10 service categories · 100 service pages · Miami-Dade, Broward & Palm Beach
View all servicesAn accessory dwelling unit is a small building with a full building's worth of rules attached: setbacks, size caps, parking, utilities and its own inspections. We design it and build it in-house across Miami-Dade, Broward and Palm Beach, so the drawing that gets approved is the one that gets built.
Miami-Dade · Broward & Palm Beach Counties
ScrollRecent projects
Twelve frames from two completed accessory dwelling units - a single-level studio and a two-level loft unit. Tap any image to see it larger.
Studio unit: its own entrance and paved forecourt.
Loft unit: open living with the bedroom level above.
Studio unit: living, kitchen and sleeping in one vaulted space.
Loft unit: oak cabinetry with white subway tile.
Studio unit: a compact full kitchen with a dark backsplash.
Loft unit: the stair, with laundry built in beneath it.
Studio unit: full bathroom with a glass shower and skylight.
Loft unit: a patterned tile shower wall.
Studio unit: the sleeping area within the open plan.
Loft unit: the bedroom on the loft level.
Studio unit: vaulted ceiling and skylight.
Loft unit: looking down from the loft over the living space.
All photographs are of real completed Elbaz Construction work. They come from two separate accessory dwelling units and are shown as recent work, not as one project.
The journey
Most ADU projects that stall do not stall in construction. They stall at zoning, at a setback nobody measured, or at a utility that could not be extended. This page walks the whole thing in order, starting with the question that decides everything: can your lot legally take one, and at what size.
Use the stage markers to jump straight to what you care about. Nothing here is a sales pitch - it is the sequence we actually follow.
Stage 01 · Discover
Four reasons, and they lead to genuinely different buildings. Which one is yours changes the layout, the services and sometimes the answer on whether to build at all.
Multi-generational living is the most common reason we are asked for an ADU here, and it is the one where accessibility deserves attention early. A unit built for a parent should be designed for how they will move in ten years, not just today - level entry, a step-free shower and door widths are far cheaper decided now than retrofitted later.

Completed Elbaz ADU: a single-level studio with a full kitchen and its own entrance.
An ADU let long-term is a different brief from a guest suite. It needs to be genuinely self-contained - its own entrance, its own kitchen, its own laundry, and ideally its own utility metering - and it needs to survive tenants rather than guests. Local rules on minimum lease terms vary and are worth confirming before you design around an assumption.

Completed Elbaz ADU: a two-level unit with a loft bedroom above an open living area.
A unit built for visiting family that might later become a rental, an office or a place for a carer should be designed for both from the start. The expensive things to change later are the ones you cannot see: the service capacity, the drainage runs and whether the kitchen is a real kitchen or a kitchenette.

Completed Elbaz ADU: a compact full kitchen with a dark subway backsplash.
Building up rather than out is often the only way to add real space on a constrained South Florida lot. A two-level ADU puts a bedroom above the living space and keeps the footprint - and therefore the lot coverage - down, which is frequently what makes the numbers work at all.

Completed Elbaz ADU: the stair to the loft level, with laundry housed beneath it.
Stage 02 · Design
Everything else is finishes. These four decide the footprint, the services and whether the scheme is approvable at all.
A single level is simpler, cheaper per square foot and fully accessible. A two-level unit gets more habitable space out of a smaller footprint, which matters when lot coverage or setbacks are the limit. It also brings a stair, which costs floor area and rules out step-free living.

Completed Elbaz ADU, loft unit: the upper level looking down over the living space.
In a small unit, a wall costs you more than the wall. A studio feels bigger and is more flexible; a separate bedroom is easier to let and gives genuine privacy where two people live there. It is worth deciding on the actual dimensions rather than in the abstract.

Completed Elbaz ADU, studio unit: the sleeping area within the open plan.
Extending services to a second dwelling is one of the two things that most often decides feasibility. Capacity at the existing panel, where the drainage can connect, and whether the jurisdiction wants separate metering all need answering before a layout is worth drawing.

Completed Elbaz ADU, loft unit: laundry built into the space beneath the stair.
A unit for a parent, a long-term tenant and a short-stay guest justify genuinely different specifications. The cost difference is real but it is smaller than people expect, because the expensive parts of an ADU are the shell, the services and the approvals - not the tile.

Completed Elbaz ADU, loft unit: a patterned tile shower wall in the bathroom.
Every photograph in this section is real Elbaz work, from two different completed ADUs. Each caption says which unit it is; they are not one project.
Project gallery 01
Ten frames from two different accessory dwelling units we designed and built. The first six are a single-level studio; the rest are a two-level loft unit. They are separate projects and each caption says which.
Project 01, guided tour










Studio unit, outside
The single-level studio from its own paved entrance, with a black canopy over the door.
Two accessory dwelling units Elbaz designed and built, photographed at completion. They are different buildings on different lots and are presented as two projects, not one.
A single-level unit with its own entrance and paved forecourt: one open room combining living, kitchen and sleeping, a full bathroom, a vaulted ceiling with an exposed beam and a skylight, and a ductless indoor unit high on the wall.
A two-level unit: open living and kitchen below, a bedroom on a loft level above behind a black metal balustrade, a full bathroom with a patterned tile shower wall, and laundry built into the space under the stair.
Grey and light plank flooring, white shaker and oak-fronted cabinetry, white subway and patterned tile, black metal balustrade and hardware, and ductless wall units in both.
No cost, timeline, address, client or permit history appears anywhere on this page. One frame from this set was withheld because it showed a full street number.
Stage 03 · Entitle
This is where ADU projects succeed or die. Almost every constraint that will shape the building is discovered here, before a foundation is priced.
We look at the lot dimensions, the existing structures, the setbacks and what the zoning permits before drawing anything. Size caps and coverage limits usually decide the building more than taste does.
ADU rules differ sharply between municipalities here - on size, height, separation from the main house, and whether one is permitted on your lot at all. This is confirmed against your address, not assumed from a neighbouring city.
Side and rear setbacks, separation from the main house, lot coverage and impervious area are measured against the actual survey. These are what most often reshape a scheme.
Some jurisdictions require an additional parking space for an ADU, some waive it near transit, some do not require one at all. It can change the site layout significantly.
Electrical capacity at the existing panel, the drainage connection point and its fall, and water supply are all confirmed on site. A scheme that cannot be serviced is not a scheme.
A full permit set for a new dwelling: site plan, floor plans, elevations, sections and the structural, electrical, plumbing and mechanical information the jurisdiction requires.
An ADU is a new structure and needs structural design, including foundation and wind-load requirements. In South Florida the wind criteria are not a formality.
Many communities have their own rules on accessory structures, and some prohibit them outright. Boards meet on their own schedule.
Submitted to the municipal building department, or to the county where the property is unincorporated. Review comments are answered and the set resubmitted.
The permit is posted and the inspection card starts. We schedule trades around the issue date, not before it.
Requirements, review times and inspection sequences are set by your local building department, and they differ across Miami-Dade, Broward and Palm Beach and between the municipalities inside them. Nothing here is a guaranteed timeline or an assurance of approval - we confirm what your address actually requires once we know it.
Stage 04 · Build
In order, with the check that closes each phase. This is new construction, so it runs longer than a remodel and has more inspection points.
Before anything is dug
Access route agreed, the main house protected, and existing landscaping and irrigation identified. Everything has to come through your garden, so the route matters.
Quality check · Access route agreed before machinery arrives

Clearing and setting out
The footprint is cleared and set out against the approved site plan, and the setbacks are physically verified on the ground rather than trusted from the drawing.
Quality check · Setbacks measured on site against the permit set

The slab and its inspections
Excavation, any required soil work, formwork, reinforcement and the pour. This carries its own inspection before concrete is placed.
Quality check · Reinforcement inspected before the pour

Walls and roof
The structure goes up to the engineered design, including the wind-load requirements that apply here. The building becomes real very quickly at this stage.
Quality check · Structural inspection at framing

Getting it weathertight
Roof, windows, doors and the weather barrier, so the interior can proceed regardless of the afternoon storms.
Quality check · Building is weathertight before interior work starts

Electrical, plumbing, mechanical
Services are run and connected back to the main supply, and the ductless system is set. This is the last moment fittings can move without opening finished walls.
Quality check · Rough-in inspections with walls still open

Closing the walls
Insulation, then wallboard, then the surfaces are made ready for finishing. The building starts to feel like a home rather than a frame.
Quality check · Inspection passed before walls are closed

Floors, tile, cabinetry
Flooring, tiling, cabinetry, worktops and joinery. In a small unit the setting-out matters more than usual because everything is visible from everywhere.
Quality check · Setting out agreed before tiling begins

Making it work
Appliances, sanitaryware, fittings, doors and trim, then the electrical and plumbing final connections.
Quality check · Every fixing lands in blocking, not just board

Sign-off and handover
Final inspections across the trades, then the walkthrough with you. A new dwelling gets signed off before it can be occupied.
Quality check · Final inspections passed, permit closed out

Stage 05 · Inspect
Balanced both ways. What is right depends on your lot, your zoning and who is going to live in it.
Simplest and fully accessible

More space from less ground

Which oneIf the unit is for an older parent, or the lot has room, build one level. If lot coverage or setbacks are the binding constraint, or you need a real bedroom separate from the living space, the loft earns the stair.
A genuinely independent dwelling

Less space, fewer services

Which oneConfirm what your jurisdiction requires for the unit to count as a dwelling before deciding. Where a full kitchen is required, or the unit will be let, build the full kitchen - it is the difference between an ADU and a large guest room.
A new structure, designed as one

Working with what is already there

Which oneIf an existing structure has the height and the footprint, converting is usually faster and cheaper. If it does not - and many garages do not once habitable standards are applied - a purpose-built unit gives you a better building for a difference that is smaller than it first looks.
Tick whatever applies. This will not produce a price - an ADU is a whole building and no honest figure exists before the zoning answer and the utility survey - but it will show which parts carry the cost and the calendar.
We do not publish figures for this work, because the same scope can differ several-fold once the existing conditions are visible. You get a real, itemised number after a site visit, in writing.
Stage 06 · Occupy
Photographs from two completed Elbaz ADUs. Building in your own garden is closer than any other project, so it is worth knowing what the months actually look like.
An ADU is new construction, not a remodel - foundation, structure, dry-in, services, finishes and multiple inspections. It runs in months rather than weeks, and we will be specific once the scope and jurisdiction are known.
Everything reaches the build area across your property. The route is agreed before machinery arrives, and it is the part of the garden most likely to need making good afterwards.
Concentrated at demolition or clearing, foundation and framing. It settles considerably once the building is dried in and work moves inside.
You keep living in it. There will be short planned interruptions to power and water when services are connected, and we tell you in advance.
A new dwelling carries more inspections than a remodel - foundation, structure, rough-in across the trades, and finals. Someone needs to provide access.
Until the building is dried in, heavy rain moves the programme. We would rather lose a day than build wet.
A new structure near a boundary is visible to them before it is finished. Working within community hours and keeping the site tidy is part of the job.
A new dwelling has to pass its final inspections before it can be occupied. We will not hand over keys to a unit that has not been signed off.
Only claims we can stand behind. Everything below is either a matter of public record or visible in the work shown on this page.
Elbaz Construction is a licensed general contractor, CBC1265280. An ADU is a new dwelling and is permitted work; permits are pulled in the company's name.
Whether your lot can take a unit, and at what size, is confirmed against your address before drawings are produced - not discovered at plan review.
The drawings, the permit application and the build are handled by the same company, so the scheme that is approved is the one that gets built.
An ADU is a new structure and is engineered as one, including the wind criteria that apply in South Florida.
Panel capacity, drainage connection and fall are checked on site before a layout is committed, because they decide feasibility.
ADU rules differ sharply between municipalities across Miami-Dade, Broward and Palm Beach - 104 of them - and that variation is a working detail for us.
You speak to the same person from the lot review to the final walkthrough.
A new dwelling is signed off and the permit closed. An open permit follows the property and turns up when it is sold.
Filter to the part of the job you are thinking about.
That is the first question and it is answered against your specific address, because rules differ sharply between municipalities here. Lot size, setbacks, coverage, height and sometimes parking all bear on it, and some communities do not permit them at all. We check before any design work begins.
Almost every jurisdiction caps ADU size, often as a percentage of the main house or as a fixed maximum, and lot coverage frequently binds before the cap does. The honest answer comes from your survey and your zoning, not from a rule of thumb.
Sometimes, and it is worth checking. The shell already exists and coverage is usually established. But you inherit the ceiling height and structure, and bringing an existing garage up to habitable standards - including current wind requirements - can cost more than people expect.
Usually yes. Most jurisdictions define a dwelling unit as needing its own cooking facilities, and a kitchenette may not qualify. It also makes the difference between something you can let and a large guest room. We confirm your local definition first.
Yes, and it is worth designing for it explicitly: a level entry decided before the slab is poured, a step-free shower, blocking behind the tile for grab bars, and door widths that still work with a walker. All of that is far cheaper now than retrofitted.
Often, and it is frequently what makes a constrained lot work - a bedroom above without adding footprint. The constraint is ceiling height: a loft is only habitable space if it genuinely complies, and height limits also apply to the building overall.
For a new structure, effectively yes. Setbacks, coverage and easements are measured against a real survey, not estimated from a plat or an aerial image.
Some jurisdictions require an additional space for an ADU, some waive it, and some do not require one. It can meaningfully change the site layout, so it is confirmed early.
Always. It is a new dwelling, so it is fully permitted work with structural, electrical, plumbing and mechanical review, and multiple inspections through construction.
Sometimes a scheme can be reshaped to comply - that is usually the better path. Where it cannot, a variance may be possible, but it is a separate process with its own timeline and no guaranteed outcome. We will tell you honestly which situation you are in.
Many communities have their own rules on accessory structures and some prohibit them outright. Board approval is separate from the building permit and runs on the board's schedule, so it is worth starting early.
Yes. There will be short planned interruptions to power and water when services are connected, and the build area is fenced and separated.
The build footprint plus the access route to it. The route is the part most likely to need making good afterwards, and it is agreed with you before anything arrives.
Because an ADU is a whole building and two of the biggest cost drivers - what the zoning permits and whether services can reach it - are unknown until the lot is reviewed. A figure before that is a guess.
In rough order: extending electrical capacity, long drainage runs, difficult site access, a second level, required parking, and any variance process. Finishes matter far less than people assume.
After the final inspections pass and the permit is closed. A new dwelling cannot lawfully be occupied before that, and we will not hand over keys sooner.
It is a whole additional building envelope - its own roof, its own services, its own systems. Budget for it the way you budget for the main house, proportionally.
Sometimes, depending on the jurisdiction and the utility. Where it is allowed it makes letting the unit considerably simpler, and it is much cheaper decided at design than retrofitted.
Nothing in that stage yet — try “All”.
Client experience
Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.
Adir Davidov2022-12-27 Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended! Lee Morali2022-12-27 They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them! Shir Partush2022-12-27 We hired them to renovate our investment property and they provided exceptional quality service for an affordable price! Mia Zafrani2022-10-25 Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction. carmit cohen2022-10-25 After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!! Omri B2022-10-20 I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work! roni yonani2022-10-19 Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same! Itzick Manasherov2022-10-19 Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need. Sophie Brito2022-10-19 Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend Elie Elancry2022-10-19 Amazing job Did a total renovation of my house with themGoogle rating score: 5.0 of 5, based on 12 reviews
Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Next steps
Grouped by what you are trying to do, not by category.
Understand what is possible on your lot
Weigh the options against each other
Zoning, drawings and approvals
Related services we build
Start here
The more you can tell us about the lot and who the unit is for, the more useful the first conversation is.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Whether your lot can take an ADU, and at what size, decides everything that follows. That answer is the first thing we get you.