRATION: private approval and the permit as parallel tracks.
ILLUSTRATION: the approved set, kept together.
Every image on this page is an ILLUSTRATION created for this guide. None is a photograph. None depicts a real association, board, submission or decision, and no document shown carries any real letterhead, stamp or seal. This is an approvals service with no construction in it, so there is no project photography to show and we have not invented any. The disclosure appears in each caption, in the alt text, and in the description stored with each image in the media library.
The journey
Approval work fails in two ways, and neither is design. Either the submission is incomplete, so it is deferred without ever being judged on its merits; or the owner assumes a building permit settles the matter and finds out afterwards that a recorded covenant says otherwise. This page walks the sequence in order, starting with the only reliable first step: reading what actually governs your property.
Use the stage markers to jump straight to what you care about. Nothing here is a sales pitch - it is the sequence we actually follow.
Stage 01 · Check
Four different regimes, and more than one can apply at once. Which ones you are in decides who has to say yes before anything is built.
Where your property is subject to recorded covenants, an architectural committee usually reviews exterior changes before they are made. Its powers come from those recorded documents and from the law governing associations - not from the building code - which is why an approval there settles nothing at the building department, and vice versa.

ILLUSTRATION: a bound governing document, its pages shown as blank placeholder lines.
Condominium approval is usually tighter than an HOA's, because you own the interior of a unit rather than a building. Anything touching structure, the exterior envelope, plumbing stacks, or the acoustic separation between units is generally the association's business, and often the building's engineer's as well.

ILLUSTRATION: a four-step review workflow, shown with blank stages.
A historic district is public regulation, administered by a local preservation board rather than by neighbours. Review focuses on what is visible from the public right-of-way, and on materials, profiles and proportions. Where a district applies, approval is commonly required before a building permit can be issued.

ILLUSTRATION: a historic residential streetscape of early twentieth-century houses.
Plenty of properties sit inside a historic district and an association at the same time, and both still need a building permit. The tracks are independent, so the sensible approach is to map every body that has to agree at the very start and run them in parallel rather than discovering the second one halfway through the first.

ILLUSTRATION: two parallel tracks running alongside each other.
Stage 02 · Design
Approval is far more about evidence and precedent than about taste. These four decide whether a submission is judged on its merits or deferred.
Almost every avoidable rejection comes from designing to what a neighbour said rather than to what the recorded documents say. We read the actual covenants, design guidelines and, where applicable, the preservation ordinance first, and design to them - including the parts people assume are negotiable.

ILLUSTRATION: the governing documents, which are the actual rulebook.
Historic review concentrates on the elevations the public can see. The same change is frequently straightforward at the rear and contentious at the front, and the details that decide it are often small: a window profile, a trim depth, the proportion of an opening. Materials matter, and so does how the thing reads from the pavement.

ILLUSTRATION: a slim traditional window profile compared with a bulkier modern one.
A submission that describes a colour gets deferred; one that includes the actual swatch gets decided. Physical samples, product data and clear photographs of the existing condition do more to move a submission forward than any amount of written justification.

ILLUSTRATION: a board with mounted roof, render, paint and trim samples.
The most common reason a submission does not succeed is that it was never fully judged: a missing sheet, no survey, drawings not to scale, or a notification requirement that was not met. A complete package is the cheapest possible improvement to your chances, and it is entirely within your control.

ILLUSTRATION: a complete submission package - drawings, site plan, folder and samples.
Every image on this page is an illustration created for this guide. This is an approvals service, so there is no construction photography to show, and we are not going to invent a project gallery for it. No image depicts a real association, board, submission or decision.
Project gallery 01
Ten illustrations drawn for this guide covering the documents, the evidence and the review process. None is a photograph, and none depicts a real association, board or decision - this is an approvals service, so there is no project photography to show.
Project 01, guided tour










The governing documents
ILLUSTRATION. A bound governing document open on a desk, its pages shown as blank placeholder lines. This is the actual rulebook, and it is where the work starts.
The documents, the evidence and the process behind an approval submission. It is an explainer, and it is labelled that way deliberately.
This is an approvals service - preparing and running submissions. There is no construction in it, so there is no project photography to show, and inventing a gallery for a document-and-process service would be misleading twice over.
Governing documents, site plans, existing and proposed elevations, window profiles, sample and colour boards, the complete submission package, notification, the review cycle, and keeping the approved set afterwards.
Every caption begins with the word ILLUSTRATION, every alt text ends with "(illustration)", and the description stored with each image repeats that it is not a photograph and depicts no real association or decision.
No association or board is named. No approval rate, decision outcome or review timeline is stated as fact. No municipality is described as easy or difficult. Nothing on this page promises that any particular submission will be approved.
Stage 03 · Submit
The aim is a package complete enough that the body reviewing it can reach a decision at its first sitting rather than defer it for more information.
Association, condominium board, historic preservation board, building department - and sometimes more than one at once. Every body with a say is identified before any design work begins.
Recorded covenants, design guidelines, architectural review procedures and the current forms. These are read in full, including the parts that are usually assumed rather than checked.
Submission deadlines relative to meeting dates, how many copies, whether samples are required and in what form, and whether the applicant is expected to attend.
The scheme is developed against the guidelines, with the constrained items - colour, materials, profiles, roof form, visibility from the street - settled deliberately rather than left to be argued.
A proper site plan, existing and proposed elevations shown side by side, and dimensioned details for anything the guidelines specifically govern.
Physical samples where required, product data for specified items, and photographs of the existing condition from the public street.
Some processes require adjoining owners to be notified or a notice to be posted. Where that applies it is done properly and on time, because it is a common reason for deferral.
The package goes in complete, ahead of the submission deadline for the meeting we are targeting, in the format the body actually asks for.
Where comments come back, they are answered in full and the set resubmitted. A partial answer usually costs another full review cycle.
The building permit application proceeds alongside, since the tracks are independent. Where a historic approval is required before a permit can issue, that sequence is respected.
Requirements, review times and inspection sequences are set by your local building department, and they differ across Miami-Dade, Broward and Palm Beach and between the municipalities inside them. Nothing here is a guaranteed timeline or an assurance of approval - we confirm what your address actually requires once we know it.
Stage 04 · Review
Assume at least one round of comments. Planning for the loop is what keeps an approval on the calendar; hoping to avoid it is what loses months.
Against the checklist
The package is checked item by item against the body's own requirements list before it goes anywhere. Most deferrals are procedural, and this is where they are prevented.
Quality check · Every listed item present before submission

Filed for a specific meeting
Lodged in the required format, ahead of the deadline for the meeting we are aiming at, with confirmation of receipt kept.
Quality check · Receipt confirmed and recorded

Where it is required
Any required notice to adjoining owners or posting on the property is completed within the specified window and evidenced.
Quality check · Notification completed and evidenced

Before the meeting
Some bodies review administratively first. Where questions arise at that stage, answering them before the meeting is far quicker than after it.
Quality check · Pre-meeting questions answered in advance

The decision sitting
The submission is considered. Where attendance is expected or useful, we attend and answer questions on the drawings rather than leaving them to be interpreted.
Quality check · Present to answer questions on the set

Read properly, answered fully
Comments are worked through in full. The most common mistake here is answering the easy ones and leaving one open, which costs an entire additional cycle.
Quality check · Every comment answered, none left open

Changed where it matters
The drawings and evidence are revised against the comments, with changes clearly identifiable so a reviewer can see what moved.
Quality check · Changes made legible to the reviewer

Back in for the next sitting
The revised package is resubmitted for the next available meeting, complete again rather than as a partial update.
Quality check · Resubmitted complete, not as a fragment

Read the conditions carefully
An approval frequently carries conditions - a specific colour, a material, a detail to be confirmed. Those conditions are part of the approval and are built into the construction documents.
Quality check · Conditions transcribed into the build set

Kept for good
The approved set, the decision and its conditions are recorded and handed to you. These matter at completion, at sale, and any time the work is queried later.
Quality check · Approved set and conditions handed over

Stage 05 · Decide
Balanced both ways. What is right depends on your governing documents, your board and how much the design matters to you.
What we recommend

Slower, but tidier

Which oneRun them in parallel unless the scheme is genuinely contentious. The tracks do not depend on each other, and sequencing them turns two moderate waits into one long one. Where a historic approval is a precondition of permit issue, that specific order is kept without stopping everything else.
Highest chance of approval

Sometimes worth it

Which oneBe clear-eyed about which parts of the design you actually care about. Stay inside the guidelines everywhere you are indifferent, and spend your argument on the one or two things that genuinely matter - a submission that departs everywhere reads as not having read the rules.
The only safe answer

We will not do this

Which oneWait. This is the one comparison on this site where the two options are not genuinely balanced - we include it only because people ask. We will not start work in an approval scope before the decision is in hand.
Tick whatever applies. This will not produce a price - what governs your property and how many bodies are involved decide most of it - but it will show which parts carry the cost and, more importantly, the calendar.
We do not publish figures for this work, because the same scope can differ several-fold once the existing conditions are visible. You get a real, itemised number after a site visit, in writing.
Stage 06 · Build
A short sequence assembled from the illustrations on this page, plus what the process actually involves. Almost all of the difficulty here is calendar and completeness rather than design.
Boards meet on their own schedule - commonly monthly, though yours may differ - and submissions close before the meeting. Missing a deadline by a day can mean waiting for the next sitting.
Most submissions attract at least one. It is normal, it is not a rejection, and planning for one cycle rather than none is what keeps the programme honest.
A package missing a sample or a survey does not get judged on its merits - it gets deferred. That is the most avoidable delay in the whole process.
These are other people's decisions, made against their documents. We can make the submission complete, well-evidenced and consistent with the rules. We cannot guarantee the outcome, and you should be wary of anyone who does.
An approval often comes with them - a specified colour, a particular material, a detail to confirm. They are binding, and they go into the construction documents.
Approval from a board does not mean the building department has agreed anything, and a permit does not satisfy a covenant. Both tracks have to be closed.
Where notification is required, adjoining owners will know. That is part of the process rather than a problem, and it is better handled properly than discovered late.
The approved set and its conditions matter at completion, at sale and any time the work is queried. We hand them over as a set for exactly that reason.
Only claims we can stand behind. Everything below is either a matter of public record or visible in the work shown on this page.
Elbaz Construction is a licensed general contractor, CBC1265280. Where the project proceeds to construction, permits are pulled in the company name.
Recorded covenants, design guidelines and the applicable ordinance - in full, before design, rather than working from what a neighbour reported.
Association, condominium board, historic board and building department. Discovering the second one halfway through the first is the most common way an approval calendar collapses.
Checked against the body's own requirement list before filing, because most deferrals are procedural rather than substantive.
Private approval and the building permit run alongside each other wherever the sequence allows it, which is usually.
These are other people's decisions. We will tell you honestly where a proposal is likely to face difficulty rather than take the fee and find out at the meeting.
No work in an approval scope begins before the decision and its conditions are in hand. Unapproved work outlives the people who authorised it.
The approved set, the decision and its conditions, recorded and given to you for keeping.
Filter to the part of the job you are thinking about.
Very likely yes. They are independent. A building permit means the authority is satisfied the work meets the code; it says nothing about a recorded covenant, and an association can still require you to alter or remove work that never went to its committee.
No, and the reverse of the same point. An association approves against its own governing documents; it has no authority over the building code. Where the work is permitted work, you need the permit as well.
Your closing documents usually identify the association, and recorded covenants are public. Historic district designation is held by the local authority. We establish all of it at the start rather than assuming, because more than one can apply at once.
Colour, roof material and profile, window and door style, fences and walls, driveways and hardscape, and anything visible from the street. Design guidelines are frequently far more specific than the covenant itself, and both apply.
It is different rather than simply stricter. Historic review is public regulation under an ordinance and concentrates on materials, profiles, proportions and what the public can see. An association reviews against a private covenant, which can be tighter on some things and silent on others.
Sometimes, depending on the district and the elevation. Profile and proportion frequently matter as much as material, and a rear elevation is generally an easier argument than a street-facing one. It is exactly the kind of question worth testing before the design is fixed.
Whatever that body's own list says - which is why we work from it directly. Typically a site plan, existing and proposed elevations to scale, details for governed items, physical samples, product data, photographs of the existing condition and the current forms.
Under some processes, yes - either by direct notice or by a posting on the property. Where it applies it is a requirement with its own timing, and missing it is a common reason for deferral.
It depends on the body and its meeting calendar, and we will not invent a number for you. What we can say is that boards commonly meet monthly, submissions close before the meeting, and most applications attract at least one round of comments - so plan for more than one cycle.
Usually yes, and they should. They are independent, so running them in sequence simply adds the calendars together. The exception is where a historic approval is a precondition of permit issue, and we respect that order.
Tell us at the start. It frequently has to be resolved before anything new will be considered, and it is far easier to address deliberately than to have it discovered during a review.
Not in the approval scope, and we will not do it. You can be required to alter or undo completed work, unapproved work surfaces at sale or refinance, and it damages your standing for every future submission.
They are part of the approval and they are binding. We transcribe them into the construction documents so the thing that gets built is the thing that was approved - which is what you will need to evidence later.
Because the work is real: reading the governing documents, designing to them, preparing drawings to scale, sourcing physical samples, handling notification, filing, and answering comments through however many cycles it takes.
In rough order: more than one approving body, a historic district, departing from the guidelines, needing a survey, and an incomplete first submission that costs an extra cycle.
The approved drawing set, the written decision and any conditions attached to it, recorded and handed over. Keep them permanently - they matter at completion, at sale, and any time the work is questioned.
Usually not for like-for-like maintenance, but frequently yes if anything changes - a different colour, a different material, a different profile. When in doubt it is much cheaper to ask than to repaint twice.
The approvals and their conditions run with the property and are commonly asked for during a sale. An owner who can produce the approved set and the decision has a materially easier transaction than one who cannot.
Nothing in that stage yet — try “All”.
Client experience
Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.
Adir Davidov2022-12-27 Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended! Lee Morali2022-12-27 They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them! Shir Partush2022-12-27 We hired them to renovate our investment property and they provided exceptional quality service for an affordable price! Mia Zafrani2022-10-25 Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction. carmit cohen2022-10-25 After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!! Omri B2022-10-20 I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work! roni yonani2022-10-19 Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same! Itzick Manasherov2022-10-19 Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need. Sophie Brito2022-10-19 Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend Elie Elancry2022-10-19 Amazing job Did a total renovation of my house with themGoogle rating score: 5.0 of 5, based on 12 reviews
Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Next steps
Grouped by what you are trying to do, not by category.
The wider planning and permitting scope
Other approval routes
Drawings and design for a submission
The work these approvals usually precede
Start here
Tell us your address and roughly what you want to do. The first useful step is establishing exactly who has to agree.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Every wasted month in an approval starts with a body nobody knew about or a package that was never complete. Both are avoidable on day one.