Freestanding poolside pavilion with timber-slat cladding, dark stone boundary wall and travertine paving, complete

Building in Palm Beach
begins with one question:
who reviews it.

Licensed general contracting, construction and remodeling in the Town of Palm Beach — where a published designation matrix decides whether your scope is approved by staff or heard by a commission, and that answer shapes the design long before it shapes the schedule.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

A-00Architectural
SHEET A-00 / SOUTH FLORIDA REFERENCE SET · 12 FRAMES

Recent work

Exterior work, which is the work that gets reviewed.

Driveways, terraces, freestanding structures and pool decks built by Elbaz Construction across South Florida. These are the categories the Town of Palm Beach designates for review — hardscape, landscape, freestanding unenclosed accessory structures. None of the properties shown is in Palm Beach, and none is a landmarked property. Select any frame to open it full size.

G-01General
SHEET G-01 / TOWN OF PALM BEACH
01

The town, defined

A barrier-island town that publishes its own answer key.

Most municipalities make you find out how your project will be reviewed by submitting it. The Town of Palm Beach does the opposite. Its Planning, Zoning & Building Department publishes a Project Designation Manual Matrix — adopted on 13 July 2022 and issued jointly by the Architectural Review Commission and the Landmarks Preservation Commission — that sorts categories of work by the level of design-review authority they attract.

In the Town’s own description, projects follow a process for compliance with the Town’s regulations "via administrative or commission-level review". Which of those you are on is not a detail. It decides who has to be persuaded, what has to be drawn to persuade them, and when the work can start.

We build to that reality. The designation question is answered against the Town’s own matrix at the start, and the scope, the drawings and the programme are set from the answer rather than adjusted after it.

Paver circular driveway lit at dusk in front of a single-storey South Florida home
REFCompleted paver approach and landscaping, South Florida project by Elbaz Construction.

The Town publishes a Development Review Calendar carrying the submittal deadlines and hearing dates for ARCOM, the Landmarks Preservation Commission and Town Council. On a commission-level project the calendar, not the construction programme, sets the first date that matters.

What is included

Scope
Feasibility and designation review, design, engineering, Town submittals, permitting, construction, inspections and closeout
Delivered by
One licensed general contractor — CBC1265280
Town
Town of Palm Beach, Palm Beach County, Florida
Reviewing bodies
Architectural Commission (ARCOM) · Landmarks Preservation Commission · Town Council · Planning, Zoning & Building Department staff
Department
Planning, Zoning & Building Department, 360 South County Road, Palm Beach, FL 33480
Permit portal
EPL Permit Portal — the Town’s Tyler EnerGov self-service system, live since April 2024
A-01Architectural
SHEET A-01 / SCOPE OF WORKS · 12 ITEMS
02

Scope index

What we build here, sorted the way the Town sorts it.

Twelve categories of work, each named as the Town’s designation matrix names it. The matrix is what determines the review path; the Department makes the determination for your specific scope.

Paver driveway with mature planting either side of the approach
REFCompleted paver driveway and planting, South Florida project by Elbaz Construction.
01 / New construction

New residential building

Ground-up construction of a new residential building is the heaviest category in the Town’s matrix, and the one where design review, zoning compliance and engineering have to be resolved as a single package rather than in sequence. We deliver it under one licensed contract, from feasibility through certificate of occupancy.

A-02Architectural
SHEET A-02 / REFERENCE SET 01 · 09 FRAMES
REFERENCE SET 01

Structure first, finishes after

Nine frames from separate South Florida projects, in build order

Freestanding and attached structures are the category owners most often imagine as a finish item. They are not. The sequence below runs from open post bases and raw ground through set structure and closed soffit to laid travertine and a complete terrace — the order in which the work actually has to happen, and the order in which it has to be drawn.

These nine frames are separate South Florida projects by Elbaz Construction, not one project and not a Palm Beach property. Select any frame to open it full size.

A-03Architectural
SHEET A-03 / REVIEW AUTHORITY · TOWN OF PALM BEACH
03

Specification

Who reviews what

Read from the Town’s Planning, Zoning & Development Review page and from the Project Designation Manual Matrix adopted 13 July 2022. The designation for a specific scope is made by the Planning, Zoning & Building Department against that matrix — this is the structure, not a determination.

Architectural Commission (ARCOM)
Design review on buildings that are not designated landmarks or historically significant — modifications visible from public rights-of-way, new construction and landscaping. The Town’s stated tests are that projects create harmony and do not disrupt the aesthetic quality of their surroundings.
Landmarks Preservation Commission
Development review where the property is a designated historic landmark or a historically significant building. The Commission also designates landmarks, issues Certificates of Appropriateness and oversees the Town’s tax abatement programme for landmarked property.
Town Council
Hears a project where the scope needs a variance, a special exception or a site plan review, and handles Comprehensive Plan amendments and zoning code changes.
Department staff
Administrative review. The matrix records that applications submitted for staff review are still subject to staff design review and require full compliance with the Town of Palm Beach Zoning Code of Ordinances.
The four designation levels
The matrix’s own columns are Commission Review, Commission Chair Review and Staff Review, with the levels named ARCOM Major, ARCOM Minor, Staff Approval and Neighbor Consent — and, on a landmarked or historically significant building, the Landmarks route to a Certificate of Appropriateness.
What the matrix is for
In its own words, to aid homeowners, design professionals and Town staff in determining the path and level of design review authority for site and construction improvements within the Town.
Where the dates come from
The Development Review Calendar published by the Town, which carries the submittal deadlines and hearing dates for ARCOM, the Landmarks Preservation Commission and Town Council.
Where the permit comes from
The EPL Permit Portal, the Town’s Tyler EnerGov self-service system, live since April 2024. Design review approval and the building permit are separate steps.
Long covered run with columns installed and the ground still open
REFStructure set with the ground still open, South Florida project by Elbaz Construction.
A-04Architectural
SHEET A-04 / MATERIAL AND DESIGN LANGUAGE
04

Design and material language

Five exterior decisions a review town makes for you.

Each of these is a category in the Town’s designation matrix before it is a specification. What is written here is what the matrix records; what is right for your property is a conversation with the Department and with the design.

Dark-framed canopy beside a pool with large-format pavers being set
DETDark-framed canopy over large-format pavers being set, South Florida project by Elbaz Construction.
Travertine pool deck under construction around a rectangular pool and spa
DETTravertine pool deck under construction, South Florida project by Elbaz Construction.
M-01

Roof covering

In-kind, or a new design

What the matrix records. Roofing is inside the building-alterations category, and the matrix separates in-kind replacement of architectural features — S tile replacement named specifically — from removal, replacement or addition of a feature with an alternate design, which also covers the installation of new S tile.

Other options. Matching the existing covering is the lighter application. Changing profile, colour or material is a design change and is designated as one, so it belongs in the earliest conversation rather than in a change order.

M-02

Fenestration

What faces the street decides it

What the matrix records. Window and door replacement sits in building alterations, and the matrix separately calls out street-facing fenestration alterations in the C-WA district and major façade alterations that affect architectural style.

Other options. Rear and side openings not visible from the right-of-way are a different proposition from the street elevation. Impact-rated products are selected against the wind-borne debris and design-pressure requirements for the address; Palm Beach County is outside the High-Velocity Hurricane Zone that applies in Miami-Dade and Broward.

M-03

Boundary treatment

Fences, walls and gates

What the matrix records. The matrix distinguishes new boundary work visible from the right-of-way — and names the use of PVC products and corrugated sheet piling — from in-kind replacement and from new work interior to the lot and not on property lines. New work on side or rear property lines is where neighbour consent enters, and the matrix notes that without consent the project moves to a minor designation.

Other options. Masonry, rendered block, hedging and metalwork all read differently from the street, and the material choice is part of the review rather than a detail settled afterwards.

M-04

Plant and screening

Mechanical equipment

What the matrix records. Condensing units, pool equipment, cooling towers, water filtration and generators up to 100 kW form one category. The matrix separates new equipment visible from the right-of-way from new equipment outside the setbacks and not visible — the latter conditional on meeting FEMA, screening and zoning requirements — and from replacement equipment in an existing location. It also records that generators above 100 kW must be housed in a building.

Other options. Where plant sits is therefore an architectural decision. Moving a generator inside a structure moves the whole application into the new-construction or additions category.

M-05

Ground plane

Hardscape, landscape, turf and lighting

What the matrix records. Driveways, patios and pools sit under site alterations for hardscape, with substantial alterations separated from minor ones and from work interior to the lot. Landscape has its own line, and artificial turf is treated by position — front yard or readily visible from the right-of-way against side and rear yards. Landscape lighting appears with the Town’s exterior lighting affidavit.

Other options. A ground-plane scheme drawn as one package — paving, planting, turf and lighting together — is easier to review than four applications that arrive separately and contradict each other.

On what is shown. Every photograph on this page is real Elbaz Construction work in South Florida, individually reviewed before publication. None of the properties shown is in Palm Beach, none is a designated landmark, and no photograph here is offered as an example of an approved Palm Beach application.

G-02General
SHEET G-02 / PROCESS · 11 STAGES
05

Process

Eleven stages, designation first.

The designation question comes before design because it changes what design has to produce. No stage here carries a duration: on a commission-level project the Town’s Development Review Calendar sets the dates, not us.

01
Consultation

What you want to change, and what is visible from the street.

02
Property status

Whether the building is a designated landmark or historically significant, because that changes the reviewing body.

03
Designation check

Your scope read against the Town’s Project Designation Manual Matrix, category by category.

04
Department confirmation

The Planning, Zoning & Building Department confirms the review path for the specific application.

05
Design

Drawn to the level the confirmed review path actually requires.

06
Engineering

Structural and MEP design, sealed by Florida-licensed engineers.

07
Calendar

Submittal booked against the published Development Review Calendar where a commission or the Council will hear it.

08
Design review

Staff review, Commission Chair review, or a commission hearing — whichever the designation produced.

09
Permitting

Application through the EPL Permit Portal once the design approval is in hand.

10
Construction

Built to the approved drawings, with inspections called as the work reaches them.

11
Closeout

Final inspections and closeout, with approved drawings and warranties handed over as a set.

P-01Permitting
SHEET P-01 / PLANNING, PERMITTING AND REVIEW · TOWN OF PALM BEACH
06

Technical brief

The designation matrix, and everything downstream of it.

The Town publishes more of its process than almost any municipality in the region. Here is what it publishes, and what each document actually decides for a project.

Concrete ribbon driveway with planted grass joints leading to a modern home
PConcrete ribbon driveway with planted joints, South Florida project by Elbaz Construction.
Large-format grey paver driveway running to a double garage
PLarge-format paver driveway to a double garage, South Florida project by Elbaz Construction.
R-01

The Project Designation Manual Matrix

Adopted 13 July 2022 and published jointly by the Architectural Review Commission and the Landmarks Preservation Commission through the Planning, Zoning & Building Department. It sorts categories of work by the level of design review authority they attract, and in its own words exists to aid homeowners, design professionals and Town staff in determining that path.

R-02

Four levels of review authority

The matrix’s columns are Commission Review, Commission Chair Review and Staff Review. The levels are named ARCOM Major, ARCOM Minor, Staff Approval and Neighbor Consent, with a parallel Landmarks route to a Certificate of Appropriateness on a landmarked or historically significant building.

R-03

Visible from the right-of-way

The single test that recurs most in the matrix. Additions, boundary work, mechanical equipment, hardscape, landscape, artificial turf and statuary are all designated differently depending on whether they are visible from a public right-of-way.

R-04

Landmarked and historically significant buildings

Where a property is a designated landmark or a historically significant building, the Landmarks Preservation Commission performs the development review and issues the Certificate of Appropriateness. The Town publishes a Landmarks Preservation Commission Project Designation Guide, a Landmarks Manual, a Landmarks Administrative Review Application and a Landmarks Tax Abatement Application.

R-05

Administrative review

Both commissions have an administrative route: the Town publishes an ARCOM Administrative Review Application and a Landmarks Administrative Review Application. The matrix records that staff-reviewed applications are still subject to staff design review and full compliance with the Zoning Code of Ordinances.

R-06

Neighbor consent

A designation level in its own right in the matrix, appearing on work such as new fences, walls and gates on side or rear property lines and landscape alterations on those lines — where the matrix notes that the project moves to a minor designation without consent.

R-07

Variance, special exception and site plan review

Where the scope needs any of these, the Town Council hears the project. The matrix carries a variance line covering all variance requests and the corresponding projects as determined by staff. Council also handles Comprehensive Plan amendments and zoning code changes.

R-08

The Development Review Calendar

The Town publishes a Development Review Calendar carrying the submittal deadlines and hearing dates for ARCOM, the Landmarks Preservation Commission and Town Council. On a commission-level project it is the first programme constraint, and it is published in advance rather than negotiated.

P-01

The EPL Permit Portal

The Town’s permit system is the EPL Permit Portal, a Tyler EnerGov self-service platform brought live in April 2024. Design review approval and the building permit are separate steps, and the portal is where the second one happens.

P-02

Contractor registration

The Town publishes contractor registration instructions for the portal alongside its account-creation, permit-and-plan and inspection-scheduling guides. Registration is the contractor’s job, not the owner’s, and it is done before an application can be filed.

P-03

The Town’s own checklists

Published alongside the construction permit application: a Demolition Checklist, a Checklist for 1 & 2 Unit Dwellings, an Information Checklist for Certificate of Occupancy and Certificate of Completion, a Condo Checklist, and FEMA’s Substantial Improvement Checklist. A submission built against the Town’s own list is the cheapest way to avoid a correction cycle.

P-04

Storm season and HB 803

The Town publishes a Post-Storm Permitting Plan 2026, and HB 803 information for contractors for 2026. On a barrier island both matter: what can be repaired after a storm, and under what process, is set out in advance.

Disclaimer. Requirements are set by the Town and change. Nothing here is a legal opinion, a zoning determination, a designation or a guarantee of approval. The Planning, Zoning & Building Department at 360 South County Road is the authority, and we confirm the current position with them for your specific address before design begins.

S-01Structural
SHEET S-01 / REVIEW ROUTE · INDICATIVE
07

Assembly

The route your application takes, drawn.

An indicative diagram of the Town’s published structure, not a determination. The property’s landmark status selects the reviewing commission; the designation matrix selects the level; a variance, special exception or site plan review sends the project to Town Council; and the building permit is a separate step through the EPL Permit Portal.

Indicative diagram of the Town of Palm Beach development review routeA scope of work is tested for landmark or historically significant status, which selects either the Landmarks Preservation Commission or the Architectural Commission. The Project Designation Manual Matrix then sets the level of review: commission review, commission chair review, staff approval or neighbor consent. A scope needing a variance, special exception or site plan review is heard by Town Council. The building permit is applied for separately through the EPL Permit Portal.01020304050607Indicative diagram — not a determination of review path

Key

01
Scope of work defined
02
Landmark or historically significant status tested
03
Variance, special exception or site plan review needed
04
Landmarks Preservation Commission route
05
Architectural Commission route
06
Designation matrix sets the level of review
07
Building permit through the EPL Permit Portal
N-01

Status before body

Whether the building is a designated landmark or historically significant is what selects the reviewing commission. It is the first thing to establish, because it changes which published guide applies to the application.

N-02

The matrix sets the level, not the body

Once the commission is known, the designation matrix sets how much authority the application needs — a full commission, the commission chair, staff, or neighbour consent. Category and visibility do most of the work in that determination.

N-03

Council is a parallel route, not a later one

A variance, a special exception or a site plan review sends the project to Town Council. That is not an appeal after a refusal; it is a separate requirement that the scope either triggers or does not.

N-04

Design approval is not the permit

The building permit is a separate application through the EPL Permit Portal. Treating design review and permitting as one step is the most common way a Palm Beach programme slips.

N-05

Deadlines are published, not negotiated

Where a commission or the Council will hear the project, the Development Review Calendar carries the submittal deadline. Missing one moves the hearing, not the deadline.

N-06

Staff review is still design review

The matrix is explicit that applications submitted for staff review remain subject to staff design review and require full compliance with the Zoning Code of Ordinances. Administrative is not automatic.

REFERENCE 02 · BOUNDARY AND GROUND PLANE

The two categories that touch the street

Boundary treatment and the ground plane are the two things a passer-by actually sees, and both are designated by position in the Town’s matrix. South Florida projects by Elbaz Construction; neither property is in Palm Beach.

01Travertine patio and spa laid out to the boundary wall.
02Covered terrace with a louvred privacy screen over a concrete deck.
Q-01Quality
SHEET Q-01 / PERFORMANCE AND QUALITY
08

Performance and quality

What we hold ourselves to in a review town.

No approval is promised on this page, and no review duration is quoted. Approval is the Town’s to give and the calendar is the Town’s to set; what we control is whether the application deserves to succeed the first time.

Poolside pavilion with timber-slat soffit and dark split-face stone wall behind
QPoolside structure with a slatted timber soffit and dark stone boundary wall, South Florida project by Elbaz Construction.
Travertine paving part-laid beneath the pavilion during installation
QTravertine part-laid beneath a completed structure, South Florida project by Elbaz Construction.
Designation established first
The review path is read against the Town’s matrix and confirmed with the Department before design work is commissioned.
Drawn for the audience
A commission-level submittal and a staff submittal are not the same document. Each is prepared for the body that will actually read it.
Visibility studied honestly
Where a category turns on what is visible from the right-of-way, that is established on site rather than assumed from a plan.
Checklists used as published
The Town’s own checklists — including the 1 & 2 unit dwelling, condo, demolition and certificate checklists — are worked through before submission, not after a correction.
Calendar respected
Submittals are booked against the published Development Review Calendar, and the construction programme is built backwards from the hearing rather than forwards from a hope.
Neighbours treated as stakeholders
Where the matrix contemplates neighbour consent, the conversation happens early and in person.
Coastal detailing
Salt exposure, drainage falls, flashing and fixings are specified for a barrier-island environment, because the cheapest version fails first here.
Documented closeout
Approved drawings, product approvals, inspection records and warranties handed over as one set at completion.
C-01Cost
SHEET C-01 / COST AND SCHEDULE VARIABLES · 13
09

Cost and timeline

Thirteen things that move a Palm Beach number.

We do not publish a price per square foot for this town, and no Town fee is quoted on this page — fees are the Town’s to set and to change. After a site visit and the designation check you get a written scope and a proposal against it.

Attached cover with a dark frame and white soffit over a concrete deck
CAttached cover with a dark frame over a concrete deck, South Florida project by Elbaz Construction.
Dark-framed canopy beside a pool with large-format pavers being set
CCanopy and large-format paving under installation, South Florida project by Elbaz Construction.
#VariableWhy it moves the number
01Review levelA commission-level application and a staff-reviewed one need different drawings, different consultants and different amounts of time before anyone breaks ground.
02Landmark or historically significant statusIt changes the reviewing body, the published guidance that applies and the documentation the application carries.
03Visibility from the right-of-wayThe same work is designated differently depending on where it sits, and the designation is what sets the pre-construction cost.
04Whether a variance is neededA variance, special exception or site plan review adds a Town Council route that a compliant scheme does not have.
05Existing fabricWhat is behind the finish on an older building is only fully known once it is opened up, and on this island that is usually where the surprises are.
06Access and logisticsBarrier-island sites are narrow, shared and closely overlooked. Deliveries, storage and parking are a real line, not an overhead.
07Coastal exposureSalt-air specification for fixings, frames, hardware and finishes costs more up front and far less over the life of the work.
08Flood and substantial improvementOn an older property the Town publishes FEMA’s Substantial Improvement Checklist for a reason — the determination can change the scope entirely.
09Fenestration and product approvalImpact-rated products selected against the requirements for the address, and the façade design that the review will accept.
10Roof scopeIn-kind replacement against a change of profile or material, and what the deck underneath turns out to need.
11Ground plane extentDriveway, patio, pool surround, planting, turf and lighting drawn as one package or as several.
12Mechanical strategyWhere plant can sit, what screening it needs, and whether a generator has to be housed in a building.
13Programme against the calendarA hearing date that lands after a mobilisation window costs money even when nothing about the building changed.
I-01Information
SHEET I-01 / QUESTION INDEX · 15
10

Question index

Straight answers about building in the Town of Palm Beach.

Fifteen questions on designation, the commissions, permitting, the calendar and cost. Where a figure is not published by the Town, it is not invented here.

01 / Designation

How do I find out whether my project goes to a commission?

The Town publishes a Project Designation Manual Matrix, adopted on 13 July 2022, that sorts categories of work by the level of design review authority they attract. It is the document to read first. The determination for your specific application is made by the Planning, Zoning & Building Department against that matrix, and we confirm it with them before design starts.

A-06Architectural
SHEET A-06 / CONSTRUCTION STUDY
Construction study

Four things to establish before you draw anything.

Travertine patio with a hot tub beneath a tiki structure and palms
STUDYCompleted travertine patio and spa, South Florida project by Elbaz Construction.

A property-owner’s short list for the Town of Palm Beach. Everything here comes from the Town’s own published material; nothing here is a determination, and the Planning, Zoning & Building Department at 360 South County Road is the authority for your address.

Observations

01
Your property’s status
Designated landmark, historically significant building, or neither. This is the branch that decides whether the Landmarks Preservation Commission or the Architectural Commission reviews your work, and therefore which published guidance applies.
02
Your category in the matrix
Find the row that matches what you actually want to do — new construction, additions, building alterations, paint, fences and walls, mechanical equipment, hardscape, landscape, turf, lighting, signage, statuary. The category is what the level of review hangs off.
03
What is visible from the street
Stand in the right-of-way and look. Whether the work can be seen from there changes the designation on most of the matrix’s categories, and it is much cheaper to find that out standing on the pavement than in a hearing.
04
The next submittal deadline
If the answer is commission-level, the Development Review Calendar carries the submittal deadline and the hearing date. That date, not the builder’s availability, is what the programme has to be built around.
G-03General
SHEET G-03 / DELIVERY AND CREDENTIALS
11

Credentials and delivery

Six reasons, all of them checkable.

No award, badge or membership is claimed here. The licence number is public and verifiable with the Florida Department of Business and Professional Regulation.

Freestanding pavilion over a paved plinth on artificial turf, complete
REFCompleted freestanding structure over a paved plinth, South Florida project by Elbaz Construction.
01

Licensed general contractor

CBC1265280 — certified building contractor, bonded and insured. Verifiable in the Florida DBPR licence register.

02

The designation question answered first

We read your scope against the Town’s own matrix and confirm the path with the Department before you commission design, because the answer changes what design has to produce.

03

One contract across design review and construction

Design, engineering, submittals, permitting and construction sit with one company, which matters most where approval and building are separate processes with separate clocks.

04

Built for the coast

Salt exposure, drainage and fixing specification treated as engineering decisions rather than finish choices, on a barrier island where the cheapest version fails first.

05

Documented, inspected, closed out

Approved drawings, product approvals, inspection records and warranties handed over as a set — which is what protects the property’s value at sale.

06

Regional, and specific about it

Miami-Dade, Broward and Palm Beach counties, where review requirements differ sharply between neighbouring municipalities and Palm Beach differs from all of them.

I-02Information
SHEET I-02 / CLIENT RECORD
12

Google reviews

In their words, unedited.

Reviews are quoted verbatim from the Elbaz Construction Google Business Profile. They describe the company as a whole — none refers specifically to a project in the Town of Palm Beach.

★★★★★

“Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.”

Mia Zafrani · Google review

★★★★★

Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze.

Lee Morali

★★★★★

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!

Shir Partush

★★★★★

From start to end- personal kind treatment, always respectful. Value for money 10/10.

roni yonani

★★★★★

Amazing job Did a total renovation of my house with them

Elie Elancry

G-04General
SHEET G-04 / ENQUIRY
13

Start here

Start with the designation question.

Tell us the address and what you want to change. The first thing we do is establish the property’s status and read the scope against the Town’s designation matrix — before anyone draws anything.

Paver driveway with mature planting either side of the approach
REFCompleted paver driveway and planting, South Florida project by Elbaz Construction.

What happens next

01
We call or email within one business day, Sunday to Friday.
02
A designation check: your property’s status, your category in the Town’s matrix, and what is visible from the right-of-way.
03
A site visit, then a written scope and a proposal against it — with the review path stated in it, not assumed.
Useful to have
A survey if you have one, any previous Town approvals for the property, and photographs of the elevation from the street.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

G-05General
SHEET G-05 / END OF SET

Find out who reviews it.
Then build it properly.

Designation review, design, engineering, Town submittals, permitting and construction under one licensed general contractor — in the Town of Palm Beach and across Palm Beach, Broward and Miami-Dade counties.

Paver circular driveway lit at dusk in front of a single-storey South Florida home
ENDCompleted paver approach at dusk, South Florida project by Elbaz Construction.