They are worth reading.

Most cities tell you the rules. North Miami also tells you the workload: how many applications it took last year, how many inspections it ran, how many people do it, and what it is carrying forward. That is a statutory report, not marketing, and it is the most useful thing published about this department. We build to it, as a licensed general contractor working across Miami-Dade, Broward and Palm Beach.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll

Start here

Start with the address

Almost everything on this page turns on the building — how old it is, and which of the City's named disciplines your plans would wake up. Tell us the address and what you are hoping to do, and the first conversation is a useful one.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Recent projects

Recent Elbaz Construction work

Eight frames of completed work across South Florida — bathrooms, showers, flooring and two accessory dwelling units. Tap any image to see it larger.

01

A completed bathroom with a freestanding tub and twin floating basins.

02

A completed primary bathroom with a vaulted ceiling and a glass-enclosed shower.

03

A curbless walk-in shower with a built-in bench and a black rain head.

04

A navy blue vanity with a stone top and an undermount basin.

05

A walk-in shower with a textured feature tile column and twin niches.

06

The view down from the loft level of a two-level accessory dwelling unit.

07

The seating side of a waterfall kitchen island, with three stools.

08

A curbless walk-in shower in stacked plank tile behind frameless glass.

All photographs are of real completed Elbaz Construction work. They come from several separate properties across South Florida and are shown as recent work. None of them was taken in North Miami, and none is captioned as though it were.

01 / 12

The journey

Six stages, from your address to a closed permit.

North Miami runs a full-service building department — building, roofing, electrical, mechanical, structural, plumbing, re-occupancy and 30-year recertification — and publishes both what it does and how much of it. This page walks the order those things reach you: what the City knows about the building, what your scope triggers, how it is filed, how the week is shaped by inspection days, the decisions that are genuinely yours, and how a permit is closed.

Use the stage markers to jump to the part you are stuck on. Nothing here is a promise about your address — the Building Department decides that — and nothing here is a timeline we invented. Where the City publishes a number, it is quoted. Where its own report leaves a field blank, this page leaves it blank too.

Stage 01 · Property

What the City already knows about your building

Four things about a North Miami property shape the job before a drawing exists. Two of them are about the building's age, and one is about a department whose workload is a matter of public record.

A department that publishes its workload

Florida Statute 553.80 requires a local government charging permit fees to publish a Building Permit and Inspection Utilization Report and to update it before adjusting its fee schedule. North Miami's is filled in: 2,906 applications submitted, 2,698 permits issued, 7,067 inspections and re-inspections requested, and 15 personnel dedicated to enforcement. Divide those how you like — the useful reading is that this is a working department with real volume, and that its capacity is published rather than guessed at.

  • 2,906 applications submitted, 2,698 permits issued (FY 2024-25)
  • 7,067 inspections and re-inspections requested in the same year
  • 15 personnel dedicated to enforcement
  • Published because F.S. 553.80 requires it, not as a courtesy
Illustration of luxury vinyl plank being laid in a staggered pattern along a corridor (illustration)

Illustration, not a photograph: luxury vinyl plank being laid in a staggered pattern, drawn to show the layer under a finished floor. It is not a photograph of a North Miami property.

And what it is carrying forward

The same report gives the money: $6,740,253 in fees collected, against $4,487,898 of personnel services and $7,695,136 of operating expenditures — and a carried-forward balance of $12,807,848. That last figure is close to twice a year's fee income. The City publishes the number and not an explanation of it, so neither do we. What it tells an owner is that this is a well-resourced department, and that the statute's requirement to publish before adjusting fees is doing something.

  • Fees collected: $6,740,253
  • Carried forward: $12,807,848
  • Personnel services $4,487,898; operating expenditures $7,695,136
  • The statute ties the report to any change in the fee schedule
Completed bathroom with a freestanding tub and a pair of floating basins on a long vanity ledge

A completed Elbaz Construction bathroom with a freestanding tub and a pair of floating basins on a long vanity ledge. A South Florida project, not a North Miami one.

30-year recertification

North Miami lists 30-year recertification among the inspection services its Building Department provides, alongside building, roofing, electrical, mechanical, structural, plumbing and re-occupancy. For an owner planning work on an older building, that is worth knowing before the scope is set: recertification is a separate process with its own findings, and discovering it in the middle of a renovation is worse than planning around it. Whether a specific building is due is a question for the City, and we do not answer it here.

  • 30-year recertification is named among the department's services
  • It sits alongside re-occupancy inspections in the same list
  • It is a separate process from your building permit
  • Confirm the building's status with the City before setting a scope
Double-height interior under construction with full-height glazing and drywall going up

Real Elbaz Construction work: a double-height interior under construction with full-height glazing installed. A South Florida site, not a North Miami one.

Miami-Dade, and the HVHZ

North Miami is in Miami-Dade County, which sits inside the Florida Building Code's High-Velocity Hurricane Zone — a designation covering Miami-Dade and Broward and nowhere else in the state. It governs the outside of the building: roofing, windows, doors and how they are attached. In practice that means product approval documentation belongs in the submission rather than being produced later when an inspector asks for it.

  • The HVHZ covers Miami-Dade and Broward counties only
  • It bites hardest on roof, glazing, openings and their fixings
  • Product approval paperwork is part of the submission
  • The City inspects structural work as its own named discipline
Primary bathroom with a vaulted ceiling, long vanity and glass-enclosed walk-in shower

A completed Elbaz Construction primary bathroom with a vaulted ceiling, a long vanity and a glass-enclosed shower. Not photographed in North Miami.

Stage 02 · Trades

Which trades your scope actually wakes up

North Miami names its inspection disciplines individually, and that list is the most practical way to understand your own project: every discipline you touch is a separate inspection, and — here more than most places — a separate day.

The disciplines, named

The City lists what its inspectors cover: building, roofing, electrical, mechanical, structural, plumbing, re-occupancy inspections and 30-year recertification. Read that as a checklist against your own scope. A kitchen remodel is usually building, electrical and plumbing; add a condenser and it is mechanical too. Each is inspected in its own right, and in North Miami each also has its own availability.

  • Building, roofing, electrical, mechanical, structural, plumbing named separately
  • Re-occupancy and 30-year recertification are on the same list
  • Every discipline you touch is its own inspection
  • Count them early — they set the shape of the programme
Walk-in shower with marble-look porcelain walls, sliding glass and black fittings

A completed Elbaz Construction walk-in shower with marble-look porcelain walls and sliding glass. A South Florida project.

Mechanical: three days a week

This is the North Miami fact that most changes a programme, and it is published plainly: mechanical inspections are done on Monday, Wednesday and Friday from 9:00 a.m. to 12:00 p.m. Not every weekday, and not afternoons. If your air conditioning work finishes on a Wednesday afternoon, the mechanical inspection is a Friday morning question, and everything that waits behind it waits with it.

  • Mechanical inspections: Monday, Wednesday and Friday only
  • The window is 9:00 a.m. to 12:00 p.m.
  • A Wednesday-afternoon finish is a Friday inspection
  • Sequence mechanical work to land before, not after, an inspection day
Curbless walk-in shower with a built-in bench, black rain head and a hexagon mosaic floor

A completed Elbaz Construction curbless walk-in shower with a built-in bench and a black rain head. A South Florida project.

Electrical: five days, earlier

Electrical inspections run Monday through Friday from 7:30 a.m. to 12:00 p.m. So two disciplines on the same job have different availability and a different start time, which is exactly the sort of detail that turns a well-planned week into a wasted one if nobody checked. Where a scope has both, the mechanical inspection is the constraint and the electrical fits around it.

  • Electrical inspections: Monday through Friday
  • From 7:30 a.m. to 12:00 p.m.
  • Different days AND a different start time from mechanical
  • On a multi-trade job, plan to the tighter of the two
Walk-in shower behind a frameless glass panel at the end of a primary bathroom, double vanity to the left

A completed Elbaz Construction walk-in shower behind a frameless glass panel at the end of a primary bathroom. Not a North Miami property.

What a request has to carry

The City states what an inspection request must include: the permit number, a contact name, a contact phone number and the type of inspection requested. It sounds trivial and it is not — a request missing the inspection type is a request that has to be made again, and on a discipline that is only inspected three days a week, making it again costs two days rather than two minutes.

  • Permit number, contact name, contact phone, inspection type
  • The inspection TYPE is the item most often left off
  • An incomplete request costs a slot, not a phone call
  • On mechanical, a lost slot is two days
Curved grey paver driveway with the border carried through the radius

A curved grey paver driveway with the border carried through the radius, from completed Elbaz Construction work in South Florida.

Every photograph in this section is real Elbaz Construction project photography from completed South Florida work. None of it was taken in North Miami and none of it is captioned as though it were. Drawn images are labelled as illustrations.

Stage 03 · Apply

Filing it, with the department's own volume in view

North Miami takes roughly 2,900 applications a year with 15 people. That is not a complaint — it is the context for why a complete first submission is worth more here than a fast one.

Counted before it is drawn

The first thing we do is count which of the City's named disciplines your scope reaches — building, electrical, mechanical, plumbing, structural, roofing. That count drives the inspection calendar, and in North Miami the inspection calendar is the thing most likely to set the finish date.

Assembled once, completely

The submission carries the drawings and, for anything in the building envelope, the product approval documentation the HVHZ requires. A department running this volume reviews what is in front of it; a submission missing an approval is a comment cycle that did not need to happen.

Filed against the address

The application goes in with the scope described in the City's own terms. The Building Department sits at 12340 NE 8th Avenue and publishes direct extensions for permit questions.

By the disciplines it touches

The application is reviewed by the disciplines involved, and comments come back against the submission. The City does not publish a review timeframe and its own utilization report leaves those fields blank, so neither we nor anyone else can honestly quote you one.

Collected against a published schedule

The City collected $6,740,253 in permit fees in the reported year and publishes that total in its utilization report, but the report is not a fee schedule and we do not reprint figures. Whatever your permit comes to appears itemised on your proposal.

Then the notice of commencement

Once the permit issues the job can start. On work above the statutory threshold a notice of commencement is recorded before the first inspection — ordinary Florida practice, and the step most often forgotten by owners running their own project.

Built before the first trade arrives

This is where a North Miami job is won or lost. Mechanical is inspected Monday, Wednesday and Friday mornings; electrical Monday to Friday from 7:30 a.m. We build the trade sequence around those windows rather than discovering them, because a discipline that misses its day waits for the next one.

This is the published sequence, not a promise about your project. What any specific address requires, which disciplines it touches and whether recertification applies are decided by the City of North Miami Building Department — not by a contractor. We confirm what your address actually requires before anything is filed.

Stage 04 · On site

A week shaped by which day the inspector comes

Most municipalities inspect every weekday and the sequence is yours to choose. North Miami publishes different days for different trades, so the calendar is partly the City's. These phases are ordered the way that constraint actually bites.

Counting the disciplines

Before anything is ordered

The scope is broken into the City's own named disciplines and each one is placed against its available inspection days. In North Miami that is a real scheduling exercise rather than a formality, because mechanical and electrical do not share a calendar and the trades behind them cannot start until each is signed off.

Quality check · Every discipline mapped to an inspection day before the programme is fixed

Close view of dark wide-plank flooring showing the grain and the plank joints

Clearing the route

Protection, and where the skip goes

Coverings, dust separation and the working route are put in before the first tool. Where the property is a condominium or has an association, lift bookings and delivery windows are agreed at the same time.

Quality check · Route and containment in place before any demolition

Walk-in shower behind a frameless glass panel at the end of a primary bathroom, double vanity to the left

Stripping out

What an older building was hiding

The scope is removed and the fabric appears. North Miami runs 30-year recertification as a named service, which tells you something about the age of its housing stock — and older stock is where undocumented earlier work turns up. Anything found is recorded and put to you before it goes back behind a wall.

Quality check · Everything uncovered is photographed and raised before it is concealed

Curbless walk-in shower in stacked plank tile behind a frameless glass panel with black fittings

Structure

Its own named discipline here

Structural work is executed to the approved drawings and inspected in its own right — the City lists structural separately from building. Nothing is closed before that inspection has happened.

Quality check · Nothing structural concealed before its own inspection

Double-height interior under construction with full-height glazing and drywall going up

The envelope

Product and paperwork together

Windows, doors, roofing and their fixings go in to the approved products and the approved attachment, with the documentation matched to what is physically installed. In the HVHZ that pairing is the thing being inspected.

Quality check · Installed products matched to their approval documents

Two-storey South Florida home with a paver driveway seen from the street

Electrical, on the wider window

Five mornings a week

Electrical rough-in is set out and installed, and booked into a window that runs Monday to Friday from 7:30 a.m. Of the trades on a typical remodel this is the flexible one, so it is scheduled around the tighter constraint rather than ahead of it.

Quality check · Electrical inspection booked with the permit number and inspection type

Two stacked recessed shower niches backed in copper-toned mosaic

Mechanical, on the narrow one

Three mornings a week

Any mechanical work is timed to finish before a Monday, Wednesday or Friday morning. This is the single phase where North Miami differs most from its neighbours, and where a day's slip costs two.

Quality check · Mechanical work completed ahead of an available inspection morning

Hexagon mosaic shower floor with a linear drain along the glass line

Closing the walls

Only against passed inspections

Board goes up after the rough-in inspections have actually passed. On a job with both mechanical and electrical that means two separate sign-offs on two separate calendars, and the wall waits for the later of them.

Quality check · Walls closed only after every rough-in has passed

View down from the loft level over the living space of a two-level accessory dwelling unit

Waterproofing and setting out

The parts that outlast everything

Tanking and falls go in under the tile and are photographed as they are built, then tile, stone and cabinetry are set out and walked with you before the field is committed.

Quality check · Falls recorded photographically; setting out agreed before the first full course

Walk-in shower behind sliding frameless glass on a black top track, with a black grab bar and rain head

Sign-off

Every discipline, then the permit

Each discipline is booked for its final on the correct day, the outstanding items are agreed in writing, and the permit is closed rather than left open.

Quality check · Every discipline passed its final and the permit closed

Sleeping area within the open plan of a studio accessory dwelling unit

Stage 05 · Weigh

The three decisions North Miami owners find hardest

Argued both ways. None of these has a universally right answer — it depends on your scope, the age of the building and how much of the calendar you control.

Include it now

One programme, one set of sign-offs

Hexagon mosaic shower floor with a linear drain along the glass line
What it is
Doing the air conditioning or ventilation work as part of the same permit as the rest of the remodel.
Benefits
One mobilisation, one set of inspections, and the ceilings are open anyway.
The constraint
Mechanical is inspected on Monday, Wednesday and Friday mornings only, so it adds a fixed point the rest of the programme has to respect.
On cost
Cheaper than returning, because the access you are paying for already exists.
Best for
Any job where ceilings or walls are open and the equipment is near the end of its life.

Leave it for later

Keep this scope tight

Walk-in shower with a textured feature tile column, twin recessed niches and a rain head
What it is
Finishing the current work without touching the mechanical system.
Benefits
One fewer discipline, one fewer inspection, and no dependency on a three-day-a-week window.
The constraint
A later mechanical job means opening finished work, and a second permit with its own inspections.
On cost
Lower now, higher in total if the equipment fails within a few years.
Best for
A recently replaced system, or a scope that genuinely does not reach the ceiling.

Which oneIf the ceilings are coming down anyway and the equipment is old, include it — the access is the expensive part and you have already bought it. If the system is recent, leave it out and keep the discipline count down, because in North Miami every discipline you add is also a day you do not control.

Open it up and look

Find out before you commit

Primary bathroom with a vaulted ceiling, long vanity and glass-enclosed walk-in shower
What it is
Exploratory opening in an older building before the scope and price are fixed.
Benefits
The unknowns become known while they are still cheap to design around.
Why here
North Miami runs 30-year recertification as a standing service, which tells you how much of its housing stock is genuinely old.
Limits
It costs a visit and some making good, before you have committed to anything.
Best for
Any building where you do not know what previous owners did, which is most of them.

Price it on assumptions

Start sooner

Walk-in shower behind sliding frameless glass on a black top track, with a black grab bar and rain head
What it is
Agreeing a scope from what is visible and dealing with surprises as they appear.
Benefits
Work starts earlier and costs less to plan.
Why here
It is the normal approach, and on a newer building it is usually right.
Limits
A surprise found mid-programme is a variation, and a variation that adds a discipline also adds an inspection day.
Best for
Newer buildings, or scopes that do not go behind anything.

Which oneOn an older North Miami building, look first. The cost of an exploratory opening is small and knowable; the cost of finding a structural surprise after the trades are booked is neither — and here it can also mean a discipline you had not planned for, waiting on a day that comes round three times a week.

Sequence to the City

Let the calendar lead

Two stacked recessed shower niches backed in copper-toned mosaic
What it is
Building the programme backwards from mechanical's Monday, Wednesday and Friday mornings.
Benefits
No trade waits on a sign-off that was never available on the day it needed one.
Limits
It occasionally means a trade idles a day to hit a window.
On the whole job
Usually shorter overall, because the dependencies run one way and nothing doubles back.
Best for
Multi-trade work, which is most remodels.

Sequence to the trades

Keep everyone moving

Curved grey paver driveway with the border carried through the radius
What it is
Running the trades in their natural order and booking inspections as each finishes.
Benefits
Nobody waits, and on paper it looks faster.
Limits
A mechanical completion on a Wednesday afternoon sits until Friday, and everything behind it sits too.
On the whole job
Often longer, because the waits land in the middle rather than at the edges.
Best for
Single-discipline work, where there is only one calendar to satisfy.

Which oneOn anything multi-trade, sequence to the City. A day of deliberate slack placed where you chose it is cheaper than two days of unplanned waiting in the middle of the job — and the published inspection days make that arithmetic knowable before the work starts rather than after.

What moves the cost and the calendar in North Miami

Tick whatever applies. This will not produce a price — no honest one exists before someone has seen the property — but it will show which parts of your project are carrying the time and the risk.

What this points to

We do not publish figures. The City publishes what it collected in a year — $6,740,253 — in its statutory utilization report, but that report is not a fee schedule and we will not turn it into one. You get a real, itemised number from us in writing after a site visit.

Stage 06 · Sign-off

What the City publishes, and what it does not

North Miami is unusually forthcoming about volume and unusually quiet about timing. Both are worth knowing, and this page does not fill in the second from the first.

The report exists because of a statute

Florida Statute 553.80 requires a local government providing a fee schedule to create and post a Building Permit and Inspection Utilization Report, and to update it before making any adjustments to that schedule.

The volume

2,906 applications submitted and 2,698 permits issued in the reported year, with 7,067 inspections and re-inspections requested.

The staffing

15 personnel dedicated to enforcement.

The money

$6,740,253 collected in fees, $4,487,898 of personnel services, $7,695,136 of operating expenditures, and $12,807,848 carried forward.

Mechanical inspection days

Monday, Wednesday and Friday, 9:00 a.m. to 12:00 p.m. That is the tightest published constraint on this page.

Electrical inspection days

Monday through Friday, 7:30 a.m. to 12:00 p.m. — a different set of days and a different start time from mechanical.

What a request must carry

Permit number, contact name, contact phone number and the type of inspection requested.

What is NOT published

A plan-review timeframe. The City states none, and the utilization report leaves those fields marked N/A. Dividing permits by staff would be arithmetic dressed up as a commitment, so this page does not do it.

What we will actually stand behind

Only claims that are either public record or visible in the work on this page. Nothing about awards, nothing about rankings, and no numbers we cannot show you.

Licensed, bonded and insured

Elbaz Construction is a licensed Florida general contractor, CBC1265280. Permits are pulled in the company's name, and the licence is verifiable at the Florida DBPR rather than on our say-so.

We plan to the published inspection days

Mechanical on Monday, Wednesday and Friday mornings; electrical Monday to Friday from 7:30 a.m. Those windows go into the programme before the trades are booked, because a discipline that misses its day does not simply try again that afternoon.

Complete inspection requests

Permit number, contact name, contact phone and the inspection type, every time. On a trade inspected three days a week, a request that has to be repeated costs two days.

We file it ourselves

Design, the permit application and the construction are handled by one company, so a reviewer's comment does not sit waiting on a hand-off between two firms.

We do not quote a review time

The City publishes none and leaves those fields blank in its own report. Anyone giving you a North Miami review time is giving you their average, not the City's.

Envelope documentation kept straight

In the HVHZ what is inspected is the pairing of installed product and approval paperwork. We keep them matched, because an envelope inspection that fails on documentation costs exactly as much as one that fails on workmanship.

Older buildings get looked at, not assumed

In a city that runs 30-year recertification as a standing service, assuming what is behind a wall is a choice with a price. We would rather open a small hole early than price a surprise late.

Permits closed out

Every permit we pull is closed out at the end of the job. An open permit follows the property and reappears when it is sold.

Questions, by stage

Filter to the part of the job you are thinking about.

Is North Miami in the High-Velocity Hurricane Zone?Your building

Yes. North Miami is in Miami-Dade County, and the Florida Building Code's High-Velocity Hurricane Zone covers Miami-Dade and Broward and nowhere else in the state. In practice it governs roofing, windows, doors and how they are fixed, and it means product approval documentation belongs in the submission rather than being produced later.

What is 30-year recertification and does it affect me?Your building

North Miami lists 30-year recertification among the inspection services its Building Department provides, alongside re-occupancy inspections. It is a separate process from a building permit, with its own findings. Whether a specific building is due is a question only the City can answer, and it is worth asking before a renovation scope is fixed rather than during one.

How busy is the department?Your building

The City publishes exactly that, because Florida Statute 553.80 requires it to. In the reported year: 2,906 applications submitted, 2,698 permits issued, 7,067 inspections and re-inspections requested, and 15 personnel dedicated to enforcement. It is a working department with real volume, which is the argument for a complete first submission rather than a fast one.

Which trades will my remodel involve?Which trades

The City names its inspection disciplines individually: building, roofing, electrical, mechanical, structural, plumbing, re-occupancy and 30-year recertification. A kitchen or bathroom remodel is usually building, electrical and plumbing; add air conditioning work and it is mechanical as well. Each is inspected in its own right, and here each also has its own availability.

Why does it matter which trades are involved?Which trades

Because in North Miami different trades are inspected on different days. Mechanical inspections happen Monday, Wednesday and Friday from 9:00 a.m. to 12:00 p.m.; electrical inspections Monday through Friday from 7:30 a.m. to 12:00 p.m. Every discipline you add is another fixed point the programme has to respect.

What if my mechanical work finishes on a Tuesday?Which trades

Then the inspection is a Wednesday morning question, and if it slips past Wednesday it is a Friday one. That is not a criticism of the City — publishing the days is more helpful than not publishing them — but it is the single most useful thing to know before you set a completion date here.

How long does a permit take in North Miami?Filing

We do not publish a number, because the City does not publish one. Its own statutory utilization report leaves the timing fields marked N/A. We could divide 2,698 permits by 15 people and print the result, but that would be arithmetic dressed up as a commitment. What we can tell you honestly is which disciplines your scope reaches and what we do to keep the comment cycles down.

What should go in with the application?Filing

The drawings, the scope described in the City's own disciplinary terms, and — for anything in the building envelope — the product approval documentation the HVHZ requires. A department taking nearly 3,000 applications a year reviews what is in front of it; anything missing is a comment cycle that did not need to happen.

Where is the Building Department?Filing

At 12340 NE 8th Avenue, North Miami. The City publishes direct extensions for permit enquiries on its Building Department page.

What happens if you find unpermitted work from a previous owner?On site

We stop and tell you, before it is covered up. It is more common than people expect in South Florida, and in a city that runs 30-year recertification as a standing service the housing stock is old enough that it should be expected rather than hoped against. It has to be resolved rather than built over.

Can I live in the house while you work?On site

Often yes, and it changes the programme rather than the price alone. Containment, protection and phasing all cost days. The honest version of this conversation happens at the site visit, where we can look at where the work is relative to where you sleep and cook.

How do you decide the order of the trades?On site

Backwards from the inspection days. Mechanical has the narrowest window, so it is placed first and the rest of the sequence is built around it. Sequencing to the trades instead looks faster on paper and usually finishes later, because the waiting lands in the middle of the job rather than at the edges.

Why won't you publish a price?Cost

Because for a remodel the same square footage can differ several-fold depending on what is behind the wall, how old the building is and how many disciplines are involved. A published rate would be a guess. You get an itemised figure in writing after a site visit, and it says what happens if something is found during demolition.

What will the permit itself cost?Cost

The City publishes what it collected across a whole year — $6,740,253 — in its statutory utilization report, but that is a total, not a schedule, and turning one into the other would be dishonest. Whatever your permit comes to appears itemised on your proposal rather than folded into a round figure.

How do I request an inspection?Inspections

The City states what a request must include: the permit number, a contact name, a contact phone number and the type of inspection requested. The inspection type is the item most often left off, and leaving it off costs a slot rather than a phone call.

When are inspections actually done?Inspections

It depends on the trade, which is the distinctive thing about this City. Mechanical inspections are done on Monday, Wednesday and Friday from 9:00 a.m. to 12:00 p.m. Electrical inspections are done Monday through Friday from 7:30 a.m. to 12:00 p.m. Confirm the current arrangement for your discipline when you book.

Can walls be closed before an inspection passes?Inspections

No, and we will not do it. Board goes up after the rough-in inspections have actually passed — not after they have been booked. On a job with both mechanical and electrical that means two sign-offs on two calendars, and the wall waits for the later one.

What happens to the permit when the job is finished?Afterwards

It gets closed out. We do not leave permits open, because an open permit stays attached to the property and reappears at sale, when it is somebody else's leverage rather than an administrative detail.

What paperwork should I keep?Afterwards

The permit record, the approved drawings, the product approval documentation for anything in the envelope, and the closeout for every discipline. In the HVHZ the envelope paperwork is the part a future buyer, insurer or inspector will actually ask for.

Do you work anywhere else in Miami-Dade?Afterwards

Yes — across Miami-Dade, Broward and Palm Beach, 104 municipalities in total. The filing routes and the inspection calendars differ genuinely between them: North Miami publishes its volume and its inspection days by trade, most of its neighbours publish neither, and those differences are a working detail for us rather than a surprise.

Client experience

What clients say, in their own words

Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.

Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.

Next steps

Where to go from here

Grouped by what you are trying to do, not by category.

Start here

Start with the address

Almost everything on this page turns on the building — how old it is, and which of the City's named disciplines your plans would wake up. Tell us the address and what you are hoping to do, and the first conversation is a useful one.

What happens next

  1. We read it properly and come back to you, usually the same or the next working day.
  2. A short call to understand the property, the scope and what is driving the timing.
  3. We count which of the City's named disciplines your scope reaches, and map each to its inspection days, before we form a view.
  4. A site visit, because what is behind a South Florida wall cannot be judged from photographs.
  5. A written, itemised proposal, including what happens if something is found during demolition.
  6. If you go ahead, we file it with the Building Department and build the trade sequence around the published inspection windows.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Completed bathroom with a freestanding tub and a pair of floating basins on a long vanity ledge

The department publishes its own numbers. Let's use them.

North Miami tells you how much work it handles, how many people handle it, and which mornings each trade is inspected. The value of a contractor here is building the programme around those facts before the first trade is booked, not discovering them in week three.