Licensed general contracting, construction and remodeling in the Town of Hillsboro Beach — where a repair costing more than half a building’s market value has to meet current flood plain, zoning and building standards, and may have to be raised above base flood elevation.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

A-00Architectural
SHEET A-00 / SOUTH FLORIDA REFERENCE SET · 12 FRAMES

Recent work

Work at the stages a threshold project passes through.

Structure, elevation, envelope and finishes by Elbaz Construction across South Florida. None of the properties shown is in Hillsboro Beach. Select any frame to open it full size.

G-01General
SHEET G-01 / TOWN OF HILLSBORO BEACH
01

The town, defined

Fifty per cent is not a guideline. It is a threshold.

Most towns scale their scrutiny to the size of the work. Hillsboro Beach adds a second test that has nothing to do with how ambitious your plans are and everything to do with arithmetic. Under the Town’s Land Development Regulations, reconstruction of a damaged building where the repair cost exceeds fifty per cent of the market value must comply with all flood plain requirements and with current zoning and building standards — not the standards the building was built to.

The consequence is the part owners do not expect. If the finished floor elevation is below flood plain requirements, the Town states that the building will need to be elevated above the base flood elevation. A project that began as a repair becomes a project that lifts a house. That is not a design decision anyone makes halfway through, which is why the ratio belongs at the start of the conversation.

Everything else here follows from the same geography. All development requires a construction permit, a Site Plan approval may be required as well, and every permit and Site Plan approval has to comply with the minimum Flood Zone finished floor elevation. The Town enforces the Florida Building Commission’s standards and the Broward County Board of Rules and Appeals’, and it runs its building department through an outside firm rather than in-house staff.

Front elevation of a new waterfront home with window openings glazed
REFFront elevation of a new waterfront home with the window openings glazed, South Florida project by Elbaz Construction.

We work across Miami-Dade, Broward and Palm Beach, so a coastal town where flood elevation governs the scope is a normal part of the job rather than an exception to it.

What is included

The threshold
Repair cost above 50% of market value
What it triggers
Current flood plain, zoning and building standards
The possible consequence
Elevation above base flood elevation
Every permit
Must meet minimum Flood Zone finished floor elevation
Codes enforced
Florida Building Commission and Broward County BORA
Department hours
7:30 a.m. to 4:00 p.m., Monday to Friday
A-01Architectural
SHEET A-01 / SCOPE OF WORKS · 10 ITEMS
02

Scope index

What we build here

Grouped by how the Town’s published requirements treat each category. Whether a particular scope crosses the 50% threshold, and what that then requires, is the Town’s determination — this is the structure, not a determination.

Rear elevation of the new home seen from the water side
REFRear elevation of a new home seen from the water side, South Florida project by Elbaz Construction.
01 / The 50% test applies

Storm or water damage repair

This is the scope the Town’s rule was written for. Where reconstruction of a damaged building costs more than half its market value, it must come up to current flood plain requirements and current zoning and building standards, and elevation may follow. Establish the ratio before the scope is fixed, not after.

A-02Architectural
SHEET A-02 / REFERENCE 01 · STRUCTURE, LEVEL AND ENVELOPE · 09 FRAMES
REFERENCE 01 · STRUCTURE, LEVEL AND ENVELOPE

What a building looks like when the work reaches its frame

Nine frames, separate South Florida projects

Crossing the threshold moves a project from finishes to structure, level and envelope. These frames show work at those stages, and the finished condition they lead to.

These nine frames are separate South Florida projects by Elbaz Construction, not one project and not a Hillsboro Beach property. Select any frame to open it full size.

A-03Architectural
SHEET A-03 / WHAT GOVERNS · TOWN OF HILLSBORO BEACH
03

Specification

Who and what a project here answers to

Read from the Town’s Permits & Regulations and Building Department pages on 2026-08-16. The Town publishes no review timeframe and neither does this page.

The Town’s Land Development Regulations
The source of the 50% rule and of the requirement that reconstruction above that threshold meet current flood plain, zoning and building standards.
Minimum Flood Zone finished floor elevation
The Town states that all permit and Site Plan approvals must comply with it. It is not reserved for damaged buildings.
The Florida Building Commission
One of the two bodies whose codes and standards the Town’s Building Department enforces.
Broward County Board of Rules and Appeals
The other. This is county-level and applies across Broward, not a Hillsboro Beach peculiarity — but it is what makes Broward practice differ from Miami-Dade’s.
Site Plan approval, where required
Depending on the development approval requested, a Site Plan approval may be required in addition to the construction permit.
An outside building department
The Town states that its Building Department is powered by Calvin, Giordano & Associates. Plan review and inspections are performed by a firm under contract rather than by Town staff, which is worth knowing before you assume a walk-in answer is available.
The Community Core portal
Where permit fees are paid, inspections scheduled, plan review comments read and inspection results checked. It requires a login, so registration is a first step rather than a later one.
The Building Department counter
Open to the public 7:30 a.m. to 4:00 p.m., Monday to Friday.
Completed structural shell with glazing installed, ready for finishes
REFCompleted structural shell with glazing installed, ready for finishes, South Florida project by Elbaz Construction.
A-04Architectural
SHEET A-04 / MATERIAL AND DESIGN LANGUAGE
04

Design and material language

The decisions the threshold reaches

Five choices that change either the cost side of the ratio or what the flood requirements will ask for.

Plank flooring in a hallway with a panelled door open
DETPlank flooring in a hallway with a panelled door open, South Florida project by Elbaz Construction.
Completed structural shell with glazing installed, ready for finishes
DETCompleted structural shell with glazing installed, South Florida project by Elbaz Construction.
M-01

Finished floor level

The governing dimension

Governed by the Town’s published requirements Every permit and Site Plan approval must comply with the minimum Flood Zone finished floor elevation, and where the threshold is crossed and the floor is low the building must be elevated above base flood elevation.

Other options. Establish the existing floor level against the requirement before anything is designed. It is the single measurement that decides the shape of the project.

M-02

How far the scope goes

The cost side of the ratio

Governed by the Town’s published requirements Repair cost is what you control. Extending a scope by one more room can move a project across a threshold that changes its category.

Other options. Cost the work honestly and early, and decide deliberately which side of fifty per cent the project is going to sit on.

M-03

Openings and glazing

Coastal exposure

Governed by the Town’s published requirements On an exposed strip the openings take the weather first, and they are governed by the Florida Building Commission and Broward County standards the Town enforces.

Other options. Settle products and ratings before the drawings are finished; substitution late is expensive on any coastal elevation.

M-04

Envelope and roof assemblies

Coastal exposure

Governed by the Town’s published requirements The roof and its edge details are the other assembly the codes exist for here.

Other options. Specify for the exposure rather than to the minimum, and keep the product approvals with the submission.

M-05

Interior finishes

Still inside the number

Governed by the Town’s published requirements Interior work is permitted work here, and its cost counts toward the value of the project when the ratio is being tested.

Other options. On a building near the threshold, phasing finishes changes the arithmetic — but the Town decides how a project is assessed, so do not assume it changes the answer.

On what is shown. Nothing here is a determination. The Town decides how repair cost and market value are established, whether the threshold is crossed and what follows — so this page describes the decisions, not their outcomes.

G-02General
SHEET G-02 / PROCESS · 11 STAGES
05

Process

How we run a project here

Eleven steps. The order is set by the threshold: the ratio is established before the scope is fixed, because it decides what kind of project this is.

01
Consultation

The scope, the address, and the age and condition of the building.

02
Levels

We establish the existing finished floor elevation against the minimum Flood Zone requirement. This is the first measurement, not a late one.

03
Cost and value

The work is costed properly and the market value question is put to the Town, because the ratio decides the category.

04
The threshold decision

With the Town’s determination in hand, the scope is either kept inside the threshold or the larger project is accepted deliberately.

05
Design

Drawn to current flood plain, zoning and building standards where the threshold applies, and to the elevation requirement in any case.

06
Engineering

Structural and, where elevation is required, the sequencing and support design that goes with raising a building.

07
Site Plan

Where the approval requested calls for it, prepared alongside the construction permit rather than after it.

08
Portal

Registration on Community Core so fees, comments, inspections and results are reachable from the start.

09
Permit

Construction permit issued through the Town’s outsourced building department.

10
Construction

Sequenced so each trade is genuinely ready for its inspection, with coastal exposure planned around rather than discovered.

11
Completion

Final inspections, certification, and the documents handed over in a form you can produce again when the property is sold.

P-01Permitting
SHEET P-01 / PERMITTING AND FLOOD COMPLIANCE · TOWN OF HILLSBORO BEACH
06

Technical brief

What the Town publishes, and what it says exactly

Ten references, each read off an official Town source on 2026-08-16.

Interior corridor at drywall stage with openings framed for glazing
PInterior corridor at drywall stage with openings framed for glazing, South Florida project by Elbaz Construction.
Plank flooring through a living room with vaulted ceiling
PPlank flooring through a living room with a vaulted ceiling, South Florida project by Elbaz Construction.
R-01

The 50% rule, quoted

"The Town’s Land Development Regulations (Ordinance 266) require reconstruction of damaged buildings, where the repair cost exceeds 50% of the market value, to comply with all flood plain requirements and current zoning and building standards."

R-02

And what follows from it

"If the finished floor elevation of the building is below flood plain requirements, the building will need to be elevated above the base flood elevation."

R-03

Everything is development

"All development (new construction, additions, renovations, alterations to properties, etc.) in the Town of Hillsboro Beach requires a construction permit."

R-04

Site Plan approval may be added

"Dependent on the development approval requested, a Site Plan approval may also be required."

R-05

The elevation rule reaches every approval

"All permit and Site Plan approvals will need to comply with the minimum Flood Zone finish floor elevation."

R-06

The two code authorities

The Department enforces "codes and standards adopted by the Florida Building Commission and Broward County Board of Rules and Appeals", and "reviews plans and performs jobsite inspections to verify compliance with the Florida Building Code".

R-07

The department is outsourced

"The Town of Hillsboro Beach Building Department is powered by Calvin, Giordano & Associates, Inc (CGA)."

R-08

The portal, and what it is for

The Town directs applicants to the Community Core permitting website "to pay permit fees, schedule inspections, view plan review comments, or check inspection results", and states that it "will require a login to the website’s portal".

R-09

Counter hours

"The Building Department is open to the public 7:30 am - 4:00 pm, Monday - Friday."

R-10

The Town asks to be told

It requests notification "of any property development without permit or if illegal dumping of material or debris into the intracoastal waterway is observed" — a reminder that on a strip this narrow the water is everyone’s boundary.

Disclaimer. Nothing on this sheet is a determination about a specific property. The Town decides what a scope requires and whether the threshold is crossed.

S-01Structural
SHEET S-01 / THE THRESHOLD TEST · INDICATIVE
07

Assembly

Where the ratio sends a project.

An indicative diagram of the Town’s published rule, not a determination. Only the Town decides how repair cost and market value are established, and only the Town decides what follows.

Indicative diagram of the Hillsboro Beach 50 per cent thresholdA scope of work is costed against the market value of the building. Where the repair cost does not exceed fifty per cent, the work proceeds as a permitted renovation meeting the minimum Flood Zone finished floor elevation. Where it does exceed fifty per cent, the Town requires compliance with all flood plain requirements and with current zoning and building standards, and if the finished floor is below flood plain requirements the building must be elevated above base flood elevation. Permit, inspections and certification follow either way.Repair cost againstmarket valueAbove 50%: current flood,zoning and building standardsAt or below: permittedrenovationMinimum Flood Zonefinished floor elevationPermit, inspections,certificationand elevation above BFE if the floor is low

Key

01
Scope defined and costed
02
Market value established
03
The ratio tested against 50%
04
Flood plain and elevation requirements applied
05
Site Plan approval where required
06
Construction permit issued
07
Inspections and certification
N-01

The ratio has two inputs, and you control one

Repair cost is a scope decision. Market value is not. A project can be brought under the threshold by narrowing the work, or it can be accepted as the larger project it has become — but the choice has to be made deliberately.

N-02

Elevation is a different job, not a bigger one

Raising a structure above base flood elevation changes the engineering, the sequencing, the services and the access. It is not a line item added to a renovation.

N-03

The floor elevation rule is not only for damaged buildings

The Town states that all permit and Site Plan approvals must comply with the minimum Flood Zone finished floor elevation. That reaches ordinary work too.

N-04

Broward, not Miami-Dade

The Board of Rules and Appeals is the county authority here. Product approvals and administrative practice differ from Miami-Dade’s, and a contractor who only works south of the county line will notice.

N-05

The department is a firm, not a floor of Town Hall

The Town states its Building Department is powered by an outside consultancy. Plan your questions and your submissions around that rather than around a counter.

N-06

Register on the portal early

Community Core requires a login before you can pay fees, schedule an inspection, read plan review comments or check a result.

REFERENCE 02 · A BUILDING BACK TO ITS STRUCTURE

What crossing the threshold actually looks like

When the ratio is exceeded, the work reaches the frame and the floor level rather than the finishes. South Florida projects by Elbaz Construction; neither property is in Hillsboro Beach.

01A side elevation showing the cantilever and glazing pattern.
02A new home under construction on a waterfront lot.
Q-01Quality
SHEET Q-01 / PERFORMANCE AND QUALITY
08

Performance and quality

How we work

Eight commitments, each one a direct consequence of something this Town publishes.

Open stair framing beside a full-height glazed wall during construction
QOpen stair framing beside a full-height glazed wall during construction, South Florida project by Elbaz Construction.
Completed bathroom remodel in a South Florida home
QTiled shower with a recessed lit niche and matt black fittings, South Florida project by Elbaz Construction.
We establish the ratio before the scope
Repair cost against market value decides the category of the project. Finding that out late is the most expensive discovery available on this island.
Floor levels are surveyed first
Every approval has to meet the minimum Flood Zone finished floor elevation, so the existing level is measured before anything is drawn.
We price for the Town’s determination, not around it
The Town decides how cost and value are established. We do not design a scope to dodge a threshold and then present it as a finding.
Elevation is quoted as the different job it is
If raising the building is on the table, it is scoped, engineered and sequenced as its own project rather than folded into a renovation figure.
Broward practice, not Miami-Dade habit
The Board of Rules and Appeals governs here, and our submissions are prepared to it.
We register on the portal at the start
Community Core needs a login before fees, comments, inspections or results are reachable.
Coastal exposure is specified for, not minimised
Openings and roof assemblies on an exposed strip get the specification the conditions call for.
One licensed contract
Design coordination, Town submittals, permitting and construction under CBC1265280, so no approval falls between two parties.
C-01Cost
SHEET C-01 / COST AND SCHEDULE VARIABLES · 10
09

Cost and timeline

What moves the number

We publish no Town permit fees — the fee schedule was not opened, and the figure that matters is current on the day you file. These are the variables that actually move a price here.

Rear elevation of the new home seen from the water side
CRear elevation of a new home seen from the water side, South Florida project by Elbaz Construction.
Completed kitchen remodel in a South Florida home
CUndermount sink and gooseneck tap at a window in a white shaker kitchen, South Florida project by Elbaz Construction.
#VariableWhy it moves the number
01Which side of 50% the project lands onIt is the largest single fork available here, and it is arithmetic rather than judgement.
02Whether elevation is requiredRaising a building above base flood elevation is a different project with different engineering, sequencing and services.
03The existing finished floor levelHow far below the requirement it sits determines how much work the elevation rule actually creates.
04Whether a Site Plan approval is neededIt is an additional approval with its own preparation and its own timetable.
05Coastal exposure of the assembliesOpenings and roofs on an exposed strip carry specification and product-approval costs that inland work does not.
06Access on a narrow stripWhere material can be stood, how it is delivered and how far it is carried is a real cost between an ocean and a waterway.
07Building age and conditionWhat is behind the finishes on an older coastal building is the largest genuine unknown on most renovation projects here.
08Structural interventionRemoving or altering structure brings engineering, and engineering brings its own review and inspection sequence.
09Multi-storey and association contextOn a building with shared structure and shared approvals, the programme is rarely set by your unit alone.
10Specification levelFinishes, joinery and fittings move a renovation budget more than square footage does, once the shell is settled.
I-01Information
SHEET I-01 / QUESTION INDEX · 12
10

Question index

Questions we are asked here

Answered from the Town’s own published material.

01 / The 50% rule

What exactly is the fifty per cent rule?

The Town’s Land Development Regulations require reconstruction of damaged buildings, where the repair cost exceeds 50% of the market value, to comply with all flood plain requirements and with current zoning and building standards. It is a threshold, not a sliding scale: below it you are renovating an existing building, above it you are bringing that building up to today’s requirements.

A-06Architectural
SHEET A-06 / CONSTRUCTION STUDY
Construction study

What to establish first

New home under construction on a canal lot, full elevation
STUDYNew home under construction on a waterfront lot, South Florida project by Elbaz Construction.

Four questions worth answering before a drawing is commissioned. All four are answered by the Town, not by a contractor.

Observations

01
What the building is worth, and what the work will cost
The ratio between them is the test that decides everything else here.
02
Where the finished floor sits against the requirement
It determines whether crossing the threshold means compliance work or a building that has to be raised.
03
Whether a Site Plan approval is required
It depends on the development approval requested, and it is an additional approval on its own timetable.
04
Who you will actually be dealing with
The Building Department is run by an outside firm and the portal needs a login. Both shape how quickly a question gets answered.
G-03General
SHEET G-03 / DELIVERY AND CREDENTIALS
11

Credentials and delivery

Why Elbaz Construction

Six things that are verifiable rather than asserted.

Modern two-storey waterfront home under construction, exterior at dry-in stage
REFModern two-storey waterfront home under construction at dry-in stage, South Florida project by Elbaz Construction.
01

Licensed general contractor

CBC1265280 — certified building contractor, bonded and insured. Verifiable in the Florida DBPR licence register.

02

We put the threshold question first

Before design, before scope, before price — because it is the question that decides what kind of project you are commissioning.

03

We read the Town’s own material

Every regulatory statement on this page was taken from an official Town source and is attributed to it.

04

We say what we do not know

No fee schedule, no review timeframes, no staff names and nothing else from Ordinance 266 appear here, because we did not establish them from a primary source.

05

Honest photography

Every image here is a real Elbaz Construction project in South Florida, captioned for what it actually shows. None is claimed as a Hillsboro Beach property.

06

Across three counties

Miami-Dade, Broward and Palm Beach — so a coastal town’s flood requirements are a normal part of the work rather than an exception to it.

I-02Information
SHEET I-02 / CLIENT RECORD
12

Google reviews

In their words, unedited.

Reproduced verbatim from the connected Google Business Profile, including original spelling. No review schema is emitted from this page.

★★★★★

“Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.”

Mia Zafrani · Google review

★★★★★

Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze.

Lee Morali

★★★★★

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!

Shir Partush

★★★★★

From start to end- personal kind treatment, always respectful. Value for money 10/10.

roni yonani

★★★★★

Amazing job Did a total renovation of my house with them

Elie Elancry

G-04General
SHEET G-04 / ENQUIRY
13

Start here

Start a Hillsboro Beach project

Tell us the scope and the address. We will establish where the finished floor sits, what the work is likely to cost against the building’s value, and what the Town’s threshold means for the project you actually want.

Front elevation of a new waterfront home with window openings glazed
REFFront elevation of a new waterfront home with the window openings glazed, South Florida project by Elbaz Construction.

What happens next

01
We call or email within one business day, Sunday to Friday.
02
A threshold check: the existing finished floor level, the likely cost of the work, and the Town’s view of how that sits against market value.
03
A site visit, then a written scope and a proposal against it — with the review path stated in it, not assumed.
Useful to have
A survey with levels if you have one, any elevation certificate for the property, and previous Town approvals.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

G-05General
SHEET G-05 / END OF SET

Find the ratio first.
Then build the right project.

Design coordination, Town submittals, permitting and construction under one licensed general contractor — in the Town of Hillsboro Beach and across Miami-Dade, Broward and Palm Beach counties.

Completed structural shell with glazing installed, ready for finishes
ENDCompleted structural shell with glazing installed, South Florida project by Elbaz Construction.