Licensed general contracting, construction and remodeling in the City of Homestead — where the naming convention can get an application refused, plan sheets are grouped by discipline, and every drawing leaves a corner empty to a published size for the City’s stamp.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

A-00Architectural
SHEET A-00 / SOUTH FLORIDA REFERENCE SET · 12 FRAMES

Recent work

Permitted work, at the stages a permitted job passes through.

Structures, covers, decks and driveways built by Elbaz Construction across South Florida — categories that in Homestead sit on the City’s structural list or need a permit regardless of value. None of the properties shown is in Homestead. Select any frame to open it full size.

G-01General
SHEET G-01 / CITY OF HOMESTEAD
01

The city, defined

A city that publishes the format, not only the rule.

Almost every municipality tells you which work needs a permit. Homestead does that too, and then keeps going: it publishes what the submission itself has to look like. Plan sheets are grouped according to disciplines. Files follow a standard naming convention, and the City states plainly that an application will not be accepted if that convention is not followed. Drawings are signed and sealed digitally rather than in ink.

The clearest example is a rectangle of empty paper. Because the City stamps its approval into the upper-right corner of every page of a plan set, it asks you to leave that corner blank — and it publishes the size, per sheet: two inches by two on an 8.5 by 11, three by three on an 11 by 17, and four and a half by four and a half on a 24 by 36, a 30 by 42 or a 36 by 48. That is a drafting instruction issued by a building department, and it tells you what kind of process this is.

The same instinct runs through everything else the City publishes. An exemption from permitting is claimed in writing, with a copy of the contract, and is reviewed by three separate desks. A private plans reviewer counts only once a Notice to Building Official has been accepted. An owner who wants to pull their own permit sits a test. A Notice of Commencement is not merely recorded but displayed on the job site. In Homestead, nothing is approved by conversation — it is approved on paper, in a format the City has already described.

Fin-clad structural columns and timber soffit seen across the pool deck
REFFin-clad structural columns under a timber soffit, South Florida project by Elbaz Construction.

We work across Miami-Dade, Broward and Palm Beach, so assembling a submission to one city’s published format is a normal part of the job rather than something learned on your project.

What is included

Permitting platform
EPL-B.U.I.L.D., launched 1 October 2025
Earlier projects
Legacy system (Community Plus), by start date
File naming
Standard convention — or the application is not accepted
Plan sheets
Grouped according to disciplines
Blank stamp area
2x2, 3x3 or 4.5x4.5 inches, by sheet size
Notice of Commencement
Recorded and displayed on site, above $2,500
A-01Architectural
SHEET A-01 / SCOPE OF WORKS · 12 ITEMS
02

Scope index

What we build here

Grouped by how the City’s own published material treats each category once HB 803 takes effect on 1 July 2026. Whether a particular scope is exempt, structural, or inside a flood hazard area is the City’s determination, made by the Building Department — this is the structure, not a determination.

Paver circular driveway lit at dusk in front of a single-storey South Florida home
REFCircular paver driveway with a planted island, lit at dusk, South Florida project by Elbaz Construction.
01 / Permit regardless of value

Kitchen renovation

A kitchen brings electrical, plumbing and mechanical work, and the City lists all three as requiring a permit regardless of cost. The value of the job is not the question; the disciplines in it are. The plan set is grouped the same way — by discipline — which is a useful way to think about the project from the start.

A-02Architectural
SHEET A-02 / REFERENCE 01 · FROM APPROVED SET TO FINISHED SURFACE · 09 FRAMES
REFERENCE 01 · FROM APPROVED SET TO FINISHED SURFACE

What the stages between a stamped drawing and a handover look like

Nine frames, separate South Florida projects

A permitted job is inspected at intervals rather than at the end, and the City lists all of its possible inspections on the back of the permit card. These frames show the stages an inspector actually sees, and the finished condition they lead to.

These nine frames are separate South Florida projects by Elbaz Construction, not one project and not a Homestead property. Select any frame to open it full size.

A-03Architectural
SHEET A-03 / SUBMISSION AUTHORITY · CITY OF HOMESTEAD
03

Specification

Every desk a Homestead submission crosses

Read from the City’s own Development Services and Building Department pages on 2026-08-16. The City names these authorities and what each one handles; it does not publish review timeframes, and neither does this page.

Building Department
Issues permits, reviews plans for new structures, reviews proposed improvements to existing structures, conducts inspections and issues certificates of occupancy and completion.
Floodplain
Named by the City as one of three reviewers of a permit exemption request. Flood hazard area status is also what removes the HB 803 exemption entirely, so this is not a formality.
Planning & Zoning
The third named reviewer of an exemption request, and a separate permit track in its own right — zoning permits are excluded from the exemption regardless of cost.
Public Works — Right of Way
Right of way permits are one of the City’s three departments in the permitting overview and are excluded from the HB 803 exemption regardless of cost.
Miami-Dade County (DERM, WAS-D, impact fees)
Where a project needs environmental, water and sewer or impact fee review, the application goes to the County’s own portal, and those upfront fees are paid separately once a County project number has been issued.
Miami-Dade County product control
Product approvals for rated assemblies. Homestead sits inside the High-Velocity Hurricane Zone, and windows, doors and roofing are all on the City’s structural list.
A private provider, if you elect one
Permitted under s. 553.791 Florida Statutes for six disciplines only — building, roofing, structural, electrical, mechanical and plumbing. The City recognises one only after it has reviewed and accepted a Notice to Building Official.
The Building Official, for an owner-builder
An owner must prove knowledge and ability to do the work, and the City states that a test will be administered. The owner must also attend in person to review the documents and application.
Large-format pavers being set beside a pool beneath a completed dark canopy
REFLouvred cover complete with deck pavers being set, South Florida project by Elbaz Construction.
A-04Architectural
SHEET A-04 / MATERIAL AND DESIGN LANGUAGE
04

Design and material language

The decisions that decide your submission

Five choices that change what the City receives, drawn from its own published requirements rather than from general practice.

Outdoor kitchen and bar seating under a timber-slat soffit with the canal beyond
DETOutdoor kitchen and bar seating under a timber-slat soffit, South Florida project by Elbaz Construction.
Dark-framed canopy beside a pool with large-format pavers being set
DETDark-framed canopy over large-format pavers being set, South Florida project by Elbaz Construction.
M-01

Windows and doors

Named as structural

Named in the City’s published material The City places windows and doors inside its own definition of structural work, which requires a permit regardless of cost. In Miami-Dade they are also a product approval question, and the approvals travel with the submission.

Other options. Settle the product and the opening size together, before the set is drawn. A substitution after approval is a revision to sheets that have already been stamped.

M-02

Roof covering

Named as structural

Named in the City’s published material Roofing appears in the City’s structural list. It is also one of the six disciplines a private provider may review and inspect, which is worth knowing if programme certainty matters more than the fee.

Other options. Decide early whether a private provider is being used, because the City recognises one only after accepting a Notice to Building Official, and only before the first required inspection.

M-03

Siding and soffits

Named as structural

Named in the City’s published material Both are named. An owner who thinks of siding as a finish and of soffit as trim will be surprised by which side of the City’s line they fall on.

Other options. Where these are in scope, treat them as part of the permitted package from the outset rather than as a late addition to a job already under way.

M-04

Fences and boundary work

On both lists

Named in the City’s published material Repair or replacement of wood fence pickets and panels appears among the items that may be exempt — expressly excluding the posts — and fences also appear in the structural list. The City determines which applies.

Other options. Ask before ordering. The difference between replacing panels and replacing posts is the difference between two categories the City treats very differently.

M-05

Floor tile and gutters

The rest of the exempt list

Named in the City’s published material These are the only other items on the City’s published list of work that may be exempt under $7,500. The value of the entire project decides, and phasing is prohibited.

Other options. If tiling or guttering is genuinely the whole job, request the exemption in writing with the contract. If it is one part of a larger renovation, the exemption is not available and it is better to know that at the estimate stage.

On what is shown. Nothing here is a determination. The City decides what a scope requires, whether an exemption applies and what a complete submission contains, and it publishes no review timeframe — so this page describes the decisions, not their outcomes.

G-02General
SHEET G-02 / PROCESS · 11 STAGES
05

Process

How we run a project here

Eleven steps. The order follows the City’s own sequence: establish the system and the category first, then build the submission to the published format, then the permit, then the inspections.

01
Consultation

The scope, the address, and whether any part of it is a project already under way in the City’s legacy system.

02
Category check

We establish with the Building Department how the scope sits against the exemption list, the structural list and flood hazard status — three separate questions with one answer between them.

03
Design

Drawn as a coordinated set rather than as separate trade sketches, because the City receives it grouped by discipline.

04
Sheet discipline

Sheet sizes chosen, title blocks positioned, and the upper-right corner of every page left blank to the size the City publishes for that sheet.

05
Naming and files

Files named to the standard convention before upload, because the City states an application will not be accepted without it.

06
Seals and notarisation

Digital signing and sealing, and notarisation — remotely where that suits the schedule.

07
County, where required

DERM, Water and Sewer or impact fee applications submitted to Miami-Dade County separately, with its upfront fees paid once a County project number is issued.

08
Submission

Through EPL-B.U.I.L.D., or the legacy route if the project began before 1 October 2025.

09
Notice of Commencement

Recorded and then displayed on the job site, for work over $2,500 in value, before the first inspection.

10
Construction

Sequenced so each trade is genuinely ready for its inspection, with the permit card and approved plans on site and access arranged.

11
Completion

Final inspections, certification, and the documents handed over in a form you can produce again when the property is sold.

P-01Permitting
SHEET P-01 / PERMITTING, SUBMITTAL AND EXEMPTION · CITY OF HOMESTEAD
06

Technical brief

What the City publishes, and what it says exactly

Fourteen references, each read off an official City source on 2026-08-16. Where the City’s own pages disagree, both versions are here.

Stone-faced chimney volume and outdoor kitchen beside a tiled spa and pool
PStone-faced chimney volume and outdoor kitchen beside a tiled spa, South Florida project by Elbaz Construction.
Paver circular driveway lit at dusk in front of a single-storey South Florida home
PNewly laid travertine pool deck, South Florida project by Elbaz Construction.
R-01

Two live systems, forked by date

The City launched EPL-B.U.I.L.D. on 1 October 2025 for building, utilities, inspections and land development applications, and states the project is being implemented in two phases. A permit application started before that date is considered a legacy project and continues through the City’s legacy system.

R-02

The naming convention is a condition of acceptance

The City publishes a standard naming convention for uploaded files and states that your application will not be accepted if the naming convention is not followed.

R-03

Plans grouped by discipline

The City allows multi-page uploads, but plans must be grouped according to disciplines — mechanical, electrical, plumbing, architectural or civil scopes of work uploaded in accordance with the applicable disciplines.

R-04

The blank corner, by sheet size

For drawings and plans to be approved the City adds a seal or stamp to the upper-right corner of each page within the plan, and asks that the corner be left blank: a 2 by 2 area on an 8.5 by 11 sheet; 3 by 3 on 11 by 17; and 4.5 by 4.5 on 24 by 36, 30 by 42 and 36 by 48.

R-05

Digital seals and remote notarisation

Drawings or documents that need to be signed and sealed must be signed and sealed digitally. Applications may be notarised using a Remote Online Notary and an electronic signature.

R-06

Miami-Dade County is a separate submission

Where a building permit requires approval from Miami-Dade County’s Department of Environmental Management, the Water and Sewer Department, or payment of impact fees, the application is submitted to Miami-Dade County through its own portal, and those upfront fees are paid separately once a County project number has been issued.

R-07

HB 803 — what may be exempt

CS/CS/HB 803 takes effect 1 July 2026 and establishes two permit exemptions for single-family residential properties. On work valued at less than $7,500, the City publishes the items that may be exempt as three: repair or replacement of wood fence pickets and panels, excluding replacing wood posts; floor tiles; and gutters.

R-08

HB 803 — what a permit still covers, regardless of cost

Electrical, plumbing, mechanical and gas work; structural work, which the City defines as "Railings, guards, pool barrier, fences, windows and doors, siding and soffits, roofing, elevated decks are all items with structural requirements and considered structural"; any work on a property located partially or entirely within a flood hazard area as defined by the Florida Building Code; right of way and planning and zoning permits; and landscape permits for tree removal or planting.

R-09

No phasing, and the request is written

The total value of the entire project decides eligibility, only one complete construction project under $7,500 is eligible, and the City states you cannot split one construction project into multiple smaller permits or phases to keep the value of each under $7,500. The exemption is requested in writing, with the City’s Permit Exemption Request Form and a copy of the written contract or other documentation of the nature and value of the work.

R-10

The legal notice, quoted in full

Published under both exemptions: "The City of Homestead has no legal duty to the owner, contractor, or their successors or assigns for any work performed under this exemption." An exemption is not an approval, and the City has said so in terms.

R-11

HB 803 — the second exemption, and its five conditions

For the voluntary installation of temporary hurricane and flood protection walls or barriers, all five of the following must be met: the wall or barrier is non-load-bearing and non-habitable; it is installed on the residential property of a single-family dwelling, two-family dwelling or townhouse; it is constructed to mitigate or prevent storm surge or floodwaters from entering a structure or property; it is installed by a contractor licensed under Part I of Chapter 489, Florida Statutes; and it complies with all applicable local zoning, drainage, easement and setback requirements. The City states that if any condition is not met, a permit is required — and that this exemption applies only to properties NOT located in a Special Flood Hazard Area.

R-12

Three desks review an exemption request

The City states that exemption requests will be reviewed by Building, Floodplain and Zoning, and are submitted through the EPL-B.U.I.L.D. portal. Being told you do not need a permit is itself a reviewed decision here.

R-13

Private providers, and the limits the City sets

Under s. 553.791 Florida Statutes an owner may elect a private provider at any time before the first required inspection, but the City recognises one only after it has reviewed and accepted a Notice to Building Official. The City will not allow plans review only. Private providers may review and inspect six disciplines — building, roofing, structural, electrical, mechanical and plumbing — and the City states that zoning, public works and fire are not allowed under the statute. If a private provider is terminated the owner must secure another, because the City will not take over plan review or inspection duties. Permit fees are reduced by ten percent of the building department portion for plans review and inspections, or five percent for inspections only, and private providers must be registered with Miami-Dade County.

R-14

Where the City’s own pages disagree on the code edition

One conflict, current on the City’s site and not resolved here. The Building Department page states that the division "Reviews proposed improvements to existing structures per Florida Building Code F.B.C. 2020 edition". The Building Code page it links to is headed "Florida Building Code 8th Edition (2023)". Confirm with the Building Department which edition your drawings must demonstrate compliance with before you commission them — the answer changes the drawings, not just the paperwork.

Disclaimer. Nothing on this sheet is a determination about a specific property. The City decides what a scope requires, whether an exemption applies, and what a complete submission contains.

S-01Structural
SHEET S-01 / SUBMISSION ROUTE · INDICATIVE
07

Assembly

The route a Homestead application takes, drawn.

An indicative diagram of the City’s published structure, not a determination. The first fork is not about the work at all — it is about when the project started, because that decides which of two live systems it belongs to.

Indicative diagram of the Homestead permit submission routeA project is first tested for when it started. Applications begun before 1 October 2025 continue through the City legacy system; everything later goes through the EPL-B.U.I.L.D. portal. Either way the drawings are prepared to the City’s published format — grouped by discipline, named to the standard convention, digitally signed and sealed, with the upper-right corner of every sheet left blank for the City’s stamp. The submission is then reviewed, and where the project requires it, Miami-Dade County reviews separately. Permit, inspections and certification follow.When did theproject start?Before 1 Oct 2025:legacy systemAfter: EPL-B.U.I.L.D.portalDrawings to the City’spublished formatReview, permit,inspectionslegacycurrentCounty review runs separately where required

Key

01
Start date establishes which system applies
02
Scope tested against the exemption and structural lists
03
Drawings grouped by discipline
04
Files named to the standard convention
05
Upper-right corner left blank to the published size
06
Digitally signed, sealed and notarised
07
Permit, inspections, certification
N-01

The first question is a date

EPL-B.U.I.L.D. launched on 1 October 2025 and is being implemented in two phases. A project begun before that date is a legacy project and continues through the City’s legacy system. Two live routes, and which one you are on is decided by history rather than by scope.

N-02

Naming is a rejection criterion

The City states that an application will not be accepted if the standard naming convention is not followed. That is not a comment on a review — it is the door.

N-03

Group the set by discipline

Mechanical, electrical, plumbing, architectural and civil sheets are uploaded according to their disciplines rather than as one continuous document.

N-04

Leave the corner empty, to size

The City stamps the upper-right corner of every page. Two by two inches on an 8.5 by 11, three by three on an 11 by 17, four and a half by four and a half on a 24 by 36, a 30 by 42 or a 36 by 48. A title block in that corner is a redraw.

N-05

Sealed digitally, notarised remotely

Anything requiring signing and sealing is done digitally, and the City accepts applications notarised by a Remote Online Notary. That removes a trip, provided it is arranged before the set is finished rather than after.

N-06

The County is a separate submission

Where DERM, Water and Sewer or impact fees apply, that application goes to Miami-Dade County’s portal and those upfront fees are paid separately, once a County project number has been issued.

REFERENCE 02 · WORK IN PROGRESS, WHICH IS WHAT INSPECTIONS SEE

The stages between an approved drawing and a finished surface

Inspections happen at intervals through a build, and the City lists all possible inspections on the back of the permit card. South Florida projects by Elbaz Construction; neither property is in Homestead.

01Travertine being laid under a completed timber-soffit cover.
02Covered terrace with the soffit finished and paving part-laid.
Q-01Quality
SHEET Q-01 / PERFORMANCE AND QUALITY
08

Performance and quality

How we work

Eight commitments, each one a direct consequence of something this City publishes.

Raised spa beside wide timber-faced steps under a dark-fascia covered terrace
QRaised spa beside wide timber-faced steps under a covered terrace, South Florida project by Elbaz Construction.
Canal-front pool deck with teak loungers below a two-storey residence
QCompleted pool deck with teak loungers, South Florida project by Elbaz Construction.
We establish which system the project is in
A project started before 1 October 2025 is a legacy project on the City’s own definition. Knowing which of the two routes applies before anything is uploaded avoids the most avoidable delay available here.
Files are named before they are uploaded
The City states an application will not be accepted if the naming convention is not followed. We treat that as a checklist item with a tick, not as guidance.
Sheets are set out for the City’s stamp
The upper-right corner of every page is left blank to the published size for that sheet size. It costs nothing at drawing stage and it is a reissue afterwards.
The set is grouped by discipline
Mechanical, electrical, plumbing, architectural and civil, assembled the way the City receives them rather than the way they were drawn.
We ask before we assume an exemption
The exempt list is three items, phasing is prohibited and the request is written with the contract attached. We would rather establish that at estimate stage than discover it mid-job.
The County submission is planned, not remembered
Where DERM, Water and Sewer or impact fees apply, that is a separate application and a separate payment on the County’s timetable, and it belongs at the front of the programme.
The Notice of Commencement goes up, not just in
Above $2,500 in job value the City requires it recorded and displayed on the job site before the first inspection. Displayed is the part that gets forgotten.
One licensed contract
Design coordination, City submittals, permitting and construction under CBC1265280, so no approval falls between two parties.
C-01Cost
SHEET C-01 / COST AND SCHEDULE VARIABLES · 13
09

Cost and timeline

What moves the number

We publish no permit fees for this City — a fee schedule exists and we have not opened it, and the figure that matters is current on the day you file. The only percentages here are the private provider reductions the City publishes as a rule. These are the variables that actually move a price.

Canal-front pool deck with teak loungers below a two-storey glass residence and a timber-soffit covered terrace
CLong pool with teak loungers below a two-storey residence, South Florida project by Elbaz Construction.
Dark-framed cover with a timber soffit beside a pool on a canal lot
CDark-framed cover with a timber soffit beside a pool, South Florida project by Elbaz Construction.
#VariableWhy it moves the number
01How many disciplines are in itThe plan set is grouped by discipline and reviewed accordingly. Each additional discipline is more drawing, more review and more inspections.
02Whether anything is genuinely exemptOn the City’s published list, very little of a real renovation is. Assuming an exemption and losing it late is more expensive than never assuming it.
03Flood hazard area statusAny work on a property partially or entirely within a flood hazard area is outside the exemption regardless of cost, and the second exemption does not apply in a Special Flood Hazard Area at all.
04Whether the County is involvedDERM, Water and Sewer or impact fees add a separate application, a separate fee event and a separate timetable that the City does not control.
05Legacy project or current platformTwo systems are live. A project carried over from the legacy route is not harder, but it is different, and mixing them is where time goes.
06Whether you elect a private providerIt reduces the building department portion of the permit fee by ten percent for plans review and inspections, or five percent for inspections only — against the cost of the provider themselves, and the condition that the City will not take the work back if they stop.
07Product approvals for rated assembliesWindows, doors and roofing are all on the City’s structural list, all need approvals, and all have their own lead times.
08Structural interventionThe City’s definition of structural is broad. Where it is genuinely structural in the engineering sense as well, engineering brings its own review and inspection sequence.
09Existing conditionsWhat is behind the finishes on an older building is the largest genuine unknown on most renovation projects anywhere.
10Survey and existing documentationA current survey and any previous City approvals for the property shorten the front of the job appreciably.
11Whether the drawings are right first timeNaming, grouping and the blank corner are all conditions the City publishes in advance. A set that satisfies them on the first upload is simply cheaper than one that does not.
12Specification levelFinishes, joinery and fittings move a renovation budget more than square footage does, once the shell is settled.
13Inspection readinessThe City asks that the site be ready, the approved plans available and access arranged. A failed inspection is a return visit and a gap in the programme.
I-01Information
SHEET I-01 / QUESTION INDEX · 18
10

Question index

Questions we are asked here

Answered from the City’s own published material. Where the City publishes two different answers, both are given.

01 / Submittal

Why does my drawing need a blank corner?

Because the City stamps its approval there. For drawings and plans to be approved, the City of Homestead adds a seal to the upper-right corner of each page within the plan, and asks that the corner be left empty so the stamp lands on paper rather than on your title block. It publishes the size per sheet: 2 by 2 inches on an 8.5 by 11, 3 by 3 on an 11 by 17, and 4.5 by 4.5 on a 24 by 36, a 30 by 42 or a 36 by 48. It is a small drafting instruction that is very annoying to discover after a set is finished.

A-06Architectural
SHEET A-06 / CONSTRUCTION STUDY
Construction study

What to establish first

Travertine paving part-laid beneath the pavilion during installation
STUDYTravertine being laid under a completed cover, South Florida project by Elbaz Construction.

Four questions worth answering before a drawing is commissioned. All four are answered by the City or by Miami-Dade County, not by a contractor.

Observations

01
When the project started
This decides which of two live systems you are in. EPL-B.U.I.L.D. from 1 October 2025; the City’s legacy system for anything begun before it. It is the cheapest question on this list and the one most often skipped.
02
Whether the property is in a flood hazard area
It removes the HB 803 exemption regardless of cost, and a Special Flood Hazard Area designation removes the temporary flood barrier exemption as well. It is also a reviewer in its own right on an exemption request.
03
Which code edition your drawings must meet
The City publishes two different answers on two of its own pages. Ask the Building Department which applies before drawings are commissioned rather than after they are submitted.
04
Whether Miami-Dade County has to see it
DERM, Water and Sewer and impact fees are a separate application to the County’s own portal, with upfront fees paid separately once a County project number is issued. That belongs at the front of a programme, not in the middle of one.
G-03General
SHEET G-03 / DELIVERY AND CREDENTIALS
11

Credentials and delivery

Why Elbaz Construction

Six things that are verifiable rather than asserted.

Paver circular driveway lit at dusk in front of a single-storey South Florida home
REFCircular paver driveway lit at dusk, South Florida project by Elbaz Construction.
01

Licensed general contractor

CBC1265280 — certified building contractor, bonded and insured. Verifiable in the Florida DBPR licence register.

02

We build the submission to the published format

Naming convention, discipline grouping, sheet sizes and the blank stamp corner are handled at drawing stage, because the City publishes all four in advance.

03

We read the City’s own material

Every regulatory statement on this page was taken from an official City source and is attributed to it, including the place where the City contradicts itself on the code edition.

04

We say what we do not know

No fee schedule, no review timeframes, no staff names and no resolution of the fence question appear on this page, because we have not established them. That is a better guide than a confident guess.

05

Honest photography

Every image here is a real Elbaz Construction project in South Florida, captioned as such. None is claimed as a Homestead property.

06

Across three counties

Miami-Dade, Broward and Palm Beach — so one city’s particular submission requirements are a normal part of the work rather than an exception to it.

I-02Information
SHEET I-02 / CLIENT RECORD
12

Google reviews

In their words, unedited.

Reproduced verbatim from the connected Google Business Profile, including original spelling. No review schema is emitted from this page.

★★★★★

“Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.”

Mia Zafrani · Google review

★★★★★

Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze.

Lee Morali

★★★★★

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!

Shir Partush

★★★★★

From start to end- personal kind treatment, always respectful. Value for money 10/10.

roni yonani

★★★★★

Amazing job Did a total renovation of my house with them

Elie Elancry

I-03Information
G-04General
SHEET G-04 / ENQUIRY
13

Start here

Start a Homestead project

Tell us the scope and the address. We will establish which system the project belongs to, how the scope sits against the City’s exemption and structural lists, and what the submission has to carry.

Canal-front pool deck with teak loungers below a two-storey glass residence and a timber-soffit covered terrace
REFCompleted pool deck below a two-storey residence, South Florida project by Elbaz Construction.

What happens next

01
We call or email within one business day, Sunday to Friday.
02
A category check: which system the project is in, how the scope sits against the exemption and structural lists, and whether the property is in a flood hazard area.
03
A site visit, then a written scope and a proposal against it — with the review path stated in it, not assumed.
Useful to have
A survey if you have one, any previous City permits for the property, and the date the project first started if it has been going a while.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

G-05General
SHEET G-05 / END OF SET

Find out what the City needs.
Then build it properly.

Design coordination, City submittals, permitting and construction under one licensed general contractor — in the City of Homestead and across Miami-Dade, Broward and Palm Beach counties.