A second home
on the same lot.
Designed to be legal.

An accessory dwelling unit is a small building with a full building's worth of rules attached: setbacks, size caps, parking, utilities and its own inspections. We design it and build it in-house across Miami-Dade, Broward and Palm Beach, so the drawing that gets approved is the one that gets built.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll

Recent projects

Two ADUs we designed and built

Twelve frames from two completed accessory dwelling units - a single-level studio and a two-level loft unit. Tap any image to see it larger.

01

Studio unit: its own entrance and paved forecourt.

02

Loft unit: open living with the bedroom level above.

03

Studio unit: living, kitchen and sleeping in one vaulted space.

04

Loft unit: oak cabinetry with white subway tile.

05

Studio unit: a compact full kitchen with a dark backsplash.

06

Loft unit: the stair, with laundry built in beneath it.

07

Studio unit: full bathroom with a glass shower and skylight.

08

Loft unit: a patterned tile shower wall.

09

Studio unit: the sleeping area within the open plan.

10

Loft unit: the bedroom on the loft level.

11

Studio unit: vaulted ceiling and skylight.

12

Loft unit: looking down from the loft over the living space.

All photographs are of real completed Elbaz Construction work. They come from two separate accessory dwelling units and are shown as recent work, not as one project.

01 / 12

The journey

Six stages, lot line to keys.

Most ADU projects that stall do not stall in construction. They stall at zoning, at a setback nobody measured, or at a utility that could not be extended. This page walks the whole thing in order, starting with the question that decides everything: can your lot legally take one, and at what size.

Use the stage markers to jump straight to what you care about. Nothing here is a sales pitch - it is the sequence we actually follow.

Stage 01 · Discover

Why people build an ADU

Four reasons, and they lead to genuinely different buildings. Which one is yours changes the layout, the services and sometimes the answer on whether to build at all.

Somewhere for family

Multi-generational living is the most common reason we are asked for an ADU here, and it is the one where accessibility deserves attention early. A unit built for a parent should be designed for how they will move in ten years, not just today - level entry, a step-free shower and door widths are far cheaper decided now than retrofitted later.

  • A level or near-level entry, decided before the slab is poured
  • A step-free shower and blocking behind the tile for future grab bars
  • Door and hallway widths that still work with a walker or chair
  • Its own entrance, so the unit is genuinely independent
  • Sound separation from the main house where they share a wall
Open living area of a studio accessory dwelling unit under a vaulted ceiling with an exposed beam

Completed Elbaz ADU: a single-level studio with a full kitchen and its own entrance.

Rental income

An ADU let long-term is a different brief from a guest suite. It needs to be genuinely self-contained - its own entrance, its own kitchen, its own laundry, and ideally its own utility metering - and it needs to survive tenants rather than guests. Local rules on minimum lease terms vary and are worth confirming before you design around an assumption.

  • Genuinely separate entrance, kitchen, bathroom and laundry
  • Hard-wearing finishes chosen for turnover, not for a showroom
  • Separate or sub-metered utilities where the jurisdiction allows it
  • Storage designed in, because small units live or die on it
  • Local rules on minimum lease length confirmed before design, not after
Open living space of a two-level accessory dwelling unit with a loft bedroom above behind a black balustrade

Completed Elbaz ADU: a two-level unit with a loft bedroom above an open living area.

Guests and flexibility

A unit built for visiting family that might later become a rental, an office or a place for a carer should be designed for both from the start. The expensive things to change later are the ones you cannot see: the service capacity, the drainage runs and whether the kitchen is a real kitchen or a kitchenette.

  • A full kitchen is far easier to build now than to add later
  • Service capacity sized for the heaviest likely future use
  • A layout that works as one bedroom or as a studio
  • Outdoor space that belongs to the unit, not borrowed from the garden
Compact full kitchen in an accessory dwelling unit with white shaker fronts and a dark subway backsplash

Completed Elbaz ADU: a compact full kitchen with a dark subway backsplash.

Adding usable square footage

Building up rather than out is often the only way to add real space on a constrained South Florida lot. A two-level ADU puts a bedroom above the living space and keeps the footprint - and therefore the lot coverage - down, which is frequently what makes the numbers work at all.

  • A loft level adds bedroom space without adding footprint
  • Lot coverage and impervious area are usually the binding constraints
  • Space under the stair is real storage or a laundry, not dead volume
  • Ceiling height and roof form are worth designing, not defaulting
Stair to the loft level of an accessory dwelling unit with laundry built into the space beneath it

Completed Elbaz ADU: the stair to the loft level, with laundry housed beneath it.

Stage 02 · Design

The four decisions that set the building

Everything else is finishes. These four decide the footprint, the services and whether the scheme is approvable at all.

One level or two

A single level is simpler, cheaper per square foot and fully accessible. A two-level unit gets more habitable space out of a smaller footprint, which matters when lot coverage or setbacks are the limit. It also brings a stair, which costs floor area and rules out step-free living.

  • Single level: simplest, cheapest, and accessible throughout
  • Two level: more space from less footprint, but a stair is unavoidable
  • Lot coverage and setbacks usually decide this, not preference
  • A loft is only habitable if the ceiling height genuinely complies
View down from the loft level over the living space of a two-level accessory dwelling unit

Completed Elbaz ADU, loft unit: the upper level looking down over the living space.

Studio or separate bedroom

In a small unit, a wall costs you more than the wall. A studio feels bigger and is more flexible; a separate bedroom is easier to let and gives genuine privacy where two people live there. It is worth deciding on the actual dimensions rather than in the abstract.

  • A studio reads larger and is more adaptable
  • A separate bedroom is usually easier to let long-term
  • A loft bedroom gives separation without a full partition downstairs
  • Whichever you choose, storage has to be designed in from the start
Sleeping area within the open plan of a studio accessory dwelling unit

Completed Elbaz ADU, studio unit: the sleeping area within the open plan.

Utilities

Extending services to a second dwelling is one of the two things that most often decides feasibility. Capacity at the existing panel, where the drainage can connect, and whether the jurisdiction wants separate metering all need answering before a layout is worth drawing.

  • Existing electrical capacity checked before anything is designed
  • Drainage connection point and fall confirmed on site
  • Separate or sub-metering where the jurisdiction allows it
  • A ductless system suits a small unit and avoids duct runs
  • Its own laundry is what makes a unit genuinely independent
Laundry appliances built into the space beneath the stair of an accessory dwelling unit

Completed Elbaz ADU, loft unit: laundry built into the space beneath the stair.

Finish level

A unit for a parent, a long-term tenant and a short-stay guest justify genuinely different specifications. The cost difference is real but it is smaller than people expect, because the expensive parts of an ADU are the shell, the services and the approvals - not the tile.

  • The shell, services and approvals dominate the cost, not the finishes
  • Hard-wearing floors and surfaces pay for themselves in a let unit
  • One considered feature - a tiled shower wall - lifts a small unit
  • Fittings chosen for the actual user, especially for an older parent
Shower in an accessory dwelling unit with a patterned tile feature wall and black fittings

Completed Elbaz ADU, loft unit: a patterned tile shower wall in the bathroom.

Every photograph in this section is real Elbaz work, from two different completed ADUs. Each caption says which unit it is; they are not one project.

Stage 03 · Entitle

Zoning, drawings and the approvals that decide it

This is where ADU projects succeed or die. Almost every constraint that will shape the building is discovered here, before a foundation is priced.

Can it take one, and how big

We look at the lot dimensions, the existing structures, the setbacks and what the zoning permits before drawing anything. Size caps and coverage limits usually decide the building more than taste does.

What your jurisdiction actually allows

ADU rules differ sharply between municipalities here - on size, height, separation from the main house, and whether one is permitted on your lot at all. This is confirmed against your address, not assumed from a neighbouring city.

The lines you cannot cross

Side and rear setbacks, separation from the main house, lot coverage and impervious area are measured against the actual survey. These are what most often reshape a scheme.

Whether a space has to be provided

Some jurisdictions require an additional parking space for an ADU, some waive it near transit, some do not require one at all. It can change the site layout significantly.

Whether services can reach it

Electrical capacity at the existing panel, the drainage connection point and its fall, and water supply are all confirmed on site. A scheme that cannot be serviced is not a scheme.

Drawings a plan reviewer will accept

A full permit set for a new dwelling: site plan, floor plans, elevations, sections and the structural, electrical, plumbing and mechanical information the jurisdiction requires.

Structural design for a new building

An ADU is a new structure and needs structural design, including foundation and wind-load requirements. In South Florida the wind criteria are not a formality.

Where a board also has to agree

Many communities have their own rules on accessory structures, and some prohibit them outright. Boards meet on their own schedule.

Filed with the right authority

Submitted to the municipal building department, or to the county where the property is unincorporated. Review comments are answered and the set resubmitted.

Permit issued and construction can begin

The permit is posted and the inspection card starts. We schedule trades around the issue date, not before it.

Requirements, review times and inspection sequences are set by your local building department, and they differ across Miami-Dade, Broward and Palm Beach and between the municipalities inside them. Nothing here is a guaranteed timeline or an assurance of approval - we confirm what your address actually requires once we know it.

Stage 04 · Build

Building a second dwelling in your garden

In order, with the check that closes each phase. This is new construction, so it runs longer than a remodel and has more inspection points.

Site protection

Before anything is dug

Access route agreed, the main house protected, and existing landscaping and irrigation identified. Everything has to come through your garden, so the route matters.

Quality check · Access route agreed before machinery arrives

Completed single-level accessory dwelling unit seen from its own paved entrance with a black door canopy

Site preparation

Clearing and setting out

The footprint is cleared and set out against the approved site plan, and the setbacks are physically verified on the ground rather than trusted from the drawing.

Quality check · Setbacks measured on site against the permit set

Completed single-level accessory dwelling unit seen from its own paved entrance with a black door canopy

Foundation

The slab and its inspections

Excavation, any required soil work, formwork, reinforcement and the pour. This carries its own inspection before concrete is placed.

Quality check · Reinforcement inspected before the pour

Completed single-level accessory dwelling unit seen from its own paved entrance with a black door canopy

Structure

Walls and roof

The structure goes up to the engineered design, including the wind-load requirements that apply here. The building becomes real very quickly at this stage.

Quality check · Structural inspection at framing

Vaulted ceiling with exposed beam and skylight in a studio accessory dwelling unit

Dry-in

Getting it weathertight

Roof, windows, doors and the weather barrier, so the interior can proceed regardless of the afternoon storms.

Quality check · Building is weathertight before interior work starts

Completed single-level accessory dwelling unit seen from its own paved entrance with a black door canopy

Services rough-in

Electrical, plumbing, mechanical

Services are run and connected back to the main supply, and the ductless system is set. This is the last moment fittings can move without opening finished walls.

Quality check · Rough-in inspections with walls still open

Laundry appliances built into the space beneath the stair of an accessory dwelling unit

Insulation and board

Closing the walls

Insulation, then wallboard, then the surfaces are made ready for finishing. The building starts to feel like a home rather than a frame.

Quality check · Inspection passed before walls are closed

Open living area of a studio accessory dwelling unit under a vaulted ceiling with an exposed beam

Finishes

Floors, tile, cabinetry

Flooring, tiling, cabinetry, worktops and joinery. In a small unit the setting-out matters more than usual because everything is visible from everywhere.

Quality check · Setting out agreed before tiling begins

Shower in an accessory dwelling unit with a patterned tile feature wall and black fittings

Fittings and trim

Making it work

Appliances, sanitaryware, fittings, doors and trim, then the electrical and plumbing final connections.

Quality check · Every fixing lands in blocking, not just board

Kitchen in a two-level accessory dwelling unit with oak-fronted cabinetry and white subway tile

Final inspections

Sign-off and handover

Final inspections across the trades, then the walkthrough with you. A new dwelling gets signed off before it can be occupied.

Quality check · Final inspections passed, permit closed out

Open living space of a two-level accessory dwelling unit with a loft bedroom above behind a black balustrade

Stage 05 · Inspect

The three decisions people find hardest

Balanced both ways. What is right depends on your lot, your zoning and who is going to live in it.

Single level

Simplest and fully accessible

Open living area of a studio accessory dwelling unit under a vaulted ceiling with an exposed beam
How
One floor, no stair, everything on the entry level.
Benefits
Cheaper per square foot, faster, fully accessible, and no floor area lost to a stair.
Limits
Needs more footprint for the same habitable space, which lot coverage may not allow.
Upkeep
Simplest of the two - one roof plane, no stair.
In South Florida
Usually the right answer when the lot is generous and the unit is for a parent.

Two level with a loft

More space from less ground

Open living space of a two-level accessory dwelling unit with a loft bedroom above behind a black balustrade
How
Living and kitchen below, a bedroom on a loft level above.
Benefits
More habitable space from a smaller footprint, and genuine separation between sleeping and living.
Limits
A stair costs floor area and rules out step-free living. Ceiling height on the loft has to genuinely comply.
Upkeep
Slightly more - a stair, a balustrade and more envelope.
In South Florida
Often what makes a constrained lot work at all.

Which oneIf the unit is for an older parent, or the lot has room, build one level. If lot coverage or setbacks are the binding constraint, or you need a real bedroom separate from the living space, the loft earns the stair.

Full kitchen

A genuinely independent dwelling

Kitchen in a two-level accessory dwelling unit with oak-fronted cabinetry and white subway tile
How
Full-size range, full-height refrigerator, proper counter run and sink.
Benefits
Makes the unit genuinely self-contained, which is usually what the zoning definition of a dwelling requires and what a long-term tenant expects.
Limits
Takes more wall length and more service capacity in a small footprint.
Upkeep
Normal kitchen maintenance.
In South Florida
Generally what an ADU has to have to count as an ADU rather than a guest room.

Kitchenette

Less space, fewer services

Compact full kitchen in an accessory dwelling unit with white shaker fronts and a dark subway backsplash
How
Compact appliances, a shorter counter run, sometimes no full oven.
Benefits
Frees wall length and floor area in a very small unit, and needs less service capacity.
Limits
May not satisfy the jurisdiction's definition of a dwelling unit, and is much harder to let long-term.
Upkeep
Less to maintain, but compact appliances are often shorter-lived.
In South Florida
Worth checking against your local definition before committing - it can change what the building legally is.

Which oneConfirm what your jurisdiction requires for the unit to count as a dwelling before deciding. Where a full kitchen is required, or the unit will be let, build the full kitchen - it is the difference between an ADU and a large guest room.

Purpose-built ADU

A new structure, designed as one

Completed single-level accessory dwelling unit seen from its own paved entrance with a black door canopy
How
A new detached building designed from the ground up for the use.
Benefits
The layout, the ceiling height, the services and the orientation are all chosen rather than inherited. Fully independent from the main house.
Limits
More cost, a longer programme, and every setback and coverage rule applies to a new structure.
Upkeep
A whole additional building envelope to maintain.
In South Florida
Wind-load design is a real part of the engineering, not a formality.

Converting existing space

Working with what is already there

View down from the loft level over the living space of a two-level accessory dwelling unit
How
Converting a garage or an existing accessory structure into a dwelling.
Benefits
The shell exists, so it is usually faster and cheaper, and coverage is often already established.
Limits
You inherit the ceiling height, the footprint and the structure. Bringing an existing structure up to habitable standards can surprise on cost.
Upkeep
Similar once complete.
In South Florida
Whether the existing structure can meet current wind and habitability standards is the deciding question.

Which oneIf an existing structure has the height and the footprint, converting is usually faster and cheaper. If it does not - and many garages do not once habitable standards are applied - a purpose-built unit gives you a better building for a difference that is smaller than it first looks.

What moves the cost and the calendar

Tick whatever applies. This will not produce a price - an ADU is a whole building and no honest figure exists before the zoning answer and the utility survey - but it will show which parts carry the cost and the calendar.

What this points to

We do not publish figures for this work, because the same scope can differ several-fold once the existing conditions are visible. You get a real, itemised number after a site visit, in writing.

Stage 06 · Occupy

What building a second dwelling is actually like

Photographs from two completed Elbaz ADUs. Building in your own garden is closer than any other project, so it is worth knowing what the months actually look like.

How long it runs

An ADU is new construction, not a remodel - foundation, structure, dry-in, services, finishes and multiple inspections. It runs in months rather than weeks, and we will be specific once the scope and jurisdiction are known.

Access through your garden

Everything reaches the build area across your property. The route is agreed before machinery arrives, and it is the part of the garden most likely to need making good afterwards.

Noise

Concentrated at demolition or clearing, foundation and framing. It settles considerably once the building is dried in and work moves inside.

Your main house

You keep living in it. There will be short planned interruptions to power and water when services are connected, and we tell you in advance.

Inspectors on site

A new dwelling carries more inspections than a remodel - foundation, structure, rough-in across the trades, and finals. Someone needs to provide access.

Weather

Until the building is dried in, heavy rain moves the programme. We would rather lose a day than build wet.

Neighbours

A new structure near a boundary is visible to them before it is finished. Working within community hours and keeping the site tidy is part of the job.

Before anyone moves in

A new dwelling has to pass its final inspections before it can be occupied. We will not hand over keys to a unit that has not been signed off.

Why design-build matters most on an ADU

Only claims we can stand behind. Everything below is either a matter of public record or visible in the work shown on this page.

Licensed, bonded and insured

Elbaz Construction is a licensed general contractor, CBC1265280. An ADU is a new dwelling and is permitted work; permits are pulled in the company's name.

Zoning answered before design

Whether your lot can take a unit, and at what size, is confirmed against your address before drawings are produced - not discovered at plan review.

Design and construction in-house

The drawings, the permit application and the build are handled by the same company, so the scheme that is approved is the one that gets built.

Structural engineering coordinated

An ADU is a new structure and is engineered as one, including the wind criteria that apply in South Florida.

Utilities surveyed early

Panel capacity, drainage connection and fall are checked on site before a layout is committed, because they decide feasibility.

Local knowledge

ADU rules differ sharply between municipalities across Miami-Dade, Broward and Palm Beach - 104 of them - and that variation is a working detail for us.

One point of contact

You speak to the same person from the lot review to the final walkthrough.

Permit closed out

A new dwelling is signed off and the permit closed. An open permit follows the property and turns up when it is sold.

Questions, by stage

Filter to the part of the job you are thinking about.

Can I build an ADU on my lot?Before starting

That is the first question and it is answered against your specific address, because rules differ sharply between municipalities here. Lot size, setbacks, coverage, height and sometimes parking all bear on it, and some communities do not permit them at all. We check before any design work begins.

How big can it be?Before starting

Almost every jurisdiction caps ADU size, often as a percentage of the main house or as a fixed maximum, and lot coverage frequently binds before the cap does. The honest answer comes from your survey and your zoning, not from a rule of thumb.

Is it cheaper to convert my garage?Before starting

Sometimes, and it is worth checking. The shell already exists and coverage is usually established. But you inherit the ceiling height and structure, and bringing an existing garage up to habitable standards - including current wind requirements - can cost more than people expect.

Does it need a full kitchen?Design

Usually yes. Most jurisdictions define a dwelling unit as needing its own cooking facilities, and a kitchenette may not qualify. It also makes the difference between something you can let and a large guest room. We confirm your local definition first.

Can it be built for an older parent?Design

Yes, and it is worth designing for it explicitly: a level entry decided before the slab is poured, a step-free shower, blocking behind the tile for grab bars, and door widths that still work with a walker. All of that is far cheaper now than retrofitted.

Can I add a loft?Design

Often, and it is frequently what makes a constrained lot work - a bedroom above without adding footprint. The constraint is ceiling height: a loft is only habitable space if it genuinely complies, and height limits also apply to the building overall.

Do I need a survey?Planning

For a new structure, effectively yes. Setbacks, coverage and easements are measured against a real survey, not estimated from a plat or an aerial image.

Will it need extra parking?Planning

Some jurisdictions require an additional space for an ADU, some waive it, and some do not require one. It can meaningfully change the site layout, so it is confirmed early.

Does an ADU need a permit?Permits

Always. It is a new dwelling, so it is fully permitted work with structural, electrical, plumbing and mechanical review, and multiple inspections through construction.

What if my lot does not meet the rules?Permits

Sometimes a scheme can be reshaped to comply - that is usually the better path. Where it cannot, a variance may be possible, but it is a separate process with its own timeline and no guaranteed outcome. We will tell you honestly which situation you are in.

What about my HOA?Permits

Many communities have their own rules on accessory structures and some prohibit them outright. Board approval is separate from the building permit and runs on the board's schedule, so it is worth starting early.

Can I live in the main house during construction?Construction

Yes. There will be short planned interruptions to power and water when services are connected, and the build area is fenced and separated.

How much of my garden will be affected?Construction

The build footprint plus the access route to it. The route is the part most likely to need making good afterwards, and it is agreed with you before anything arrives.

Why can you not give me a price now?Cost

Because an ADU is a whole building and two of the biggest cost drivers - what the zoning permits and whether services can reach it - are unknown until the lot is reviewed. A figure before that is a guess.

What makes an ADU more expensive?Cost

In rough order: extending electrical capacity, long drainage runs, difficult site access, a second level, required parking, and any variance process. Finishes matter far less than people assume.

When can someone move in?Completion

After the final inspections pass and the permit is closed. A new dwelling cannot lawfully be occupied before that, and we will not hand over keys sooner.

Does an ADU need separate maintenance?Maintenance

It is a whole additional building envelope - its own roof, its own services, its own systems. Budget for it the way you budget for the main house, proportionally.

Can utilities be separately metered?Maintenance

Sometimes, depending on the jurisdiction and the utility. Where it is allowed it makes letting the unit considerably simpler, and it is much cheaper decided at design than retrofitted.

Client experience

What clients say, in their own words

Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.

Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.

Start here

Book the site visit

The more you can tell us about the lot and who the unit is for, the more useful the first conversation is.

What happens next

  1. We read it properly and come back to you, usually the same or next working day.
  2. A short call to understand the property and what is driving the project.
  3. A lot review - we check zoning, setbacks, coverage and whether services can reach the build area.
  4. A written, itemised proposal with the scope set out, including how unknowns are handled.
  5. If you go ahead, we prepare and file any permit before work starts.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Open living area of a studio accessory dwelling unit under a vaulted ceiling with an exposed beam

Start with the zoning, not the floor plan.

Whether your lot can take an ADU, and at what size, decides everything that follows. That answer is the first thing we get you.