A full kitchen remodel is the highest-density room in the house: cabinetry, stone, appliances, plumbing, electrical, ventilation and lighting all landing in a few square metres, in a fixed order. Elbaz Construction runs the design, the selections, the trades and the inspections as one contract — because in a kitchen, the sequence is the job.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll

Kitchen remodeling · South Florida

Layout first. Everything else is selection.

Most kitchen disappointment is not about the finishes. It is about a layout that was inherited rather than decided — a work triangle that does not work, an island that blocks a run, a bin nowhere near the sink.

We start with how the room is actually used: who cooks, how many at once, where the shopping lands, where the waste goes, whether it needs to seat people. The cabinetry catalogue comes after that conversation, not before it — because a beautiful kitchen in the wrong layout is a beautiful kitchen you work around every day.

4.8Google rating across 343 reviews
104municipalities across three counties
CBC1265280Florida general contractor licence
Licensed and insured

Florida-licensed general contractor, License No. CBC1265280. Bonded and insured.

Layout resolved before ordering

Plan, elevations and appliance schedule agreed before a single cabinet is ordered, because cabinetry is the least forgiving thing in the house to change.

Trades sequenced under one contract

Demolition, electrical, plumbing, ventilation, tiling, cabinetry, stone templating and fit-out scheduled against each other.

Financing available

Financing options are available through Mosaic.

  • Licensed & insuredState-licensed GC, bonded and insured
  • Design-buildDrawings and construction under one contract
  • Permits & inspectionsSubmission, review comments and closeout
  • LocalMiami-Dade · Broward · Palm Beach
  • FinancingOptions available through Mosaic

What a full remodel changes

A kitchen that fits how you actually cook.

The difference between a refreshed kitchen and a properly remodelled one is whether the layout, the services and the storage were allowed to change.

Move the walls.
Or at least the plumbing.

A full remodel is the one opportunity to put the sink, the run, the appliances and the sockets where they should be rather than where the previous kitchen left them. Once the cabinetry is in, those positions are fixed for the life of the kitchen — which is why the services drawing matters more than the door style.

  • Work triangle and prep runs planned around how many people cook at once.
  • Appliance positions, sizes and clearances confirmed before cabinetry is ordered.
  • Power, water, waste and ventilation moved while the walls are open.
  • Storage designed for what you own rather than a standard cabinet mix.

Ventilation is not an accessory

In a South Florida kitchen, extraction and make-up air do more for how the room feels day to day than almost any finish. It needs a duct route, and duct routes are decided at rough-in, not at fit-out.

Stone is templated, not ordered

Worktops are templated off the installed cabinetry, which is why there is a gap between cabinets going in and stone arriving. Planning for that gap is the difference between a schedule and a surprise.

Renovated kitchen island lit by pendant lighting
Completed kitchen from an Elbaz Construction project in South Florida.

Lighting is designed with the plan, not after it.

Task lighting over the runs, something under the wall units, and a separate circuit for anything decorative — all of it has to be positioned before the ceiling and walls close. Retro-fitting kitchen lighting afterwards means either surface conduit or opening finished surfaces, and neither is a good outcome.

Reface, replace, or re-plan?

If the layout works and the carcasses are sound, refacing redirects budget to stone and appliances. If the layout is the problem, no amount of new doors will fix it. We compare them properly below.

Completed kitchens

Kitchens we have finished.

Genuine photographs of completed Elbaz Construction kitchens across South Florida, at handover.

Finished kitchen with extractor hood and worktop runCompleted kitchen island with a waterfall worktop edgeRenovated kitchen with full-height cabinetryCompleted kitchen island and pendant lighting in a South Florida homeFinished kitchen with integrated fridge and tall unitsCompleted kitchen range and extractor installationRenovated kitchen island with drawer storage
01

Finished kitchen with extractor hood and worktop run

Real completed Elbaz Construction kitchens, photographed after handover. They come from different homes rather than one project, so read them as a record of finish quality and workmanship. Captions describe only what is visible in the frame.

Completed kitchen island with a waterfall worktop edge
Completed kitchen island with a waterfall worktop edge
Renovated kitchen with full-height cabinetry
Renovated kitchen with full-height cabinetry
Completed kitchen island and pendant lighting in a South Florida home
Completed kitchen island and pendant lighting in a South Florida home
Finished kitchen with integrated fridge and tall units
Finished kitchen with integrated fridge and tall units
Completed kitchen range and extractor installation
Completed kitchen range and extractor installation
Renovated kitchen island with drawer storage
Renovated kitchen island with drawer storage

How a kitchen is built

Nine trades, one order.

Project record

Scope
Full kitchen remodel — strip out and rebuild
Typically includes
Demolition · electrical · plumbing · ventilation · plastering · tiling · cabinetry · stone · appliances · flooring · lighting · decoration
Decided before demolition
Layout, appliance schedule, cabinetry specification, stone and tile
Templated on site
Worktops, splashbacks and any bespoke joinery
Not included by default
Structural openings, window replacement and whole-house rewiring — quoted separately
01

How the room is used

Before any drawing: who cooks, how many at once, where shopping and waste go, whether the room seats people, what never gets used in the current kitchen. This conversation decides more about the result than the catalogue does.

02

Plan, elevations and appliances

A layout with real dimensions, elevations for every run, and a confirmed appliance schedule — model by model, because clearances, door swings and service positions all follow from it. Cabinetry is only ordered once this is signed off.

03

The work you never see

Demolition, then electrical, plumbing, ventilation ducting and any framing changes, then inspection, then walls and ceilings closed and levelled. Every position fixed here is fixed for good, so this is where the time goes.

04

Fit-out, in order

Flooring or substrate, cabinetry set and levelled, stone templated and later installed, splashback, appliances connected, lighting, decoration, then handles and adjustment. The gap between cabinetry and stone is normal and is planned for.

Want a layout resolved before you are asked to choose a door style?

That is the order we work in — how the room is used, then the plan, then the selections.

Scope options

Three ways a kitchen gets scoped.

Planning tiers, not packages. Which fits depends on whether the layout works and what condition the services behind it are in.

Refit scope

Same layout, new kitchen

The existing plan works; everything visible is replaced without moving services.

  • Strip out and dispose of the existing kitchen
  • New cabinetry in the existing layout
  • New worktops, templated and fitted
  • Splashback and tiling
  • Appliance replacement in existing positions
  • Making good, decoration and lighting replacement
  • Final adjustment and handover

Full remodel

Layout and services move

The common full-remodel scope: the plan changes and the services follow it.

  • Everything in Refit scope
  • Layout re-planned around how the room is used
  • Plumbing relocated for sink, dishwasher and any second point
  • Electrical rewired with dedicated appliance circuits
  • Extraction ducted to outside with a planned route
  • Flooring replaced across the room
  • Permits and inspections for the trades that require them

Open-plan scope

The room itself changes

Where the kitchen's problem is the wall around it rather than the kitchen in it.

  • Everything in Full remodel
  • Wall removal with structural engineering and beam
  • Kitchen, dining and living planned as one space
  • Island or peninsula with services run to it
  • Ceiling levelled and lighting designed across the whole space
  • Flooring run continuously through the combined space
  • Heating, cooling and ventilation rebalanced

Add-ons and upgrades, priced individually

  • Structural engineering and beam for wall removal
  • Electrical service or panel upgrade where the new load requires it
  • Bespoke joinery — pantry, utility or seating built-ins
  • Water treatment, filtered tap or instant hot water
  • Integrated appliance upgrades and specialist ventilation
  • Underfloor heating or floor levelling to a specified tolerance
  • Window or door alterations to bring light into the run
  • Temporary kitchen provision during construction

The tiers exist to start the conversation. What your kitchen needs depends on whether the layout works and what the survey finds behind the units.

Kitchen by kitchen

What finished looks like.

Completed Elbaz Construction kitchens. Different homes, different budgets, the same standard of fit.

Completed kitchen with island seating and tiled splashback
01

Setting out the runs

The layout is measured on site and drawn before anything is ordered, so filler panels are planned rather than improvised and appliance clearances are real.

Renovated kitchen island with counter stools
02

Carcasses and levelling

Every carcass is levelled and fixed to the wall independently before doors go anywhere near it. If the base is not right, no amount of adjustment at the door hinge hides it.

Completed kitchen range set into a stone worktop run
03

Worktops and edges

Worktops are templated after installation of the bases, not from the drawing, and seam positions are agreed in advance rather than discovered on the day.

Finished kitchen with pendant lighting over the island
04

Splashbacks and tiling

Tile or slab is set out from the visible corners inward, so cut pieces end up where they are least noticed and the grout lines run through.

Completed kitchen viewed across the island toward the sink run
05

Services and appliances

Electrical, gas, water and extraction are all first-fixed to suit the final layout, including the socket you only realise you need when the island is in.

Renovated kitchen with a farmhouse sink and tiled splashback
06

Doors, drawers and handles

Doors and drawer fronts are aligned at the end of the build, with consistent shadow gaps, and handles are drilled from a jig so the line is the same the length of the run.

Each frame is a genuine completed Elbaz Construction kitchen. They come from different projects, which is why they are shown individually.

Process and client experience

Ten stages, and what each one asks of you.

A kitchen is short but dense. Knowing where your decisions actually bite is what keeps it short.

Initial consultation

We look at the room and talk about how you actually use it, not about catalogues.

What to expect

About an hour, in the kitchen. Bring the frustrations, not just the inspiration.

Your decision

Whether to proceed to a measured design.

Measured survey

Room measured precisely, services traced, panel capacity checked, floor levels taken.

QC · Levels and service positions are recorded before anything is drawn.
What to expect

Access to the panel, the stopcock and under the sink.

Your decision

Nothing yet.

Layout and elevations

A plan and elevations for every run, worked around how the room is used.

What to expect

Two or three rounds. This is where the kitchen is really decided.

Your decision

Layout, work triangle, island or no island, seating.

Appliance and cabinetry specification

Appliances confirmed model by model; cabinetry specified against them.

QC · Appliance clearances are checked against the drawing before ordering.
What to expect

Decisions with real deadlines — clearances and services follow from these.

Your decision

Every appliance and the full cabinetry specification.

Selections and estimate

Stone, tile, handles, paint and lighting selected; an itemised proposal issued against the drawn scope.

What to expect

A proposal you can compare like for like against another kitchen quote.

Your decision

Finishes, and allowance levels.

Permits and ordering

Applications submitted where the electrical, plumbing or structural work requires them; cabinetry ordered.

What to expect

Lead time. Cabinetry is the long pole on almost every kitchen.

Your decision

Nothing further — the decisions were made at stage 04.

Protection and strip-out

Route and adjacent rooms protected; existing kitchen removed and disposed of.

What to expect

Two noisy days. The room becomes unusable from here.

Your decision

Whether you want a temporary kitchen set up.

First fix and inspection

Electrical, plumbing, ventilation ducting and any framing changes — then inspected before walls close.

QC · Services are photographed before the walls are closed.
What to expect

Slower than it looks, and the phase that determines how the kitchen works.

Your decision

Final socket, light and appliance positions.

Fit-out

Cabinetry set and levelled, stone templated then fitted, splashback, appliances, lighting, decoration.

QC · Cabinetry is levelled and checked before stone is templated.
What to expect

A visible gap between cabinets and stone while the worktops are made. It is normal and it is planned.

Your decision

Only late confirmations.

Snagging and handover

Doors and drawers adjusted, sealant finished, appliances tested and demonstrated, permits closed.

QC · Nothing is called complete until appliances are tested and the permit is closed.
What to expect

A working kitchen, warranty documentation and a closed permit file.

Your decision

Sign-off once the snag list is genuinely finished.

We do not promise building-department approval or inspection dates.

Planning and risk reduction

A kitchen goes wrong at the ordering stage.

Almost every kitchen that overruns did so because something was ordered before it was resolved, or resolved after it was ordered.

The paperwork sequence, in order

  1. Measured surveyRoom dimensions, floor levels, service positions and panel capacity recorded on site.
  2. Use analysisHow the room is actually used, before any layout is drawn.
  3. Layout and elevationsA plan and an elevation for every run, dimensioned.
  4. Appliance scheduleEvery appliance confirmed by model, with clearances and service requirements.
  5. Cabinetry specificationSpecified against the appliance schedule and the measured room, then ordered.
  6. Services drawingFinal positions for power, water, waste and extraction, agreed before first fix.
  7. SelectionsStone, tile, handles, paint and lighting chosen with lead times attached.
  8. Permit applicationsSubmitted where electrical, plumbing or structural work requires them.
  9. Inspection sequenceFirst fix inspected before anything is closed up.
  10. Templating windowThe planned gap between cabinetry installation and stone delivery.
  11. Change managementAny change priced and documented in writing before it is built.
  12. HandoverAppliances tested and demonstrated, documentation handed over, permit closed.

Why each step exists

Why appliances are confirmed by model

Cabinetry is built around exact dimensions and clearances. A substituted appliance after ordering can mean a remade cabinet run.

Why services are drawn before first fix

Sockets, waste and extraction positions are fixed once the walls close. Moving one afterwards means opening finished surfaces.

Why templating creates a gap

Stone is templated off installed cabinetry so it fits the room as built. That gap is planned into the schedule, not a delay.

Why panel capacity is checked early

A kitchen with induction, oven and dishwasher can need circuits an older panel does not have. Better found at survey than at first fix.

What we will not tell you

We will not promise a building-department date. We will not quote a kitchen before the layout and appliance schedule exist, because a number without those is a guess. And we will not tell you a kitchen can be finished in a fortnight when the cabinetry alone has a lead time.

Cost and timeline transparency

What actually drives a kitchen number.

We do not publish kitchen prices. The same room can differ by a factor of four depending on cabinetry specification, appliances and whether the services move.

Cabinetry specification

Carcass construction, door material and finish, and the proportion of specialist storage. The single largest line on most kitchens.

Appliance package

The range between competent mid-market and premium integrated appliances is enormous and entirely within your control.

Worktop material

Laminate, engineered stone, quartzite and natural stone are separated by both material cost and templating and fabrication complexity.

Do the services move

Relocating sink, waste, extraction or adding circuits turns a refit into a remodel, and brings inspections with it.

Layout changes and structure

Removing a wall for open-plan brings engineering, a beam, making good and knock-on ceiling and flooring work.

Ventilation route

Ducting extraction to outside is straightforward on an external wall and considerably harder through a ceiling void or across a plan.

Flooring

Whether the floor is replaced, and whether the substrate needs levelling before it can be.

Existing conditions

What is behind the old units: failed plaster, old wiring, hidden leaks, out-of-square walls.

Lighting scope

Task, ambient and decorative lighting on separate circuits, all positioned at first fix.

Site access

Getting cabinetry and stone into the room — stairs, tight turns and lift access all count.

Low Moderate High Very high

Typical influence on a South Florida full kitchen remodel budget. General guidance for planning — not a quote.

What actually moves the schedule

  • Cabinetry lead time, which starts only when the specification is signed off.
  • The templating window between cabinetry installation and stone delivery.
  • First-fix inspections, which have to pass before walls close.
  • Appliance availability, particularly for integrated and specialist models.
  • Any layout change introduced after first fix, which resets several trades at once.

Questions worth asking any contractor

  • Is there a dimensioned plan and an elevation for every run?
  • Is the appliance schedule confirmed model by model before cabinetry is ordered?
  • Where is the extraction being ducted to?
  • Is the electrical work being inspected, and who submits the permit?
  • What is the cabinetry lead time, and when does it start?
  • How long is the gap between cabinets and stone?
  • What is an allowance here and what is a fixed price?

How to prepare for an accurate estimate

  • Write down what frustrates you about the current kitchen, room by room in it.
  • Note how many people cook at once and whether the room needs to seat anyone.
  • Decide roughly on appliance level before design — it changes the cabinetry.
  • Check whether you have a preferred worktop material and its rough cost band.
  • Identify whether a wall might need to come out.
  • Sort financing in principle so specification and budget move together.

Estimates follow scope, not the other way round.

We price against a drawn scope, with allowances stated as allowances. That is what makes a proposal comparable to anyone else’s.

How a kitchen is sequenced

The order, drawn.

A kitchen is a short project with an unforgiving order. Nearly every kitchen that overruns did so by starting a band before the one above it was finished.

Kitchen build sequenceSix stacked bands showing the order a full kitchen remodel runs in: use analysis and layout, appliance and cabinetry specification, strip-out, first fix and inspection, cabinetry and stone templating, then fit-out and handover. Each band has to be finished before the next can start.USE ANALYSIS AND LAYOUTHow the room is used, then a dimensioned plan and elevationsSPECIFICATION AND ORDERINGAppliances confirmed by model, cabinetry specified and orderedSTRIP-OUTExisting kitchen removed, room protected, substrate exposedFIRST FIX AND INSPECTIONElectrical, plumbing, extraction and framing — inspected before closingCABINETRY AND TEMPLATINGUnits set and levelled, then stone templated off themFIT-OUT AND HANDOVERStone, splashback, appliances, lighting, decoration, snaggingBUILD ORDER

Diagram drawn by Elbaz Construction for this page. Illustrative of a typical full kitchen remodel; every room varies.

Each band gates the next

  • Use analysis and layout. Nothing is specified before the plan reflects how the room is actually used.
  • Specification and ordering. Appliances confirmed model by model, then cabinetry specified against them and ordered.
  • Strip-out. The room is protected and cleared, and the real condition of walls, floor and services becomes visible.
  • First fix and inspection. Every socket, waste, duct and circuit position is fixed here — and inspected before it is covered.
  • Cabinetry and templating. Units set and levelled first, because the stone is templated off the kitchen as actually installed.
  • Fit-out and handover. Stone, splashback, appliances, lighting and decoration, then snagging and demonstration.
Where kitchens go wrong

At band two. A kitchen ordered before the appliance schedule is confirmed will need a cabinet run remade, and that lands in the middle of a project where every other trade is already booked around it.

Comparison, mistakes and buyer guide

The kitchen decisions worth getting right.

Refacing or refitting an existing kitchen compared with a full remodel

Refacing or refitting an existing kitchen compared with a full remodel. General guidance for South Florida homes.
FactorReface / refitFull remodel
LayoutUnchanged — you keep the existing plan.Re-planned around how the room is used.
ServicesStay where they are.Sink, waste, extraction and circuits can move.
DisruptionShorter, often around a week or two.Longer, and the room is unusable throughout.
CostMaterially lower.Higher, and the range is much wider.
Best whenCarcasses are sound and square and the layout genuinely works.The layout is the problem, or the services are tired.
RiskHidden damage found after new doors are ordered.Fewer surprises, because everything is exposed early.
LifespanLimited by the carcasses you kept.A new kitchen throughout.

Worktop materials

Worktop materials, compared on the things that actually differ in a working kitchen.
FactorEngineered stoneNatural stone
ConsistencyPredictable — the slab looks like the sample.Varies slab to slab; you should see the actual slab.
PorosityNon-porous; no sealing required.Porous to varying degrees; needs sealing and re-sealing.
HeatCan be damaged by direct heat; use a trivet.Generally more heat tolerant, depending on the stone.
RepairChips can be filled; colour match is usually good.Repairable, but the result depends on the stone.
CostWide range, generally more predictable.Wide range, driven by the specific material.

The mistakes that cost the most

  1. Choosing doors before resolving the layoutDoor style is the last decision that matters and the first one everyone makes. The plan is what you live with.
  2. Ordering cabinetry before confirming appliancesCabinetry is built to exact clearances. A substituted appliance after ordering means a remade run.
  3. Treating extraction as optionalA recirculating hood in a South Florida kitchen is a compromise you will notice daily. The duct route is decided at first fix or not at all.
  4. Forgetting the templating gapStone is templated off installed cabinetry. Expecting worktops the same week as cabinets is expecting the impossible.
  5. Under-planning powerModern kitchens need more dedicated circuits than older panels were built for. Check capacity at survey, not at first fix.
  6. Choosing a worktop without seeing the slabNatural stone varies. Approving a sample and receiving a slab is how disappointment happens.
  7. Ignoring floor levelsAn out-of-level floor shows up as an out-of-level cabinet run and a stone joint that will not close.
  8. Leaving sockets and lighting to the electricianPositions should come from the elevations you approved, not from a decision made on site on the day.

Buyer checklist

Prepare before you call

Ask at the first meeting

Expect from a qualified contractor

Tick these off as you go — nothing is stored or sent, the list is here purely so you can use it while you compare contractors.

What the build is like

Three to six weeks without a kitchen.

Completed kitchen sink run with a pull-down tap
Completed kitchen from an Elbaz Construction project in South Florida.

The room is unusable from strip-out

From the day the old kitchen comes out until appliances are connected, there is no kitchen. Planning a temporary setup — kettle, microwave, fridge somewhere sensible — makes a real difference.

Preparation you can do

Empty every cupboard well before the start date, decide what is being kept, and clear a route from the front door to the room for cabinetry and stone.

How communication runs

One point of contact and a known weekly sequence, with notice before water or power is interrupted.

Quality control, not just inspection

Cabinet runs are levelled and checked before stone is templated, and services are photographed before walls close. Getting stone to fit depends entirely on the accuracy of the run beneath it.

What completion means

Appliances tested and demonstrated, doors and drawers adjusted, sealant finished, warranty documentation handed over and the permit closed.

Questions, answered

Full kitchen remodels in South Florida.

  • On site, commonly a few weeks — but the schedule is set by cabinetry lead time, which starts when the specification is signed off, and by the templating gap between cabinets and stone.

    Design and selections routinely take longer than owners expect. Construction cannot start until they are finished.

  • Usually yes for the electrical and plumbing work, and always if you are moving walls. A like-for-like replacement with no service changes may not.

    We assemble and submit the applications, answer plan-review comments, and schedule and attend the inspections.

  • If the carcasses are sound and square and the layout is staying, refacing or replacing doors and drawer fronts is a legitimate way to redirect budget to stone and appliances.

    If the layout is changing, or there is water damage, replacement is usually cheaper once everything is counted.

  • Before cabinetry is ordered, and confirmed model by model. Cabinetry is built around exact dimensions, clearances, door swings and service positions.

    Substituting an appliance after ordering is one of the most expensive changes available on a kitchen.

  • It depends on how you use the kitchen more than on looks. Engineered stone is non-porous and predictable; natural stone is more variable and needs sealing but many people prefer it.

    If you choose natural stone, see the actual slab rather than a sample.

  • Because stone is templated off the cabinetry as actually installed, then cut and fabricated. It is the only way to get joints and overhangs that fit the room rather than the drawing.

    We plan that window into the schedule from the start.

  • It does not have to, but in a South Florida kitchen it makes a large difference to how the room feels. A recirculating hood removes some grease and no heat or moisture.

    The duct route has to be decided at first fix, because it runs inside the structure.

  • Often, but not always. Induction hobs, ovens and dishwashers need dedicated circuits and modern kitchens need more of them than older panels were built for. It is checked during survey so the answer arrives before design.

  • Frequently yes, but if the wall is load-bearing it needs structural engineering and a beam, which brings a permit, inspections and making good into the scope. It is a materially larger project than a kitchen remodel.

  • Almost always. What you will not have is a kitchen, from strip-out until appliances are connected. Most households set up a temporary kitchen elsewhere.

  • Yes — financing options are available through Mosaic. Sorting it before design means specification and budget are decided together rather than the specification being cut late.

  • Manufacturer warranties apply to appliances, cabinetry and worktops, with documentation handed over at closeout. Workmanship coverage is set out in your contract — ask for it in writing before you sign, with us or anyone else.

Why Elbaz Construction

Verified, and nothing more than that.

  • Licensed general contractorFlorida-licensed general contractor, License No. CBC1265280. Bonded and insured.
  • Layout before catalogueWe resolve how the room is used and produce a dimensioned plan before anyone talks about door styles.
  • Every trade under one contractDemolition, electrical, plumbing, ventilation, tiling, cabinetry, stone and fit-out sequenced against each other.
  • Appliances confirmed before orderingModel by model, so cabinetry is built to the right clearances the first time.
  • Local knowledgeWorking across 104 municipalities in Miami-Dade, Broward and Palm Beach counties.
  • CommunicationOne point of contact from first conversation through closeout.
  • Quality control and closeoutRuns levelled before templating, services photographed before closing, appliances tested at handover, permits closed.
  • Reviews you can readA 4.8 average across 343 Google reviews, published in full on Google.

What homeowners say

Reviews, unedited.

Published on Google, quoted here word for word. We do not shorten, merge or rewrite a review.

4.8Average across 343 Google reviews
Read all 343 reviews on Google
I am very grateful that Ashley took on my project . Now every morning I run to my beautiful kitchen because it is more than I expected. Thank you Ashley for your efforts, understanding and patience
RIo NormanGoogle review
Excellent beautiful work on our kitchen project. Asher passion and professionalism were outstanding! Very happy with the outcome
Alan SchroederGoogle review
Highly recommended for any bathroom or kitchen projects! Raz is very knowledgeable at this field and gave us wonderful ideas for the design. It was done in a timely manner. Thank you !!
Valerie CisnerosGoogle review
If you are planning to remodel your kitchen or bathroom or do any other construction project, call Sean from Elbaz Construction . He has a lot of experience and will recommend the best options/ suggestions to your project. He did high quality job !
Kameron AllisonGoogle review

Related reading and services

Schedule a Consultation (754) 236-0675

Start here

Start with the layout, not the catalogue.

One consultation in your kitchen, then a dimensioned plan you can actually price. No cabinetry ordered before the appliance schedule exists.

What happens after you send this

  1. We call you back to understand how the room is used and what frustrates you about it.
  2. We measure the room, take floor levels and check the panel and service positions.
  3. You get a dimensioned plan and elevations for every run, with an appliance schedule.
  4. An itemised proposal follows the drawn scope, with allowances stated as allowances.

Worth having to hand

  • What frustrates you about the current kitchen
  • How many people cook at once
  • Rough appliance level
  • A preferred worktop material, if you have one
  • Whether a wall might come out

Licensed, bonded and insured · License No. CBC1265280

Design, permitting and construction under one contract

Serving Miami-Dade, Broward and Palm Beach counties

Sun–Fri 7am–7pm · Saturday closed

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team. We will call you back to arrange the site visit. If it is urgent, call (754) 236-0675.