How does open plan versus private offices change the scope?
Private offices add walls, doors, extra lighting and often extra air-conditioning zones, so they take more time on site and more ceiling work. Open plans need fewer partitions but more thought for sound and privacy. We can price both options from your program and show what each one adds.
Is vinyl plank suitable over a concrete slab in Florida?
Yes, if the slab is dry and flat. South Florida slabs hold moisture, so we test it before laying and use the underlayment the manufacturer requires. Vinyl plank is quiet and warm underfoot. It is not the choice for a slab with active moisture, which needs a barrier or a different floor.
What happens to sprinklers when we move walls?
Sprinkler heads have to cover each room, so new partitions often mean relocating or adding heads. A licensed fire sprinkler contractor makes the change and the work is inspected. We include it in the plan from the start, because adding it after the ceiling goes up means opening it again.
Does the IT room need its own cooling?
Usually, yes. Switches and servers give off heat all day, and the building's air-conditioning may be switched off at night or on weekends. A small dedicated unit keeps the room within the equipment's range. We also check power capacity and a clean, dry location before you commit to a layout.
Do lighting controls follow a code?
Yes. The Florida Building Code, Energy Conservation, requires controls on most commercial lighting, such as occupancy sensors or time switches, plus limits on how much power lighting may use. We include the required controls in the electrical scope, because the inspector checks them before final approval.
When should furniture be ordered?
As soon as the layout is fixed, since lead times for desks and chairs can run longer than construction. Arrival should follow the final inspection, so the room is clean and the floors are protected. We coordinate delivery windows and elevator reservations with building management.
How do we keep sound down between offices?
Run walls up to the structure above, not just to the ceiling, and fill them with insulation. Seal gaps around doors and outlets, and avoid back-to-back electrical boxes. Glass fronts look open but carry sound, so rooms for calls and meetings need heavier walls. Tell us which rooms matter, and we will price them.
What does move-in day need from the contractor?
A clean room, working systems and the paperwork the landlord asks for. We run final cleaning, check doors, locks and lights, hand over keys and walk through the space with you and the property manager. Any small open items go on a punch list with dates, so move-in is not held up.