Delray Beach.
Three days if it is on the list.
Triple if you did it first.

Licensed general contracting and renovation in Delray Beach — where three named permit types are issued inside three days, and an after-the-fact permit costs three times what it should have.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll
Start here

Tell us the scope
and the address.

We will tell you whether any of it is on the City’s express list, and what the rest of it needs before anyone lifts a tool.

Why we ask before anything starts

This City rewards permitting first and prices the alternative at triple.

Delray Beach publishes both halves plainly. Three permit types are expedited and issued within three days. Everything else follows the normal route — and if work has already started without a permit, Code Enforcement issues a stop work notice and the after-the-fact permit costs three times the normal amount, with third-party engineering fees on top where the work has been covered up.

Prefer to talk now(754) 236-0675

Sun–Fri 7am–7pm · Saturday closed. Licensed, bonded and insured · CBC1265280.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Delray Beach · Palm Beach County

A genuine fast lane,
and a genuine
penalty.

Most municipalities have one or the other. Delray Beach publishes both, in plain language, on its own pages — a three-day express list with a narrow emergency allowance, and a tripled after-the-fact cost with a stop-work notice attached. Between them they describe exactly how this City wants work to be sequenced.

White shaker kitchen by Elbaz Construction with a quartz peninsula and two stools, a run of base units under the window and a gas range beyond
What we build

Kitchens, bathrooms and whole-home renovation, permitted first

Cabinetry, worktops, tiling, and the electrical, plumbing and mechanical work behind them — run by one licensed general contractor, with the permit in hand and the inspections booked before the trades arrive rather than after.

Start your project
The express list, exactly

Three types, three days

The City states that A/C change-out, water heater replacement and re-roof permits are considered express permits and will be expedited and issued within three days. That is the City’s own commitment about its own service, and it is the only duration on this page.

The narrow allowance

Emergencies, within 24 hours

The one after-the-fact route the City publishes: emergency A/C change-outs and water heater replacements can be accommodated if the permit is submitted within 24 hours of doing the work. It is a genuine provision for a genuine failure — and it covers two things, not everything.

Everything else

Tripled, and stopped

Start without a permit and a stop work notice will be issued by Code Enforcement, the cost of the after-the-fact permit will be tripled, and where the areas of work are concealed there may be fees for a third party engineering analysis. Without an application at all, a Notice of Violation can follow, and fines with it.

Before you can even file

Contractor registration

Contractors must register and maintain their current licence on file prior to permit submittal. It is not something to sort out while the application is in the queue — it gates the submittal itself.

How the process actually runs

Two clocks, and
a sentence about
silence.

Five things about building in Delray Beach that are not true of the city next door.

01 · The expiry rule people misread

No inspection is treated as proof the job was abandoned.

The City’s wording deserves reading twice: permits expire and become null and void if work is not started and an inspection is requested within 180 days; after work has commenced, the permit expires when work is suspended or abandoned within 180 days — and lack of an inspection within this time will serve as validation that the job has been suspended or abandoned. You do not have to decide to stop. Going quiet is the evidence.

02 · The document before the first inspection

Notice of Commencement

The City requires a recorded NOC before the first inspection for all permits valued above $5,000, or for air conditioner replacements valued at $15,000 or greater. It must be recorded at a Palm Beach County Court House, and the City points out that the most convenient one sits just south of City Hall.

03 · What arrives with the permit

A white placard, printed on the back

The list of required inspections is on the back of the white permit placard, and instructions for scheduling them come with the permit. The City is explicit that it is the applicant’s responsibility to ensure all required inspections are made before proceeding with work — not the inspector’s, and not ours to assume.

04 · Digital, with a paper option that costs

eServices and ePlans

Permitting is fully digital: submit documents, pay fees and download permits online, with electronic plan review being introduced gradually, more permit types at a time. Paper is still accepted — the City will scan your documents for you, for a fee.

05 · If you are pulling it yourself

You have to appear in person

Under state statute an owner who owns and occupies the home may act as their own contractor. The City adds that owners acting as their own contractor, or listed as a subcontractor, are required to personally appear and sign the permit application — and that a contractor is required for all commercial and multi-family property.

06 · And a warning the City prints itself

If they ask you to pull it, beware

On choosing a contractor, the City says: check references, ask to see the State licence, check the number on the state website for complaints — and “if they ask to secure the permit, beware. They may not be licensed, which puts the homeowner at risk.” A contractor who wants the permit in your name is telling you something.

Structural work

The stages
an inspection
is booked for.

Structural work on an Elbaz Construction project, shown as one property at successive stages rather than as separate jobs.

Why the sequence matters here

Concealed work is the expensive kind to regularise

The City warns that an after-the-fact permit can carry third-party engineering analysis fees where the areas of work are concealed. Once framing is boarded, services are buried and a slab is poured, proving what is behind them stops being an inspection and becomes an investigation. That is the practical argument for calling the inspection at the open stage.

A custom home under construction, its two-storey glazed elevation formed and the openings framed, with a site trailer on the pad

The frame and openings formed, before anything was covered.

The same house from the side, showing the projecting roof plane and the window openings before glazing

The same house from the side, roof plane in place.

The structure from further back across the compacted site, with the roof line and upper glazing in place

The structure from across the site, glazing still to come.

Two things to check early

Historic districts,
and who is
registered.

Neither is difficult. Both are much easier before drawings exist than after.

Historic preservation

Find out whether your property is on the register — from the City

Delray Beach maintains a Local Register of Historic Places and historic districts, and publishes a lookup so an owner can check whether a property is listed or sits inside a district. We are not going to tell you what that means for your project, because the standards and the review process are the City’s to state and we have not read them. What we will do is check the lookup with you at the start, because if it applies it changes the order of everything that follows.

Contractor registration

Before submittal, not during

The City requires contractors to register and maintain a current licence on file prior to permit submittal. Registration runs through the City’s business tax receipt process, and an application cannot be filed on an unregistered contractor.

Landscape comes with the building

The same division reviews it

Delray Beach’s Building Division also handles reviewing and inspecting all landscaping to new single-family units, commercial and multi-family projects, and says it encourages water conservation and the preservation of trees and coastal vegetation where possible. On a project that touches the grounds, that is one more review in the same building.

How a project closes

CO, or a CC on request

For new dwellings, once all fees are paid and all required inspections are completed, a Certificate of Occupancy is issued. For minor projects, a Certificate of Completion can be obtained on request — worth asking for, because it is the document that proves the work was closed out properly.

And what we will not guess

Milestone inspections

The City publishes a Milestone Inspection page and a permit and inspection utilization report. We have not read either, so this page does not describe what they require. If your building is one where milestone inspection applies, that is a conversation with the City rather than with a contractor’s website.

Owner’s guide

Five things worth
settling first.

Specific to this city, and in the order they actually bite.

01

Check the historic register before you draw anything

The City publishes a lookup for whether a property is on the Local Register or inside a district. If it applies, it changes the sequence, and finding out late is expensive.

02

Ask whether any part of your scope is express

A/C change-out, water heater replacement and re-roof are issued within three days. If your project includes one of those, it may not need to wait for the rest.

03

Never let work start ahead of the permit

A stop work notice, a tripled permit cost, and possibly a third-party engineering analysis if it has been covered up. There is no version of this that is cheaper than waiting.

04

Record the Notice of Commencement in time

Above $5,000, or for an air conditioner replacement of $15,000 or more, it has to be recorded at a Palm Beach County Court House and in place before the first inspection.

05

Do not let the job go quiet

The City treats the absence of an inspection inside the window as validation that the job was suspended or abandoned. Keep the inspections moving even if the finishes are waiting.

And one caution

One duration, and no fees

The only timeframe on this page is the City’s own three-day express commitment, and the only money figures are its published rules — the tripled after-the-fact cost, and the $5,000 and $15,000 Notice of Commencement thresholds. We publish no permit fee amounts for Delray Beach, because the City sets them on the contracted amount and the scope of work, and the figure that matters is current on the day you file. Confirm everything here with the Building Division before you rely on it.

Common questions

Before you start.

What owners in Delray Beach ask first, answered from the Building Division’s own FAQ and permit pages rather than from what is usually true elsewhere in Palm Beach County.

It gets expensive, and the City says so plainly. A stop work notice will be issued by Code Enforcement, and the cost for an After the Fact permit will be tripled. On top of that, there may be fees for a third party engineering analysis if the areas of work are concealed — because once the work is covered up, proving what is behind it is no longer a normal inspection. And if no permit is applied for at all, a Notice of Violation can be issued and fines levied.

Yes, but only for two specific things. The City states that emergency A/C change-outs and water heater replacements can be accommodated if the permit is submitted within 24 hours of doing the work. That is the only after-the-fact allowance it publishes. Everything else falls under the tripled after-the-fact rule above.

Three types. The City states that A/C change-out, water heater replacement and re-roof permits are considered express permits and will be expedited and issued within three days. That three-day figure is the City’s own commitment about its own service — it is the only timeframe on this page, and we do not extend it to anything else.

Two clocks, and one sentence that catches people. Permits expire and become null and void if work is not started and an inspection is requested within 180 days. Once work has commenced, the permit expires when work is suspended or abandoned within 180 days. And the City adds: lack of an inspection within this time will serve as validation that the job has been suspended or abandoned. You never have to decide to stop — going quiet is itself the evidence, so we keep inspections moving even when a finish is on back-order.

The City requires it before the first inspection for all permits valued above $5,000, or for air conditioner replacements valued at $15,000 or greater. It has to be recorded at a Palm Beach County Court House — the City notes that the most convenient one is just south of City Hall. Note that other municipalities phrase the same statutory pair differently, so use this City’s wording for a Delray Beach job.

A contractor is required for all commercial and multi-family property. For a home you own and occupy, state statute allows you to act as your own contractor. The City adds the conditions: if you do not do all the work yourself you must supervise it and hire licensed trade subcontractors for electrical, plumbing, a/c and roofing; and owners acting as their own contractor or listed as a subcontractor are required to personally appear and sign the permit application.

The City’s own answer is blunt, and worth quoting: “If they ask to secure the permit, beware. They may not be licensed, which puts the homeowner at risk.” Its wider advice is to ask for and check references, ask to see the State licence, and check the number on the state website for complaints. A licensed contractor pulls permits in their own name because they carry the responsibility that goes with them. Ours is CBC1265280.

They are printed where you will actually find them: the list of required inspections is on the back of the white permit placard, and scheduling instructions are provided when the permit is issued. The City is clear that it is the applicant’s responsibility — owner-builder or contractor — to ensure all required inspections are made before proceeding with work.

Digitally. The City describes its permitting process as fully digital: submit documents, pay fees and download permits online through its eServices portal, with an electronic plan review system being implemented gradually, adding more permit types over time. Paper has not been abolished — you can bring documents in and the City will digitise them for you with its scanning service, for a fee.

Possibly quite a lot, and this is one place we will not guess. Delray Beach maintains a Local Register of Historic Places and historic districts, and publishes a lookup so you can check whether a property is listed or sits inside one. We have not read the City’s preservation standards or its review process, so this page says nothing about what they require. What we do is run the lookup with you at the very start, because if it applies it changes the order of everything after it.

Yes — landscaping. The Building Division states that it handles reviewing and inspecting all landscaping to new single-family units, commercial, and multi-family projects, and that it encourages water conservation and the preservation of trees and coastal vegetation where possible. On a project that reshapes the grounds as well as the house, that is one more review sitting in the same department.

Not from a page. The City sets permit fees on the contracted amount and the scope of work, so we publish no figures. The only duration here is the City’s own three-day express commitment. What we can do first is check the historic register, tell you which parts of your scope are express and which are not, work out what the Notice of Commencement will need, and then price against drawings.

Google reviews

What clients say.

4.8 across 343 Google reviews. Text reproduced verbatim, including original spelling.

Licensed and accountable

CBC1265280

Florida certified building contractor. Licensed, bonded and insured, working across Miami-Dade, Broward and Palm Beach.

Start your project
“Elbaz Construction provided excellent service and outstanding craftsmanship. The team was professional and attentive to our needs. We’re extremely satisfied with the results!”
Damian Nunez · Google
“I give them a five star rating not only for their excellent roofing skills and timelines, but also for their competitive pricing and the honesty and professionalism of the team !! We are very pleased with the outcome”
Zachary Gugliotta · Google
“We had a good time dealing with Asher and the crew, he went over and above all our expectations and made every effort to ensure that the end result was up to their high standards. Thank you !!”
Emmett Giffin · Google

No review schema is emitted from this page. Aggregate ratings marked up on a business’s own service pages are self-serving under Google’s structured-data policy, so the rating above is presented as visible content only.

Start your project

Tell us what you
are planning.

Send the scope and the address. We will come back with what is express, what is not, and what has to be recorded before the first inspection.

What happens next

Three steps, and no showroom appointment

  • 01We call you back, go through the scope and check the historic register for the address
  • 02We walk the property, work out which inspections gate which stages and what the Notice of Commencement will need
  • 03You get a written scope priced against drawings, not against a description
What to expect

A straight read, including when to wait

If something has already been done without a permit, we will tell you plainly what regularising it is likely to involve here — including that the permit itself costs triple — rather than quietly building over it.

Prefer to talk now(754) 236-0675

Sun–Fri 7am–7pm · Saturday closed. Licensed, bonded and insured · CBC1265280.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Start your Delray Beach project

Ready when you are

Let us do it in the order this City rewards.

Send us the scope and the address. We will tell you what is on the express list, what the drawings and the Notice of Commencement have to carry, and how to keep the permit alive through to the final inspection. Licensed, bonded and insured, CBC1265280.

Backlit mirror cabinet over a white basin with a matt black mixer, beside open timber shelving