One contractor.
The whole house.

A whole-home renovation is not ten small projects booked back to back — it is one sequenced programme where the kitchen, the bathrooms, the floors, the electrical and the finishes all have to land in the right order. Elbaz Construction runs the design, the permitting, the trades and the inspections as a single contract, so the sequence is somebody's job rather than your problem.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll

Residential remodeling · South Florida

Renovate once, in the right order.

The most expensive way to renovate a whole house is one room at a time, over five years, with a different contractor each time and no plan connecting them.

A whole-home programme lets the work that hides inside walls — electrical, plumbing, ductwork, waterproofing — happen once, while the walls are already open, instead of being reopened for every future room. That single decision is usually worth more than any finish selection on the page.

4.8Google rating across 343 reviews
104municipalities across three counties
CBC1265280Florida general contractor licence
Licensed and insured

Florida-licensed general contractor, License No. CBC1265280. Bonded and insured.

One contract, every trade

Demolition, structure, MEP, tile, cabinetry, paint and finishes are scheduled against each other rather than booked separately.

Design decided before demolition

Layouts, selections and long-lead items are settled up front, because a decision made mid-build is the one that stops the site.

Financing available

Financing options are available through Mosaic. Applying before design lets scope and budget be set together.

  • Licensed & insuredState-licensed GC, bonded and insured
  • Design-buildDrawings and construction under one contract
  • Permits & inspectionsSubmission, review comments and closeout
  • LocalMiami-Dade · Broward · Palm Beach
  • FinancingOptions available through Mosaic

What a whole-home programme buys

The parts you never see are the parts worth doing.

Finishes are what visitors notice. Sequence, systems and consistency are what you live with — and they are only cheap to get right while everything is already open.

One disruption.
Not five.

Room-by-room renovation means living through dust, trades and lost rooms repeatedly, and paying mobilisation, protection and clean-down costs every single time. A single programme concentrates the disruption into one planned window with one protection setup and one clean handover at the end.

  • Electrical, plumbing and HVAC upgraded once, while walls and ceilings are open.
  • Flooring runs continuously between rooms instead of meeting at mismatched thresholds.
  • Door, trim, hardware and paint specifications stay consistent through the whole house.
  • One permit programme and one inspection sequence rather than several unrelated ones.

Consistency is a budget decision

Matching a tile, a trim profile or a paint sheen three years later usually means replacing more than you planned, because ranges change. Specifying the whole house at once removes that risk entirely.

Value that an appraiser can read

Permitted work, a closed-out file and current documentation are what shows up in a valuation. A run of unpermitted room refreshes generally does not.

Renovated kitchen island with seating and pendant lighting
Completed kitchen from an Elbaz Construction residential renovation.

Kitchens and bathrooms set the standard for everything else.

They are the rooms with plumbing, ventilation, waterproofing and the highest finish density, so they take the longest and set the quality bar the rest of the house is measured against. In a whole-home programme they are scheduled first for exactly that reason — the wet rooms drive the critical path, and everything drier can flex around them.

Everything at once, or in planned phases?

Both are legitimate. The answer usually comes down to whether you can vacate, how the budget is released, and whether the systems work can be isolated cleanly. We compare them properly further down.

Completed rooms

Rooms we have actually finished.

Genuine photographs from completed Elbaz Construction residential projects across South Florida — kitchens, bathrooms and living space, at handover.

Finished kitchen cabinetry and appliance housingRenovated kitchen with island, tall units and stainless appliancesCompleted kitchen island with stone worktop in a South Florida renovationFinished kitchen range and worktop runCompleted kitchen with tiled splashback and farmhouse sinkCompleted bathroom with tiled shower and dark vanityRenovated bathroom double vanity with storage drawers
01

Finished kitchen cabinetry and appliance housing

These are real completed rooms from Elbaz Construction projects, photographed after handover. They are drawn from several different homes rather than one single whole-home programme, so read them as a record of finish quality and workmanship rather than as one property. Captions describe only what is visible.

Renovated kitchen with island, tall units and stainless appliances
Renovated kitchen with island, tall units and stainless appliances
Completed kitchen island with stone worktop in a South Florida renovation
Completed kitchen island with stone worktop in a South Florida renovation
Finished kitchen range and worktop run
Finished kitchen range and worktop run
Completed kitchen with tiled splashback and farmhouse sink
Completed kitchen with tiled splashback and farmhouse sink
Completed bathroom with tiled shower and dark vanity
Completed bathroom with tiled shower and dark vanity
Renovated bathroom double vanity with storage drawers
Renovated bathroom double vanity with storage drawers

How the programme runs

Sequence is the whole job.

Project record

Scope
Whole-home renovation, occupied or vacated
Typically includes
Kitchen · bathrooms · flooring · electrical · plumbing · HVAC · interior doors and trim · paint · lighting
Decided first
Layout changes, structural openings, selections with long lead times
Runs last
Flooring, trim, paint and final fit-out, in that order
Not included by default
Roofing, windows, exterior envelope and site work — quoted separately when the house needs them
01

Survey and scope

Every room is measured and recorded, the electrical panel and service capacity are checked, and the existing plumbing and mechanical runs are traced. The scope is written down before anything is priced, because a whole-home number attached to a vague scope is not a number.

02

Design and selections

Layouts, elevations and a full selections schedule — tile, cabinetry, fixtures, hardware, paint — are settled before demolition. Long-lead items are identified and ordered early, because cabinetry and specialist tile are what most often hold a finished house hostage.

03

Rough-in while it is open

Electrical, plumbing, ductwork, waterproofing and any framing changes all happen in one window, then get inspected. This is the phase that justifies doing the whole house at once.

04

Finish, in order

Drywall, then tile, then cabinetry and counters, then flooring, then trim and paint, then fixtures and hardware. The order matters: reversing any two of those creates rework that nobody budgets for.

Want a scope written down before you hear a number?

That is the order we work in. A measured scope first, then a price attached to it, then a schedule attached to both.

Scope options

Three ways a whole-home programme gets scoped.

These are planning tiers for conversation, not packages. Which one fits depends on the condition of the house's systems as much as on taste.

Refresh scope

Surfaces and fittings, systems left alone

For a structurally sound house with recent systems that simply looks tired.

  • Paint throughout, interior doors and trim
  • Flooring replacement across the main level
  • Kitchen and bathroom fixture and fitting replacement
  • Lighting and switch/outlet refresh
  • Cabinet refacing or new doors where carcasses are sound
  • Minor drywall repair and levelling
  • Final clean and handover

Full renovation

Rooms rebuilt, systems brought up to date

The common whole-home scope: rooms are rebuilt properly and the services behind them are renewed.

  • Everything in Refresh scope
  • Kitchen and bathrooms stripped and rebuilt
  • Electrical rewiring and panel upgrade where required
  • Plumbing supply and waste replacement in wet areas
  • HVAC replacement or re-zoning
  • Waterproofing to current standards in every wet area
  • Permit programme and inspections through closeout

Comprehensive

Layout, structure and envelope as well

When the plan itself is the problem, not just its condition.

  • Everything in Full renovation
  • Wall removals and structural openings with engineering
  • Kitchen and living areas re-planned rather than replaced
  • Impact window and door replacement
  • Insulation and air-sealing upgrades
  • Interior joinery and built-in storage
  • Exterior finishes and landscape reinstatement

Add-ons and upgrades, priced individually

  • Structural engineering for wall removals and new openings
  • Electrical service upgrade where the existing panel cannot carry the new load
  • Whole-home water treatment or repiping
  • Smart home, security and network infrastructure
  • Acoustic treatment between floors or bedrooms
  • Custom joinery and built-in storage
  • Temporary accommodation coordination during the loudest phase
  • Furniture storage and protected staging

Scope tiers exist so the conversation can start somewhere sensible. What your house actually needs is decided by what the survey finds behind the walls, not by which column reads best.

Room by room

What finished looks like.

Completed rooms from Elbaz Construction residential projects. Different homes, same standard of finish.

Completed bathroom vanity, mirror and lighting
01

Cabinetry and joinery

Runs are set out to the room rather than to a catalogue, so end panels land on a wall and not halfway across one, and the gaps at either end of a run match.

Renovated bathroom with painted vanity and window
02

Worktops and junctions

Templating happens after the carcasses are fixed and levelled. Joints are placed where they are least visible, and the upstand meets the wall the same way along the whole run.

Completed bathroom with patterned floor tiling
03

Tiling and setting out

Tile layout is drawn before the first sheet is cut, so the cuts land in corners and behind fittings instead of down the middle of the most visible wall.

Finished shower enclosure with recessed niche and black fittings
04

Wet areas and waterproofing

Waterproofing goes in as a system rather than a product: substrate, membrane, corners, penetrations and falls all specified together and checked before anything is covered.

Completed bathroom with shower, toilet and tiled walls
05

Lighting and switching

Lighting is designed with the layout, so the switching makes sense from the door you actually walk in through and there is light where you work, not only in the middle of the ceiling.

Renovated bathroom with round mirror and twin basins
06

Finishes and closeout

The last ten per cent is where a renovation is judged. Doors are adjusted, silicone lines are cut straight, sockets sit level, and the snag list is worked through before the site is handed back.

Each frame is a genuine completed Elbaz Construction room. They come from more than one project, which is why they are presented individually rather than as a single walk-through.

Process and client experience

Ten stages, and what each one asks of you.

A whole-home renovation is long. Knowing the shape of it — and where your decisions actually bite — is worth as much as knowing the number.

Initial consultation

We walk the whole house with you and separate what you want from what the building needs.

What to expect

About ninety minutes. Bring anything you have: a survey, old permits, an appraisal, inspiration.

Your decision

Whether to proceed to a measured survey and scope.

Measured survey

Every room measured, services traced, panel and capacity checked, existing conditions photographed.

QC · Existing conditions are recorded before anything is designed.
What to expect

Access to the attic, panel, water heater and every room.

Your decision

Nothing yet — this stage is fact-finding.

Scope and design

Layouts, elevations and a written scope covering every room and every system.

What to expect

Several rounds of review. This is where the project is really decided.

Your decision

Layout changes, which systems are renewed, what stays.

Selections schedule

Tile, cabinetry, counters, fixtures, hardware, paint and lighting chosen and scheduled against lead times.

QC · Long-lead items are identified and ordered before demolition.
What to expect

Homework. Selections are the single most common cause of avoidable delay.

Your decision

Every finish in the house.

Estimate and proposal

An itemised proposal against the written scope, with allowances stated as allowances.

What to expect

A document you can compare like for like against another contractor's.

Your decision

Scope trade-offs, allowance levels, financing.

Permits

Applications assembled and submitted for the work that requires them; plan-review comments answered.

QC · Applications are checked for completeness before submission.
What to expect

Waiting. Review timelines belong to the building department.

Your decision

Nothing, unless a comment changes something you chose.

Protection and demolition

Floors, stairs, HVAC returns and anything staying are protected; then demolition, in sequence.

What to expect

The loudest, dustiest week. Dust barriers and negative-air where it makes sense.

Your decision

Whether you are staying in the house.

Rough-in and inspections

Framing changes, electrical, plumbing, ductwork and waterproofing — then inspected before anything closes.

QC · Nothing is closed up before it is inspected and photographed.
What to expect

Slower than it looks. This is the phase that decides how the house performs.

Your decision

Final positions for outlets, lighting and plumbing.

Finish sequence

Drywall, tile, cabinetry, counters, flooring, trim, paint, then fixtures and hardware.

What to expect

Visible progress every week, and the part most people enjoy.

Your decision

Only late confirmations — the decisions were made at stage 04.

Punch list and closeout

We walk every room with you, complete the punch list, and close the permits out.

QC · Nothing is called complete until the permit is closed.
What to expect

A finished list, warranty documentation and a closed permit file.

Your decision

Sign-off, once the list is genuinely finished.

We do not promise approval or inspection dates for any building department.

Planning and risk reduction

Most whole-home overruns are decided before demolition.

On a project this size, the expensive surprises are almost never the finishes. They are the things nobody checked while it was still cheap to check them.

The paperwork sequence, in order

  1. Measured existing conditionsRoom dimensions, ceiling heights, service runs and levels recorded on site rather than assumed.
  2. Electrical capacity checkPanel size, service capacity and circuit availability confirmed against the proposed load.
  3. Plumbing and drainage surveySupply material, waste routes and vent locations traced before layouts are fixed.
  4. Structural review where walls moveAny wall being removed or opened assessed, and engineered where it is load-bearing.
  5. Written scopeA room-by-room scope both sides agree on before pricing.
  6. Selections scheduleEvery finish chosen and checked against lead time before demolition starts.
  7. Permit applicationsAssembled complete; incomplete submissions are the most common self-inflicted delay.
  8. Protection planWhat is being kept, how it is protected, and where dust barriers go.
  9. Inspection sequenceRough electrical, plumbing, framing and insulation scheduled so trades are not waiting.
  10. Change managementAny change priced and documented in writing before it is built.
  11. Progressive documentationServices photographed before they are covered, kept with the job file.
  12. CloseoutFinal inspections passed, permits closed, documentation handed over.

Why each step exists

Why capacity is checked first

Discovering mid-build that the panel cannot carry the new kitchen is a redesign. Discovering it during survey is a line item.

Why selections come before demolition

A cabinetry order placed late holds a finished house empty for weeks. Nothing else on the schedule can absorb that.

Why scope is written down

Two whole-home proposals can differ by an entire rewire. A written scope is what makes them comparable.

Why we photograph the rough-in

Once drywall closes, the only record of what is behind it is the one somebody took.

What we will not tell you

We will not promise a building-department approval date. We will not quote a whole-home number before there is a written scope attached to it. And we will not tell you a house needs a full rewire before anyone has looked in the panel.

Cost and timeline transparency

What actually moves a whole-home number.

We do not publish whole-home prices, because the same square footage can differ by a factor of three depending on what is behind the walls and how far the finishes go.

Systems condition

Whether the electrical, plumbing and HVAC are being renewed or left alone. The single largest swing on most whole-home projects.

Scope of wet rooms

How many kitchens and bathrooms, and whether they are refitted or fully rebuilt with new waterproofing.

Layout changes

Removing or moving walls brings in engineering, structural work and knock-on effects for services and finishes.

Finish level

The gap between a well-built standard specification and a high-end one is real, and it compounds across an entire house.

Flooring extent

Whole-floor continuity costs more than patching room by room, and levelling an old slab can cost more than the floor.

Occupied or vacant

Working around a family means phasing, protection and lost efficiency; an empty house is faster and cheaper per week.

Existing conditions

What is found once walls open: old wiring, failed waterproofing, undersized framing, prior unpermitted work.

Permit scope

How much of the work is permittable, and how many trades' inspections have to be sequenced.

Long-lead selections

Cabinetry, specialist tile and imported fixtures are ordered against schedules, not pulled off a shelf.

Site access and storage

Where materials land, where waste goes, and whether furniture needs storing off site.

Low Moderate High Very high

Typical influence on a South Florida whole-home renovation budget. General guidance for planning conversations — not a quote.

What actually moves the schedule

  • Selections. Late decisions on cabinetry and tile stop the site more often than anything else.
  • Rough-in inspections, which have to pass before anything can be closed up.
  • Long-lead orders placed after design rather than during it.
  • Discoveries behind walls that change the scope mid-programme.
  • Whether the house is occupied, which caps how much can happen at once.

Questions worth asking any contractor

  • Is this scope written room by room, or is it a lump sum?
  • Which systems are being renewed and which are being left in place?
  • What is an allowance here, and what is a fixed price?
  • Who holds the selections schedule and the lead times?
  • How are change orders priced and documented before they are built?
  • What is the inspection sequence, and who attends?
  • What happens to the permits at the end?

How to prepare for an accurate estimate

  • Walk the house and mark what must change versus what you would like to change.
  • Find the survey, prior permits and any original plans.
  • Note anything already known to be non-standard — additions, prior unpermitted work, recurring leaks.
  • Decide honestly whether you can vacate, and for how long.
  • Set a finish level per room; not every room needs the same one.
  • Sort financing in principle before design so scope and budget move together.

Estimates follow scope, not the other way round.

We price against a drawn scope, with allowances stated as allowances. That is what makes a proposal comparable to anyone else’s.

How the programme is ordered

The sequence, drawn.

Whole-home renovation is a scheduling problem before it is a building problem. Reverse any two of these bands and you create rework that nobody has budgeted for.

Whole-home renovation sequenceSix stacked bands showing the order a whole-home renovation runs in: survey and scope, design and selections, demolition, rough-in and inspection, finishes, then closeout. The first three are planning and preparation; the last three are execution.SURVEY AND SCOPEMeasured conditions, systems capacity, written scopeDESIGN AND SELECTIONSLayouts, elevations, every finish chosen against lead timesPERMITS AND PROTECTIONApplications submitted, house protected, staging plannedDEMOLITION AND ROUGH-INStructure, electrical, plumbing, ductwork, waterproofing — then inspectedFINISH SEQUENCEDrywall, tile, cabinetry, flooring, trim, paint, fixturesPUNCH LIST AND CLOSEOUTSnagging completed, permits closed, documentation handed overPROJECT ORDER

Diagram drawn by Elbaz Construction for this page. Illustrative of a typical programme; every house sequences slightly differently.

Every band has to finish before the next starts

  • Survey and scope. Nothing is priced before the house has been measured and the systems checked.
  • Design and selections. Layouts and every finish settled, with long-lead items identified and ordered.
  • Permits and protection. Applications submitted complete; everything staying is protected before anything is removed.
  • Demolition and rough-in. The one window where services are open. Everything hidden happens here, and gets inspected.
  • Finish sequence. Strictly ordered: drywall, tile, cabinetry, flooring, trim, paint, then fixtures.
  • Punch list and closeout. The list is finished rather than declared finished, and the permits are formally closed.
Where whole-home projects go wrong

Almost always at band two. A programme that starts demolition with selections still open will stop later, with an empty house and a cabinetry lead time nobody can compress.

Comparison, mistakes and buyer guide

Phased or all at once — and how not to get it wrong.

Comprehensive whole-home renovation compared with a phased, room-by-room approach

Comprehensive whole-home renovation compared with a phased, room-by-room approach. General guidance for South Florida.
FactorAll at oncePhased over time
DisruptionOne concentrated window; the house is largely unusable during it.Repeated smaller windows; you keep most of the house, for longer overall.
Systems workElectrical, plumbing and HVAC renewed once while everything is open.Services reopened for each phase, or left mismatched between rooms.
Cost per roomLower — one mobilisation, one protection setup, shared trade visits.Higher per room, but spread across budget cycles.
Design consistencySpecified once; finishes and details match throughout.Drifts as ranges change and tastes move between phases.
Living arrangementsUsually needs vacating for at least the noisiest phase.Generally possible to stay throughout.
Total elapsed timeShorter overall.Considerably longer from first phase to last.
Best whenThe house is empty or you can vacate, and funding is available in one programme.Funding is released over time, or the house genuinely cannot be vacated.

Keeping existing kitchen or bathroom carcasses versus full replacement

Keeping existing kitchen or bathroom carcasses versus full replacement.
FactorKeep and refaceFull replacement
Makes sense whenCarcasses are sound, square and the layout works.Layout changes, water damage, or units past their life.
LimitsYou inherit the existing layout and internal dimensions.None beyond budget and structure.
ServicesExisting plumbing and electrical positions usually stay.Everything can be repositioned while walls are open.
RiskHidden damage found after the new doors are ordered.Fewer surprises; more of the cost is known up front.

The mistakes that cost the most

  1. Starting demolition with selections openThe single most common whole-home mistake. The site catches up with the decisions, then stops.
  2. Renewing finishes over tired systemsNew tile over failed waterproofing, or a new kitchen on an overloaded panel, is money spent twice.
  3. Comparing proposals with different scopesOne whole-home number may include a rewire and the other may not. Compare the scope, not the total.
  4. Underestimating living through itFamilies routinely overestimate what they can tolerate for how long. Decide honestly at planning, not week three.
  5. Leaving flooring to the end without planning itContinuous flooring needs level substrate and a run-direction decision early, not after cabinetry lands.
  6. Treating the punch list as optionalThe last two per cent is what you look at every day for a decade.
  7. Changing layout after rough-inMoving a wall after services are in touches structure, MEP and inspections at once.
  8. Skipping documentationOnce the drywall is on, the only record of what is behind it is the one somebody took.

Buyer checklist

Prepare before you call

Ask at the first meeting

Expect from a qualified contractor

Tick these off as you go — nothing is stored or sent, the list is here purely so you can use it while you compare contractors.

What living through it is like

The honest version of a whole-home renovation.

Completed kitchen sink run beneath a window
Completed room from an Elbaz Construction residential project.

The loud phase is short and identifiable

Demolition and rough-in are the weeks with noise, dust and no usable kitchen. Everything after that is quieter and more predictable, and it is worth planning your life around that shape.

Preparation you can do

Empty what is being worked on, store anything fragile off site, decide where pets and home offices go, and agree parking and skip placement before day one.

How communication runs

One point of contact, a known weekly sequence, and notice before anything that interrupts power or water. Questions go to the person running your job.

Quality control, not just inspection

Waterproofing, services and structural connections are checked and photographed before they are covered. Building-department inspections confirm the work; they are not the only time anybody looks.

What completion means

A finished punch list, warranty documentation, closed permits, and a house that is genuinely clean rather than swept.

Questions, answered

Whole-home renovation in South Florida.

  • Sometimes, but it depends on the scope and on your household. If the kitchen and all bathrooms are being rebuilt at once, staying is usually impractical. If the work can be zoned so one bathroom and a temporary kitchen stay live, it can work.

    We plan this at scope stage rather than after demolition, because it changes sequencing, protection and cost.

  • By zoning the house so a working bathroom and a temporary kitchen are always available, and by grouping the noisy, dusty work into defined windows.

    Phasing costs more overall — more mobilisations, more protection, more lost efficiency — but it is a legitimate trade when vacating is not realistic.

  • Permits and inspections, protection and waste removal, the selections you have not chosen yet, and a genuine contingency for what is found behind walls.

    On older South Florida houses the common discoveries are outdated wiring, failed waterproofing in wet areas, and prior work that was never permitted.

  • It depends far more on scope and selections than on square footage. Design and selections routinely take longer than owners expect, and construction cannot outrun them.

    We do not quote building-department review times, because no contractor controls them.

  • Not for everything. Paint, flooring and like-for-like fittings generally do not require a permit; electrical, plumbing, mechanical, structural changes and most kitchen and bathroom rebuilds do.

    We assemble and submit the applications, answer plan-review comments, schedule the inspections and close the permits out.

  • Only if the survey says so. It comes down to the existing service capacity, the panel's condition and availability of circuits, and what the new kitchen, HVAC and any added rooms will draw.

    It is checked during survey precisely so the answer arrives before design rather than during rough-in.

  • You do, from a schedule we prepare with real lead times attached. We will tell you where a selection creates a technical problem — a tile that needs a different substrate, a fixture that will not fit the rough-in — but the choices are yours.

  • If the carcasses are sound and square and the layout is staying, refacing or replacing doors and drawer fronts is a legitimate way to redirect budget elsewhere.

    If the layout is changing or there is water damage, replacement is usually the cheaper answer once everything is counted.

  • It gets priced and documented in writing before it is built, and you decide. Discoveries behind walls are normal on older houses; unpriced verbal changes are how projects end in disputes.

  • Yes — financing options are available through Mosaic. Sorting it in principle before design means scope and budget can be decided together rather than the scope being cut late.

  • Yes. Design, permitting, construction and inspections run in-house under one contract, so nobody is waiting on a handoff between two companies.

  • Manufacturer warranties apply to installed products, with documentation handed over at closeout. Workmanship coverage is set out in your contract — ask for it in writing and read what it covers before you sign, with us or anyone else.

Why Elbaz Construction

Verified, and nothing more than that.

  • Licensed general contractorFlorida-licensed general contractor, License No. CBC1265280. Bonded and insured. The number is on every page of this site so you can verify it.
  • One contract for the whole houseDesign, permitting, every trade and the inspections run under one agreement — the sequencing is our problem, not yours.
  • Scope written before priceA room-by-room scope comes first, then a number attached to it. That is what makes a proposal comparable.
  • Local knowledgeWorking across 104 municipalities in Miami-Dade, Broward and Palm Beach counties. Each has its own review process and its own habits.
  • CommunicationOne point of contact from first conversation through closeout. Notice before anything that affects power, water or access.
  • Quality control and closeoutServices and waterproofing photographed before they are covered, a punch list finished rather than declared finished, and permits formally closed.
  • Reviews you can readA 4.8 average across 343 Google reviews, published in full on Google.
  • FinancingFinancing options are available through Mosaic. Available before design so budget and scope can be settled together.

What homeowners say

Reviews, unedited.

Published on Google, quoted here word for word. We do not shorten, merge or rewrite a review.

4.8Average across 343 Google reviews
Read all 343 reviews on Google
Great experience! The team was professional, efficient, and delivered high-quality work on time. They communicated clearly throughout the project and exceeded our expectations. Highly recommend for any construction needs!
AndrewGoogle review
Elbaz Construction provided excellent service and outstanding craftsmanship. The team was professional and attentive to our needs. We’re extremely satisfied with the results!
Damian NunezGoogle review
I am very grateful that Ashley took on my project . Now every morning I run to my beautiful kitchen because it is more than I expected. Thank you Ashley for your efforts, understanding and patience
RIo NormanGoogle review
Elbaz Construction provided excellent service and great customer service. also provide the right team to get the job done. Any project or style that’s needed it. Elbaz Construction is the place to call. Thank you!
Jaee RodriguezGoogle review

Related reading and services

Schedule a Consultation (754) 236-0675

Start here

Get the scope written down first.

One walk-through, then a measured scope you can actually price. No number before there is something to attach it to.

What happens after you send this

  1. We call you back to understand the house and what has to change.
  2. We walk every room, measure, and check the panel, plumbing and mechanical.
  3. You get a written room-by-room scope and a selections schedule with real lead times.
  4. An itemised proposal follows the scope — with allowances stated as allowances.

Worth having to hand

  • Your property survey
  • Any prior permits or original plans
  • A must-change versus want-to-change list
  • Whether you can vacate, and for how long
  • A finish level per room

Licensed, bonded and insured · License No. CBC1265280

Design, permitting and construction under one contract

Serving Miami-Dade, Broward and Palm Beach counties

Sun–Fri 7am–7pm · Saturday closed

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team. We will call you back to arrange the site visit. If it is urgent, call (754) 236-0675.