All service areasThe Town contracts its building official and inspection company rather than employing one, and requires all applicants — owners, builders and contractors alike — to register through it before anything is uploaded. Inspections are booked one day ahead, on a request in before 4 p.m. the day before. It is an unusually explicit calendar, and we build to it as a licensed general contractor working across Palm Beach, Broward and Miami-Dade.
Miami-Dade · Broward & Palm Beach Counties
ScrollStart here
Almost everything on this page turns on how many inspection events your project needs and how tightly they can be sequenced. Tell us the address and what you are hoping to do, and the first conversation is a useful one.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.
Recent projects
Eight frames of completed work across South Florida — bathrooms, showers, flooring and two accessory dwelling units. Tap any image to see it larger.
A completed bathroom with a freestanding tub and twin floating basins.
A completed primary bathroom with a vaulted ceiling and a glass-enclosed shower.
A walk-in shower with a textured feature tile column and twin niches.
A walk-in shower with marble-look porcelain walls and sliding glass.
A curbless walk-in shower with a built-in bench and a black rain head.
The view down from the loft level of a two-level accessory dwelling unit.
A curved grey paver driveway with the border carried through the radius.
The seating side of a waterfall kitchen island, with three stools.
All photographs are of real completed Elbaz Construction work. They come from several separate properties across South Florida and are shown as recent work. None of them was taken in Lake Park, and none is captioned as though it were.
The journey
Most municipality pages begin with the property. Lake Park begins with registration, because the Town does: no application is uploaded until the applicant is registered with the company the Town has contracted as its building official. Everything after that — how documents move, when inspections can be booked, who answers a question — follows from that arrangement.
Use the stage markers to jump to the part you are stuck on. Nothing here is a promise about your address — the Town and its building official decide that — and nothing here is a figure we invented. Where the Town publishes a rule, it is quoted. Where it does not, this page says so instead of guessing.
Stage 01 · Register
Four things about how this Town is organised shape a project before a drawing exists. The first is the one nobody expects.
The Town states that CAP is "the Town's contracted building official and inspection company", and that applications and all associated documents are uploaded through it. This is a genuinely different arrangement from a municipal department with its own staff, and it is neither better nor worse — it is simply the thing to understand first, because it determines where every document goes and who looks at it.

A close view of dark wide-plank flooring showing the grain and the plank joints, on a completed Elbaz Construction project in South Florida. Not a Lake Park property.
The wording is specific and it is the part most often skimmed: "All applicants (owners, builders and contractors) are required to register." Owners are named first. If you are pulling a permit yourself, or if you expect to see documents and correspondence directly, registration is yours to complete as well as your contractor's — and it is worth doing at the start rather than at the point something needs signing.

A completed Elbaz Construction bathroom with a freestanding tub and a pair of floating basins on a long vanity ledge. A South Florida project.
The Town publishes that its Building Division has four separate functions: Permitting, Plan Review, Field Inspections and the processing of Business Tax Receipts. Knowing which of the four you need is genuinely useful in a small department, because the answer to a permitting question and the answer to a plan review question come from different places even though the telephone number is the same.

The view down from the loft level over the living space of a completed Elbaz Construction accessory dwelling unit. Not a Lake Park property.
Separately from the contracted building official, the Town publishes a Private Provider Registration route for building permit application plans review and/or inspections. Florida law allows an owner or contractor to engage a qualified private provider for those functions. It is a real option and it is not a shortcut: it substitutes one accountable route for another, with its own registration and its own paperwork.

A completed Elbaz Construction walk-in shower behind sliding frameless glass on a black top track. A South Florida project, not a Lake Park one.
Stage 02 · Divisions
Lake Park publishes the tightest inspection-booking rule on this matrix, and it is the single fact that most changes how a job here is run.
The Town states that inspections are only scheduled one day in advance, with requests received before 4 p.m. the day prior, emailed to the Town's permit address. Both halves matter. You cannot book a week of inspections in advance to give a trade certainty, and you cannot book tomorrow's at half past four today. A programme here is confirmed a day at a time, which means somebody has to be watching it every afternoon.

A completed Elbaz Construction navy blue vanity with a stone top and an undermount basin. A South Florida project.
The practical effect is a daily judgement: at some point each afternoon somebody has to decide whether the work will genuinely be ready for an inspector tomorrow, and commit before four. Book too early and the inspection fails; book too late and the trade waiting behind it loses a day. This is the phase of a Lake Park job where site management is worth what it costs.

A completed Elbaz Construction curbless walk-in shower with a built-in bench and a black rain head. Not photographed in Lake Park.
When each inspection costs a day of notice, the sensible response is to reduce how many separate booking events a job needs — completing work so that disciplines are ready together where the sequence genuinely allows it, rather than calling an inspector as each trade finishes. That is a planning decision made at the start, not an improvisation in week four.

Two stacked recessed shower niches backed in copper-toned mosaic, from completed Elbaz Construction work in South Florida.
Once registered, permit applications — "including all associated documents" — are uploaded through the contracted building official. That phrase is worth reading carefully: it is not just the application form, it is the drawings, the product approvals and the supporting paperwork. A document sent by a different route is a document that is not where the reviewer will look for it.

A completed Elbaz Construction curbless walk-in shower in stacked plank tile behind a frameless glass panel. A South Florida project.
Every photograph in this section is real Elbaz Construction project photography from completed South Florida work. None of it was taken in Lake Park and none of it is captioned as though it were.
Project gallery 01
Six frames of completed Elbaz Construction work across South Florida. Different properties, not one project, and not photographed in Lake Park — each caption says what it actually is.
Project 01, guided tour






Bathroom, freestanding tub
A completed bathroom with a freestanding tub and a pair of floating basins on a long vanity ledge.
Six frames from completed Elbaz Construction projects across South Florida, grouped by room rather than by property.
A town page is about a process, and a process is only worth reading if the company at the end of it builds. These are the finished result of the same six stages this page walks.
South Florida. None is claimed to be in Lake Park, because none was verified as being in Lake Park.
No cost, no address, no client name and no permit history appears anywhere on this page.
Stage 03 · Upload
Two steps that cannot be reversed, and a Town department that still answers its own counter. The sequence below is the one the Town publishes.
The Town requires all applicants — owners, builders and contractors — to register through its contracted building official before applications are uploaded. Ours is in place. If you want direct visibility of the documents, yours is worth completing at the start rather than when something needs signing.
The Building Division publishes four separate functions. Directing a question to the right one is the difference between an answer and a message passed along, which in a small department is most of the delay people experience.
The application has to describe a scope that can be reviewed: what is altered, which trades are involved, and what supporting documentation each needs. Getting that complete is what keeps a review to one cycle instead of three.
Everything goes up through the contracted building official — the application, the drawings, the product approvals, the supporting paperwork. The Town's phrase is "including all associated documents", and it means it.
The submission is reviewed and comments come back. The Town publishes no review timeframe, so we do not quote one. What we can tell you is what is outstanding and what each item is waiting on.
The Town separately publishes a Private Provider Registration route for plans review and/or inspections under Florida law. It is a genuine option on the right project, and it is a substitution of route rather than a reduction of requirement — its own registration, its own documents, its own accountability.
Once the permit issues the job can start. On work above the statutory threshold a notice of commencement is recorded before the first inspection — ordinary Florida practice, and the step most often forgotten by owners running their own project.
This is the published sequence, not a promise about your project. What any specific address requires, and what a plan review returns, are decided by the Town of Lake Park and its contracted building official — not by a contractor. We confirm what your address actually requires before anything is filed.
Stage 04 · Day before
Lake Park schedules inspections one day ahead on a request in before 4 p.m. That single rule turns site management into a daily discipline rather than a weekly one, and these phases are ordered around it.
Before the first trade arrives
Somebody is made responsible for the afternoon call — deciding, every working day, whether tomorrow's inspection can honestly be booked. In Lake Park that is a named responsibility from day one rather than something that falls to whoever is on site, because the cost of getting it wrong is a whole day either way.
Quality check · A named person owns the daily pre-4 p.m. booking decision

Agreed with the neighbours too
Coverings, dust separation and the working route go in, and deliveries and parking are settled with the neighbours in advance. On a street of small lots that conversation is cheaper had early than defended later.
Quality check · Route, containment and deliveries agreed before work starts

And what the record does not show
The scope is removed and the fabric appears. Anything that does not match the permit record is photographed and raised with you before it is concealed again, because resolving it properly is cheaper while the wall is open than it will ever be again.
Quality check · Everything uncovered photographed and raised before it is concealed

Built to the reviewed drawings
Load-bearing alterations are executed to the drawings that were reviewed. Where site conditions genuinely differ, that goes back through the same upload route rather than being settled on site and remembered by nobody.
Quality check · Nothing structural concealed before its inspection

Fewer booking events
Electrical, plumbing and mechanical rough-in are sequenced so that, where the work genuinely allows it, disciplines reach readiness together. Every separate inspection is another day of notice, so reducing the number of booking events is worth real planning effort here.
Quality check · Disciplines brought to readiness together wherever the sequence allows

Made honestly, before four
The inspection is booked only when the work will genuinely be ready. Booking optimistically does not produce a fast inspection, it produces a failed one — and in Lake Park a failed inspection costs the next day as well, because the rebooking is itself a day ahead.
Quality check · Inspections booked only when the work is genuinely ready

After the pass, not the booking
Board goes up once the rough-in inspections have actually passed. On a one-day-ahead calendar the temptation to close early is real, and giving in to it is how a finished wall gets opened again.
Quality check · Walls closed only against passed inspections

Recorded as it is built
Tanking, backer board and falls go in under the tile and are photographed as they are built. It is the one layer no later inspection can examine.
Quality check · Falls and waterproofing recorded photographically before tiling

Walked with you first
Tile, stone and cabinetry are set out and confirmed with you before the field is committed, then the visible work is installed.
Quality check · Setting out walked with you before the first full course

Finals, then closeout
The final inspections are booked on the same one-day rhythm, outstanding items are agreed in writing, and the permit is closed rather than left open.
Quality check · Every final passed and the permit closed

Project gallery 02
Three frames from real Elbaz Construction work in South Florida — the parts of a shower that have to be right before anything is visible.
These are real photographs of Elbaz Construction work on South Florida projects. They are shown because the parts that decide whether a bathroom lasts are the parts nobody photographs. None of this work was in Lake Park and none of it is presented as though it were.
Project 02, during and complete



The floor and the drain line
A hexagon mosaic shower floor with a linear drain running along the glass line.
Real Elbaz Construction work in South Florida, photographed on completion and in detail.
Because "booked only when the work is genuinely ready" is abstract until you have seen what an inspector is actually looking at. The fall to that drain either passes or it does not.
It is not a Lake Park project, it is not presented as one, and no address, client or cost appears anywhere.
Stage 05 · Options
Argued both ways. None of these has a universally right answer — it depends on your scope, your appetite for administration and how much of the calendar you control.
The default route

Published as an option

Which oneFor an ordinary residential remodel, the Town's route — it is published, understood and adds nothing to manage. The private provider route is real and the Town registers it properly, but it earns its place on projects where controlling the review and inspection calendar is worth taking on a second set of paperwork.
Fewer booking events

Keep the trades moving

Which oneGroup where the sequence honestly allows and call as you go where it does not. The mistake is treating this as a preference rather than a calculation: on a one-day-ahead calendar, every extra inspection event is a day of notice somebody has to manage correctly.
The Town names you first

One less account

Which oneRegister. It costs one form at the start of a project, the Town names owners first among applicants, and the moment it matters is exactly the moment when setting it up would otherwise be a delay. We will handle everything either way — this is about your visibility, not our workload.
Tick whatever applies. This will not produce a price — no honest one exists before someone has seen the property — but it will show which parts of your project are carrying the time and the risk.
We do not publish figures, and we do not publish permit fees either: the Town publishes none that we read, and we would rather say so than print a number we cannot stand behind. You get a real, itemised number from us in writing after a site visit.
Project gallery 03
Four frames from completed Elbaz Construction accessory dwelling units and one South Florida build photographed during construction.
Project 03, guided tour




Sleeping, inside the open plan
The sleeping area within the open plan of a completed studio accessory dwelling unit.
Completed Elbaz Construction accessory dwelling units in South Florida, and one ground-up build photographed while it was still a site.
A second dwelling needs many separate inspections, and on a one-day-ahead booking calendar the number of inspection events is a real driver of the programme rather than an administrative detail.
South Florida. None of these is claimed to be in Lake Park.
Stage 06 · Final
Lake Park publishes a small number of rules very precisely. Everything below is quoted from the Town's own pages, and where it publishes nothing, this page says so.
"All applicants (owners, builders and contractors) are required to register through CAP, the Town's contracted building official and inspection company."
"Once registered, permit applications (including all associated documents) must be uploaded through CAP."
The Building Division has "four separate functions: Permitting, Plan Review, Field Inspections and the processing of Business Tax Receipts."
Inspections are only scheduled one day in advance.
The request must be received before 4 p.m. the day prior, emailed to the Town's permit address.
Community Development is "a full-service department responsible for all planning and building, and the enforcement of the Town's Code of Ordinances."
The Town separately publishes Private Provider Registration for building permit application plans review and/or inspections.
A plan-review timeframe, and any fee we could verify. Where a number is missing from this page it is missing because the Town does not state it. Also note that lakeparkflorida.net is an old shelf; the current site is lakeparkflorida.gov.
Only claims that are either public record or visible in the work on this page. Nothing about awards, nothing about rankings, and no numbers we cannot show you.
Elbaz Construction is a licensed Florida general contractor, CBC1265280. Permits are pulled in the company's name, and the licence is verifiable at the Florida DBPR rather than on our say-so.
The Town requires every applicant to be registered with its contracted building official before documents move. Ours is in place and maintained, so the start of a project is not spent on administration.
On a one-day-ahead calendar with a 4 p.m. cut-off, the daily booking decision is a named responsibility on our jobs rather than something that falls to whoever is on site. It is the single biggest determinant of whether a Lake Park programme runs or idles.
Booking an inspection optimistically does not make it happen sooner; it produces a failure and costs the next day as well. We would rather lose an afternoon than a day and a half.
Applications and all associated documents through the route the Town publishes. A drawing sent another way is a drawing the reviewer will not find.
Design, the application and the construction are handled by one company, so a reviewer's comment does not sit waiting on a hand-off between two firms.
The Town publishes none. Anyone giving you a Lake Park review time is giving you their own average, not the Town's.
Every permit we pull is closed out at the end of the job. An open permit follows the property and reappears when it is sold.
Filter to the part of the job you are thinking about.
Both, if you want to act as an applicant. The Town's wording names owners first: "All applicants (owners, builders and contractors) are required to register through CAP, the Town's contracted building official and inspection company." Registering early costs one form and removes a delay at the moment something needs your signature.
Because the Town contracts the function rather than employing it, and it publishes that plainly. It is a common arrangement in smaller municipalities and it is neither better nor worse than an in-house department — but it does determine where every document goes and who reviews it, which is why it is the first thing on this page.
No, and the Town publishes both separately. The contracted building official is the Town's own route for everybody. A private provider is something an owner or contractor may separately engage for plans review and/or inspections under Florida law, with its own registration through the Town.
It depends which of the Building Division's four published functions you need: Permitting, Plan Review, Field Inspections or the processing of Business Tax Receipts. Knowing which one shortens the conversation considerably. There is a front counter at Town Hall and a published telephone number, 561-881-3320.
The Town describes it as "a full-service department responsible for all planning and building, and the enforcement of the Town's Code of Ordinances" — so planning questions, building questions and code enforcement all sit within the same department even though the Building Division has its own four functions.
Through the Town's contracted building official, once registered. The Town states that applications "including all associated documents" must be uploaded that way — which means the drawings and the product approvals too, not just the form.
We do not publish a number, because the Town does not publish one. What we can tell you honestly is what is outstanding at any moment and what each item is waiting on. Anyone quoting you a Lake Park review time is quoting their own average.
The Town publishes no fee figure that we were able to read, so this page carries none. Ask the Building Division directly, and whatever it comes to appears itemised on your proposal rather than folded into a round figure.
One day, and no further. The Town states that inspections are only scheduled one day in advance, with the request received before 4 p.m. the day prior. That means a week of inspections cannot be booked in advance to give a trade certainty, and it is the single most important scheduling fact about building here.
The inspection moves to the following day, and everything sequenced behind it moves too. That is why the afternoon booking decision is a named responsibility on our jobs rather than something left to whoever happens to be on site at four o'clock.
It costs the next day as well, because the rebooking is itself a day in advance. That arithmetic is exactly why we book only when the work is genuinely ready — an optimistic booking is not a fast one, it is a slow one with an extra step.
We stop and tell you, before it is covered up. It is more common than people expect in South Florida, and it has to be resolved rather than built over — both because an inspector will find it and because it becomes yours at the point you conceal it.
Often yes, and it changes the programme rather than the price alone. Containment, protection and phasing all cost days. The honest version of this conversation happens at the site visit, where we can look at where the work is relative to where you sleep and cook.
Every working afternoon, before four, somebody decides whether tomorrow's inspection can honestly be booked. Where the construction sequence allows, we also group disciplines so that fewer separate bookings are needed — because on this calendar every inspection event carries a day of notice.
Because for a remodel the same square footage can differ several-fold depending on what is behind the wall and how many inspection events the job needs. A published rate would be a guess. You get an itemised figure in writing after a site visit, and it says what happens if something is found during demolition.
It makes it more management-intensive, which shows up as duration rather than as materials. The honest answer is that good sequencing largely absorbs it and poor sequencing does not — which is why we put a named person on the daily booking decision rather than treating it as an afterthought.
It gets closed out. We do not leave permits open, because an open permit stays attached to the property and reappears at sale, when it is somebody else's leverage rather than an administrative detail.
The permit record, the approved drawings, the product approval documentation for anything in the envelope, and the closeout. If you registered as an applicant yourself, much of it will be visible to you directly.
Yes — across Palm Beach, Broward and Miami-Dade, 104 municipalities in total. The filing routes differ genuinely between them: Lake Park contracts its building official and books inspections a day ahead, its neighbours do neither, and those differences are a working detail for us rather than a surprise.
Nothing in that stage yet — try “All”.
Client experience
Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.
Adir Davidov2022-12-27 Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended! Lee Morali2022-12-27 They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them! Shir Partush2022-12-27 We hired them to renovate our investment property and they provided exceptional quality service for an affordable price! Mia Zafrani2022-10-25 Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction. carmit cohen2022-10-25 After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!! Omri B2022-10-20 I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work! roni yonani2022-10-19 Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same! Itzick Manasherov2022-10-19 Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need. Sophie Brito2022-10-19 Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend Elie Elancry2022-10-19 Amazing job Did a total renovation of my house with themGoogle rating score: 5.0 of 5, based on 12 reviews
Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Next steps
Grouped by what you are trying to do, not by category.
The county and the neighbouring cities
The parts of this page we do as a service
What we most often build here
When the answer is more than a remodel
Start here
Almost everything on this page turns on how many inspection events your project needs and how tightly they can be sequenced. Tell us the address and what you are hoping to do, and the first conversation is a useful one.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Lake Park contracts its building official, asks every applicant to register, and books inspections one day ahead on a request in before four. None of that is difficult — it is simply unforgiving of being discovered late. The value of a contractor here is having all of it in place before the first trade arrives.
Or see the rest of what we cover on the Palm Beach County page if your property is somewhere else in the county.