10 service categories · 100 service pages · Miami-Dade, Broward & Palm Beach
View all servicesAn island has to earn its floor twice - once as worktop and storage, and once as the space you walk around it. Put a sink or a cooktop in one and, on the slab most South Florida homes are built on, it also means cutting concrete. We design and install islands across Miami-Dade, Broward and Palm Beach, services included.
Miami-Dade · Broward & Palm Beach Counties
ScrollRecent projects
Twelve frames from four completed kitchens - a waterfall island with seating, a marble island with the cooktop in it, a navy kitchen island and a compact one. Tap any image to see it larger.
Waterfall island with seating for three.
A different kitchen: marble island with seating for four.
The seating side of the waterfall island.
Marble island with the gas cooktop set into the top.
Navy kitchen: a freestanding waterfall island.
Wine refrigerator built into the island run.
The marble worktop and cooktop, close.
A waterfall end, mitred and veining-matched.
The undermount sink set into the island top.
The navy kitchen island top, clear of services.
A compact island with seating for two.
The end of the waterfall island, looking out.
All photographs are of real completed Elbaz Construction work. They come from four separate kitchens and are shown as recent work, not as one project.
The journey
Island projects go wrong in two places, and neither is the cabinet. Either the walkway around it ends up too tight to actually use, or a sink or cooktop gets decided after the floor has already been closed up. Both are settled long before anyone orders stone. This page walks the sequence in order, starting with the measurement that decides whether an island belongs in the room at all.
Use the stage markers to jump straight to what you care about. Nothing here is a sales pitch - it is the sequence we actually follow.
Stage 01 · Measure
Four reasons, and they produce genuinely different islands. Which one is yours changes the size, the services and occasionally the answer on whether to build one.
The most common reason, and the easiest to get right. An island used primarily for preparation wants an uninterrupted run of worktop and no seating eating into it. That sounds obvious until seating is added late and the usable prep length halves. Decide which side of the island is for working and which is for sitting before the size is fixed.

Completed Elbaz project: a marble island top with the cooktop set into it.
Seating at an island is the feature people ask for most and specify least. It needs an overhang deep enough for knees, support under the stone once that overhang gets long, and enough width per seat that two people are not touching elbows. Counter height and bar height also want different overhangs and different stools.

Completed Elbaz project: a waterfall island with seating for three.
An island is the only cabinetry in a kitchen that can be reached from both sides, which makes it the best place for deep drawers, and the only practical home for things like a wine refrigerator or a second dishwasher without giving up perimeter wall. It also means the back has to be finished, because it is on show.

Completed Elbaz project: the island end, with a wine refrigerator built into the run.
Plenty of islands begin as a wall or a peninsula that is coming out. That is a bigger job than adding an island to an open room, because whatever was in the wall - services, sometimes structure - has to go somewhere else, and the floor underneath it will need making good.

Completed Elbaz project: a freestanding waterfall island in a navy kitchen.
Stage 02 · Design
Everything else is finish selection. These four decide the size, the services and whether the room still works once it is in.
This is backwards from how most people approach it. You do not decide how big the island should be and then see what walkway is left - you fix the walkway first, and the island is whatever remains. The clearance most kitchen designers work to is around 42 inches for a single cook and 48 where two people work at once, more where an appliance door or a dishwasher has to open into the gap.

Completed Elbaz project: a full-height waterfall island with seating for three.
This single decision separates a cabinet with a top on it from a construction project. An island with nothing in it needs, at most, a circuit. An island with a sink needs supply, waste and a vent. An island with a cooktop needs power or gas and, critically, somewhere for the extraction to go. On a slab-on-grade house all of that arrives from below, through the concrete.

Completed Elbaz project: a marble island with the gas cooktop set into it and seating on the far side.
Seating is where islands most often disappoint, and always for the same two reasons: not enough depth for knees, and not enough width per seat. Counter-height seating at 36 inches and bar-height seating at 42 inches want different overhangs and different stools, and once the overhang gets long the stone needs support under it - your fabricator specifies how much for the material you have chosen.

Completed Elbaz project: island seating with the screened lanai beyond.
A waterfall end - where the worktop turns down the side of the island to the floor - is a fabrication decision more than a design one. The corner is a mitred joint, and it looks right only when the veining runs continuously around it, which means the pieces have to be cut from the same slab in the right order. That needs more material and a fabricator who plans the cut before making it.

Completed Elbaz project: a waterfall end, with the stone mitred and the veining carried down the side.
Every photograph in this section is real Elbaz work, from four different completed kitchens. Each caption says which project it is; they are not one kitchen.
Project gallery 01
Ten frames from four different kitchens we built. A contemporary waterfall island with seating, a marble island with the cooktop set into it, a navy kitchen's freestanding island, and a compact island in a small footprint. They are separate projects and each caption says which.
Project 01, guided tour










Waterfall island, wide
A full-height waterfall island with seating for three, an undermount sink and the cooking wall beyond.
Four kitchen islands Elbaz built, photographed at completion. They are four different kitchens on four different properties, presented as four projects rather than one.
A large contemporary island with a waterfall end, seating for three on a long overhang, an undermount sink with a drainer channel cut into the stone, and a wine refrigerator built into the run.
A different kitchen entirely: a marble-topped island with a gas cooktop set into the worktop, seating for four kept clear on the opposite side, and dark shaker cabinetry below.
A freestanding white waterfall island against navy perimeter cabinetry with brass hardware, and no seating - an island specified for preparation and storage.
A small island with seating for two in a much tighter kitchen, included because it shows the other end of the range: an island does not have to be large to be worth building.
No cost, timeline, address, client or permit history appears anywhere on this page. Photographs from other folders in the source library were excluded because they could not be confirmed as South Florida work.
Stage 03 · Permit
Whether an island needs a permit depends entirely on what goes into it. A cabinet with a top needs none. A sink, a cooktop or a wall coming out is a different matter.
The room is measured and the walkways set out on the floor before a size is proposed. If the clearance does not work, no amount of design fixes it later.
This decision drives everything after it - the permit, the slab, the programme and a good part of the cost. It is made early and deliberately, not left open.
Most South Florida homes are slab-on-grade, so services to an island arrive by saw-cutting and trenching the concrete. Where there is a crawl space or a floor above a void, the answer is different and usually simpler.
Where the island replaces a wall or a peninsula, whether that wall is load-bearing is established properly. Where it is, structural design and a permit follow.
Countertop receptacles are GFCI-protected, and a receptacle is never set face-up in the worktop. Whether one is required in the island itself depends on the code edition your jurisdiction has adopted, which has changed recently - we confirm which applies at your address.
A cooktop in an island has no wall behind it, so extraction is either a ceiling-mounted hood over the island or a downdraft within it. High-extraction hoods can also require a make-up air provision.
An island sink cannot be vented up through a wall, because there is no wall. It needs a loop vent run below the floor or an air admittance valve where the jurisdiction permits one - and not every one of them does.
Where a permit is needed, the set is prepared and filed with your municipality, or with the county where the property is unincorporated. Review comments are answered and the set resubmitted.
Condominium and HOA boards frequently have their own rules and their own schedule, particularly where plumbing is being altered. Worth starting alongside the permit rather than after it.
Stone is templated from the installed cabinetry, never from the drawing. Seam positions and any overhang support are agreed with you before the slab is cut.
Requirements, review times and inspection sequences are set by your local building department, and they differ across Miami-Dade, Broward and Palm Beach and between the municipalities inside them. Nothing here is a guaranteed timeline or an assurance of approval - we confirm what your address actually requires once we know it.
Stage 04 · Install
The order matters more here than in most kitchen work, because almost everything that is difficult happens below the floor and has to be finished before anything visible starts.
Before anything is opened
The route in is protected, the rest of the kitchen and the adjoining rooms are sheeted, and dust containment goes up. Cutting concrete indoors is dusty work and it is managed rather than tolerated.
Quality check · Containment up before the first cut

Peninsula, wall or old island out
Whatever is being removed comes out, and what was inside it is properly identified rather than guessed at. Anything load-bearing has its support in place before removal, not after.
Quality check · Nothing removed until what it carries is known

The island marked on the floor
The island footprint and the walkways are marked on the actual floor and walked before any concrete is cut. This is the last cheap moment to move it, and people frequently do.
Quality check · Footprint walked and agreed on site

Trenching for the services
Where a sink or cooktop is going in, the slab is saw-cut and trenched along the service route. This is the noisiest day of the job and it is done in one go rather than spread out.
Quality check · Trench routed to the island footprint

Supply, waste, vent and power
Drainage with its fall, the vent arrangement, supply lines, and the circuits for outlets and any appliance are all run in the trench and tested before it is closed.
Quality check · Rough-in inspected where the scope is permitted

Concrete back, floor made good
The trench is filled and the slab made good, then the floor finish is patched or replaced across the affected area. A patch in a tiled floor is visible unless the tile matches, and that is discussed before it happens, not after.
Quality check · Floor made good before cabinetry lands

The island set and levelled
The cabinet run is set out, levelled and fixed, with the ends and back panelled because they are on show. Any overhang support is built in at this stage, not added later.
Quality check · Island level across its full length

Stone measured off the real thing
The fabricator templates from the installed cabinetry. Seam positions and, for a waterfall, the slab layout and the direction the veining runs are agreed before cutting.
Quality check · Slab layout approved before the saw

Stone in, sink and cooktop set
The worktop is installed, any waterfall ends are mitred and joined on site, and the sink or cooktop cut-outs are set. This is the day the island stops being cabinets.
Quality check · Mitred corners closed and matched

Making it work
Plumbing and electrical final connections, the extraction commissioned where there is a cooktop, then trim, silicone and the walkthrough with you.
Quality check · Finals passed and the walkway measured as built

Stage 05 · Inspect
Balanced both ways. What is right depends on your room, your floor and how the kitchen is actually used.
Face the room while you work

Uninterrupted worktop

Which oneIf you are opening the floor anyway - for a cooktop, or because the flooring is being replaced - put the sink in. If the floor would otherwise stay closed, be honest about whether facing the room is worth cutting the slab for. Plenty of excellent kitchens keep the island clear.
One piece does both jobs

Keep the island for working

Which oneIf the room can take a table without blocking a walkway, the island works harder without seating. If it cannot, put the seating at the end rather than along the working side - you keep the prep run and still seat people.
The stone turns down to the floor

Worktop stops at the cabinet

Which oneA waterfall earns itself where the end of the island is genuinely visible from a living space. Where it faces a wall or a walkway, the money is better spent on the worktop material itself. It is a visibility decision, not a quality one.
Tick whatever applies. This will not produce a price - what is under your floor decides too much of it - but it will show which parts carry the cost and the calendar.
We do not publish figures for this work, because the same scope can differ several-fold once the existing conditions are visible. You get a real, itemised number after a site visit, in writing.
Stage 06 · Use
Photographs from four completed Elbaz kitchens. An island touches the floor, the services and the middle of the room, so it is worth knowing what the weeks actually look like.
A clear island on an open floor is a short job. One with a sink or a cooktop on a slab runs considerably longer, because the concrete has to be cut, the services run and inspected, and the floor made good before the cabinetry arrives. We will be specific once the scope is set.
Saw-cutting concrete indoors. It is loud, it is dusty, and it is contained and done in one go rather than spread across the job.
Concrete cutting and any demolition are the dusty parts. Containment goes up before the first cut, not after someone notices.
Where the island is an addition to an otherwise working kitchen, you often keep using the perimeter. Where a peninsula or wall is coming out, expect a period without it, and we will tell you honestly how long.
Trenching a slab means the floor over that route is opened and made good. If the existing tile or wood cannot be matched, that is raised before any cutting starts, never afterwards.
Where the scope is permitted, rough-in is inspected with the trench still open, and there are finals at the end. Someone needs to provide access.
There is a wait between the cabinetry being set and the worktop arriving, because the stone is templated from the built island. It is normal, it is planned for, and the kitchen looks unfinished during it.
We measure the finished walkways with you at handover, against what was agreed at setting-out. It is the number that decides whether the island works.
Only claims we can stand behind. Everything below is either a matter of public record or visible in the work shown on this page.
Elbaz Construction is a licensed general contractor, CBC1265280. Where island work is permitted work, permits are pulled in the company name.
The plumbing, the electrical, the concrete work and the cabinetry are coordinated by the same contractor, so nobody is waiting on somebody else to come back.
What is under your floor is established before a size is agreed, because on a slab it decides the scope more than anything above it.
The footprint is marked on the actual floor and walked before concrete is cut, which is the last cheap moment to move it.
An island sink has no wall to vent through. The arrangement is designed for what your jurisdiction accepts, not improvised at rough-in.
Worktops are templated from the installed cabinetry, and seam positions and slab layout are agreed with you before cutting.
Requirements differ across the 104 municipalities of Miami-Dade, Broward and Palm Beach, and which code edition applies at your address is confirmed rather than assumed.
Where a permit is pulled it is signed off and closed. An open permit follows the property and surfaces when it is sold.
Filter to the part of the job you are thinking about.
That is a clearance question, not a size question. Fix the walkway you need around it first - around 42 inches for one cook, 48 where two people work, and more wherever an appliance door opens into the gap - and the island is whatever floor is left. If nothing sensible is left, a peninsula or a moveable cart may serve you better, and we will say so.
It depends entirely on what goes in it. A cabinet run with a worktop on it generally does not. Add a sink, a cooktop, gas, new circuits, or take out a wall, and you are into permitted work. We confirm this against your address and your scope before anything starts.
Often, yes - that is one of the more common versions of this job. The questions are whether the clearance works and what is under the floor. If the island stays clear of services, it can be a genuinely contained project.
Whatever is left after the walkways are fixed. A long, relatively narrow island usually works better in a real kitchen than a large square one, because a square island is too deep to reach across and pushes the walkways tight at the ends.
Enough depth for knees and enough width per seat that two people are not sharing an elbow, and the two heights are different: counter height and bar height want different overhangs and different stools. Beyond a certain unsupported length the stone needs support underneath, and your fabricator specifies that for the material chosen.
Whichever you use facing the room. A sink in the island suits people who prepare and wash while talking to the room; a cooktop suits people who cook that way, but it brings the extraction question with it. Putting both in is possible and usually crowds the worktop.
One where the worktop turns down the side of the island to the floor instead of stopping at the cabinet. The corner is a mitred joint, and it looks right when the veining runs continuously around it - which means the pieces are cut from the same slab in a planned order.
In most South Florida homes, a concrete slab on grade. That matters because any service going to an island - drain, water, gas, or a circuit - has to be routed through it, which means saw-cutting and trenching the concrete and then making the floor good.
Not through a wall, because there is not one. It is done either with a loop vent run below the floor or with an air admittance valve where the jurisdiction permits one - and not all of them do. It is designed for what your building department accepts before the trench is cut.
Sometimes, and it is a common way to make room for an island. Whether the wall is load-bearing is established properly rather than assumed. Where it is, that means structural design, a permit and support in place before anything is removed.
It needs a real answer, because there is no wall behind it. That is either a ceiling-mounted hood over the island or a downdraft within it. Hoods above a certain extraction rate can also require a make-up air provision, which is confirmed against the code edition in force at your address.
Countertop receptacles are GFCI-protected and are never installed face-up in the worktop. Whether one is required in the island itself depends on which code edition your jurisdiction has adopted, and that requirement has changed in recent editions - so we confirm which applies rather than working from memory.
For a clear island added to a working kitchen, often not at all. Where the slab is being cut or a peninsula is coming out, there is a genuine period without it, and the honest length depends on the scope and the inspection schedule.
Wherever a slab is trenched, the floor over that route is opened. If your existing tile or wood can be matched, the patch disappears. If it cannot - a discontinued tile, an aged wood finish - it will be visible, and we raise that before cutting anything, never after.
Because the photograph shows the part that costs least. What decides the number is under the floor: whether the slab is being cut, how far the services have to run, and whether anything structural is involved.
In rough order: putting a sink or cooktop in it, cutting a slab to reach it, removing a load-bearing wall, matching a floor that no longer exists, and waterfall ends. The stone itself is usually not the biggest line.
We measure the finished walkways with you against what was set out on the floor at the start, confirm every drawer and door clears, run the water and the extraction, and check the overhang support is doing its job.
Follow the fabricator's care instructions for the specific material - marble, quartz and granite are genuinely different, and some need sealing while others never do. The vertical face of a waterfall end takes knocks at floor level, so that is the part worth watching.
Nothing in that stage yet — try “All”.
Client experience
Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.
Adir Davidov2022-12-27 Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended! Lee Morali2022-12-27 They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them! Shir Partush2022-12-27 We hired them to renovate our investment property and they provided exceptional quality service for an affordable price! Mia Zafrani2022-10-25 Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction. carmit cohen2022-10-25 After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!! Omri B2022-10-20 I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work! roni yonani2022-10-19 Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same! Itzick Manasherov2022-10-19 Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need. Sophie Brito2022-10-19 Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend Elie Elancry2022-10-19 Amazing job Did a total renovation of my house with themGoogle rating score: 5.0 of 5, based on 12 reviews
Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Next steps
Grouped by what you are trying to do, not by category.
The parts of the kitchen an island touches
Where an island is one option among several
Drawings, structure and approvals
If the island is part of something larger
Related services we build
Longer reading on kitchen decisions
Start here
The more you can tell us about the room and what you want in the island, the more useful the first conversation is.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

The clearance around an island decides whether it improves the kitchen or quietly ruins it. That measurement is the first thing we take.