Kitchens, bathrooms, additions and whole-home work in Coral Springs — where the City publishes an operational duty that begins the moment a Hurricane Watch is named, and an open site is exactly what it applies to.
Miami-Dade · Broward & Palm Beach Counties
ScrollCoral Springs enquiries
We have your details and a member of the team will be in touch. If it is urgent, call 754-236-0675.
Everywhere in South Florida treats hurricanes as a design load: a wind speed a window has to survive, an approval number on a door. Coral Springs publishes something else as well — a duty that starts the moment the National Weather Service names a Watch, before anything has happened at all.
Citing Florida Building Code 110.13 and Section 1-8.1 (d)(33) of its own City Code, the City states that "during times designated by the National Weather Service as a Hurricane Watch, all furniture, display racks, material and similar loose objects in exposed outdoor locations shall be securely fastened to rigid construction or stored in buildings". A Watch is typically issued around 48 hours out. Read that against a renovation with a skip in the driveway, sheet material stacked by the side gate and a scaffold at the rear, and it stops being weather advice and becomes a scheduling constraint with a legal basis. It is the reason our programme treats June to November as a planning input rather than as bad luck.
Not a Warning, not landfall. The duty attaches when the National Weather Service designates a Hurricane Watch.
All loose objects in exposed outdoor locations "securely fastened to rigid construction or stored in buildings".
The City cites Florida Building Code 110.13 alongside Section 1-8.1 (d)(33) of its own City Code.
Elbaz Construction is a licensed general contractor working across Broward. Coral Springs is a planned city of mostly single-family homes built from the late 1960s onward, which means the commonest project here is a considered update to a sound house rather than a rescue.
The commonest project in the city, and the one where the trades stack up most tightly behind a single wall.
Waterproofing is inspected before tiling, which is the single most important sequencing fact in any wet room.
One permit record and one accountable contractor rather than five trades arriving in whatever order suits them.
An addition is a zoning and setback question before it is a construction one, and on a planned-city lot the setbacks are rarely generous.
Broward specifies for high wind loads. Approvals and anchorage details are reviewed rather than assumed, and they are also the work most exposed to the season.
Anything opening the envelope is planned around the calendar rather than squeezed into it.
Substrate and level decisions are made once and are visible for the life of the floor.
Structures outside the house are permitted construction — and they are also the first thing a Watch applies to.
The structural and electrical report is an engineer’s work, not ours. What we do is carry out whatever it identifies, under permit.
South Florida projects by Elbaz Construction
Both sets are Elbaz Construction projects in South Florida. Neither is represented as being in Coral Springs, and neither is presented as the same property as the other.




The glass-fronted dresser and the tall run behind the island only work because the lighting was drawn at first fix, not chosen at the end.
Where a kitchen opens into dining and living, the island sets every route through the space. It is placed on a plan before it is priced.
The veined worktop is cut from a template taken after the cabinets were set. Nothing about that step can be brought forward.
Unlacquered brassware and handles change over the first year. Owners are told that before they choose it, not afterwards.

Most of what goes wrong on a project here is a calendar problem, and the City has published enough for the calendar to be built properly.
Anything loose on an exposed site has to be fastened or stored. Planning for that is cheaper than reacting to it at 48 hours’ notice.
Where an inspection can be done virtually, a day is not lost to travel — and the City publishes how to schedule one.
Changed in 2023. On a house at that age the structural and electrical report is part of the context a remodel sits in.
The Broward County Uniform Building Permit Application was revised 14 November 2025 and no previous version is accepted from 1 December 2025.
The City states its flood zones have recently changed. What that means for a specific address is the City’s to answer, not ours.
A closed record is what a future buyer’s search finds and what an insurer asks for.
The wind zone, the water table and the wet season apply across South Florida and are planned for on every project we run. What is specific here is that Coral Springs has written the Watch duty down.

The second set is a different property and a different room, and it is here because a bathroom is where the invisible half of a remodel is easiest to explain.

Shower and vanity together, glass between them

The double vanity, twin basins under a full-width mirror

The niches, set out to the mosaic coursing

The rain head, and the band running full height

Looking out of the shower to the window beyond

Not an exhaustive list — the six decisions where this county, this climate and this City’s published rules change the answer.
The photographs on this page are Elbaz Construction projects in South Florida. None is represented as having been taken in Coral Springs.
What the work is, what kind of building it is, and how much of the envelope it opens. That last question decides where in the year it should sit.
What is actually there. On a house of this city’s typical age the surprises are in the services rather than in the structure.
Envelope work placed deliberately against June-to-November, and site storage planned so the City’s Hurricane Watch duty can be met without stopping the job.
A set complete enough to be reviewed once, on the current Broward County Uniform Building Permit Application rather than a superseded one.
Glazing and doors selected with their approvals attached, because in this county that documentation is part of the review.
All new applications are submitted online through the City’s Citizen Access portal. Complete, rather than nearly complete.
Comments answered as a set. A partial answer starts another cycle.
Booked when the work will genuinely pass, and using the City’s virtual inspection route where it applies.
Final inspections, any certificate that applies, and the documents handed over.
Every statement above is the City of Coral Springs’ published position as read on 19 August 2026 at coralsprings.gov. Municipal procedure and flood mapping both change; confirm the current requirement with the Building Department before relying on any of it. No fee is quoted here.
Five steps. The third is the one that is genuinely local, and on a Coral Springs project booked for the summer it is the one that saves the programme.
What kind of building, what the scope opens, and — because the City says its mapping has changed — what the current flood position is, established with the City rather than assumed.
Which trades it touches and how much of the envelope comes off. That decides both the inspection list and the right months to do it in.
Envelope work placed against June to November, and site storage designed so the Hurricane Watch duty can be met in an afternoon rather than a scramble.
On the current Broward County Uniform Building Permit Application, submitted online with everything attached.
Field or virtual inspections called when the work will pass, then the certificate and the documents handed over.
We do not publish prices, and we do not publish the City’s fees or timelines as if they were ours to promise. What follows is where the number and the calendar actually move.
Twenty minutes on the phone, or at the property, answers most of it. We will talk about what the scope opens, where in the year it belongs, and which questions only the Building Department can answer.

Coral Springs questions
The City publishes the duty directly, citing Florida Building Code 110.13 and Section 1-8.1 (d)(33) of the City Code: during a National Weather Service Hurricane Watch, all furniture, display racks, material and similar loose objects in exposed outdoor locations must be securely fastened to rigid construction or stored in buildings. On a live site that means the skip, the stacked material and anything loose.
Not automatically. It means the site has to be made safe on a short timescale, which is why we plan storage and staging for it from the beginning rather than improvising at 48 hours’ notice.
No — but anything that opens the roof or the envelope is worth placing deliberately. Interior work runs perfectly well through the summer. That conversation happens at programme stage, not after a start date has been promised.
The City states that they are and publishes how to schedule one. Whether your particular inspection qualifies is the Building Department’s call, and it is worth asking, because it removes a travel day.
The City states the Broward Building Safety Inspection Program "became effective in Broward County in January 2006. In 2023, the program requirements changed. The current program requires structural and electrical safety inspections for buildings 25 years old and then every ten years thereafter", per BORA Policy # 05-05. The report is an engineer’s or architect’s work, not a contractor’s.
The Broward County Uniform Building Permit Application, in its current version. The City states it was revised on 14 November 2025 and that from 1 December 2025 no previous version is accepted.
The City says so: its flood zones "have recently changed as part of an update to the flood models used by the Federal Emergency Management Agency (FEMA)", including a new vertical datum. What that means for your address is for the City and FEMA to answer, and we will help you ask.
All new permit applications are submitted online through the City’s Accela Citizen Access portal, and the same system handles fee payment, inspection scheduling and permit record searches.
Almost certainly, because a bathroom remodel involves plumbing and usually electrical work. What your specific scope requires is the Building Department’s to state, and it is a short call rather than a guess.
Yes. We assemble the submittal on the current form, file it through Accela, answer the review, and book every inspection — virtual where that applies. What we will not do is promise a review duration that is the City’s to decide.
Licence CBC1265280 — licensed, bonded and insured, so several permitted scopes on one property run under a single contract.
The City has written the Hurricane Watch duty down. Storage and staging are designed for it before the first delivery arrives.
Roof and window scopes go where they belong in the year. Interiors run through the summer without difficulty.
The Broward uniform application changed with a hard cut-over. Filing on a superseded version is an avoidable fortnight.
The City offers it. Not using it is choosing to lose a day.
Fees, flood-zone determinations and safety-inspection reports all belong to somebody else. We will tell you exactly who, and ask with you.
Financing options are available — ask and we will explain what applies to your project.
A closed permit record and the documents to prove it, which is what a future buyer’s search will find.
Reproduced verbatim from our Google Business Profile. Nothing here has been edited, merged or rewritten.
Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended!
Adir DavidovGoogle reviewThey are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them!
Lee MoraliGoogle reviewWe hired them to renovate our investment property and they provided exceptional quality service for an affordable price!
Shir PartushGoogle reviewAmazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.
Mia ZafraniGoogle reviewAfter I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!!
carmit cohenGoogle reviewI highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work!
Omri BGoogle reviewProudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Send the property address and roughly what you have in mind, and tell us when you were hoping to start. We will tell you whether that timing suits the scope and what the City will want to see.
Licensed, bonded and insured — certified building contractor CBC1265280. Serving Miami-Dade, Broward and Palm Beach.
We have your details and a member of the team will be in touch. If it is urgent, call 754-236-0675.