One master permit,
or four separate ones.

Hypoluxo takes permit submittals in person, requires a current contractor registration number on every application, and publishes one sentence that quietly decides how a project is billed: put the subpermit costs on the master permit, or the subpermits are treated as individual permits. That is a paperwork decision with a financial consequence, and it is made before anything is filed.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll

Start here

Send us the address and the rooms. We will tell you what it needs.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team. We will call you back to arrange the site visit and the scope conversation. If it is urgent, call us on (754) 236-0675.

What decides a Hypoluxo application

Registered first, in person, and costed correctly.

This is a small town that runs a conventional process very deliberately, and the parts it chooses to publish are the parts that trip people up.

Three things are true of every Hypoluxo permit application. It is submitted in person, with one electronic copy of the plans possibly required alongside. It carries a current contractor registration number, which the Town requires on all permit applications. And if the job has subpermits — and most do — the Town asks for their costs to be included on the master permit, because otherwise “the subpermits will be treated as individual permits.” None of that is difficult. All of it is easier to get right before the drawings are finished than on the morning somebody drives to the Town office.

1master permit, if the costs are on it
3PMinspection deadline, the day before
5inspection days a week
In person

The Town states that permit submittal is in person. One electronic copy of plans may also be required.

A registration number on every application

“A current contractor registration number is required on all permit applications.”

Insurance naming the Town

Registration takes current state or county certification, a current business tax receipt, and certificates of insurance naming the Town as Certificate Holder for liability and workers compensation.

Subpermit costs on the master

Otherwise the Town treats the subpermits as individual permits. It is one sentence, and it is the most consequential one on the page.

  • Licensed & insuredState-licensed GC, bonded and insured
  • Design-buildDrawings, permitting and construction in-house
  • Registered before we fileCertification, tax receipt and insurance
  • 104 municipalitiesHypoluxo is one of them
  • CBC1265280Verifiable with the Florida DBPR

What we build

Kitchens, bathrooms, additions and accessory units.

Every one of these involves more than one trade, which means every one of these involves subpermits, which means the master permit question applies to all of them.

A subpermit is not a formality.
It is a separate application.

The Town is explicit that subpermits are required for each entity and that each is a separate application. That is normal. What is unusual is that Hypoluxo also tells you what happens if the costs are not carried on the master permit, which is that the subpermits get treated as individual permits instead. Knowing that before the electrical, plumbing and mechanical values are written down is worth more than any amount of general advice about permitting.

  • Kitchen and bathroom remodelling, which is three trades before it is a room
  • Home additions, where the trade list grows and so does the subpermit list
  • Accessory and in-law units, which carry a full set of trades of their own
  • Whole-home renovation, where every entity on the job needs its own application

The master permit

The building permit the project runs under, and where the Town asks for the subpermit costs to be included.

The subpermits

One per entity, each a separate application. Electrical, plumbing and mechanical are the usual three, and each needs its own registered contractor.

Bedroom with storage in a completed accessory living space
A renovated bathroom with round mirror and twin basins, on a South Florida project by Elbaz Construction. Not photographed in Hypoluxo.

An accessory living space, completed

A bedroom with storage in a completed accessory living space, on a South Florida project by Elbaz Construction. A self-contained unit carries a full set of trades, and therefore a full set of subpermits.

Not sure how many entities your job actually involves?

Most owners are not, and it is the number that decides how the file is built. Tell us the brief and we will tell you the trade list.

The work itself

Finished rooms, and the verification behind them.

Three frames from South Florida projects by Elbaz Construction. The third is somebody checking a member before it disappears behind a wall.

Basin and tap detail in a completed bathroom remodelHerringbone flooring laid through a hallway and entranceFraming member marked out on site during structural verification
01

A basin and tap detail in a completed bathroom remodel. The tap position is set at first fix, weeks before anybody sees it.

Every photograph on this page is of a South Florida project by Elbaz Construction. None is presented as being in Hypoluxo, and no pictured property is said to have been permitted by the Town.

Herringbone flooring laid through a hallway and entrance
Herringbone flooring laid through a hallway and entrance. A pattern that turns a corner has to be set out from the corner, not from the door.
Framing member marked out on site during structural verification
A framing member marked out on site during structural verification. Marking before cutting is the cheapest quality control there is.

How we work

One contractor, from the first sketch to the last inspection.

What design-build changes in Hypoluxo

Registration
Current certification, tax receipt and insurance, in place
Trade list
Every entity identified before the master permit is costed
Filing
Delivered in person, with the electronic copy if required
Construction
Built by the team that filed the applications
Inspections
Booked before three in the afternoon, the day before
01

Register before you need to

A current contractor registration number is required on all permit applications, and the certification, business tax receipt and insurance behind it are administrative rather than technical. They can be done early, so they are.

02

Count the entities

Subpermits are required for each entity and each is a separate application. Knowing how many there are is what makes the master permit correct.

03

Cost the master properly

The Town asks for subpermit costs to be included on the master permit, and says what happens if they are not. That is a decision made once, before filing.

04

Build to the approved set

What was approved is what gets built, and the inspections are booked to the published deadline rather than hoped for on the day.

Want the trade list settled before the drawings start?

That conversation is free, and in this Town it changes how the file is built.

Three ways a Hypoluxo project runs

Pick the one that matches how many entities are on the job.

None of these is better than the others. They differ in how many separate applications the same project turns into.

A

One trade, one application

Genuinely single-trade work, where there is no subpermit conversation because there is nothing to subpermit.

  • One registered contractor
  • One application, in person
  • No master permit costing question
  • Only right if the brief truly is one trade

B

A room, and its three trades

A kitchen or bathroom: electrical, plumbing and mechanical under a building permit, with the costs carried correctly.

  • Subpermits for each entity
  • Costs included on the master permit
  • Every subcontractor registered with the Town
  • Right when the house has the space and not the layout

C

A whole project, and every entity on it

Additions, accessory units and whole-home work, where the trade list is long and every entity needs its own registration and application.

  • The longest list of separate applications
  • The most registrations to keep current
  • The master permit costing matters most here
  • Right for more floor area, not better floor area

Things that add an entity to the file

  • Electrical work, which is its own registered contractor and its own application
  • Plumbing work, on the same basis
  • Mechanical work, including anything that moves air or gas
  • Roofing, where the scope touches the roof covering
  • A new or altered service, which can bring an additional entity in
  • Pool or exterior work carried out by a separate specialist
  • Anything subcontracted to a firm not already registered with the Town
  • A trade added after the master permit was costed, which is the expensive way to do it

The town publishes no board review for residential work, and this page does not invent one. Registration and insurance requirements are the town rules, not ours, and the list above is how a trade list tends to grow rather than a ruling about your project.

The sequence

From an idea to an issued Hypoluxo permit.

The Town publishes what has to be in place and when inspections can be booked. It does not publish how long review takes, and neither will we.

Modern entry and glazing on a two-storey South Florida home
01

Registration

Current state or county certification, a current business tax receipt and insurance certificates naming the Town as Certificate Holder, for every entity that will file.

Bedroom and mirror in a finished accessory unit
02

Scope and trade list

Establish what the brief needs and how many entities that involves, because that number is what the master permit has to account for.

Completed wood deck seen from the house doors looking out into the yard
03

Drawings and written specification

Produced to the trades identified, with the specification written rather than assumed and allowances stated as allowances.

Kerb ramp and flush accessible route between parking and a building entrance
04

Master permit, costed

Subpermit costs included on the master, because the Town states what happens when they are not.

Plank flooring installed in a room during fit-out
05

In-person submittal

Delivered to the Town office, with one electronic copy of plans where it is required, and any comments answered as one response.

Completed white kitchen with island and range in an Elbaz Construction home renovation
06

Build and inspect

Construction against the approved set, with every inspection requested by three in the afternoon on the day before it is needed.

No duration is stated anywhere in this sequence. Hypoluxo publishes no review duration, and neither do we.

What we do, step by step

Ten things that happen on a Hypoluxo project.

Written plainly, because most of the value of a design-build contractor sits in the parts a homeowner never sees.

First conversation

The brief, the property, the budget shape

QC · Free
What to expect

What you want the house to do, and what is actually in the way.

Your decision

A scope direction and an early view of the trade list

Site visit

Measure, photograph, look at what is there

QC · Free
What to expect

Existing conditions establish what is possible before anything is drawn.

Your decision

A record of the property as it actually is

Registration check

Ours, and every subcontractor

QC · Free
What to expect

A current registration number is required on all permit applications, and the certification, tax receipt and insurance behind it have dates on them.

Your decision

Every entity on the job able to file

Trade list

How many entities, and which

QC · Free
What to expect

The count that decides how many separate applications this project becomes.

Your decision

A written list of the applications required

Concept drawings

Layout, and the decisions that drive cost

QC · Agreed up front
What to expect

Enough to decide with, before anything is engineered.

Your decision

Drawings you can react to

Specification

Written, not assumed

QC · Agreed up front
What to expect

We price against a drawn scope and a written specification, with allowances stated as allowances.

Your decision

A specification that a price can stand on

Master permit costing

Subpermit values on the master

QC · Agreed up front
What to expect

The Town asks for the costs to be included there, and states that otherwise the subpermits are treated as individual permits.

Your decision

An application costed the way the Town asked for

In-person submittal

At the Town office

QC · Included
What to expect

Permit submittal is in person, with one electronic copy of plans where it is required. The Building Official is available by appointment.

Your decision

A package delivered rather than posted

Comments

Answered as one set

QC · Included
What to expect

Reconciled across the drawings before anything is resubmitted, so a second look is a shorter look.

Your decision

One coherent response instead of several partial ones

Build and inspect

Booked by three, the day before

QC · The contract
What to expect

Inspections are performed Monday to Friday and the deadline to submit one is 3:00 PM the day before. Recorded requests are not accepted.

Your decision

A finished project and a closed permit

Nothing here is a review-time promise. Hypoluxo publishes no review duration, and neither do we.

What the Town publishes

Hypoluxo building and zoning, in the Town’s own words.

Everything in this section is published Town of Hypoluxo material, read on 20 August 2026.

The paperwork sequence, in order

  1. Submittal“Permit submittal is in person.”
  2. AndOne electronic copy of plans may also be required.
  3. On every application“A current contractor registration number is required on all permit applications.”
  4. Registration needsCurrent state or county certification.
  5. AndA current business tax receipt.
  6. AndCertificates of insurance for liability and workers compensation.
  7. Named on themThe Town, as Certificate Holder.
  8. Subpermits“Subpermits are required for each entity and is a separate application.”
  9. The costing rule“Please include costs on the master permit otherwise, the subpermits will be treated as individual permits.”
  10. Inspections“Inspections will be performed Monday through Friday.”
  11. The deadline“The deadline to submit an inspection is 3:00 PM the day before the inspection.” Recorded requests are prohibited.
  12. The Building OfficialAvailable by appointment in the Hypoluxo office.

Four things worth knowing before you file in Hypoluxo

The costing sentence is the one to read twice

Including subpermit costs on the master permit is what keeps them subpermits. The Town says what happens otherwise, in the same sentence.

Registration is per entity, not per project

Every contractor filing here needs a current registration number, so a late subcontractor change is an administrative event as well as a commercial one.

The Town wants to be on the insurance

Certificates naming the Town as Certificate Holder for liability and workers compensation are part of registering, and insurers do not always issue them same-day.

Inspections have a hard cut-off

Three in the afternoon, the day before, and recorded requests are not accepted. That is a site-management fact more than a paperwork one.

What we will not tell you

We do not publish the Town registration fee amounts, though the Town does. We do not publish a review duration, because Hypoluxo publishes none. And we will not describe a design review or an architectural board process for residential work here: the town publishes no board review for residential work, and this page does not invent one. Registration and insurance requirements are the town rules, not ours. Requirements change: confirm the current position with the town of hypoluxo, or ask us to. We do it on every file.

What moves the number

What actually drives a Hypoluxo budget.

We do not publish prices, because a price without a drawn scope is a guess dressed as a number. What can be published honestly is what moves it.

How many entities the job involves

Each is a separate application, a separate registration to keep current and a separate line on the master permit.

Whether the master permit is costed correctly

The Town states what happens when subpermit costs are left off it, and it is not a discretionary matter.

Whether load-bearing structure moves

A wall that carries brings an engineer into the set and a sequence into the programme.

Whether the footprint changes

A bigger house is a longer trade list before it is anything else.

The condition of what is already there

What is behind the wall decides more of the price than what goes on it.

How far the services move

Plumbing and electrical are cheap to extend and expensive to relocate.

Specification level

Allowances are stated as allowances so the price does not quietly become somebody else’s decision later.

Inspection sequencing

A three in the afternoon deadline the day before rewards a programme that thinks a day ahead and punishes one that does not.

Site access and storage

Where material can be delivered and left changes labour more than most owners expect.

How complete the first submittal is

The one variable entirely within your control, and it is worth a second read before somebody drives to the Town office.

Low Moderate High Very high

Every driver above changes either the drawings, the applications or the build — and most change two of the three.

What a realistic programme looks like

  • Registration for every entity that will file, done early
  • Scope and trade list agreed before anything is engineered
  • Drawings and specification produced to the trades identified
  • Master permit costed with the subpermit values on it, then filed in person
  • Construction against the approved set, with inspections booked a day ahead

Seven questions worth asking any contractor here

  • Is your Hypoluxo registration current, and are your subcontractors registered?
  • Is the Town named as Certificate Holder on the insurance?
  • Are the subpermit costs going on the master permit?
  • How many separate applications is this job?
  • What is in the specification, and what is an allowance?
  • Who books the inspections, and by what time?
  • What is your licence number, and can I verify it?

Useful to have ready

  • The property address
  • Any survey you hold, and how old it is
  • Any permits pulled on the property, and roughly when
  • Which trades you already know are involved
  • What you want the house to do, rather than a solution
  • A budget range you are comfortable saying out loud

We price against a drawn scope

We price against a drawn scope and a written specification, with allowances stated as allowances. That is what makes a proposal comparable to anyone else’s.

The same thing, drawn

Administration is the schedule here.

None of this is technically hard. All of it has a date on it, which is why it belongs at the start of a programme rather than the end.

What has to be true before Hypoluxo takes an applicationA drawn diagram, not a photograph. Six bands showing the conditions the Town publishes for a permit application, from contractor registration through to where the subpermit costs are written.REGISTRATION NUMBERrequiredCERTIFICATIONcurrentBUSINESS TAX RECEIPTcurrentINSURANCETown namedSUBMITTALin personSUBPERMIT COSTSon the masterThe published conditions, in the order they have to be met

Drawn from the published Town building and zoning material. The conditions are the Town’s; the ordering is ours and is not a Town publication.

The pieces, and where they come from

  • The registration number. Required by the Town on all permit applications
  • State or county certification. Held by the contractor, and current
  • Business tax receipt. Held by the contractor, and current
  • Insurance certificates. Issued by the insurer, naming the Town
  • The master permit. Where the Town asks subpermit costs to be included
  • The inspection deadline. Three in the afternoon, the day before
A short list is still a list

Everything here can be finished before a drawing exists, which makes it the cheapest part of the programme to get right and the most annoying part to get wrong.

Decisions worth making early

The choices that change a Hypoluxo project most.

Subpermit costs on the master, or left off it

Compared on the sentence the Town publishes about it. This is the only decision on the page where the Town states the consequence itself.
FactorCosts on the masterCosts left off
What the Town saysPlease include costs on the master permitThe subpermits will be treated as individual permits
How the file readsOne project with its trades attachedSeveral permits that happen to share an address
When it is decidedBefore filing, onceBy omission, also once
Who has to knowWhoever costs the applicationWhoever finds out afterwards
Effort involvedCollecting trade values before filingNone, which is exactly the problem
RiskNeeding accurate trade values earlyA structure of permits nobody intended
Our adviceCollect the values, then fileThere is no argument for this column

Registering early, or on the day you file

Registration is administrative rather than technical, which means it is the part of the programme most easily finished in advance and most easily forgotten.
FactorRegistered in week oneRegistered on filing day
What it needsCertification, tax receipt, insurance certificatesThe same three, urgently
Who else it involvesEvery subcontractor who will fileThe same people, at short notice
Insurer lead timeAbsorbed quietlyDiscovered publicly
Best whenAlwaysNever, but it happens

Eight things that cost Hypoluxo projects time

  1. Leaving subpermit costs off the master permitThe Town says what follows, and it is not a discretionary matter.
  2. Assuming registration is a formalityA current registration number is required on all permit applications, and the documents behind it have expiry dates.
  3. Forgetting the Town on the insurance certificatesNaming the Town as Certificate Holder is part of registering, and insurers do not always issue same-day.
  4. Adding a trade after the master permit is costedIt is the expensive way to arrive at a subpermit.
  5. Booking an inspection on the morningThe deadline is three in the afternoon the day before, and recorded requests are not accepted.
  6. Turning up without an appointmentThe Building Official is available by appointment in the Hypoluxo office.
  7. Skipping the written specificationAn allowance that is not stated as an allowance becomes an argument later.
  8. Changing the set after approvalWhat was approved is what is inspected. A later change is a revision, not an adjustment.

What a good Hypoluxo submittal looks like

Registered on every side

Costed the way the Town asked

Delivered, not posted

Tick these off as you go — nothing is stored or sent, the list is here purely so you can use it while you compare contractors.

More of the work

Rooms, decks and the details in between.

Compact bathroom vanity with a lit mirror and black tap
South Florida projects by Elbaz Construction. None is presented as being in Hypoluxo.

Kitchens

Full remodels including layout changes, relocated services and appliance runs that need their own attention at rough-in.

Bathrooms

Plumbing, electrical and ventilation in the smallest room in the house, where the waterproofing detail matters most.

Additions

Where the trade list grows, and with it the number of separate applications the project becomes.

Outdoor living

Decks, paving and the connections between a house and the ground it sits on.

Questions we are actually asked

Hypoluxo, answered.

  • The Town publishes it in one sentence: "Subpermits are required for each entity and is a separate application. Please include costs on the master permit otherwise, the subpermits will be treated as individual permits." It is worth reading twice before an application is costed.

  • The Town states that permit submittal is in person. One electronic copy of plans may also be required, but the submittal itself is a visit rather than an upload.

  • It is the Town own registration, and it is required on all permit applications. Getting one takes current state or county certification, a current business tax receipt and certificates of insurance for liability and workers compensation.

  • Because registration requires certificates of insurance naming the Town as Certificate Holder. It is a standard request and it is not always instantaneous, which is why it belongs early in a programme.

  • Inspections are performed Monday through Friday, and the deadline to submit one is 3:00 PM the day before the inspection. Recorded requests are prohibited, so somebody has to make the booking properly.

  • The Town publishes that the Building Official is available by appointment in the Hypoluxo office. Appointment, rather than a queue.

  • The Town publishes no board review for residential work of this kind, and this page does not invent one. If a project raises something unusual, the right move is to ask rather than to assume a process exists.

  • Hypoluxo publishes no review duration, and neither do we. A figure borrowed from a third-party permitting site is worse than no figure, because it reads as though the Town said it.

  • Almost certainly, and probably more than one. A kitchen is usually electrical, plumbing and mechanical as well as building, and in this Town each of those entities files its own application.

  • The new entity needs a current registration number of its own, and the subpermit is a separate application. It is manageable, and it is easier when it is planned.

  • You can, and the question is whether they cover every trade the job actually involves. In a town that counts entities, an incomplete trade list is a paperwork problem as much as a design one.

  • The people who counted the trades are the people who drew the set, costed the master permit, filed in person and booked the inspections. Nothing is lost in a handover, because there is no handover.

  • Against a drawn scope and a written specification, with allowances stated as allowances. We do not give a number before there is a scope for it to stand on.

  • Elbaz Construction is a Certified Building Contractor, licence CBC1265280, licensed, bonded and insured, and verifiable with the Florida Department of Business and Professional Regulation.

  • Yes. We file in 104 municipalities across Miami-Dade, Broward and Palm Beach, and Hypoluxo is one of them. Filing widely is how we keep registrations current in the towns that require them.

  • No. Everything attributed to the Town on this page is its own published wording, read on 20 August 2026, and requirements change. We do not publish review-time promises or approval odds, because neither is ours to give.

Why Elbaz

One contractor, and every entity registered.

  • Design-build, genuinelyDrawings, permitting and construction under one contract. The person who decided the scope is the person on site.
  • We register earlyCertification, business tax receipt and insurance naming the Town, in place before an application is written rather than after.
  • We count the entities firstThe trade list decides how many separate applications a project becomes, so it is settled at scope stage.
  • We cost the master permit properlySubpermit values on it, because the Town states what happens otherwise.
  • CBC1265280Certified Building Contractor, licensed, bonded and insured, verifiable with the Florida DBPR.
  • 104 municipalities, three countiesMiami-Dade, Broward and Palm Beach. Every one files differently.
  • We price against a drawn scopeAnd a written specification, with allowances stated as allowances.
  • We quote the Town, not ourselvesEvery process fact on this page is published Hypoluxo material.

What homeowners say

Reviews, unedited.

Published on Google, quoted here word for word. We do not shorten, merge or rewrite a review.

4.8Average across 343 Google reviews
Read all 343 reviews on Google
Dealing with Asher was a truly enjoyable experience. His team is experienced and swift. They did a splendid job!
Sandy ZuritaGoogle review
Outstanding service by Elbaz Construction. The team finished our bathroom in a timely fashion. Highly recommended for anyone who is looking for reliable construction work
Paco JazzGoogle review
Asher has a lot of experience . We replaced our windows to energy efficient windows. He got down to business right away and did high quality work. His team is very professional! Thanks again
jessica berlinerGoogle review
The team was amazing. Did a fabulous job with the landscaping, roofing and backyard renovation. The best contractors I have worked with! Will definitely use this company in the future.
Derpy DayGoogle review

Related reading and services

Schedule a Consultation (754) 236-0675

Start here

Tell us the address. We will tell you how many applications it is.

Most of what determines a Hypoluxo project is knowable before anything is drawn: how many entities the work involves, whether every one of them is registered, and where the subpermit costs are going to be written.

What happens after you send this

  1. A call back within one business day
  2. A site visit to see what is actually there
  3. A written scope, and the trade list that comes with it
  4. A price against that scope, with allowances stated

Useful to have ready

  • The property address
  • Any survey you hold
  • Any permits pulled on the property
  • Which trades you already know are involved
  • What you want the house to do

Licensed, bonded and insured

Certified Building Contractor CBC1265280

Design-build: drawings, permitting and construction in-house

104 municipalities across three counties

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team. We will call you back to arrange the site visit and the scope conversation. If it is urgent, call us on (754) 236-0675.