10 service categories · 100 service pages · Miami-Dade, Broward & Palm Beach
View all services104 municipalities · Miami-Dade, Broward & Palm Beach
All service areasThe Village asks for three colour swatches before you repaint the outside of your own home, and keeps a pre-approved list at Village Hall. That one rule tells you how everything else here works: appearance and construction are reviewed separately, and the second one is not the one people forget. We build to both, as a licensed general contractor working across Miami-Dade, Broward and Palm Beach.
Miami-Dade · Broward & Palm Beach Counties
ScrollStart here
Almost everything on this page turns on where the property actually is and what the street can see of it. Tell us the address and what you are hoping to do, and the first conversation is a useful one.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.
Recent projects
Eight frames of completed work across South Florida — bathrooms, kitchens, flooring and two accessory dwelling units. Tap any image to see it larger.
A completed bathroom with a hammered vessel basin and a glazed walk-in shower.
A completed open-plan kitchen looking through to the living space.
The open living area of a completed accessory dwelling unit.
A wet-room bathroom with a freestanding tub and an open walk-in shower on one floor.
A compact kitchen island with seating for two.
A recessed shower niche backed in scallop marble mosaic with a metal trim edge.
The kitchen of a two-level accessory dwelling unit in oak-fronted cabinetry.
A corner shower bench in large-format tile above a hexagon mosaic floor.
All photographs are of real completed Elbaz Construction work. They come from several separate properties across South Florida and are shown as recent work. None of them was taken in Biscayne Park, and none is captioned as though it were.
The journey
Biscayne Park is small enough that its rules are published on a single page, and specific enough that the single page contains a rule about paint. What follows is the order those rules actually apply in: what the Village knows about your lot, what your scope triggers, how the application is filed, what happens on site, the decisions that are genuinely yours, and how a permit is closed rather than left open.
Use the stage markers to jump to the part you are stuck on. Nothing here is a promise about your address — the Building Permit Coordinator and the Village decide that — and nothing here is a timeline we invented. Where the Village publishes a rule, it is quoted. Where it does not, this page says so instead of guessing.
Stage 01 · Lot
Four things about a Biscayne Park address change what your project has to answer for. Work out which apply before anything is drawn, because two of them are decided by people who never look at the structural drawings.
The Village states plainly that exterior painting requires zoning approval, and that you submit three colour swatches with the application. It also states that certain pre-approved colours held at Village Hall do not require that approval. So there are two routes to a repainted house here: pick from a list the Village has already agreed, or make a case with three samples. Neither route is the building permit — this is a zoning question, answered by a different part of the same small office.

Illustration, not a photograph: a row of muted heritage colour swatches, drawn to show what a swatch submission looks like. It is not the Village of Biscayne Park palette, which is held at Village Hall and was not published in a readable form.
Among the Village's standing boards is a Planning and Design Review Board — a body whose name says what it is for. A municipality that maintains a permanent design review board, and that writes paint colour into its permit page, has decided as a matter of policy that appearance is a public question rather than a private one. What that means practically is that the design conversation should happen early, not after drawings are finished. We do not publish this Board's meeting schedule or its submission deadlines, because the Village does not publish them in a form we could read — confirm them before you plan a calendar around them.

A completed Elbaz Construction kitchen looking through to the living space beyond. A South Florida project; not photographed in Biscayne Park.
Biscayne Park sits in Miami-Dade County, which is inside the Florida Building Code's High-Velocity Hurricane Zone — a designation covering Miami-Dade and Broward and nowhere else in the state. In practice the HVHZ governs the outside of the building: roofing, windows, doors, shutters and, above all, how they are attached. It is also why product approval documentation is part of a submission here rather than something produced later when an inspector asks for it. On a village lot that intersects the colour rule in a way worth planning for: replacing windows is an envelope job, a permit job and, if it changes what the street sees, a design question at the same time.

A completed Elbaz Construction bathroom: a fluted oak vanity with an integrated basin and a backlit mirror cabinet beside a window. Not a Biscayne Park property.
The Village publishes its own hours, and they are the hours of a small municipality: Monday to Thursday from 9:00 a.m. to 1:00 p.m. and again from 2:00 to 5:00 p.m., Fridays from 9:00 a.m. to noon, closed on holidays. There is one Building Permit Coordinator and one telephone number. That is not a complaint — a small office is often faster than a large one, because you reach the person who decides. But it does mean a question asked at 1:30 on a Thursday is a question asked on Friday morning, and it means the answer to "can we just call and check?" is yes, within a window.

Dark wide-plank flooring in a completed Elbaz Construction interior with material sample boards on display stands. Not a Biscayne Park project.
Stage 02 · Scope
The Village's list of permitted work is broad and it is written broadly on purpose. The interesting part is not the list — it is the sentence after it, and the separate rule about paint.
The Village names electrical, plumbing, mechanical, roofing, pools, fencing and "both interior and exterior construction or repairs" as work needing a permit. Read that last clause carefully: it does not distinguish between building something new and repairing something old, and it does not carve out interior work. A kitchen or bathroom remodel is inside every one of those categories at once, which is why the honest answer to "does my remodel need a permit in Biscayne Park?" is yes, before anyone has seen the drawings.

A completed Elbaz Construction bathroom with a hammered vessel basin, backlit mirror and a glazed walk-in shower. A South Florida project, not a Biscayne Park one.
The Village follows its list with a sentence most municipalities leave out: "Exceptions may apply, so consult with the Building Permit Coordinator before initiating any work." That is unusual and it is useful. Larger cities publish an exemption list and expect you to interpret it; Biscayne Park publishes a person. The practical reading is that the Village would rather answer a question than open a case, and that a five-minute call before work starts is a documented part of the process here rather than a favour.

Two stainless grab bars fitted either side of a completed Elbaz Construction walk-in shower, with a handheld shower on a slide bar. Not photographed in Biscayne Park.
This is the rule that distinguishes the Village. Exterior painting requires zoning approval; you submit three colour swatches with the application; and certain pre-approved colours held at Village Hall do not require the approval at all. Notice which way round it runs. In many South Florida municipalities repainting a single-family house is the one exterior job that needs nothing. Here it is the job that needs a different department. If you are already opening a permit for other work, settle the colour in the same conversation rather than discovering it at the end.

An emerald green tiled shower with a white hexagon mosaic bench and a recessed niche, from a completed Elbaz Construction project in South Florida. Not a Biscayne Park property.
The Village's permit page also states that garage sales require a permit and that the number of sales per year is limited. It sits on the same page as the electrical and roofing rules, which is the clearest possible signal about how this Village thinks: the permit is the Village's way of knowing what is happening on its streets, not merely a safety instrument. Carry that assumption into a renovation and very little about the process will surprise you. We do not publish the annual cap, because the Village states that one exists without stating the number.

A plain poured concrete driveway with a broom finish and cut control joints, from completed Elbaz Construction work in South Florida. Not a Biscayne Park driveway.
Every photograph in this section is real Elbaz Construction project photography from completed South Florida work. None of it was taken in Biscayne Park and none of it is captioned as though it were. The one drawn image is labelled as an illustration.
Project gallery 01
Six frames of completed Elbaz Construction work across South Florida. Different properties, not one project, and not photographed in Biscayne Park — each caption says what it actually is.
Project 01, guided tour






Bathroom, vessel basin
A completed bathroom with a hammered vessel basin, backlit mirror and a glazed walk-in shower.
Six frames from completed Elbaz Construction projects across South Florida, grouped by room rather than by property. Bathrooms, kitchens and the details that take the longest to get right.
A village page is about a process, and a process is only worth reading if the company at the end of it builds. These are the finished result of the same six stages this page walks.
South Florida. None of them is claimed to be in Biscayne Park, because none was verified as being in Biscayne Park. Where a caption says "a completed project", that is the whole of the claim.
No cost, no address, no client name and no permit history appears anywhere on this page.
Stage 03 · File
The Village publishes three requirements about filing and they are unusually blunt: full plans, online submission, and approval before work commences. Each one closes a door that owners commonly try.
The Village states that submission of full plans is required for review and approval before the issuance of a building permit. "Full" is doing real work in that sentence: it rules out filing a partial scope to start early and adding the rest later, which is the single most common reason a small job turns into three review cycles.
Biscayne Park uses OpenGov for permitting, and the Village's own guidance is to search by the type of work — type "electrical" for an electrical permit, and so on. Everything is uploaded against the application there rather than handed across a counter.
The Village asks owners directly to "ensure that your contractor is licensed and insured". That is addressed to you, not to us, and it is worth taking literally: it is a check you can make yourself before signing anything, with anybody.
If the scope changes what the street sees — paint above all, but also anything that alters the elevation — zoning approval enters alongside the building permit. Paint carries its own rule: three colour swatches with the application, unless the colour is already on the Village's pre-approved list.
The Village states that permit applications "must be approved prior to commencing any work". There is no phased reading of that sentence and no interpretation under which demolition counts as preparation. On a lot this size, work that starts early is visible from the street on the first day.
The application is reviewed and comments come back against the submission. In a village this size the reviewer is reachable, which materially shortens a comment cycle — most cycles are lengthened by waiting on a decision, not by the reviewer.
The Village adopted an Amended Master Building Fee Schedule on 7 February 2023 and publishes it. We do not reprint figures here, because the Village's own schedule is a better answer than anything we could print, and it appears itemised on your proposal.
Once the permit issues the job can start. On work above the statutory threshold a notice of commencement is recorded before the first inspection — ordinary Florida practice rather than anything peculiar to Biscayne Park, but it is the step most often forgotten by owners running their own project.
This is the published sequence, not a promise about your project. What any specific address requires, whether zoning approval applies and whether the Planning and Design Review Board becomes involved are decided by the Village of Biscayne Park — not by a contractor. We confirm what your address actually requires before anything is filed.
Stage 04 · Site
Biscayne Park is a grid of small lots with short frontages, and a Village office that answers its own telephone. Both change how a build actually runs here: access is tight enough to belong in the programme rather than in the apologies, and a question can be settled in a morning instead of a fortnight. These are the phases in the order they arrive, and what each one turns on in this Village.
Agreed before the first van
Lots here are narrow and the houses sit close to the street, so where the skip stands, where materials are unloaded and where trades leave vehicles are decided in advance instead of improvised. In Biscayne Park all three are visible to every neighbour from day one, and getting them wrong is the quickest way to turn an ordinary job into something the Village hears about before we do.
Quality check · Access, unloading and skip position settled before anything is delivered

Inside its published hours
The Village asks to be consulted before work begins, and its office runs Monday to Thursday with a closed hour in the middle of each day and a half day on Friday. We make that call with the scope already written down, because what the Building Permit Coordinator says about your address governs — not our reading of a web page.
Quality check · Scope confirmed with the Village before anything is opened up

What the house has been through
With the scope removed, the fabric is visible for the first time. Older South Florida housing stock often carries alterations nobody filed, and in a municipality whose permit record is short enough to read end to end, an undocumented change is easier to find later rather than harder. Anything uncovered is recorded and put to you before it goes back behind a wall.
Quality check · Everything uncovered is photographed and raised before it is concealed

Built to the plans that were approved
Anything carrying load is executed to the drawings the Village reviewed — the full plans it required before issuing the permit, not a version agreed on site afterwards. Where conditions genuinely differ from the drawing, that is a conversation with the Village rather than a decision for a carpenter.
Quality check · Nothing structural is concealed before it has been inspected

Two questions, two desks
This is where Biscayne Park differs most from its neighbours. Windows, doors, roofing and their fixings have to satisfy the High-Velocity Hurricane Zone, which is a building question answered with product approval paperwork. Anything the street can see is also an appearance question, answered on the zoning side. Both must be settled before the elevation is finished, and the same person does not settle them.
Quality check · Installed products matched to their approvals, and the elevation agreed

Electrical, plumbing, mechanical
The Village lists electrical, plumbing, mechanical, roofing, pools and fencing by name as work needing a permit. On a remodel at least two are live at this point, each inspected separately against the same permit, and each one a booking rather than an assumption.
Quality check · Every named discipline inspected on its own before anything closes

The layer that decides the next decade
Tanking, backer board and falls go in beneath the tile. None of it is ever seen again and none of it is optional: it is the part of a South Florida bathroom that either lasts or quietly does not, and photographs of it are worth more in five years than any assurance given now.
Quality check · Falls and waterproofing recorded photographically before tiling

Confirmed with you, on the floor
Tile, stone and cabinetry are set out and walked with you before the field is committed. This is the last phase in which a change is inexpensive, and the one owners most often assume somebody already decided on their behalf.
Quality check · Setting out walked with you before the first full course

Against the swatch that was approved
If the elevation is being repainted, the finish is checked against the colour the Village actually approved — the swatch that went in with the application, or a colour taken from the pre-approved list at Village Hall. Approving one colour and applying another costs nothing to avoid and a great deal to resolve.
Quality check · Finished elevation checked against the approved swatch

So nothing follows the house
Final inspections are booked, the outstanding items are agreed in writing, and the permit is closed rather than left sitting. In a municipality this small the permit record is a short document, and a future buyer will read all of it.
Quality check · Permit closed out and the record left clean

Project gallery 02
Three frames from real Elbaz Construction work in South Florida — one taken while the tiling was still being set out, two after it was done.
These are real photographs of Elbaz Construction work, taken on a South Florida project. The first is the middle of the job, which is the part an owner actually lives through and the part nobody puts in a brochure. This project was not in Biscayne Park and is not presented as though it were.
Project 02, during and complete



During: setting out
Shower walls part-tiled in vertical stacked plank tile, with the layout marks still visible on the floor.
Real Elbaz Construction work in South Florida, photographed during construction and again on completion.
Because the six stages above are abstract until you have seen the middle of one. The layout marks in the first frame are what "setting out agreed before the field is laid" actually looks like.
It is not a Biscayne Park project, it is not presented as one, and no address, client or cost appears anywhere.
Stage 05 · Choose
Argued both ways. None of these has a universally right answer — it depends on your scope, your elevation and how much of the calendar you control.
Skip an approval entirely

Make the case for your colour

Which oneIf you have no strong view, look at the pre-approved list first — the Village says it removes the approval, and a removed approval is worth more than a preferred shade. If you do have a view, submit the three swatches and start that conversation at the same time as the building application, not after it. The mistake is doing it last.
Full plans, once

A bounded first project

Which onePhase for a reason you would happily explain to the Building Permit Coordinator — occupancy, budget, a child's school year. Do not phase in order to file less than the full plans for the work you are actually doing; that is the thing the Village's wording is written to prevent, and it turns one review into three.
The Village published this option

Let the process decide

Which oneConsult first. This is the one comparison on this page with a clear answer, and it is the Village's own: it published the invitation, and a municipality that writes "consult before initiating any work" on its permit page has told you what it prefers. We make that call as a matter of routine before filing.
Tick whatever applies. This will not produce a price — no honest one exists before someone has seen the property — but it will show which parts of your project are carrying the time and the risk.
We do not publish figures, and we do not publish permit fees either: the Village adopted its Amended Master Building Fee Schedule on 7 February 2023 and publishes it, which is a better answer than anything we could print here. You get a real, itemised number from us in writing after a site visit.
Project gallery 03
Four frames from completed Elbaz Construction accessory dwelling units — the kind of project where a small lot and a design-conscious municipality meet.
Project 03, guided tour




Studio, open plan
The open living area of a completed studio accessory dwelling unit under a vaulted ceiling with an exposed beam.
Completed Elbaz Construction accessory dwelling units in South Florida: one single-level studio and one two-level loft unit, both photographed on completion.
A second dwelling is a permitted structure with its own services, its own envelope and its own inspection list — and, in a village that reviews appearance, its own design conversation. It is the clearest case of a job where the approval route decides the calendar.
South Florida. Neither unit is claimed to be in Biscayne Park.
Stage 06 · Finish
Biscayne Park publishes less than a large city does, and what it publishes is more specific. Everything below is either quoted from the Village's own pages or explicitly flagged as something the Village does not publish.
Village Hall runs Monday to Thursday, 9:00 a.m. to 1:00 p.m. and 2:00 to 5:00 p.m., and Fridays 9:00 a.m. to noon. There is a closed hour in the middle of every day and a half-day at the end of the week.
The Village names a Building Permit Coordinator and one number, 305-899-8000. In a village this is an advantage — you reach the person who decides — provided you call inside the window.
The Village's own words are "consult with the Building Permit Coordinator before initiating any work". That is published guidance, not a courtesy.
Submission of full plans is required for review and approval before a building permit issues. Filing a fragment to start early is the thing this rule exists to stop.
The Village uses OpenGov, and suggests searching by the type of work — type "electrical" for an electrical permit.
Applications "must be approved prior to commencing any work". There is no soft reading of that sentence.
Exterior painting is a zoning approval with three colour swatches, unless the colour is pre-approved at Village Hall. It does not travel with the building permit.
The Village publishes no plan-review timeframe, no inspection cut-off time and no exemption threshold. Where a number is missing from this page, it is missing because the Village does not state it.
Only claims that are either public record or visible in the work on this page. Nothing about awards, nothing about rankings, and no numbers we cannot show you.
Elbaz Construction is a licensed Florida general contractor, CBC1265280. Permits are pulled in the company's name, and the Village asks owners directly to ensure their contractor is licensed and insured — a check you can make on us before signing anything.
The Village invites a call before work starts. We make it as a matter of routine, because a five-minute answer from the Building Permit Coordinator is worth more than an assumption carried into a submission.
Design, the permit application and the construction are handled by one company, so a reviewer's comment does not sit waiting on a hand-off between two firms.
We do not file a partial scope to get started. The Village's rule and our own interest point the same way: one complete submission is faster than three cycles of catching up.
In the HVHZ what is inspected is the pairing of installed product and approval paperwork. We keep them matched, because an envelope inspection that fails on documentation costs exactly as much as one that fails on workmanship.
Where zoning approval attaches to a swatch, the finished elevation is checked against that swatch. Approving one colour and applying another is a code case waiting to happen.
Every permit we pull is closed out at the end of the job. An open permit follows the property and reappears when it is sold.
The same person from the first site visit to the walkthrough, across Miami-Dade, Broward and Palm Beach — 104 municipalities, each with its own filing route.
Filter to the part of the job you are thinking about.
Yes. Biscayne Park is in Miami-Dade County, and the Florida Building Code's High-Velocity Hurricane Zone covers Miami-Dade and Broward and nowhere else in the state. In practice that governs the outside of the building — roofing, windows, doors and how they are fixed — and it means product approval documentation is part of the submission rather than something produced later.
The Village lists a Planning and Design Review Board among its standing boards. We do not publish its meeting schedule, its deadlines or the scopes that reach it, because the Village does not publish those in a form we could read. Ask the Building Permit Coordinator whether your scope reaches the Board, and ask before drawings are finished rather than after.
The Village publishes Monday to Thursday, 9:00 a.m. to 1:00 p.m. and 2:00 to 5:00 p.m., and Fridays 9:00 a.m. to noon, closed on holidays. There is a closed hour in the middle of each day. It is a small office, so the person who answers is usually the person who knows.
In practice, yes. The Village names electrical, plumbing, mechanical, roofing, pools and fencing, and then adds "both interior and exterior construction or repairs". A kitchen or bathroom remodel is inside several of those at once. The Village also invites you to consult with the Building Permit Coordinator before starting, because "exceptions may apply" — so the honest answer is yes, and the free answer is a phone call.
The Village does not publish a list, and we are not going to guess at one. What it publishes instead is a person: "consult with the Building Permit Coordinator before initiating any work." That is unusual and it is genuinely useful — a larger city would publish a table and leave you to interpret it. Here you can ask.
The Village's wording is "both interior and exterior construction or repairs", so it does not draw the line most people expect between building something new and repairing something old. Ask about your specific repair rather than assuming it is too small to count.
The Village's permit page says so, and adds that the number of sales per year is limited. It does not publish the cap, so neither do we. It is on this page because it tells you something true about how Biscayne Park works: the permit is how the Village knows what is happening on its streets, not only a safety instrument.
It means the plans for the whole of the work being applied for, not a first instalment. The Village requires submission of full plans for review and approval before a building permit issues. The practical consequence is that the scope has to be settled before we file — including the parts you are unsure about, because adding them later restarts the review.
Online. The Village uses OpenGov for permitting and suggests searching by the type of work — type "electrical" for an electrical permit, "dumpster" for a temporary dumpster permit. Everything is uploaded against the application rather than handed over a counter.
No. The Village states that applications "must be approved prior to commencing any work". There is no phased reading of that, and on a village lot early work is visible from the street on the first day.
We do not publish a number, because the Village does not publish one. What we can tell you honestly is which approvals your scope triggers — building, zoning, or both — and what we do to keep the comment cycles down. Anyone quoting you a Biscayne Park review time is quoting you their own average, not the Village's.
Yes, unless your colour is already on the Village's list. The Village states that exterior painting requires zoning approval and that you submit three colour swatches with the application — and that certain pre-approved colours held at Village Hall do not require the approval. This is the reverse of what most South Florida owners expect, and it is the single most useful thing to know before you buy paint.
The Village describes them as being at Village Hall. They were not published in a form we could read, so we do not reproduce or paraphrase them — a paraphrased palette would be worse than none. Ask the Building Permit Coordinator to see the list before you choose, because a colour on it removes an entire approval from your programme.
No, and that is the point. It is a zoning approval, which means it is answered by a different part of the process from the one that reviews your structural drawings. If you are already opening a permit for other work, settle the colour in the same conversation rather than discovering it at the end of the job.
The Village's rule as published is about exterior painting. Interior finishes are part of the scope of the work you are permitting rather than a separate appearance question. If your project is interior-only and touches no service, ask the Building Permit Coordinator — that is exactly the "exceptions may apply" conversation.
We stop and tell you, before it is covered up. It is more common than people expect in South Florida, and it has to be resolved rather than built over — both because an inspector will find it and because it becomes yours at the point you conceal it.
Often yes, and it changes the programme rather than the price alone. Containment, protection and phasing all cost days. The honest version of this conversation happens at the site visit, where we can look at where the work is relative to where you sleep and cook.
Agreed before the first delivery rather than after the first complaint. Frontages here are narrow, and access genuinely constrains how fast a trade can work — it belongs in the programme, not in the apologies.
Because for a remodel the same square footage can differ several-fold depending on what is behind the wall, which disciplines are involved and whether the elevation changes. A published rate would be a guess. You get an itemised figure in writing after a site visit, and it says what happens if something is found during demolition.
The Village adopted an Amended Master Building Fee Schedule on 7 February 2023 and publishes it, which is a better answer than any number we could print here. Whatever it comes to appears itemised on your proposal rather than folded into a round figure.
Against the issued permit, in the order the work reaches them. The Village does not publish an inspection cut-off time or a booking window, so we do not print one — where a number is missing from this page it is missing because the Village does not state it. We book to whatever the Village asks for at the time and plan the trades around it.
Where a zoning approval attaches to a swatch, the finished elevation should match the colour that was approved. We check it, because approving one colour and applying another is a code case waiting to happen and it is entirely avoidable.
It gets closed out. We do not leave permits open, because an open permit stays attached to the property and reappears at sale, when it is somebody else's leverage rather than an administrative detail.
The permit record, the approved drawings, the product approval documentation for anything in the envelope, any zoning approval for the colour, and the closeout. In the HVHZ the envelope paperwork is the part a future buyer, insurer or inspector will actually ask for.
Yes — across Miami-Dade, Broward and Palm Beach, 104 municipalities in total. The filing routes differ genuinely between them: Biscayne Park files through OpenGov and treats paint as zoning, its neighbours do neither, and those differences are a working detail for us rather than a surprise.
Nothing in that stage yet — try “All”.
Client experience
Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.
Adir Davidov2022-12-27 Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended! Lee Morali2022-12-27 They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them! Shir Partush2022-12-27 We hired them to renovate our investment property and they provided exceptional quality service for an affordable price! Mia Zafrani2022-10-25 Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction. carmit cohen2022-10-25 After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!! Omri B2022-10-20 I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work! roni yonani2022-10-19 Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same! Itzick Manasherov2022-10-19 Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need. Sophie Brito2022-10-19 Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend Elie Elancry2022-10-19 Amazing job Did a total renovation of my house with themGoogle rating score: 5.0 of 5, based on 12 reviews
Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Next steps
Grouped by what you are trying to do, not by category.
The county and the neighbouring cities
The parts of this page we do as a service
What we most often build here
When the answer is more than a remodel
Start here
Almost everything on this page turns on where the property actually is and what the street can see of it. Tell us the address and what you are hoping to do, and the first conversation is a useful one.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Biscayne Park tells you what it wants: full plans, an online filing, approval before work starts, and a separate answer about how the house will look. The value of a contractor here is knowing which of those your project triggers before the drawings are done, not after.
Or see the rest of what we cover on the Miami-Dade County page if your property is somewhere else in the county.