Renovate the space.
Do not close
the business.

Commercial property renovation across Miami-Dade, Broward and Palm Beach — retail, office, medical and hospitality. Phased so the parts that earn keep earning, and sequenced around the inspections that actually gate your certificate.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Phased so your property keeps trading

Miami-Dade · Broward & Palm Beach Counties

Scroll

Step one

Tell us about the property.

Use type, approximate square footage, whether it stays open during the work, and your date pressure. Those four things shape everything else.

  • Licensed, bonded and insured · CBC1265280
  • Phased so trading areas stay open
  • 104 municipalities across three counties

What to have ready

Use type, rough square footage, whether you are the owner or the tenant, and any lease dates or opening dates already committed.

What happens next

We walk the space and come back with a phasing approach and a permit path before anyone talks about finishes.

What the consultation covers

Existing conditions, what triggers upgrade requirements, how the work can be phased around occupancy, and where the schedule risk actually is.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with us. A licensed general contractor will come back to you to arrange a site walk. If it is urgent, call (754) 236-0675.

Illustrative sequence — shell, services, finishes, completion

What we do

On a commercial job the schedule is the product.

A residential renovation is measured in how it looks when it is done. A commercial one is measured in how much it cost you while it was happening — in closed days, in rent on a space you cannot use, in an opening date that moved. So the plan comes first: which areas close and when, which work has to happen after hours, what has to be inspected before the next trade can start, and what in your existing building will trigger an upgrade requirement the moment you touch it. Get that right and the finishes are the easy part.

  • 01

    Phased around occupancy

    Work sequenced so the parts of the property that earn stay open, with temporary partitions and protected routes where they are needed.

  • 02

    Permit path first

    What is permittable, what triggers an upgrade, and how long the jurisdiction actually takes — established before the programme is promised.

  • 03

    Trades sequenced to inspections

    Above-ceiling work closes only after it passes. Rework caused by covering something early is the classic commercial schedule killer.

  • 04

    Accessibility handled properly

    Route, entrance, restroom and signage requirements resolved against the adopted code, not assumed from a previous project.

  • 05

    Out-of-hours where it pays

    Noisy and disruptive operations moved outside trading hours when the cost of the premium is less than the cost of the closure.

See the phasing sequence

Illustrative, AI-generated: a suspended ceiling grid partly tiled in a commercial space
Illustrative, AI-generated: an open ceiling grid with services above it, before tiles close the void

Illustrative - AI-generated

Showcase 01

What a commercial renovation actually involves

Illustrative sequence — not photographs of an Elbaz project

Full disclosure: every image on this page is an AI-generated illustration, not a photograph of our work. Our documented project photography is residential, and we will not present a stock commercial interior as something we built. What is illustrated here is the actual sequence of a commercial fit-out, and every caption and alt text says it is an illustration.

Illustrative, AI-generated: a commercial interior stripped to the shell, structural columns and open ceiling above
The shell. Illustrative, AI-generated. A bare commercial space stripped to structure and slab. Deck height here decides ceiling height later.
Illustrative, AI-generated: ductwork, cable tray and sprinkler pipework coordinated in a commercial ceiling void
Services. Illustrative, AI-generated. Ductwork, conduit, sprinkler and drainage in the ceiling void, coordinated so they cross rather than collide.
Illustrative, AI-generated: a suspended ceiling grid partly tiled in a commercial space
Ceiling grid. Illustrative, AI-generated. Suspended grid set out from the room, not from a corner, so the cut tiles land where nobody looks.
Illustrative, AI-generated: recessed linear lighting installed above an open commercial work area
Lighting. Illustrative, AI-generated. Layout and levels planned for the use of the space. Retail, office and medical want very different light.
Illustrative, AI-generated: a temporary dust-protection partition dividing finished space from construction
Phasing. Illustrative, AI-generated. A temporary partition separating a working area from a trading one, with a protected route past it.
Illustrative, AI-generated: a commercial accessible restroom with grab rails and clear turning space
Accessibility. Illustrative, AI-generated. An accessible restroom with clear floor space, grab bars and reachable controls, laid out to the approved drawings.
Illustrative, AI-generated: large-format commercial floor tile being laid in a wide corridor, half bare screed
Floors. Illustrative, AI-generated. Commercial-grade flooring going down over a prepared slab. Substrate preparation is most of this job.
Illustrative, AI-generated: a commercial storefront glazing system in an aluminium frame, empty interior beyond
Storefront. Illustrative, AI-generated. A glazed shopfront system. In this county the glazing specification is a wind-borne-debris question first.
Illustrative, AI-generated: a commercial entrance with a level threshold and a wide door opening
Entrance. Illustrative, AI-generated. The entrance approach — threshold, door hardware and the route in, which is where accessibility is judged.
Illustrative, AI-generated: a resurfaced commercial parking area with fresh bay markings and a marked accessible bay
The site. Illustrative, AI-generated. Parking, marked accessible stalls and the accessible route from them to the entrance.
Illustrative, AI-generated: a two-storey commercial building mid-renovation with scaffolding along one bay
Exterior. Illustrative, AI-generated. A commercial exterior with no name on it. Facade work is often what makes the lease worth signing.
Illustrative, AI-generated: a finished commercial reception with durable large-format tile and linear lighting
Completed. Illustrative, AI-generated. A finished, unbranded commercial interior ready for a tenant to fit out and open.
Detail of the same frame: Illustrative, AI-generated: a commercial interior stripped to the shell, structural columns and open ceiling above
Detail of the same frame: Illustrative, AI-generated: ductwork, cable tray and sprinkler pipework coordinated in a commercial ceiling void
Detail of the same frame: Illustrative, AI-generated: a suspended ceiling grid partly tiled in a commercial space
Detail of the same frame: Illustrative, AI-generated: recessed linear lighting installed above an open commercial work area
Detail of the same frame: Illustrative, AI-generated: a temporary dust-protection partition dividing finished space from construction
Detail of the same frame: Illustrative, AI-generated: a commercial accessible restroom with grab rails and clear turning space
Detail of the same frame: Illustrative, AI-generated: large-format commercial floor tile being laid in a wide corridor, half bare screed
Detail of the same frame: Illustrative, AI-generated: a commercial storefront glazing system in an aluminium frame, empty interior beyond
Detail of the same frame: Illustrative, AI-generated: a commercial entrance with a level threshold and a wide door opening
Detail of the same frame: Illustrative, AI-generated: a resurfaced commercial parking area with fresh bay markings and a marked accessible bay
Detail of the same frame: Illustrative, AI-generated: a two-storey commercial building mid-renovation with scaffolding along one bay
Detail of the same frame: Illustrative, AI-generated: a finished commercial reception with durable large-format tile and linear lighting
Detail


The shell

What you are actually starting from — structure, slab, deck height and the services that arrive at the space.

The services

Mechanical, electrical, plumbing and fire protection, which together decide the ceiling height you end up with.

The phasing

Which areas close, when, and how the public and staff move while they are closed.

The finishes

The part everybody pictures, and the part that is entirely dependent on the three above being right.

How it runs

Eleven stages, and eight of them happen before a finish is chosen.

A commercial programme is built backwards from the date you need to open and forwards from the inspections you cannot skip.

Illustrative sequence — survey, services, partitions, finishes, handover

  1. Property walk

    Existing conditions, use type, what is staying and what is coming out. Photographed and recorded, because on a commercial job the existing conditions are the argument.

  2. Scope and phasing plan

    Which areas close and when, how people move while they do, and what has to happen out of hours.

  3. Code and permit review

    What the adopted code requires for this use, what your work triggers, and what the jurisdiction will want to see.

  4. Design and drawings

    Prepared for permit, not just for looks. Coordination between the disciplines happens here or it happens expensively on site.

  5. Permit submission

    Submitted, tracked, and comments answered. Review time varies by jurisdiction and by season and it is the largest single schedule unknown.

  6. Demolition & protection

    Strip out, with dust, noise and route protection in place first if any part of the property is still trading.

  7. Structure & envelope

    Any structural alteration, plus storefront, roof and envelope work, done before the interior is closed.

  8. Services rough-in

    Mechanical, electrical, plumbing and fire protection installed and coordinated in the ceiling void.

  9. Inspections & close-in

    Nothing gets covered until it has passed. This is the stage where a rushed job pays for itself twice.

  10. Partitions & finishes

    Walls, ceilings, floors, joinery, lighting and decoration, phased area by area.

  11. Final inspections & handover

    Final sign-offs, snagging, documentation and the certificate the jurisdiction issues, not one we promise.

Permit review times, inspection scheduling and certificate issue are controlled by the jurisdiction. We manage submissions and coordinate inspections; we do not control the calendar and we will not quote you a date as if we did.

Temporary partitions with a proper dust seal, not a sheet of plastic taped to a ceiling grid. A protected route in and out with an accessible surface and edge protection. Noise moved to hours when nobody is buying anything. Deliveries scheduled around the loading bay's busy period rather than into it. Power and life-safety systems kept live in the trading area even while the same systems are being rebuilt fifteen feet away. None of it appears in a finished-project photograph, and all of it is what you are actually paying a commercial contractor for.

Showcase 02

Working around an open business

Illustrative — the parts of the job the customer is not supposed to notice

Also AI-generated illustrations, for the same reason as above. These are the arrangements that let a property keep trading while it is being renovated.

Illustrative - AI-generated

The decisions

Six decisions that set the budget.

On a commercial job these six are decided long before anyone picks a colour, and they are where the money goes. Switch between the questions to see each from a different angle.

Illustrative, AI-generated: a commercial interior stripped to the shell, structural columns and open ceiling above

Use type and change of use

What the space is classified as now and what you intend it to be.

Illustrative - AI-generated

Illustrative, AI-generated: ductwork, cable tray and sprinkler pipework coordinated in a commercial ceiling void

Services capacity

Whether the existing electrical service, HVAC and drainage can carry what you intend to do.

Illustrative - AI-generated

Illustrative, AI-generated: a commercial accessible restroom with grab rails and clear turning space

Accessibility compliance

The accessible route, entrance, restrooms, counters and signage required for a public-facing space.

Illustrative - AI-generated

Illustrative, AI-generated: a temporary dust-protection partition dividing finished space from construction

Phasing and occupancy

Whether the property trades during the work, and how the work is divided so that it can.

Illustrative - AI-generated

Illustrative, AI-generated: a commercial storefront glazing system in an aluminium frame, empty interior beyond

Envelope and storefront

Glazing, entrance systems, roof and anything else separating inside from outside.

Illustrative - AI-generated

Illustrative, AI-generated: large-format commercial floor tile being laid in a wide corridor, half bare screed

Finish specification

Commercial-grade floors, walls, ceilings and lighting chosen for traffic and maintenance rather than for a photograph.

Illustrative - AI-generated

Living with it

Keep the documentation

Permits, approvals, product approvals and as-builts. The next tenant improvement will need them and so will your insurer.

Plan the reactive route

Know how a contractor gets to a leak or a failed circuit without going through your trading area.

Service the plant

Rooftop and mechanical equipment on a schedule. It is the commonest deferred cost in commercial property and the most expensive to defer.

Re-check the envelope annually

Sealants, flashings and door hardware, before storm season rather than after it.

Showcase 03

How a phased fit-out is sequenced.

Six stages, in the order they have to happen. The reason for the order is that each one covers up the last, and uncovering it later costs more than the work did.

Illustrative, AI-generated: a temporary dust-protection partition dividing finished space from construction

01

Protect and separate

Illustrative, AI-generated. Temporary partitions, dust seals and a protected route go in before demolition starts, not after the first complaint.

Illustrative - AI-generated

Illustrative, AI-generated: a commercial interior stripped to the shell, structural columns and open ceiling above

02

Strip to the shell

Illustrative, AI-generated. Removal back to structure and slab, which is also when the surprises in the existing building appear.

Illustrative - AI-generated

Illustrative, AI-generated: ductwork, cable tray and sprinkler pipework coordinated in a commercial ceiling void

03

Services rough-in

Illustrative, AI-generated. Mechanical, electrical, plumbing and fire protection installed and coordinated before anything closes over them.

Illustrative - AI-generated

Illustrative, AI-generated: a suspended ceiling grid partly tiled in a commercial space

04

Inspect, then close

Illustrative, AI-generated. The grid goes up only after the void has passed inspection. This is the sequence rule that gets broken most often.

Illustrative - AI-generated

Illustrative, AI-generated: recessed linear lighting installed above an open commercial work area

05

Finishes and lighting

Illustrative, AI-generated. Floors, walls, ceilings and lighting, phased so one area completes while the next is still open for trade.

Illustrative - AI-generated

Illustrative, AI-generated: a finished commercial reception with durable large-format tile and linear lighting

06

Final inspections

Illustrative, AI-generated. Final sign-offs and handover documentation. The certificate is issued by the jurisdiction on their schedule.

Illustrative - AI-generated

A phased commercial fit-out

Trading area, work area, and the protected route between them

Schematic plan of a phased commercial fit-out A rectangular commercial floor plan divided by a temporary partition. The left half is marked as the trading area that stays open, with the entrance at the bottom left and a protected route running along the front. The right half is the work area, containing the ceiling void being opened, services rough-in and finishes. A hatched strip along the front marks the protected customer route, and a separate rear door marks the contractor access and delivery point, kept out of the trading area. TRADING AREASTAYS OPEN WORK AREAPHASE IN PROGRESS PROTECTED CUSTOMER ROUTE 1 TEMPORARY PARTITION 2 DUST + NOISE SEPARATION 3 PROTECTED ROUTE 4 PUBLIC ENTRANCE 5 CONTRACTOR ACCESS PHASES ROTATE - AREAS REOPEN 123 45

Schematic. Actual phasing, egress and separation requirements are set by the adopted code, the fire official and the approved plans for your specific property.

Answers

Commercial renovation questions.

Usually yes, and it is normally the right call. The work is divided into phases with temporary partitions, dust and noise separation and a protected route for staff and customers, and disruptive operations move outside trading hours. It costs more in labour and takes longer overall than closing — and the comparison that matters is against lost revenue, not against the un-phased price.

Verified

What clients wrote on Google.

Reproduced exactly as published on the company's Google Business Profile. Read them on Google

Illustrative, AI-generated: a finished commercial reception with durable large-format tile and linear lighting

Illustrative - AI-generated

I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work!

Omri B

Google review

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!

Shir Partush

Google review

Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend

Sophie Brito

Google review

Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended!

Adir Davidov

Google review

Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need.

Itzick Manasherov

Google review

Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.

Mia Zafrani

Google review

Amazing job Did a total renovation of my house with them

Elie Elancry

Google review

They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them!

Lee Morali

Google review

Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same!

roni yonani

Google review

After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!!

carmit cohen

Google review

Schedule a Consultation (754) 236-0675

Start here

Let us look at the phasing first.

Before finishes, before budget, before anything: how the work divides up so your property keeps earning while it happens.

What happens after you send this

We read it and come back to arrange a property walk — usually within one working day.

What to have ready

Use type, rough square footage, owner or tenant, and any lease or opening dates already committed.

What we will cover

Existing conditions, what your scope triggers, how it can be phased around occupancy, and where the real schedule risk sits.

Prefer to talk it through first?

(754) 236-0675
  • Licensed, bonded and insured · CBC1265280
  • Phasing plan before a finishes conversation
  • Sun–Fri 7am–7pm · Sat closed

Illustrative sequence — survey, services, partitions, finishes, handover

Illustrative - AI-generated

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with us. A licensed general contractor will come back to you to arrange a site walk. If it is urgent, call (754) 236-0675.