Completed bathroom remodel in a South Florida home

A spa bathroom
is waterproofing
you can see.

The calm comes from surfaces without clutter, light you can dim, and a shower that drains properly. All three depend on the layer nobody ever sees — the waterproofing under the tile.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll
A-00Architectural
SHEET A-00 / BATHROOM INDEX · 12 FRAMES

Recent work

Check out our bathroom remodels.

Showers, vanities, tiling, niches and fittings across South Florida bathrooms. Select any frame to open it full size.

G-01General
SHEET G-01 / SPA BATHROOM REMODEL
01

The service, defined

Everything restful about it is decided before the tile goes on.

A spa bathroom remodel is the reconstruction of a bathroom around calm surfaces and generous wet areas — usually a large walk-in shower, a freestanding or built-in tub, a continuous vanity, and lighting that can be taken down to a low level without becoming gloomy.

It serves owners who want the room to feel like somewhere to spend time rather than somewhere to pass through. What makes that possible is unglamorous: waterproofing, falls to drain, ventilation sized for the room, and services planned before anything is closed up.

Completed bathroom remodel in a South Florida home
REFCompleted bathroom with walk-in shower and tiled surfaces.

Humidity is the constant here, and a bathroom that cannot dry between uses will develop problems no amount of finish quality prevents. Ventilation sized to the room and vented outside rather than into a ceiling void matters more in South Florida than almost anywhere. In condominiums there is a second constraint: the waste stack usually cannot move, and the building often specifies what may be done to the floor.

What is included

Scope
Design and layout, demolition, plumbing and electrical alterations, waterproofing, screeds and falls, tiling, glazing, vanity and joinery, fittings, lighting, ventilation, inspections and finish
Delivered by
One licensed general contractor — CBC1265280
Region
Miami-Dade, Broward and Palm Beach counties
Typical elements
Walk-in or wet-room shower · freestanding or built-in tub · double vanity · recessed niches · frameless glazing · layered lighting
Behind the finishes
Bonded waterproof membrane · linear or point drainage · sound-rated ventilation · dimmable circuits
A-01Architectural
SHEET A-01 / SCOPE OF WORKS · 11 ITEMS
02

Scope index

Everything a bathroom remodel actually contains.

Eleven items, four phases. Five of them are buried behind tile, and those are the five that decide whether the room lasts.

Completed bathroom remodel in a South Florida home
REFTiled shower with niche and fittings.
01 / Pre-design

Survey and constraints

Existing layout, stack and vent positions, floor build-up, ceiling void depth for ventilation, and whether the property is a condominium with rules of its own.

A-02Architectural
SHEET A-02 / PROJECT 01 · 09 FRAMES
PROJECT 01

Walk-In Shower Bathroom

Tiled wet area, vanity and fittings in a completed remodel

A completed bathroom documented after handover — a large tiled shower with a recessed niche, a continuous vanity, and glazing set after the tiling so the panels meet the finished surfaces cleanly.

Select any frame to open it full size. All nine frames are the same bathroom.

A-03Architectural
SHEET A-03 / SPECIFICATION · PROJECT 01
03

Specification

Walk-In Shower Bathroom

Recorded from the photography only. Dimensions, cost, schedule, address, client and product brands are not documented in the source material and are not stated.

Project type
Full bathroom remodel with a large walk-in shower
Wet area
Walk-in shower with glazed screen and tiled walls to full height
Storage
Recessed niche within the wet area, set out to whole tiles
Vanity
Continuous vanity with mirror above and integrated lighting
Visible materials
Wall and floor tiling · glazed screen · brassware and accessories in a consistent finish
Detailing
Niche aligned to the tile module · consistent grout lines across wall and floor · glazing meeting finished tile rather than sitting proud of it
Functional improvement
A step-free wet area with generous shower footprint in place of an enclosed cubicle
Stage documented
Complete
Completed bathroom remodel in a South Florida home
REFWalk-in shower with tiled walls and glazed screen.
A-04Architectural
SHEET A-04 / MATERIAL AND DESIGN LANGUAGE
04

Design and material language

Five decisions that decide whether it lasts.

What goes into a wet room, what was used on the documented bathrooms, and what the alternatives actually change.

Completed bathroom remodel in a South Florida home
DETRecessed niche set out to full tiles.
Completed bathroom remodel in a South Florida home
DETVanity and mirror in the finished room.
M-01

Waterproofing

The layer that decides everything

Used on these bathrooms. A bonded membrane over the substrate, turned up the walls and lapped into the drain. Everything visible in these bathrooms sits on top of it.

Other options. Sheet membranes and liquid-applied systems both work when installed to their own detail. What does not work is relying on the tile and grout, which are not waterproof and never were.

M-02

Drainage

Linear or point

Used on these bathrooms. Falls formed in the screed so the whole wet area runs to the drain, rather than relying on a lip to contain water.

Other options. A linear drain lets the floor fall in one direction and suits large-format tile. A centre point drain needs falls from four directions, which means more cuts and a busier floor.

M-03

Tile format

Large formats need a flatter substrate

Used on these bathrooms. Wall and floor tiling set out so full tiles land at the eye line and at the niche, with cuts pushed to the least visible edges.

Other options. Large-format tile reads calmer and has fewer grout lines to clean, but is far less forgiving of an uneven substrate. Small mosaic suits a sloped floor because it can follow the fall.

M-04

Glazing

Frameless, measured last

Used on these bathrooms. Glazed screens measured after tiling is complete, so the panels meet the finished surface rather than a drawing.

Other options. Framed enclosures cost less and tolerate more deviation. Frameless looks better and demands walls that are genuinely plumb, which is a substrate decision made weeks earlier.

M-05

Ventilation

The least glamorous, most important fitting

Used on these bathrooms. Extraction sized for the room volume and ducted to outside. In a humid climate this is what stops a beautiful bathroom developing mould at the ceiling line.

Other options. Quieter units cost more and get used more, which matters — an extractor nobody switches on is not ventilation. Humidity-sensing controls remove the decision entirely.

On what is shown. Every photograph on this page is a real Elbaz Construction bathroom. The alternative options described are named for comparison only and are not claimed to be what is pictured.

G-02General
SHEET G-02 / PROCESS · 10 STAGES
05

Process

Ten stages, in order.

Waterproofing and tiling both need curing time that cannot be compressed, and glazing is measured only after tiling. That sequence sets the programme more than the size of the room does.

01
Consultation

How the room is used and what fails now.

02
Survey

Layout, stack position, floor build-up and ceiling void.

03
Design

Layout, wet-area strategy and lighting resolved.

04
Selections

Tile, brassware, vanity, glazing and fittings chosen together.

05
Approvals

Permit where required; association approval in a condominium.

06
Demolition

Strip out to substrate with protection and dust control.

07
Rough-in

Plumbing and electrical run and inspected.

08
Falls and waterproofing

Screeds to fall, membrane applied, tested where the detail warrants it.

09
Tiling

Set out and laid; curing time respected.

10
Glazing, fittings, handover

Measured, installed, adjusted, cleaned.

P-01Permitting
SHEET P-01 / APPROVALS AND BUILDING COORDINATION
06

Technical brief

What needs permission, and what the building will ask for.

Bathrooms almost always involve plumbing and electrical alteration, which makes most of them permitted work. In a condominium the association usually asks for more than the city does.

Completed bathroom remodel in a South Florida home
PThe room read from the shower toward the vanity.
Completed bathroom remodel in a South Florida home
PTiling detail at the wet-area wall.
A-01

Plumbing alteration

Moving a shower, WC or basin changes drainage and needs correct falls and venting. That is permitted, inspected work in every jurisdiction here.

A-02

Electrical work

Lighting circuits, extraction, heated elements and any socket in a bathroom carry specific protection requirements and are inspected.

A-03

The waste stack

In a condominium the stack is usually shared and fixed. The WC in particular is constrained by it, and layouts that assume otherwise fail at approval.

A-04

Waterproofing and the unit below

In multi-storey buildings a leak is someone else’s ceiling. Associations often specify the waterproofing standard and may require inspection or a flood test before tiling.

A-05

Sound requirements

Buildings frequently specify impact-sound requirements for hard flooring, which applies to bathroom floors as much as to living areas.

A-06

Association approval

Written approval before starting, plus contractor licensing and insurance naming the association. Its own timetable, separate from the permit.

A-07

Ventilation routing

Extraction must discharge outside, not into a ceiling void or attic. In condominiums the available route is sometimes the constraint on the whole design.

A-08

Older buildings

Disturbing finishes in an older property can raise asbestos or lead questions. Where the age makes it plausible, it is tested before demolition.

A-09

Closeout

Where work was permitted, the permit is closed on final inspection and handed over with the product and warranty documentation.

Disclaimer. Requirements are set by your municipality and, in a condominium, by the association and the building. Nothing here is a legal opinion. We confirm what applies at your address before work starts.

S-01Structural
SHEET S-01 / WET-AREA BUILD-UP
07

Assembly

Section through the wet area.

An indicative section through a tiled wet area — the layers in order, and the two junctions where nearly every bathroom leak actually begins.

Indicative section through a tiled wet-area floor and wallSection showing the wall substrate and tiling, the waterproof membrane turned up the wall and lapped into the drain, the screed formed to a fall, the structural floor beneath, and the drain assembly at the low point.010203040506fall to drainIndicative section — not a construction drawing

Key

01
Wall substrate and tiling
02
Membrane turned up the wall
03
Floor tiling
04
Screed formed to a fall
05
Structural floor
06
Drain, membrane lapped in
S-01

Tile and grout are not waterproof

They are the wearing surface. Water passes through grout and reaches the membrane, which is why the membrane — not the tile — is what keeps the room dry.

S-02

The wall-to-floor junction

This is the single most common failure point in a bathroom. The membrane has to be continuous around that corner, which is a detailing question rather than a product question.

S-03

The drain lap

The membrane must lap into the drain body, not stop next to it. Done wrongly, water tracks under the tile bed toward the nearest joist.

S-04

Falls are formed, not assumed

The screed is laid to fall. A flat floor with a drain in it holds water at the edges regardless of how good the tiling looks.

Q-01Quality
SHEET Q-01 / PERFORMANCE AND QUALITY
08

Performance and quality

What we hold ourselves to.

No product performance figure or warranty term is claimed on this page. Those come from the manufacturer of what is actually specified for your bathroom.

Completed bathroom remodel in a South Florida home
QFloor and wall tiling meeting at the wet area.
Completed bathroom remodel in a South Florida home
QFittings and brassware against the tiled surface.
Continuous waterproofing
The membrane is continuous at every corner, upstand and penetration. Continuity is the whole point of it.
Falls formed in screed
The floor is laid to fall toward the drain rather than relying on the tile bed to make up the difference.
Testing where warranted
Wet areas are flood-tested before tiling where the detail or the building calls for it.
Substrate flatness
Walls made plumb and flat before tiling, which is what makes frameless glazing possible.
Tile set-out
Planned so full tiles land at the eye line and in the niche, with cuts pushed to the least visible edges.
Ventilation sized and ducted
Extraction sized to the room volume and discharged outside, not into a void.
Services inspected
Plumbing and electrical inspected before they are covered.
Protection and cleanliness
Routes protected and dust controlled, which matters most in an occupied home or apartment.
C-01Cost
SHEET C-01 / COST AND SCHEDULE VARIABLES · 12
09

Cost and timeline

The twelve things a real number is built from.

We do not publish bathroom prices. Tile choice alone spans a multiple, and whether the layout moves changes the job entirely. After a survey you get a written scope and a fixed proposal against it.

Completed bathroom remodel in a South Florida home
CShower area with fittings and niche.
Completed bathroom remodel in a South Florida home
CThe completed bathroom seen from the entrance.
#VariableWhy it moves the number
01Whether the layout movesKeeping the WC and drainage where they are saves real money. Moving them, where the building allows it, does not.
02Wet-area size and typeA fully tanked wet floor costs more than a formed shower base and looks considerably better.
03Waterproofing systemSystem type and how much of the room is tanked.
04Tile specificationFormat, material and finish. Large-format and natural stone both cost more to buy and to lay.
05Tiling labourSet-out complexity, niches, mitred edges and how many cuts the design generates.
06GlazingFramed versus frameless, panel size, and whether anything is curved or notched.
07Vanity and joineryStock unit, semi-custom or made to measure, and the counter material.
08Brassware and fittingsThe range here is enormous at identical installation cost.
09Electrical scopeLighting circuits, dimming, heated elements and extraction.
10Ventilation routeWhere the duct can go, and what has to be opened to get it there.
11Hidden damagePrevious leaks found at strip-out, which is common in older bathrooms.
12Access and building rulesCondominium hours, elevator use and protection requirements.
I-01Information
SHEET I-01 / QUESTION INDEX · 15
10

Question index

Straight answers about bathroom remodels.

Fifteen questions across waterproofing, layout, drainage, tiling, ventilation, condominium rules, cost and schedule.

01 / Waterproofing

Isn’t tile waterproof?

No, and this is the single most common misunderstanding in bathroom work. Tile is the wearing surface; grout is porous and water passes through it. What keeps the room dry is the membrane underneath. A bathroom that looks immaculate can be leaking into the structure from the day it was finished.

A-06Architectural
SHEET A-06 / CONSTRUCTION STUDY
Construction study

Four things worth looking for.

Completed bathroom remodel in a South Florida home
STUDYWalk-in shower with tiled walls and glazed screen.

These frames are real Elbaz Construction bathrooms in South Florida. The catch-all folder in the source archive was excluded — it contains confirmed cross-client material from another market.

Observations

01
The niche lands on whole tiles
A recessed niche set out to the tile module rather than cut into it. That alignment is decided before the first tile and cannot be corrected afterwards.
02
Grout lines continue across surfaces
Wall and floor joints line through where the geometry allows. It is a set-out decision that costs planning rather than money.
03
Glazing meets finished tile
The screen sits against the completed surface, which only works if the glazing was measured after tiling rather than ordered from a drawing.
04
Fittings on a consistent line
Valves, outlets and accessories are set to coherent heights and centre lines rather than positioned individually during rough-in.
G-03General
SHEET G-03 / DELIVERY AND CREDENTIALS
11

Credentials and delivery

Six verifiable reasons, and no badges.

Nothing here is an award or a membership we cannot substantiate. The licence number is public and checkable.

Completed bathroom remodel in a South Florida home
REFThe completed room read from the shower toward the vanity.
01

Licensed general contractor

CBC1265280 — certified building contractor, bonded and insured, which is what most associations require before approving work.

02

Waterproofing treated as structure

The membrane detail is designed and inspected rather than left to whoever is tiling that week.

03

Services under the same contract

Plumbing, electrical and ventilation stay with us instead of becoming your coordination problem.

04

Condominium experience

Association approvals, insurance certificates, sound requirements and elevator windows planned into the programme up front.

05

Set-out before tiling

Tile layout is planned so the visible alignments are right, which costs thought rather than budget.

06

One point of contact

The same people from survey through to snagging and handover.

I-02Information
SHEET I-02 / CLIENT RECORD
12

Google reviews

In their words, unedited.

Reviews are quoted verbatim from the Elbaz Construction Google Business Profile. They describe the company as a whole — none refers specifically to the bathrooms documented above.

★★★★★

“Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work.”

Itzick Manasherov · Google review

★★★★★

They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent.

Omri B

★★★★★

Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !!

Adir Davidov

★★★★★

Met my exact requests with so much patience and knowledge.

Lee Morali

★★★★★

Every espect of the work was clear, and fair. Value for money 10/10.

roni yonani

Project files

Spa baths, photographed finished.

A wet room with a freestanding tub and wood-look tile, a white marble-look bath, and a collection of spa-style baths from several jobs. Pick a tab and look at the details.

3Projects shown
20Photos
3Site videos
PROJECT 01

Wet-room bath with a tub and wood-look tile

A wet-room bath puts a freestanding tub under a rain head against a wood-look tile accent wall, with a linear drain in the floor. Large gray tile, a niche and a frosted window finish the room. A second shower in gray plank-look tile has a rain head, a handheld and a digital control.

Scope of work

  • Wet-room floor with a linear drain
  • Freestanding tub against a wood-look tile wall
  • Rain head over the tub area
  • Recessed niche in beige tile
  • Gray plank-look shower with a digital valve
  • Hex marble shower floor and a smart toilet

Materials & finishes

Wood-look porcelainGray plank-look tileLarge-format tileHex marble floorLinear drainFrosted windowDigital shower control

What to look for in the photos

Look at where the tub meets the floor: the wet-room floor slopes to a drain, so the whole area is part of the shower. Then look at the wood-look wall, where the planks run vertically.

Elbaz Construction project photo · 6 photos

PROJECT 02

White marble-look bath with a tub and sliding glass

A white marble-look bath combines a freestanding tub, a sliding-glass shower and louvered closet doors. Another view shows a walk-in shower with frameless glass, a bench and an LED niche lit blue, with a window and a toilet. A white vessel sink sits on a floating vanity under an LED mirror.

Scope of work

  • Marble-look large-format wall and floor tile
  • Freestanding tub
  • Sliding-glass shower enclosure
  • Frameless walk-in shower with a bench
  • LED-lit niche
  • Floating vanity with a vessel sink and LED mirror

Materials & finishes

Marble-look porcelainLarge-format tileSliding glassFrameless glassLED nicheVessel sinkLED mirror

What to look for in the photos

Look at the lit niche: the light sits inside the wall opening, not on a fixture. Then look at how the marble-look tile continues from floor to wall in the shower.

Elbaz Construction project photo · 3 photos

PROJECT 03

Collection: spa-style baths from several jobs

Photos from several Elbaz bathroom jobs, grouped by one idea: a bath built for soaking and showering. They differ in stone, tile and fixtures, so treat this as a collection, not one house. The common thread is a freestanding tub, glass shower and soft lighting.

Scope of work

  • Freestanding tubs in dark and light stone rooms
  • Frameless glass walk-in showers
  • Steam-style shower with a wood bench
  • Floating and double vanities
  • LED cove and mirror lighting
  • Marble and marble-look wall and floor tile

Materials & finishes

Gray marbleMarble-look tileFrameless glassWood benchBrass fixturesLED lightingWood vanity

What to look for in the photos

Compare how each room lights its tub: cove light, a mirror strip or a window. Then compare the stone: gray, blue and white veining each change the mood.

Collection: photos from several Elbaz Construction jobs · 6 photos

In motion

Spa baths, in motion.

Three slow clips of finished spa-style baths, with floating vanities, backlit mirrors and glass showers.

Walnut vanity, oval mirror, glass shower pan
Gold faucet, lit niche, glass door opens
Backlit mirrors, wood vanity, bench shower

Cost and time

Where a spa bath spends.

A typical budget split for a spa bathroom, and the sequence of the work. The membrane and glass carry the calendar.

Where a typical spa bathroom budget goes

100%OF BUDGET
  • Waterproofing & substrate12%
  • Tile & setting22%
  • Plumbing & valves17%
  • Tub, glass & fixtures24%
  • Lighting, electrical & controls9%
  • Demo, framing & labor12%
  • Permit & inspections4%

Typical shares only. A wet room, a steam shower or a floor-filled tub shifts weight to waterproofing and plumbing.

A typical spa bathroom, week by week

Design & selections
Selections
Permit & orders
Orders
Demo & rough-in
Waterproof & flood test
Tile & grout
Tub, glass & fixtures
Commissioning & handover
Week 0Week 6.5Week 13

Weeks are indicative. Tub, glass and special-order fixtures set the finish date.

How it works

What makes a bath restful.

Three drawings of the parts behind a spa bathroom that you cannot see.

LINEAR DRAINBATH FLOOR (FLUSH)SLOPE 1/4 in PER FTNO CURB TO STEP OVER

Floor falling to a drain

A curbless shower floor slopes to a linear drain. In a wet room the slope runs across the whole floor.

SHOWER WALL, INSIDE OUTTile + groutThinset mortarWaterproof membraneCement backer boardWood or metal studExterior wall / CBS

Membrane behind the tile

A shower wall: framing, backer, a waterproof membrane, then tile. In a wet room this assembly covers more of the room.

NICHE BETWEEN STUDSpitched sill, waterproofed12 in

Niche with a pitched sill

A recessed niche between studs, with a sill that pitches back into the shower. A built-in light goes in before the tile.

Scope planner

Scope a spa bath in four answers.

Choose what applies. You get an indicative time on site and the trades involved.

What kind of wet area?
Is there a tub?
How is the shower controlled?
What lighting?

Details

The details of a restful room.

Drains, slide bars, tubs and fillers up close. A spa bath is made of small, quiet decisions.

Hex floor, square drain
Slide-bar handheld, niche
White tub, wood-look wall
Black marble, floor filler
Tub on wood-look platform

More questions

Questions about a restful bath.

Wet rooms, digital valves, lighting and hard water: what to ask about a spa bathroom in South Florida.

Ask us directly
What is a wet room, and how is it built?

A wet room is a bathroom where the whole floor is waterproofed and slopes to a drain, so water can land anywhere without damage. The walls are waterproofed to a higher line, and the door threshold is sealed. It needs careful framing and a flood test, and the drain is usually a linear one.

What does a digital shower valve need behind the wall?

A digital valve needs power and a control unit, either in the wall or in a nearby cabinet. The unit and the valve both need to be reachable for service, so we plan an access panel on the dry side. The electrical feed is GFCI protected. We check that the controller and fixtures are from one maker.

Will a soaking tub use up all the hot water?

A large tub can hold 60 gallons or more, which a small tank heater cannot supply on its own. We compare the tub volume against the heater and the recovery rate. Options include a larger tank, a tankless unit or a flow-limited filler. Knowing the tub before the plumbing is roughed in avoids surprises.

Is a light in a shower niche safe?

Yes, when it is low-voltage and rated for wet locations. The LED strip sits inside a sealed channel, and the driver is outside the wet area, with an access point. The light is placed before the niche is tiled, and the wiring runs in the wall. We use products listed for wet use, with a warranty.

How do I keep wood-look tile from looking repetitive?

Pick a tile with many different faces, ideally eight or more, and mix them as you lay. Offset the planks by about a third, not half, so joints do not stack. Use a matching grout. We lay out a few boxes on the floor before installing, so the pattern is balanced across the wall.

How do I keep rain-head water inside the shower?

A rain head throws a wide, soft spray. Glass at least as tall as the head, a fixed panel on the open side and a floor that slopes toward the drain all help. Set the head to one side of the valve so you can turn on the water without standing under it. We check the spray pattern against the glass layout.

What does hard water do to glass and fixtures?

South Florida water is hard and leaves white scale on glass and chrome. A factory glass coating makes it easier to wipe, and a squeegee after each shower stops it forming. Matte black and brass show spots more than polished chrome. A water softener reduces scale throughout the house.

How high and deep should a shower bench be?

A comfortable bench seat sits about 17 to 18 inches above the floor, and is 12 to 15 inches deep. It slopes slightly toward the drain so water does not pool. A longer bench can double as a ledge for toiletries. We build it to your height, since a bench set too high or too low feels wrong.

G-04General
SHEET G-04 / ENQUIRY
13

Start here

Book the bathroom survey.

Tell us what the room gets wrong now. We will measure it, find the stack, and tell you honestly what the layout can and cannot do.

Completed bathroom remodel in a South Florida home
REFCompleted bathroom with walk-in shower.

What happens next

01
We call or email within one business day, Sunday to Friday.
02
A survey: layout, stack position, floor build-up and ventilation route.
03
A layout and a written scope with a fixed proposal against it.
Useful to have
Your building’s renovation rules if you are in a condominium, and any images of what you are aiming for.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

G-05General
SHEET G-05 / END OF SET

Waterproof it properly.
Then make it beautiful.

Design, approvals, services, waterproofing, tiling and finishes under one licensed general contractor across Miami-Dade, Broward and Palm Beach.

Completed bathroom remodel in a South Florida home
ENDVanity and mirror in a completed bathroom.