10 service categories · 100 service pages · Miami-Dade, Broward & Palm Beach
View all servicesAnyone can draw more bedrooms. What makes a multi-family building work is everything between the dwellings: rated separation, sound, stacked services, corridors that are also escape routes, and a meter for every unit. We build ground-up across Miami-Dade, Broward and Palm Beach, with the entitlement and the permitting handled in-house.
Miami-Dade · Broward & Palm Beach Counties
ScrollRecent projects
Twelve images. Six are genuine Elbaz photographs of a ground-up build in progress - a single-family house - and six are illustrations drawn for this guide. Tap any image to see it larger; each caption says which.
PHOTOGRAPH, single-family build: structure and glazing in place.
ILLUSTRATION: a rated separation wall between two dwellings.
PHOTOGRAPH, single-family build: a double-height interior at drywall stage.
ILLUSTRATION: a vertical riser serving stacked units.
PHOTOGRAPH, single-family build: glazing installed, looking to the water.
ILLUSTRATION: a common corridor and the exit stair beyond.
PHOTOGRAPH, single-family build: the stair structure going in.
ILLUSTRATION: the floor assembly between stacked dwellings.
PHOTOGRAPH, single-family build: the lot and its seawall.
ILLUSTRATION: dwellings carried above ground-level parking.
PHOTOGRAPH, single-family build: working at height during drywall.
ILLUSTRATION: an enclosed exit stair through three levels.
This is an explainer combined with genuine photography, not a multi-family project gallery. The photographs are real Elbaz Construction ground-up construction work on a single-family build and are captioned as such - we have not relabelled them as a multi-family development. The illustrations are created for this guide and are labelled as illustrations in their captions, their alt text and the media library.
The journey
Multi-family projects almost never fail on construction. They fail earlier - on a density the zoning would not carry, a utility connection nobody confirmed, or a parking requirement that quietly deleted four units. This page walks the sequence in the order it genuinely happens, starting with the only question that matters at the beginning: what will this site actually take?
Use the stage markers to jump straight to what you care about. Nothing here is a sales pitch - it is the sequence we actually follow.
Stage 01 · Feasibility
Four common shapes, and they are genuinely different projects - different structure, different parking, different approval route.
The most common multi-family project here, and the most achievable. A small building on an infill lot behaves much like a large house until you cross the thresholds where rated separation, accessibility and multiple egress routes begin to apply - and knowing exactly where those thresholds fall is most of the early design work.

Real photograph: ground-up construction, structure and glazing in place. This is a single-family build.
Townhomes trade the corridor for a party wall. Each dwelling has its own entrance and often its own garage, so there is no common circulation to build or maintain - but the wall between each pair of homes becomes a rated, acoustically separated assembly that runs the full height of the building.

Illustration: a fire-rated separation wall between two dwelling units.
Stacking is where multi-family becomes genuinely its own discipline. Sound travels between floors, services have to stack vertically to be buildable, the corridor is also an escape route, and every dwelling needs its own metering. The plan is disciplined by all of that at once.

Illustration: a common corridor with unit entrance doors and an exit stair beyond.
Where the site cannot spare ground for both parking and building, the parking goes underneath. That brings a structural transfer level, a different construction type and a different cost base - but it is frequently the only way the numbers work on a constrained urban lot, and in flood-prone areas raising the dwellings has a second benefit.

Illustration: residential floors carried on a transfer level above ground-level parking.
Stage 02 · Design
Everything else is finishes and specification. These four decide the structure, the approval route and the cost per unit.
Density, height, setbacks, lot coverage and parking together decide the unit count, and parking is very often the binding constraint rather than density. This is established against the actual parcel before any design work, because every hour spent designing to the wrong number is wasted.

Illustration: a multi-family site with laydown area and crane position.
The assemblies between dwellings have to do two jobs: resist fire for a required period, and control sound transmission. They are related but not the same, and an assembly that satisfies one can be poor at the other. Getting both right is designed at assembly level, and it is what residents actually notice once they move in.

Illustration: a floor assembly with a resilient layer between stacked units.
In a stacked building, kitchens and bathrooms need to sit above one another so drainage, supply and ventilation can run in continuous vertical risers. A plan that ignores this is buildable only at considerable cost. It is the single most common reason an attractive early layout has to be reworked.

Illustration: a vertical riser serving stacked units on three levels.
Common circulation in a multi-family building is an escape route before it is a hallway. That governs its width, its protection, the travel distance from the furthest dwelling door, and the number of stairs. It also has to be accessible, which affects levels, door hardware and clear widths throughout.

Illustration: an enclosed exit stair running through three levels.
The photographs on this page are genuine Elbaz Construction ground-up construction photography of a single-family build, and every caption says so - we are not presenting it as a multi-family project. The multi-family-specific images are illustrations drawn for this guide and are labelled as illustrations.
Project gallery 01
Ten images. Four are genuine Elbaz photographs of a ground-up build in progress - a single-family house, and captioned as such - and six are illustrations drawn for this guide showing what is different in a multi-family building. Every caption says which it is.
Project 01, guided tour










The site
REAL PHOTOGRAPH, single-family build. A cleared waterfront lot with its seawall and the canal beyond, before the structure went up.
Genuine ground-up construction work, and the elements that are specific to building more than one dwelling. It is an explainer combined with real photography, not a multi-family project gallery.
Four frames from a ground-up build we constructed on a South Florida canal - the cleared lot and seawall, the structure and glazing, the stair going in, and a double-height interior at drywall stage.
That build is a single-family house. We have not relabelled it as multi-family, because it is not. What it honestly evidences is ground-up capability: structure, envelope, glazing, stairs and interior fit-out delivered on a real site.
Six images drawn for this guide showing rated separation between dwellings, acoustic separation between stacked units, vertical service risers, common corridors, enclosed exit stairs and per-unit metering. None is a photograph and none represents a specific project.
No cost, timeline, address, client, unit count or permit history appears anywhere on this page, and no image here is presented as a completed Elbaz multi-family development.
Stage 03 · Entitle
This is where multi-family projects are actually decided. By the time you are pricing structure, the important questions have all been answered.
Density, height, setbacks, coverage and parking are established against the actual parcel and its zoning designation, before any design work begins.
A realistic unit count with its parking provision, because parking is frequently what limits yield rather than density. This is the number the whole project is then designed to.
Water, sewer, power and stormwater capacity are confirmed with the providers. Capacity at the connection point is a genuine constraint on multi-family, not a formality.
Drainage, retention and finished floor levels are established early. In South Florida this interacts with flood zone requirements and it can reshape the site plan.
Layouts are developed with the stacking discipline, rated separation and egress built in from the first sketch rather than applied afterwards.
Structural design including the wind criteria that apply here, plus civil, mechanical, electrical and plumbing, all coordinated into one set.
Covered multi-family buildings carry accessibility design requirements for units and common areas. These are designed in from the start, because retrofitting them is expensive and sometimes impossible.
Some schemes need only a building permit; others need site plan approval, a rezoning or a variance, each with its own public process and calendar.
The full set is submitted to your municipality, or the county where unincorporated. Review comments are answered and the set resubmitted.
Impact fees, connection charges and concurrency requirements are real costs on multi-family and belong in the numbers from the beginning rather than as a surprise before permit issue.
Requirements, review times and inspection sequences are set by your local building department, and they differ across Miami-Dade, Broward and Palm Beach and between the municipalities inside them. Nothing here is a guaranteed timeline or an assurance of approval - we confirm what your address actually requires once we know it.
Stage 04 · Build
Multi-family runs the same sequence as any ground-up build, with two differences: everything repeats across units, and the assemblies between dwellings have to be right before they are covered up.
Clearing, grading, drainage
Clearing, grading, stormwater infrastructure and the underground utilities that will serve the building. Most of the first phase ends up buried and invisible.
Quality check · Drainage and services in before anything goes vertical

What carries the building
Foundations to the engineered design, including any transfer structure where the building sits over parking. Inspected before concrete is placed.
Quality check · Reinforcement inspected before the pour

Frame and floors
The structure goes up floor by floor to the engineered design, including the wind requirements that apply here. This is when the building becomes real very quickly.
Quality check · Structural inspections as each level completes

Making it weathertight
Roof, glazing, doors and the weather barrier, so interior work can proceed regardless of the afternoon storms. On a multi-level building this happens in a rolling sequence.
Quality check · Each level dried in before interior work starts

The walls and floors between dwellings
Rated separation walls and floor assemblies are built to the tested detail, with every penetration firestopped. Getting this right before it is covered is the whole job.
Quality check · Rated assemblies inspected before closing up

Stacked and metered
Risers, branch services and the metering arrangement are installed. Every penetration through a rated assembly is firestopped as it is made, not afterwards.
Quality check · Rough-in inspected with the assemblies still open

Before the floors go down
Resilient layers and ceiling isolation go in as designed. This is the part residents notice most and the part that cannot be added later at any sensible cost.
Quality check · Resilient layers verified before the floor finish

Repeated across every unit
Insulation, board, floors, joinery, tiling and fittings, repeated unit by unit. Consistency across units matters more here than in any single house.
Quality check · First unit set out as the benchmark for the rest

Corridors, stairs, accessibility
Corridors, stair enclosures, entrance doors and the accessible route are completed and checked against the approved drawings rather than approximated.
Quality check · Egress routes and clear widths verified as built

Signed off, then handed over
Final inspections across every trade, then the certificate of occupancy. On a phased scheme this can be building by building rather than all at once.
Quality check · Certificate of occupancy before anyone moves in

Stage 05 · Inspect
Balanced both ways. What is right depends on the parcel, the market and how the scheme is being funded.
No common circulation

More units per acre

Which oneLand cost usually decides this before preference does. Where the parcel is generous, townhomes are simpler to build, sell and maintain. Where it is not, stacking is what makes the site work at all - and then sound separation deserves real money rather than the minimum.
Cheap, but it eats the site

Buys back the footprint

Which oneIt is arithmetic: compare the cost of the transfer structure against the value of the units it lets you build. On an expensive urban parcel that comparison usually favours building over the parking; on a cheaper suburban one it rarely does.
Fastest and cheapest per unit

Revenue earlier, costs spread

Which oneIf it is funded, one phase is cheaper per unit and finishes sooner. Phasing is a funding and market-risk decision - a legitimate one - but plan the whole site in phase one, because the drainage and utilities have to be sized for the finished scheme either way.
Tick whatever applies. This will not produce a price - on multi-family the site and the entitlement route move the number more than the building does - but it will show which parts carry the cost and the calendar.
We do not publish figures for this work, because the same scope can differ several-fold once the existing conditions are visible. You get a real, itemised number after a site visit, in writing.
Stage 06 · Occupy
A short sequence from our ground-up construction photography, plus what the programme actually involves. Multi-family runs in years rather than months once entitlement is counted.
Construction runs in many months. Feasibility, entitlement and permitting frequently take as long again before it starts, and on a scheme needing rezoning or site plan approval, longer.
Site works, drainage and underground utilities consume a real part of the programme and produce nothing you can photograph. It is normal, and it is not slow progress.
Once the structure starts going up, visible progress is rapid. That phase is also where the weather has the most influence on the schedule.
Multi-family gets its efficiency from doing the same thing many times. The first unit is set out carefully as the benchmark, and the rest follow it.
Rated assemblies, firestopping and rough-in are all inspected before they are covered. Nothing gets closed up ahead of its inspection, whatever the programme pressure.
Until each level is dried in, heavy rain moves the programme. We would rather lose a day than build wet, and on a multi-level building that sequencing is planned.
A multi-unit site is visible and audible to a whole neighbourhood for a long time. Working within permitted hours and keeping the site clean is part of the job.
Nobody moves in before the certificate of occupancy. On a phased scheme these can come building by building, which is often what makes phasing worthwhile.
Only claims we can stand behind. Everything below is either a matter of public record or visible in the work shown on this page.
Elbaz Construction is a licensed general contractor, CBC1265280. Ground-up work is fully permitted and permits are pulled in the company name.
What the parcel will carry is established against the actual zoning and the actual utility capacity before drawings are produced.
The drawings, the permit set and the build are handled by the same company, so the scheme that is approved is the one that gets built.
Wet rooms stack and risers run straight because the plan was drawn that way, not because it was patched later.
Separation between dwellings is built to the assembly that was tested, with every penetration firestopped as it is made.
Structural, civil and MEP are coordinated into one set, including the wind criteria that apply in South Florida.
Zoning, parking, impact fees and approval routes differ sharply across the 104 municipalities of Miami-Dade, Broward and Palm Beach.
Every permit is signed off and closed. Open permits follow a property and surface at sale or refinance.
Filter to the part of the job you are thinking about.
That is a zoning question answered against the actual parcel, and parking frequently limits it before density does. Setbacks, height and coverage all bind at once. It is the first thing we establish, because designing to the wrong number wastes everything after it.
Sometimes. If the scheme fits the existing designation you may need only a building permit, or site plan approval. If it does not, a rezoning or variance is a separate public process with its own calendar and no guaranteed outcome - and you should know which situation you are in before spending on design.
Townhomes sit side by side with a rated party wall and no common circulation. Stacked flats sit above one another off a common corridor, which gets you far more units per acre but brings corridors, stairs, lifts, and sound between floors as primary design concerns.
So the drainage, supply and ventilation can run in continuous vertical risers. A plan where wet rooms wander between floors is buildable only at considerable cost, and it is the most common reason an attractive early layout has to be reworked.
With designed assemblies rather than added insulation. Between stacked units that means a floor build-up with a resilient layer and often a resiliently mounted ceiling below. It is a design decision made early - it cannot sensibly be added afterwards.
Covered multi-family buildings carry accessibility design requirements for dwellings and common areas. They shape the plan - levels, thresholds, clear widths, door hardware, bathroom dimensions - so they are designed in from the beginning rather than retrofitted.
Utility capacity, usually. A parcel can be perfectly zoned for your unit count and still have a connection point that cannot carry it. Confirming water, sewer, power and stormwater capacity early is not a formality.
Charges levied by the jurisdiction to fund the public infrastructure your development draws on. On multi-family they are substantial and payable before permit issue, so they belong in the feasibility model from the beginning rather than appearing near the end.
Frequently yes. It affects the required finished floor level and what may be built below it, and it can reshape the site plan and the parking strategy. It is established at feasibility, not during design.
Considerably more than a house. Foundations, structure at each level, rated assemblies, firestopping, rough-in across every trade, accessibility, and finals - and each one gates the work that follows it.
Often yes on a phased scheme, and it is frequently what makes phasing worth doing - earlier buildings can be occupied and generating revenue while later ones are still under construction.
Construction runs in many months. Feasibility, entitlement and permitting frequently take as long again beforehand. We will give you a realistic programme for both once we know the parcel and the approval route.
Because the first phase is largely underground - clearing, grading, drainage and utilities. It consumes real programme time and produces nothing visible. Once the structure starts, progress becomes very fast.
Not a number anyone can honestly give you before the site is understood. Building over parking, a rezoning, utility upgrades, flood requirements and unit mix all move it substantially - and the site frequently moves it more than the building does.
The things between the dwellings: rated separation, acoustic assemblies, common circulation, lifts, accessibility, and per-unit metering. Then site infrastructure and impact fees, which have no equivalent on a single house.
Certificates of occupancy, closed permits, product approvals for the envelope, and the operation and maintenance documentation for the common systems - all of which matter for the association and at refinance or sale.
Common areas, roofs, the envelope, lifts where present, and the parking structure if there is one. A multi-family building has significant shared infrastructure, and reserve planning for it should start before handover.
Sound between units, almost always - which is exactly why the separation assemblies are worth spending real money on at design stage rather than meeting the minimum and hearing about it for twenty years.
Nothing in that stage yet — try “All”.
Client experience
Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.
Adir Davidov2022-12-27 Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended! Lee Morali2022-12-27 They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them! Shir Partush2022-12-27 We hired them to renovate our investment property and they provided exceptional quality service for an affordable price! Mia Zafrani2022-10-25 Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction. carmit cohen2022-10-25 After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!! Omri B2022-10-20 I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work! roni yonani2022-10-19 Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same! Itzick Manasherov2022-10-19 Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need. Sophie Brito2022-10-19 Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend Elie Elancry2022-10-19 Amazing job Did a total renovation of my house with themGoogle rating score: 5.0 of 5, based on 12 reviews
Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Next steps
Grouped by what you are trying to do, not by category.
The wider new construction scope
Other ground-up approaches
Entitlement, drawings and approvals
Related commercial and residential work
Longer reading on building here
Start here
Tell us where the parcel is and roughly what you are trying to achieve on it. Feasibility is the useful first conversation, not design.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

What the zoning permits and what the utilities can carry decide the scheme. Every hour spent designing before those are answered is an hour at risk.