In Lake Park the building official
is a company —
and you register with it too.

The Town contracts its building official and inspection company rather than employing one, and requires all applicants — owners, builders and contractors alike — to register through it before anything is uploaded. Inspections are booked one day ahead, on a request in before 4 p.m. the day before. It is an unusually explicit calendar, and we build to it as a licensed general contractor working across Palm Beach, Broward and Miami-Dade.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll

Start here

Start with the address

Almost everything on this page turns on how many inspection events your project needs and how tightly they can be sequenced. Tell us the address and what you are hoping to do, and the first conversation is a useful one.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Recent projects

Recent Elbaz Construction work

Eight frames of completed work across South Florida — bathrooms, showers, flooring and two accessory dwelling units. Tap any image to see it larger.

01

A completed bathroom with a freestanding tub and twin floating basins.

02

A completed primary bathroom with a vaulted ceiling and a glass-enclosed shower.

03

A walk-in shower with a textured feature tile column and twin niches.

04

A walk-in shower with marble-look porcelain walls and sliding glass.

05

A curbless walk-in shower with a built-in bench and a black rain head.

06

The view down from the loft level of a two-level accessory dwelling unit.

07

A curved grey paver driveway with the border carried through the radius.

08

The seating side of a waterfall kitchen island, with three stools.

All photographs are of real completed Elbaz Construction work. They come from several separate properties across South Florida and are shown as recent work. None of them was taken in Lake Park, and none is captioned as though it were.

01 / 12

The journey

Six stages, from registration to a closed permit.

Most municipality pages begin with the property. Lake Park begins with registration, because the Town does: no application is uploaded until the applicant is registered with the company the Town has contracted as its building official. Everything after that — how documents move, when inspections can be booked, who answers a question — follows from that arrangement.

Use the stage markers to jump to the part you are stuck on. Nothing here is a promise about your address — the Town and its building official decide that — and nothing here is a figure we invented. Where the Town publishes a rule, it is quoted. Where it does not, this page says so instead of guessing.

Stage 01 · Register

Who you are actually dealing with in Lake Park

Four things about how this Town is organised shape a project before a drawing exists. The first is the one nobody expects.

A contracted building official

The Town states that CAP is "the Town's contracted building official and inspection company", and that applications and all associated documents are uploaded through it. This is a genuinely different arrangement from a municipal department with its own staff, and it is neither better nor worse — it is simply the thing to understand first, because it determines where every document goes and who looks at it.

  • CAP is the Town's contracted building official and inspection company
  • Applications and all associated documents are uploaded through it
  • This is an arrangement, not a department — the Town publishes it plainly
  • It determines where documents go and who reviews them
Close view of dark wide-plank flooring showing the grain and the plank joints

A close view of dark wide-plank flooring showing the grain and the plank joints, on a completed Elbaz Construction project in South Florida. Not a Lake Park property.

Owners register too

The wording is specific and it is the part most often skimmed: "All applicants (owners, builders and contractors) are required to register." Owners are named first. If you are pulling a permit yourself, or if you expect to see documents and correspondence directly, registration is yours to complete as well as your contractor's — and it is worth doing at the start rather than at the point something needs signing.

  • Owners, builders and contractors are all named as applicants
  • Registration is at the company's own site, capfla.com
  • Do it at the start of the project, not when a document is waiting
  • It is a Town requirement, not a contractor's preference
Completed bathroom with a freestanding tub and a pair of floating basins on a long vanity ledge

A completed Elbaz Construction bathroom with a freestanding tub and a pair of floating basins on a long vanity ledge. A South Florida project.

Four functions in one division

The Town publishes that its Building Division has four separate functions: Permitting, Plan Review, Field Inspections and the processing of Business Tax Receipts. Knowing which of the four you need is genuinely useful in a small department, because the answer to a permitting question and the answer to a plan review question come from different places even though the telephone number is the same.

  • Permitting, Plan Review, Field Inspections, Business Tax Receipts
  • They are named as four separate functions
  • Knowing which one you need shortens the conversation
  • Front counter at Town Hall, or 561-881-3320
View down from the loft level over the living space of a two-level accessory dwelling unit

The view down from the loft level over the living space of a completed Elbaz Construction accessory dwelling unit. Not a Lake Park property.

And a private provider route

Separately from the contracted building official, the Town publishes a Private Provider Registration route for building permit application plans review and/or inspections. Florida law allows an owner or contractor to engage a qualified private provider for those functions. It is a real option and it is not a shortcut: it substitutes one accountable route for another, with its own registration and its own paperwork.

  • The Town publishes a Private Provider Registration route
  • It covers plans review and/or inspections
  • It is a substitution of route, not a reduction of requirement
  • It has its own registration and its own documents
Walk-in shower behind sliding frameless glass on a black top track, with a black grab bar and rain head

A completed Elbaz Construction walk-in shower behind sliding frameless glass on a black top track. A South Florida project, not a Lake Park one.

Stage 02 · Divisions

The 4 p.m. rule, and what it does to a programme

Lake Park publishes the tightest inspection-booking rule on this matrix, and it is the single fact that most changes how a job here is run.

One day in advance

The Town states that inspections are only scheduled one day in advance, with requests received before 4 p.m. the day prior, emailed to the Town's permit address. Both halves matter. You cannot book a week of inspections in advance to give a trade certainty, and you cannot book tomorrow's at half past four today. A programme here is confirmed a day at a time, which means somebody has to be watching it every afternoon.

  • Inspections are scheduled only one day in advance
  • The request must be received before 4 p.m. the day prior
  • Requests go by email to the Town's permit address
  • A week of inspections cannot be booked ahead to give a trade certainty
Navy blue vanity with a stone top and undermount basin beneath a wall mirror

A completed Elbaz Construction navy blue vanity with a stone top and an undermount basin. A South Florida project.

The afternoon decision

The practical effect is a daily judgement: at some point each afternoon somebody has to decide whether the work will genuinely be ready for an inspector tomorrow, and commit before four. Book too early and the inspection fails; book too late and the trade waiting behind it loses a day. This is the phase of a Lake Park job where site management is worth what it costs.

  • Every working afternoon carries a booking decision
  • Booking optimistically produces a failed inspection, not a fast one
  • Booking late costs the following day for everyone behind it
  • It is a management task, not an administrative one
Curbless walk-in shower with a built-in bench, black rain head and a hexagon mosaic floor

A completed Elbaz Construction curbless walk-in shower with a built-in bench and a black rain head. Not photographed in Lake Park.

Sequencing around it

When each inspection costs a day of notice, the sensible response is to reduce how many separate booking events a job needs — completing work so that disciplines are ready together where the sequence genuinely allows it, rather than calling an inspector as each trade finishes. That is a planning decision made at the start, not an improvisation in week four.

  • Every inspection costs a day of notice, whoever books it
  • Grouping ready work reduces the number of booking events
  • It is decided in the programme, not on site
  • Order the trades so that dependencies do not stack up behind one booking
Two stacked recessed shower niches backed in copper-toned mosaic

Two stacked recessed shower niches backed in copper-toned mosaic, from completed Elbaz Construction work in South Florida.

Everything through one route

Once registered, permit applications — "including all associated documents" — are uploaded through the contracted building official. That phrase is worth reading carefully: it is not just the application form, it is the drawings, the product approvals and the supporting paperwork. A document sent by a different route is a document that is not where the reviewer will look for it.

  • Applications AND all associated documents go through the same route
  • That includes drawings and product approval paperwork
  • A document sent another way is not where the reviewer looks
  • Registration precedes upload, for every applicant
Curbless walk-in shower in stacked plank tile behind a frameless glass panel with black fittings

A completed Elbaz Construction curbless walk-in shower in stacked plank tile behind a frameless glass panel. A South Florida project.

Every photograph in this section is real Elbaz Construction project photography from completed South Florida work. None of it was taken in Lake Park and none of it is captioned as though it were.

Stage 03 · Upload

Filing it: register, then upload

Two steps that cannot be reversed, and a Town department that still answers its own counter. The sequence below is the one the Town publishes.

For every applicant, including you

The Town requires all applicants — owners, builders and contractors — to register through its contracted building official before applications are uploaded. Ours is in place. If you want direct visibility of the documents, yours is worth completing at the start rather than when something needs signing.

Permitting, review, inspections or BTR

The Building Division publishes four separate functions. Directing a question to the right one is the difference between an answer and a message passed along, which in a small department is most of the delay people experience.

Assembled as one submission

The application has to describe a scope that can be reviewed: what is altered, which trades are involved, and what supporting documentation each needs. Getting that complete is what keeps a review to one cycle instead of three.

Applications and all associated documents

Everything goes up through the contracted building official — the application, the drawings, the product approvals, the supporting paperwork. The Town's phrase is "including all associated documents", and it means it.

And no timeframe we will invent

The submission is reviewed and comments come back. The Town publishes no review timeframe, so we do not quote one. What we can tell you is what is outstanding and what each item is waiting on.

A different accountable route

The Town separately publishes a Private Provider Registration route for plans review and/or inspections under Florida law. It is a genuine option on the right project, and it is a substitution of route rather than a reduction of requirement — its own registration, its own documents, its own accountability.

Then the notice of commencement

Once the permit issues the job can start. On work above the statutory threshold a notice of commencement is recorded before the first inspection — ordinary Florida practice, and the step most often forgotten by owners running their own project.

This is the published sequence, not a promise about your project. What any specific address requires, and what a plan review returns, are decided by the Town of Lake Park and its contracted building official — not by a contractor. We confirm what your address actually requires before anything is filed.

Stage 04 · Day before

A job run one afternoon at a time

Lake Park schedules inspections one day ahead on a request in before 4 p.m. That single rule turns site management into a daily discipline rather than a weekly one, and these phases are ordered around it.

Setting the booking rhythm

Before the first trade arrives

Somebody is made responsible for the afternoon call — deciding, every working day, whether tomorrow's inspection can honestly be booked. In Lake Park that is a named responsibility from day one rather than something that falls to whoever is on site, because the cost of getting it wrong is a whole day either way.

Quality check · A named person owns the daily pre-4 p.m. booking decision

Close view of dark wide-plank flooring showing the grain and the plank joints

Protection and access

Agreed with the neighbours too

Coverings, dust separation and the working route go in, and deliveries and parking are settled with the neighbours in advance. On a street of small lots that conversation is cheaper had early than defended later.

Quality check · Route, containment and deliveries agreed before work starts

Two-storey South Florida home with a paver driveway seen from the street

Opening up

And what the record does not show

The scope is removed and the fabric appears. Anything that does not match the permit record is photographed and raised with you before it is concealed again, because resolving it properly is cheaper while the wall is open than it will ever be again.

Quality check · Everything uncovered photographed and raised before it is concealed

Walk-in shower behind a frameless glass panel at the end of a primary bathroom, double vanity to the left

Structure

Built to the reviewed drawings

Load-bearing alterations are executed to the drawings that were reviewed. Where site conditions genuinely differ, that goes back through the same upload route rather than being settled on site and remembered by nobody.

Quality check · Nothing structural concealed before its inspection

Double-height interior under construction with full-height glazing and drywall going up

Grouping the rough-in

Fewer booking events

Electrical, plumbing and mechanical rough-in are sequenced so that, where the work genuinely allows it, disciplines reach readiness together. Every separate inspection is another day of notice, so reducing the number of booking events is worth real planning effort here.

Quality check · Disciplines brought to readiness together wherever the sequence allows

Two stacked recessed shower niches backed in copper-toned mosaic

The afternoon call

Made honestly, before four

The inspection is booked only when the work will genuinely be ready. Booking optimistically does not produce a fast inspection, it produces a failed one — and in Lake Park a failed inspection costs the next day as well, because the rebooking is itself a day ahead.

Quality check · Inspections booked only when the work is genuinely ready

Hexagon mosaic shower floor with a linear drain along the glass line

Closing the walls

After the pass, not the booking

Board goes up once the rough-in inspections have actually passed. On a one-day-ahead calendar the temptation to close early is real, and giving in to it is how a finished wall gets opened again.

Quality check · Walls closed only against passed inspections

Sleeping area within the open plan of a studio accessory dwelling unit

Waterproofing

Recorded as it is built

Tanking, backer board and falls go in under the tile and are photographed as they are built. It is the one layer no later inspection can examine.

Quality check · Falls and waterproofing recorded photographically before tiling

Curbless walk-in shower in stacked plank tile behind a frameless glass panel with black fittings

Setting out and finishes

Walked with you first

Tile, stone and cabinetry are set out and confirmed with you before the field is committed, then the visible work is installed.

Quality check · Setting out walked with you before the first full course

Walk-in shower with marble-look porcelain walls, sliding glass and black fittings

The last booking

Finals, then closeout

The final inspections are booked on the same one-day rhythm, outstanding items are agreed in writing, and the permit is closed rather than left open.

Quality check · Every final passed and the permit closed

Walk-in shower with a textured feature tile column, twin recessed niches and a rain head

Stage 05 · Options

The three decisions Lake Park owners find hardest

Argued both ways. None of these has a universally right answer — it depends on your scope, your appetite for administration and how much of the calendar you control.

The Town's contracted official

The default route

Completed bathroom with a freestanding tub and a pair of floating basins on a long vanity ledge
What it is
Registering with the Town's contracted building official and uploading everything through it.
Benefits
It is the route the Town publishes, everyone involved already knows it, and there is nothing extra to arrange.
The calendar
Inspections are scheduled one day in advance on a request before 4 p.m. the day prior.
Administration
One registration for each applicant, and one upload route for everything.
Best for
Most residential projects, and anyone who would rather not manage a second relationship.

A registered private provider

Published as an option

Walk-in shower behind sliding frameless glass on a black top track, with a black grab bar and rain head
What it is
Engaging a qualified private provider for plans review and/or inspections, under the Town's published registration route.
Benefits
On the right project it can give more control over review and inspection scheduling.
The calendar
It changes who performs the function, not what the Code requires.
Administration
Its own registration, its own documents and its own accountability to manage.
Best for
Larger or time-critical projects where the scheduling control genuinely pays for the extra administration.

Which oneFor an ordinary residential remodel, the Town's route — it is published, understood and adds nothing to manage. The private provider route is real and the Town registers it properly, but it earns its place on projects where controlling the review and inspection calendar is worth taking on a second set of paperwork.

Group where you can

Fewer booking events

Two stacked recessed shower niches backed in copper-toned mosaic
What it is
Sequencing so that disciplines reach readiness together and fewer separate inspections are needed.
Benefits
Each inspection costs a day of notice, so fewer events means less notice time overall.
Limits
It only works where the construction sequence genuinely allows it; forcing it creates its own problems.
Why here
The one-day-ahead rule makes every separate booking expensive in a way it is not elsewhere.
Best for
Multi-trade work with genuine flexibility in the order.

Call each as it finishes

Keep the trades moving

Primary bathroom with a vaulted ceiling, long vanity and glass-enclosed walk-in shower
What it is
Booking an inspection as each discipline completes, in the natural construction order.
Benefits
Simple, and no trade is asked to wait for another.
Limits
More booking events, each carrying a day of notice, and more afternoons on which the call can be got wrong.
Why here
It is the normal approach and it is not wrong — it is simply more expensive in notice time here.
Best for
Jobs where the trades genuinely cannot be brought to readiness together.

Which oneGroup where the sequence honestly allows and call as you go where it does not. The mistake is treating this as a preference rather than a calculation: on a one-day-ahead calendar, every extra inspection event is a day of notice somebody has to manage correctly.

Register as an owner

The Town names you first

Navy blue vanity with a stone top and undermount basin beneath a wall mirror
What it is
Completing your own applicant registration, as the Town's wording contemplates.
Benefits
Direct visibility of the file, and nothing waits on us to forward a document.
The cost
A registration, once, at the start of the project.
When it matters
Anything needing an owner signature, and any point at which you want to see the record yourself.
Best for
Owners who want to follow the process rather than be told about it.

Let the contractor handle it

One less account

Curbless walk-in shower with a built-in bench, black rain head and a hexagon mosaic floor
What it is
Relying on our registration and our upload route for everything.
Benefits
Nothing for you to set up, and one party responsible for the file.
The cost
You see the file through us rather than directly.
When it matters
Less on a straightforward job; more if anything becomes contested.
Best for
Owners who would rather delegate the administration entirely.

Which oneRegister. It costs one form at the start of a project, the Town names owners first among applicants, and the moment it matters is exactly the moment when setting it up would otherwise be a delay. We will handle everything either way — this is about your visibility, not our workload.

What moves the cost and the calendar in Lake Park

Tick whatever applies. This will not produce a price — no honest one exists before someone has seen the property — but it will show which parts of your project are carrying the time and the risk.

What this points to

We do not publish figures, and we do not publish permit fees either: the Town publishes none that we read, and we would rather say so than print a number we cannot stand behind. You get a real, itemised number from us in writing after a site visit.

Stage 06 · Final

The Town's published rules, in its own words

Lake Park publishes a small number of rules very precisely. Everything below is quoted from the Town's own pages, and where it publishes nothing, this page says so.

Everyone registers

"All applicants (owners, builders and contractors) are required to register through CAP, the Town's contracted building official and inspection company."

Then everything uploads

"Once registered, permit applications (including all associated documents) must be uploaded through CAP."

Four functions

The Building Division has "four separate functions: Permitting, Plan Review, Field Inspections and the processing of Business Tax Receipts."

One day in advance

Inspections are only scheduled one day in advance.

Before 4 p.m.

The request must be received before 4 p.m. the day prior, emailed to the Town's permit address.

A full-service department

Community Development is "a full-service department responsible for all planning and building, and the enforcement of the Town's Code of Ordinances."

A private provider route

The Town separately publishes Private Provider Registration for building permit application plans review and/or inspections.

What is NOT published

A plan-review timeframe, and any fee we could verify. Where a number is missing from this page it is missing because the Town does not state it. Also note that lakeparkflorida.net is an old shelf; the current site is lakeparkflorida.gov.

What we will actually stand behind

Only claims that are either public record or visible in the work on this page. Nothing about awards, nothing about rankings, and no numbers we cannot show you.

Licensed, bonded and insured

Elbaz Construction is a licensed Florida general contractor, CBC1265280. Permits are pulled in the company's name, and the licence is verifiable at the Florida DBPR rather than on our say-so.

Registered before we need to be

The Town requires every applicant to be registered with its contracted building official before documents move. Ours is in place and maintained, so the start of a project is not spent on administration.

Somebody owns the afternoon call

On a one-day-ahead calendar with a 4 p.m. cut-off, the daily booking decision is a named responsibility on our jobs rather than something that falls to whoever is on site. It is the single biggest determinant of whether a Lake Park programme runs or idles.

We book when the work is ready

Booking an inspection optimistically does not make it happen sooner; it produces a failure and costs the next day as well. We would rather lose an afternoon than a day and a half.

Everything goes up one route

Applications and all associated documents through the route the Town publishes. A drawing sent another way is a drawing the reviewer will not find.

We file it ourselves

Design, the application and the construction are handled by one company, so a reviewer's comment does not sit waiting on a hand-off between two firms.

We do not quote a review time

The Town publishes none. Anyone giving you a Lake Park review time is giving you their own average, not the Town's.

Permits closed out

Every permit we pull is closed out at the end of the job. An open permit follows the property and reappears when it is sold.

Questions, by stage

Filter to the part of the job you are thinking about.

Do I have to register, or just my contractor?Registration

Both, if you want to act as an applicant. The Town's wording names owners first: "All applicants (owners, builders and contractors) are required to register through CAP, the Town's contracted building official and inspection company." Registering early costs one form and removes a delay at the moment something needs your signature.

Why is the building official a company?Registration

Because the Town contracts the function rather than employing it, and it publishes that plainly. It is a common arrangement in smaller municipalities and it is neither better nor worse than an in-house department — but it does determine where every document goes and who reviews it, which is why it is the first thing on this page.

Is this the same as a private provider?Registration

No, and the Town publishes both separately. The contracted building official is the Town's own route for everybody. A private provider is something an owner or contractor may separately engage for plans review and/or inspections under Florida law, with its own registration through the Town.

Who do I actually talk to?Who to ask

It depends which of the Building Division's four published functions you need: Permitting, Plan Review, Field Inspections or the processing of Business Tax Receipts. Knowing which one shortens the conversation considerably. There is a front counter at Town Hall and a published telephone number, 561-881-3320.

What does Community Development cover?Who to ask

The Town describes it as "a full-service department responsible for all planning and building, and the enforcement of the Town's Code of Ordinances" — so planning questions, building questions and code enforcement all sit within the same department even though the Building Division has its own four functions.

How do I submit an application?Filing

Through the Town's contracted building official, once registered. The Town states that applications "including all associated documents" must be uploaded that way — which means the drawings and the product approvals too, not just the form.

How long does a permit take in Lake Park?Filing

We do not publish a number, because the Town does not publish one. What we can tell you honestly is what is outstanding at any moment and what each item is waiting on. Anyone quoting you a Lake Park review time is quoting their own average.

What will the permit cost?Filing

The Town publishes no fee figure that we were able to read, so this page carries none. Ask the Building Division directly, and whatever it comes to appears itemised on your proposal rather than folded into a round figure.

How far ahead can inspections be booked?Inspections

One day, and no further. The Town states that inspections are only scheduled one day in advance, with the request received before 4 p.m. the day prior. That means a week of inspections cannot be booked in advance to give a trade certainty, and it is the single most important scheduling fact about building here.

What happens if we miss the 4 p.m. cut-off?Inspections

The inspection moves to the following day, and everything sequenced behind it moves too. That is why the afternoon booking decision is a named responsibility on our jobs rather than something left to whoever happens to be on site at four o'clock.

What if an inspection fails?Inspections

It costs the next day as well, because the rebooking is itself a day in advance. That arithmetic is exactly why we book only when the work is genuinely ready — an optimistic booking is not a fast one, it is a slow one with an extra step.

What happens if you find unpermitted work from a previous owner?On site

We stop and tell you, before it is covered up. It is more common than people expect in South Florida, and it has to be resolved rather than built over — both because an inspector will find it and because it becomes yours at the point you conceal it.

Can I live in the house while you work?On site

Often yes, and it changes the programme rather than the price alone. Containment, protection and phasing all cost days. The honest version of this conversation happens at the site visit, where we can look at where the work is relative to where you sleep and cook.

How do you decide when to book?On site

Every working afternoon, before four, somebody decides whether tomorrow's inspection can honestly be booked. Where the construction sequence allows, we also group disciplines so that fewer separate bookings are needed — because on this calendar every inspection event carries a day of notice.

Why won't you publish a price?Cost

Because for a remodel the same square footage can differ several-fold depending on what is behind the wall and how many inspection events the job needs. A published rate would be a guess. You get an itemised figure in writing after a site visit, and it says what happens if something is found during demolition.

Does the one-day-ahead rule make a project more expensive?Cost

It makes it more management-intensive, which shows up as duration rather than as materials. The honest answer is that good sequencing largely absorbs it and poor sequencing does not — which is why we put a named person on the daily booking decision rather than treating it as an afterthought.

What happens to the permit when the job is finished?Afterwards

It gets closed out. We do not leave permits open, because an open permit stays attached to the property and reappears at sale, when it is somebody else's leverage rather than an administrative detail.

What paperwork should I keep?Afterwards

The permit record, the approved drawings, the product approval documentation for anything in the envelope, and the closeout. If you registered as an applicant yourself, much of it will be visible to you directly.

Do you work anywhere else in Palm Beach County?Afterwards

Yes — across Palm Beach, Broward and Miami-Dade, 104 municipalities in total. The filing routes differ genuinely between them: Lake Park contracts its building official and books inspections a day ahead, its neighbours do neither, and those differences are a working detail for us rather than a surprise.

Client experience

What clients say, in their own words

Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.

Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.

Next steps

Where to go from here

Grouped by what you are trying to do, not by category.

Start here

Start with the address

Almost everything on this page turns on how many inspection events your project needs and how tightly they can be sequenced. Tell us the address and what you are hoping to do, and the first conversation is a useful one.

What happens next

  1. We read it properly and come back to you, usually the same or the next working day.
  2. A short call to understand the property, the scope and what is driving the timing.
  3. We map your scope to the inspection events it needs and check what the Town's record already holds for the address, before we form a view.
  4. A site visit, because what is behind a South Florida wall cannot be judged from photographs.
  5. A written, itemised proposal, including what happens if something is found during demolition.
  6. If you go ahead, we register the job, upload it through the Town's contracted building official and manage the daily booking rhythm.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Completed bathroom with a freestanding tub and a pair of floating basins on a long vanity ledge

A day-ahead calendar rewards planning. Let's do the planning.

Lake Park contracts its building official, asks every applicant to register, and books inspections one day ahead on a request in before four. None of that is difficult — it is simply unforgiving of being discovered late. The value of a contractor here is having all of it in place before the first trade arrives.

Or see the rest of what we cover on the Palm Beach County page if your property is somewhere else in the county.