10 service categories · 100 service pages · Miami-Dade, Broward & Palm Beach
View all services104 municipalities · Miami-Dade, Broward & Palm Beach
All service areas
Licensed general contracting, construction and remodeling in the Town of Palm Beach — where a published designation matrix decides whether your scope is approved by staff or heard by a commission, and that answer shapes the design long before it shapes the schedule.
Miami-Dade · Broward & Palm Beach Counties
ScrollYour details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.
Recent work
Driveways, terraces, freestanding structures and pool decks built by Elbaz Construction across South Florida. These are the categories the Town of Palm Beach designates for review — hardscape, landscape, freestanding unenclosed accessory structures. None of the properties shown is in Palm Beach, and none is a landmarked property. Select any frame to open it full size.
The town, defined
Most municipalities make you find out how your project will be reviewed by submitting it. The Town of Palm Beach does the opposite. Its Planning, Zoning & Building Department publishes a Project Designation Manual Matrix — adopted on 13 July 2022 and issued jointly by the Architectural Review Commission and the Landmarks Preservation Commission — that sorts categories of work by the level of design-review authority they attract.
In the Town’s own description, projects follow a process for compliance with the Town’s regulations "via administrative or commission-level review". Which of those you are on is not a detail. It decides who has to be persuaded, what has to be drawn to persuade them, and when the work can start.
We build to that reality. The designation question is answered against the Town’s own matrix at the start, and the scope, the drawings and the programme are set from the answer rather than adjusted after it.

The Town publishes a Development Review Calendar carrying the submittal deadlines and hearing dates for ARCOM, the Landmarks Preservation Commission and Town Council. On a commission-level project the calendar, not the construction programme, sets the first date that matters.
Scope index
Twelve categories of work, each named as the Town’s designation matrix names it. The matrix is what determines the review path; the Department makes the determination for your specific scope.

Ground-up construction of a new residential building is the heaviest category in the Town’s matrix, and the one where design review, zoning compliance and engineering have to be resolved as a single package rather than in sequence. We deliver it under one licensed contract, from feasibility through certificate of occupancy.
The matrix treats additions differently depending on storey, and on whether the addition is visible from the right-of-way — and it draws lines at 400 square feet for a one-storey addition not visible from the right-of-way, and at 200 square feet for a second-floor addition not visible from it. Where an addition sits against those lines is a design decision worth making deliberately.
A two-storey accessory structure is designated separately from a single-storey one. Guest accommodation, garage-with-studio and pool-house schemes all land here, and the storey count changes the review before it changes the cost.
The matrix names them explicitly — pergolas, trellises, arbors, follies and canopies. They are the most common way an owner improves a garden and the most commonly underestimated in review terms, because unenclosed does not mean unreviewed.
Windows, doors, garage doors, roof, siding, gutters and decorative shutters are one category in the Town’s matrix. Within it the matrix distinguishes an in-kind replacement of an architectural feature from removal, replacement or addition with an alternate design — including the installation of new S tile.
Roofing sits inside building alterations, and the matrix specifically separates in-kind replacement of architectural features, S tile replacement included, from an alternate design. Matching what is there is a different application from changing it.
Window and door replacement is a design-review question in this town as well as a code one. Palm Beach County lies outside the High-Velocity Hurricane Zone that covers Miami-Dade and Broward, so product approval follows the wind-borne debris and design pressure requirements that apply at your address rather than the HVHZ route.
The matrix carries a paint category for a change in colour on landmark and commercial buildings. A repaint is one of the cheapest jobs on a property and one of the most visible from the street, which is exactly why it is designated at all.
Driveways, patios and pools. The matrix separates substantial alterations from minor ones, and treats work interior to the lot and not readily visible from the right-of-way differently again.
Landscape alterations, artificial turf and landscape lighting each have their own line in the matrix, with the front yard and anything readily visible from the right-of-way treated more strictly than side and rear yards.
The matrix distinguishes new work visible from the right-of-way — and calls out the use of PVC products and corrugated sheet piling — from in-kind replacement and from new work interior to the lot. Work on side or rear property lines is where neighbour consent appears.
Condensing units, pool equipment, cooling towers, water filtration and generators up to 100 kW are one line in the matrix; it records that generators above 100 kW must be housed in a building, which turns a plant decision into a new-construction or additions application. Screening, setbacks and FEMA requirements all bear on where equipment can sit.
Nine frames from separate South Florida projects, in build order
Freestanding and attached structures are the category owners most often imagine as a finish item. They are not. The sequence below runs from open post bases and raw ground through set structure and closed soffit to laid travertine and a complete terrace — the order in which the work actually has to happen, and the order in which it has to be drawn.
These nine frames are separate South Florida projects by Elbaz Construction, not one project and not a Palm Beach property. Select any frame to open it full size.
Specification
Read from the Town’s Planning, Zoning & Development Review page and from the Project Designation Manual Matrix adopted 13 July 2022. The designation for a specific scope is made by the Planning, Zoning & Building Department against that matrix — this is the structure, not a determination.

Design and material language
Each of these is a category in the Town’s designation matrix before it is a specification. What is written here is what the matrix records; what is right for your property is a conversation with the Department and with the design.


In-kind, or a new design
What the matrix records. Roofing is inside the building-alterations category, and the matrix separates in-kind replacement of architectural features — S tile replacement named specifically — from removal, replacement or addition of a feature with an alternate design, which also covers the installation of new S tile.
Other options. Matching the existing covering is the lighter application. Changing profile, colour or material is a design change and is designated as one, so it belongs in the earliest conversation rather than in a change order.
What faces the street decides it
What the matrix records. Window and door replacement sits in building alterations, and the matrix separately calls out street-facing fenestration alterations in the C-WA district and major façade alterations that affect architectural style.
Other options. Rear and side openings not visible from the right-of-way are a different proposition from the street elevation. Impact-rated products are selected against the wind-borne debris and design-pressure requirements for the address; Palm Beach County is outside the High-Velocity Hurricane Zone that applies in Miami-Dade and Broward.
Fences, walls and gates
What the matrix records. The matrix distinguishes new boundary work visible from the right-of-way — and names the use of PVC products and corrugated sheet piling — from in-kind replacement and from new work interior to the lot and not on property lines. New work on side or rear property lines is where neighbour consent enters, and the matrix notes that without consent the project moves to a minor designation.
Other options. Masonry, rendered block, hedging and metalwork all read differently from the street, and the material choice is part of the review rather than a detail settled afterwards.
Mechanical equipment
What the matrix records. Condensing units, pool equipment, cooling towers, water filtration and generators up to 100 kW form one category. The matrix separates new equipment visible from the right-of-way from new equipment outside the setbacks and not visible — the latter conditional on meeting FEMA, screening and zoning requirements — and from replacement equipment in an existing location. It also records that generators above 100 kW must be housed in a building.
Other options. Where plant sits is therefore an architectural decision. Moving a generator inside a structure moves the whole application into the new-construction or additions category.
Hardscape, landscape, turf and lighting
What the matrix records. Driveways, patios and pools sit under site alterations for hardscape, with substantial alterations separated from minor ones and from work interior to the lot. Landscape has its own line, and artificial turf is treated by position — front yard or readily visible from the right-of-way against side and rear yards. Landscape lighting appears with the Town’s exterior lighting affidavit.
Other options. A ground-plane scheme drawn as one package — paving, planting, turf and lighting together — is easier to review than four applications that arrive separately and contradict each other.
On what is shown. Every photograph on this page is real Elbaz Construction work in South Florida, individually reviewed before publication. None of the properties shown is in Palm Beach, none is a designated landmark, and no photograph here is offered as an example of an approved Palm Beach application.
Process
The designation question comes before design because it changes what design has to produce. No stage here carries a duration: on a commission-level project the Town’s Development Review Calendar sets the dates, not us.
What you want to change, and what is visible from the street.
Whether the building is a designated landmark or historically significant, because that changes the reviewing body.
Your scope read against the Town’s Project Designation Manual Matrix, category by category.
The Planning, Zoning & Building Department confirms the review path for the specific application.
Drawn to the level the confirmed review path actually requires.
Structural and MEP design, sealed by Florida-licensed engineers.
Submittal booked against the published Development Review Calendar where a commission or the Council will hear it.
Staff review, Commission Chair review, or a commission hearing — whichever the designation produced.
Application through the EPL Permit Portal once the design approval is in hand.
Built to the approved drawings, with inspections called as the work reaches them.
Final inspections and closeout, with approved drawings and warranties handed over as a set.
Technical brief
The Town publishes more of its process than almost any municipality in the region. Here is what it publishes, and what each document actually decides for a project.


Adopted 13 July 2022 and published jointly by the Architectural Review Commission and the Landmarks Preservation Commission through the Planning, Zoning & Building Department. It sorts categories of work by the level of design review authority they attract, and in its own words exists to aid homeowners, design professionals and Town staff in determining that path.
The matrix’s columns are Commission Review, Commission Chair Review and Staff Review. The levels are named ARCOM Major, ARCOM Minor, Staff Approval and Neighbor Consent, with a parallel Landmarks route to a Certificate of Appropriateness on a landmarked or historically significant building.
The single test that recurs most in the matrix. Additions, boundary work, mechanical equipment, hardscape, landscape, artificial turf and statuary are all designated differently depending on whether they are visible from a public right-of-way.
Where a property is a designated landmark or a historically significant building, the Landmarks Preservation Commission performs the development review and issues the Certificate of Appropriateness. The Town publishes a Landmarks Preservation Commission Project Designation Guide, a Landmarks Manual, a Landmarks Administrative Review Application and a Landmarks Tax Abatement Application.
Both commissions have an administrative route: the Town publishes an ARCOM Administrative Review Application and a Landmarks Administrative Review Application. The matrix records that staff-reviewed applications are still subject to staff design review and full compliance with the Zoning Code of Ordinances.
A designation level in its own right in the matrix, appearing on work such as new fences, walls and gates on side or rear property lines and landscape alterations on those lines — where the matrix notes that the project moves to a minor designation without consent.
Where the scope needs any of these, the Town Council hears the project. The matrix carries a variance line covering all variance requests and the corresponding projects as determined by staff. Council also handles Comprehensive Plan amendments and zoning code changes.
The Town publishes a Development Review Calendar carrying the submittal deadlines and hearing dates for ARCOM, the Landmarks Preservation Commission and Town Council. On a commission-level project it is the first programme constraint, and it is published in advance rather than negotiated.
The Town’s permit system is the EPL Permit Portal, a Tyler EnerGov self-service platform brought live in April 2024. Design review approval and the building permit are separate steps, and the portal is where the second one happens.
The Town publishes contractor registration instructions for the portal alongside its account-creation, permit-and-plan and inspection-scheduling guides. Registration is the contractor’s job, not the owner’s, and it is done before an application can be filed.
Published alongside the construction permit application: a Demolition Checklist, a Checklist for 1 & 2 Unit Dwellings, an Information Checklist for Certificate of Occupancy and Certificate of Completion, a Condo Checklist, and FEMA’s Substantial Improvement Checklist. A submission built against the Town’s own list is the cheapest way to avoid a correction cycle.
The Town publishes a Post-Storm Permitting Plan 2026, and HB 803 information for contractors for 2026. On a barrier island both matter: what can be repaired after a storm, and under what process, is set out in advance.
Disclaimer. Requirements are set by the Town and change. Nothing here is a legal opinion, a zoning determination, a designation or a guarantee of approval. The Planning, Zoning & Building Department at 360 South County Road is the authority, and we confirm the current position with them for your specific address before design begins.
Assembly
An indicative diagram of the Town’s published structure, not a determination. The property’s landmark status selects the reviewing commission; the designation matrix selects the level; a variance, special exception or site plan review sends the project to Town Council; and the building permit is a separate step through the EPL Permit Portal.
Whether the building is a designated landmark or historically significant is what selects the reviewing commission. It is the first thing to establish, because it changes which published guide applies to the application.
Once the commission is known, the designation matrix sets how much authority the application needs — a full commission, the commission chair, staff, or neighbour consent. Category and visibility do most of the work in that determination.
A variance, a special exception or a site plan review sends the project to Town Council. That is not an appeal after a refusal; it is a separate requirement that the scope either triggers or does not.
The building permit is a separate application through the EPL Permit Portal. Treating design review and permitting as one step is the most common way a Palm Beach programme slips.
Where a commission or the Council will hear the project, the Development Review Calendar carries the submittal deadline. Missing one moves the hearing, not the deadline.
The matrix is explicit that applications submitted for staff review remain subject to staff design review and require full compliance with the Zoning Code of Ordinances. Administrative is not automatic.
Boundary treatment and the ground plane are the two things a passer-by actually sees, and both are designated by position in the Town’s matrix. South Florida projects by Elbaz Construction; neither property is in Palm Beach.
Performance and quality
No approval is promised on this page, and no review duration is quoted. Approval is the Town’s to give and the calendar is the Town’s to set; what we control is whether the application deserves to succeed the first time.


Cost and timeline
We do not publish a price per square foot for this town, and no Town fee is quoted on this page — fees are the Town’s to set and to change. After a site visit and the designation check you get a written scope and a proposal against it.


| # | Variable | Why it moves the number |
|---|---|---|
| 01 | Review level | A commission-level application and a staff-reviewed one need different drawings, different consultants and different amounts of time before anyone breaks ground. |
| 02 | Landmark or historically significant status | It changes the reviewing body, the published guidance that applies and the documentation the application carries. |
| 03 | Visibility from the right-of-way | The same work is designated differently depending on where it sits, and the designation is what sets the pre-construction cost. |
| 04 | Whether a variance is needed | A variance, special exception or site plan review adds a Town Council route that a compliant scheme does not have. |
| 05 | Existing fabric | What is behind the finish on an older building is only fully known once it is opened up, and on this island that is usually where the surprises are. |
| 06 | Access and logistics | Barrier-island sites are narrow, shared and closely overlooked. Deliveries, storage and parking are a real line, not an overhead. |
| 07 | Coastal exposure | Salt-air specification for fixings, frames, hardware and finishes costs more up front and far less over the life of the work. |
| 08 | Flood and substantial improvement | On an older property the Town publishes FEMA’s Substantial Improvement Checklist for a reason — the determination can change the scope entirely. |
| 09 | Fenestration and product approval | Impact-rated products selected against the requirements for the address, and the façade design that the review will accept. |
| 10 | Roof scope | In-kind replacement against a change of profile or material, and what the deck underneath turns out to need. |
| 11 | Ground plane extent | Driveway, patio, pool surround, planting, turf and lighting drawn as one package or as several. |
| 12 | Mechanical strategy | Where plant can sit, what screening it needs, and whether a generator has to be housed in a building. |
| 13 | Programme against the calendar | A hearing date that lands after a mobilisation window costs money even when nothing about the building changed. |
Question index
Fifteen questions on designation, the commissions, permitting, the calendar and cost. Where a figure is not published by the Town, it is not invented here.
The Town publishes a Project Designation Manual Matrix, adopted on 13 July 2022, that sorts categories of work by the level of design review authority they attract. It is the document to read first. The determination for your specific application is made by the Planning, Zoning & Building Department against that matrix, and we confirm it with them before design starts.
The matrix sets out Commission Review, Commission Chair Review and Staff Review, with the levels named ARCOM Major, ARCOM Minor, Staff Approval and Neighbor Consent. On a designated landmark or a historically significant building the route runs instead to the Landmarks Preservation Commission and a Certificate of Appropriateness.
Because it is the test the matrix uses most. Additions, fences and walls, mechanical equipment, hardscape, landscape, artificial turf and statuary are all designated differently depending on whether they can be seen from a public right-of-way. It is often the difference between a staff review and a commission hearing.
The Architectural Commission performs design review on buildings that are not designated landmarks or historically significant — modifications visible from public rights-of-way, new construction and landscaping. The Town states the tests as creating harmony and not disrupting the aesthetic quality of the surroundings.
The Landmarks Preservation Commission performs development review where the property is a designated historic landmark or a historically significant building, and issues the Certificate of Appropriateness. The Town publishes a Landmarks Preservation Commission Project Designation Guide, a Landmarks Manual and a Landmarks Administrative Review Application, and the Commission also oversees a tax abatement programme for landmarked property.
Where the scope needs a variance, a special exception or a site plan review. The matrix also carries a variance line covering all variance requests and the corresponding projects as determined by staff. Council additionally handles Comprehensive Plan amendments and zoning code changes.
Yes. The Town publishes both an ARCOM Administrative Review Application and a Landmarks Administrative Review Application. Note what the matrix says about it: applications submitted for staff review are still subject to staff design review and require full compliance with the Town of Palm Beach Zoning Code of Ordinances.
Through the EPL Permit Portal, the Town’s Tyler EnerGov self-service system, which the Town brought live in April 2024. Design review approval and the building permit are separate steps — the first does not produce the second.
Your contractor does. The Town publishes contractor registration instructions for the portal alongside its account-creation, permit-and-plan and inspection guides. It is our job to be registered and current before an application is filed.
A construction permit application, a Demolition Checklist, a Checklist for 1 & 2 Unit Dwellings, an Information Checklist for Certificate of Occupancy and Certificate of Completion, a Condo Checklist and FEMA’s Substantial Improvement Checklist, along with HB 803 information for contractors for 2026. Building the submission against those lists is the cheapest correction avoidance there is.
We will not print a number of weeks, because the Town sets the dates and they depend on the review level and the calendar. What we can tell you is where the dates come from: the Town publishes a Development Review Calendar carrying the submittal deadlines and hearing dates for ARCOM, the Landmarks Preservation Commission and Town Council.
The Town publishes a Post-Storm Permitting Plan for 2026 setting out how permitting works after a storm event. On a barrier island that is worth reading before the season rather than during it.
Wind-borne debris protection and product approval are decided by the requirements that apply at your address. Palm Beach County lies outside the High-Velocity Hurricane Zone that covers Miami-Dade and Broward, so the product-approval route differs from the one used further south. On a reviewed elevation the appearance of the chosen system is part of the design conversation as well.
Roofing sits inside the building-alterations category of the matrix, which separates in-kind replacement of architectural features — S tile replacement is named — from removal, replacement or addition with an alternate design, including the installation of new S tile. Matching what is there and changing it are different applications.
Because in this town the pre-construction path is a real part of the cost and it is not uniform. A staff-reviewed alteration and a commission-level new building on the same street carry different drawings, different consultants and different programmes. After a site visit and the designation check you get a written scope and a proposal against it.

A property-owner’s short list for the Town of Palm Beach. Everything here comes from the Town’s own published material; nothing here is a determination, and the Planning, Zoning & Building Department at 360 South County Road is the authority for your address.
Credentials and delivery
No award, badge or membership is claimed here. The licence number is public and verifiable with the Florida Department of Business and Professional Regulation.

CBC1265280 — certified building contractor, bonded and insured. Verifiable in the Florida DBPR licence register.
We read your scope against the Town’s own matrix and confirm the path with the Department before you commission design, because the answer changes what design has to produce.
Design, engineering, submittals, permitting and construction sit with one company, which matters most where approval and building are separate processes with separate clocks.
Salt exposure, drainage and fixing specification treated as engineering decisions rather than finish choices, on a barrier island where the cheapest version fails first.
Approved drawings, product approvals, inspection records and warranties handed over as a set — which is what protects the property’s value at sale.
Miami-Dade, Broward and Palm Beach counties, where review requirements differ sharply between neighbouring municipalities and Palm Beach differs from all of them.
Google reviews
Reviews are quoted verbatim from the Elbaz Construction Google Business Profile. They describe the company as a whole — none refers specifically to a project in the Town of Palm Beach.
★★★★★
“Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.”
Mia Zafrani · Google review
★★★★★
Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze.
Lee Morali
★★★★★
We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!
Shir Partush
★★★★★
From start to end- personal kind treatment, always respectful. Value for money 10/10.
roni yonani
★★★★★
Amazing job Did a total renovation of my house with them
Elie Elancry
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Knowledge library
A short, deliberate list: the county page, the approvals work this town actually needs, and the categories the designation matrix names.
Start here
Tell us the address and what you want to change. The first thing we do is establish the property’s status and read the scope against the Town’s designation matrix — before anyone draws anything.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.
Designation review, design, engineering, Town submittals, permitting and construction under one licensed general contractor — in the Town of Palm Beach and across Palm Beach, Broward and Miami-Dade counties.
