Fort Lauderdale · Broward County

In this city the property line is often a seawall.

Fort Lauderdale is built around water. Roughly three hundred miles of navigable canals run behind its houses, and whether a parcel touches one changes the work more than any other single fact about it.

The residential stock is genuinely mixed - post-war single-storey houses on finger canals, larger contemporary rebuilds on the same lots, the historic sections around Sailboat Bend and Himmarshee, and downtown mid- and high-rise. The one thing a canal address adds is a second frontage. It has its own condition, its own maintenance history and its own set of approvals, and it belongs in a budget from the first conversation rather than the last.

Permitting runs through the City's Development Services Department. Its Building Services division is responsible for all permitting in the city, issues the permits and performs the inspections. Applications are digital: the city states that all new submissions can be submitted online through LauderBuild, its Accela Citizen Access portal, with plan review handled in the LauderBuild Plan Room, where each reviewer's notes are visible and revisions go back the same way.

One live caveat worth knowing before you plan around a date: the department has published permitting processing, payment and fee changes to comply with Florida House Bill 803, taking effect on 1 July 2026. We confirm the current process for the specific address rather than quoting a rule that may have moved.

CBC1265280Florida certified building contractor. Licensed, bonded and insured.
Broward + 2Fort Lauderdale, all of Broward, and Miami-Dade and Palm Beach.
4.8 / 343Average rating across Google reviews.
One contractorPermitting, structure, envelope and finishes under one licence.

On the water in Fort Lauderdale? Start with the seawall, not the kitchen.

What a Fort Lauderdale address changes

Six things that are true here and not everywhere.

City · county · state · federal

01

The permit is filed through LauderBuild

The city processes permit applications digitally. New submissions go in online through LauderBuild, and plan review runs in the LauderBuild Plan Room, where you can read each city reviewer's comments and send revisions back without a trip to a counter.

02

A dock or a seawall is not only a city permit

Dock and seawall work also requires Broward County approval alongside the city permit. Two authorities, two clocks. Sequencing them properly is most of the difference between a waterfront job that runs and one that waits.

03

Bigger marine scope can reach further still

Depending on scope and location, work in or over the water can involve the U.S. Army Corps of Engineers under Section 10 of the Rivers and Harbors Act, and Florida DEP where sovereignty submerged lands are affected. Not every project - but it has to be established early, not discovered.

04

Broward sits inside the HVHZ

The High-Velocity Hurricane Zone covers Miami-Dade and Broward, so roofing, windows, doors and shutters need product approval accepted for HVHZ use. It narrows what may be specified and it is not a preference.

05

Flood elevation is a design input, not a formality

The city runs a floodplain management programme - NFIP participation, elevation certificates and Community Rating System participation among them. On a low waterfront parcel the required floor level drives fill, driveway gradients and how the house meets the ground.

06

Some blocks answer to a preservation board

Fort Lauderdale has designated historic districts and a Historic Preservation Board, and work on a designated property can require a Certificate of Appropriateness. Whether yours is affected is a matter of record, and it is checked at the address rather than assumed.

City, county, state, federal - we work out which of them your project meets.

At the water’s edge · 01

A canal lot, read from the seawall inwards

8 images · one South Florida project by Elbaz Construction · the municipality is not documented, so none is claimed

New concrete seawall cap and composite dock decking on a South Florida canal, photographed on an Elbaz Construction project
A rough-graded waterfront lot with a two-storey house set back from the canal, built by Elbaz Construction in South Florida
Street elevation of a South Florida house by Elbaz Construction with stucco finished and every opening glazed, protective film still on the glass
Three-quarter view of a two-storey South Florida house by Elbaz Construction, the upper volume stepped back over the entrance
Side elevation showing stacked window openings marking a double-height room, on an Elbaz Construction project in South Florida
Double-height glazed bay under a cantilevered upper terrace, with the garage bay still open, on an Elbaz Construction build
Multi-slide glass door seen from inside a South Florida house by Elbaz Construction, opening onto the canal
Double-height interior volume at drywall stage with the upper gallery edge framed, on an Elbaz Construction project

A new concrete seawall cap and composite dock decking. On a waterfront parcel this is the first thing that has to be right and the last thing that is cheap to change.

1 / 8

This is what the front-end work looks like once it is standing.

What the photographs show

The seawall is the first drawing, not the last

The build above is on a canal lot, photographed at the stage where the structure is up, the stucco is on and the impact glazing is in and still carrying its protective film. The frame it opens on is the water's edge: a new concrete seawall cap and composite dock decking, with the lot behind it still at rough grade.

That order is deliberate, because it is the order the work happens in. The shoreline sets the elevation the house has to sit at, the exposure the envelope has to be rated for, and the list of agencies whose approval the programme depends on. A design that arrives before those answers gets drawn twice.

On the water, the programme is set by the shoreline long before it is set by the building.

Nothing here is stated about the property beyond what is visible in the photographs. The image set carries no address, no client, no contract value and no dates, so this page claims none of them - including which municipality the house stands in.

Observed specification
SiteA canal parcel at rough grade, with a new seawall cap and dock
StructureTwo storeys, upper volume stepped back over the entrance
EnvelopeStucco finish with impact-rated glazing to large openings
Interior stageDrywall hung and taped; double-height volume with upper gallery
Water frontageConcrete seawall cap and composite dock decking, newly built
Not documentedMunicipality, address, client, contract value, dates and area

Described only from what is visible in the photography, plus the general requirements that govern work of this kind in Broward County. One frame in the original set was set aside because a neighbour's boat carried another company's name; the version used here is cropped so that it does not.

Send us the address and we will read the shoreline record for you.

Detail

The water's edge, component by component

Photography: Elbaz Construction projects in South Florida

New concrete seawall cap and composite dock decking on a South Florida canal, photographed on an Elbaz Construction project

The seawall

Everything upstream of it

A seawall holds the ground your house sits on. Its condition decides whether a renovation is a renovation or a marine project with a kitchen attached, and its top elevation is regulated rather than chosen. It is also the item most often left out of a first budget, which is why we ask about it before we ask about finishes.

Finished canal-front pool deck and covered terrace by Elbaz Construction in South Florida, with the dock immediately beyond

The deck

Where the house ends

On a canal lot the terrace is not a garden feature, it is the route to the water. Deck, coping and seawall have to fall together, and that is a setting-out problem solved on paper.

Street elevation of a South Florida house by Elbaz Construction with stucco finished and every opening glazed, protective film still on the glass

The envelope

Rated, then installed

In Broward the wall and every opening in it are approved as a system for high-velocity wind. Substituting a product on site changes what was permitted, which is a paperwork problem long before it is a physical one.

Multi-slide glass door seen from inside a South Florida house by Elbaz Construction, opening onto the canal

The widest opening

View against load

The best view usually faces the worst exposure. That trade-off is priced at design stage or discovered at glazing stage.

Covered outdoor kitchen framed on the canal rather than the garden, on an Elbaz Construction project in South Florida

Outdoor rooms

Built, not furnished

Covered terraces, outdoor kitchens and their services are permitted work with structure, drainage and power behind them.

A rough-graded waterfront lot with a two-storey house set back from the canal, built by Elbaz Construction in South Florida

Ground level

Fill, falls and access

The finished floor follows the flood requirement, and everything outside it - driveway, deck, drainage - then has to meet the ground it leaves.

Seawall, deck, envelope, openings - in that order.

Common questions

Fort Lauderdale questions

What owners here actually ask before starting work, and the answers we can give without guessing at your address.

With the City's Development Services Department. Its Building Services division is responsible for all permitting in the city, issues permits and performs inspections. The city states that all new submissions can be submitted online through LauderBuild, its Accela Citizen Access portal.

The city's digital plan-review system. Drawings and supporting documents are uploaded, progress is tracked online, the notes each city reviewer records are visible, revisions go back the same way, and approved stamped plans are released once fees are paid.

Waterfront structures are their own scope. Dock and seawall work requires Broward County approval in addition to the city permit, so a waterfront project is running at least two approval tracks from the start.

It depends on the scope and the location. Larger marine and shoreline work can involve the U.S. Army Corps of Engineers under Section 10 of the Rivers and Harbors Act, and Florida DEP where sovereignty submerged lands are affected. We establish which apply to your parcel before design, not after.

Yes. The HVHZ covers Miami-Dade and Broward counties, so roofing, windows, doors and shutters have to carry product approval accepted for HVHZ use. Palm Beach County, by contrast, sits outside it.

The flood zone and base flood elevation set the finished floor level, which then drives fill, stem walls, driveway gradients and how the building meets the ground. The city runs a floodplain management programme, participates in the NFIP and the Community Rating System, and holds elevation certificate records.

Fort Lauderdale has designated historic districts and a Historic Preservation Board, and work affecting a designated property can require a Certificate of Appropriateness. That review sits ahead of the building permit, so it belongs at the front of the programme.

A route the city offers through LauderBuild for simpler scopes. The city notes that Walk-Thru applications may be created at any time, but are only processed the next business day, Monday to Friday between 8:00 am and 9:30 am. Useful, but not the same as instant.

The Development Services Department has published permitting processing, payment and fee changes to comply with Florida House Bill 803, taking effect on 1 July 2026. We confirm the current position at the time of filing rather than quoting a figure that may have moved.

No. We are a Florida certified building contractor, licence CBC1265280, working across Broward, Miami-Dade and Palm Beach. Fort Lauderdale simply has more waterfront parcels than most, so more of the work here starts at the seawall.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Living on the canal · 02

What the water is actually worth

6 images · more than one South Florida property · Elbaz Construction project photography · select to enlarge

Outdoor rooms on a canal are permitted work, and we build them that way.

How the work runs here

From the address to the final inspection

10 stages · approvals in parallel, not in series

01

The address, first

Parcel, zoning, flood zone, designation status and - if there is water - what the shoreline record says. All of it exists before we do.

02

Scope against constraints

What you want, tested against the envelope, the flood requirement and the HVHZ product rules, before anything is drawn in detail.

03

Design and engineering

Architecture and structure developed together, with wind pressures and floor level treated as inputs rather than as revisions.

04

Contractor and licensing in order

Licensed professionals register and keep documentation current with the City through LauderBuild. Nothing should stall at this step, and it does when it is left late.

05

Application through LauderBuild

The permit application is filed digitally through the city's portal, with the submittal package assembled to the city's published requirements.

06

Plan review in the Plan Room

Reviewer comments are read, answered and resubmitted online. This is where a well-prepared package earns its money.

07

Parallel agency approvals

Broward County for dock and seawall scope, and where the work reaches far enough, state and federal authorisations. Run alongside the building permit, not after it.

08

Permit issued, work starts

Site set-up, protection of the shoreline and the neighbours, then the sequence the permit assumed.

09

Inspections as the work proceeds

Inspections of permitted work are scheduled and managed online. Each one is a checkpoint against what was approved, not a formality.

10

Final inspection and close-out

Final inspections, close-out and the records handed over, so the next owner inherits paperwork rather than a mystery.

Which approvals a project needs, and which agencies are involved, depends on the parcel, the scope and the shoreline. We confirm them for your address. The city has published permitting processing, payment and fee changes to comply with Florida House Bill 803 taking effect 1 July 2026 - confirm current requirements before filing. We do not publish review durations.

One licensed contractor from the LauderBuild filing to the final inspection.

Before you buy, or before you build

Six checks that decide whether a waterfront parcel works

Owner’s guide · Fort Lauderdale

01

The seawall, honestly assessed

Age, cap condition, tie-backs, whether it has been raised, and whether water has ever come over or around it. A wall at the end of its life is a five- or six-figure item that has nothing to do with the house, and the city's tidal barrier provisions can require a minimum top elevation when a wall is rebuilt or is in significant disrepair. Confirm the current requirement for the address before you plan the work.

02

The dock's paperwork, not just its planks

A dock that exists is not necessarily a dock that was permitted. Ask for the permit history, because a rebuild inherits whatever the record says - and dock work needs Broward County approval as well as the city's.

03

Flood zone and the elevation certificate

The zone and the base flood elevation set the finished floor. An existing elevation certificate is the cheapest document you will ever obtain, and the city maintains a floodplain programme rather than leaving it to the insurer.

04

Who has jurisdiction over your shoreline

City, county, and - depending on scope and location - state and federal agencies. The answer is specific to the parcel and the work, and it decides the programme far more than the construction does.

05

Whether the property is designated

Historic designation and district boundaries are a matter of public record. If the property is affected, the review sits ahead of the building permit rather than beside it.

06

What the envelope actually allows

Setbacks, height, coverage and any overlay, measured from both frontages. On a canal lot the buildable area is frequently smaller than the plat suggests.

Which of these apply, and what each requires, is set by the parcel, its flood zone, its designation status and the agencies with jurisdiction over the shoreline. We verify them for the specific address rather than working from a general rule, and we do not publish review durations or fee figures.

Six checks, and we run all six before you commit to a waterfront parcel.

Budget

What moves a Fort Lauderdale number

Relative impact · not a quotation

01

Whether the parcel is on water

Seawall condition, dock scope, marine access and the extra approvals. Two identical houses on two different frontages are not two identical projects.

Highest impact
02

Size and complexity of the scope

Floor area, storeys, spans and how many corners the plan has. Complexity costs more per square foot than area does.

High impact
03

Envelope and openings

In the HVHZ, glazing, doors and roofing are specified as approved systems. Wide openings facing the water are the most expensive square metres on the drawing.

High impact
04

Flood elevation and site works

Fill, stem walls, driveway gradients, drainage and how the building meets the ground once the floor level is fixed.

Moderate to high
05

Finish specification

Joinery, stone, tile, brassware and appliances - the most visible line and the most adjustable one.

Moderate, and yours to control
06

Design, engineering and approvals

Drawings, engineering, permit fees and agency approvals. Small against the build, and the thing that most often sets the start date.

Lower in cost, decisive in time

The bars show the relative weight these factors typically carry against one another on residential work in this market. They are not prices, not percentages of a budget and not a quotation, and the order changes with the parcel.

For a number specific to your parcel, we need to look at it.

Google reviews

What clients said on Google

4.8 Based on 343 Google reviews

★★★★★
Elbaz Construction provided excellent service and outstanding craftsmanship. The team was professional and attentive to our needs. We’re extremely satisfied with the results!
Damian Nunez · Google
★★★★★
We had a good time dealing with Asher and the crew, he went over and above all our expectations and made every effort to ensure that the end result was up to their high standards. Thank you !!
Emmett Giffin · Google
★★★★★
I give them a five star rating not only for their excellent roofing skills and timelines, but also for their competitive pricing and the honesty and professionalism of the team !! We are very pleased with the outcome
Zachary Gugliotta · Google
★★★★★
If you are planning to remodel your kitchen or bathroom or do any other construction project, call Sean from Elbaz Construction . He has a lot of experience and will recommend the best options/ suggestions to your project. He did high quality job !
Kameron Allison · Google
★★★★★
Asher has a lot of experience . We replaced our windows to energy efficient windows. He got down to business right away and did high quality work. His team is very professional! Thanks again
jessica berliner · Google
★★★★★
Asher was knowledgeable and gave us cool ideas that we didn't even know before. Nice beautiful color and design. We appreciate the price !
Sierra Bernabeo · Google

Review text is reproduced verbatim from the connected Google Business Profile, including its original spelling. Nothing is rewritten, shortened or combined, and no review schema is emitted on this page.

Join owners across Broward, Miami-Dade and Palm Beach.

Schedule a Consultation (754) 236-0675
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Next step

Bring us the address, not the wish list

We will tell you which agencies your shoreline answers to, what the flood requirement does to the floor level, and what the approvals path looks like - before anyone draws anything.