Drywall stage in a hallway and tall interiors
Three frames of an interior at the drywall stage: a hallway with hung drywall and framed doorways, a double-height stair hall with a steel floating stair and scaffolding, and a long interior with a scissor lift and loft balcony. These are from a new-construction job, not storm damage. They show the stage every rebuild reaches once rooms are closed in again.
Scope of work
- Drywall hung over framed walls
- Framed doorways and openings
- Steel floating stair in a tall stair hall
- Scaffolding and a scissor lift for high work
- Tall windows at the end of the hallway
- Loft balcony above a double-height room
Materials & finishes
What to look for in the photos
Look at where the drywall stops and the framing shows. After a water loss, this is the stage a room returns to: closed in, dry and ready for tape and finishes.
Elbaz Construction project photo · 3 photos