10 service categories · 100 service pages · Miami-Dade, Broward & Palm Beach
View all servicesElbaz Construction builds accessory dwelling units designed around how they will actually be let — a private entrance, utilities that can be billed separately, and finishes chosen for turnover rather than for a photo. We confirm what your specific address is permitted to rent, and for how long, before you build a plan around it.
Miami-Dade · Broward & Palm Beach Counties
ScrollStep one
Send us the property and what you have in mind. Before anything is drawn we check what that address is actually allowed to build and rent.
The property address, a rough idea of the unit size you want, and whether you are thinking detached, attached or a conversion of existing space.
We come back to you to arrange a site visit, and we look up the current rule for your municipality before that conversation rather than after it.
What the lot and the zoning will carry, where utilities can run, likely unit layouts, and the permitting path for your jurisdiction.
Your details are with us. A licensed general contractor will come back to you to arrange a site walk. If it is urgent, call (754) 236-0675.
Photo sequence — completed Elbaz accessory dwelling units, studio and two-level loft
What we build
A rental ADU is built for a job: to be let. That does not mean cutting corners — it means making different decisions than you would for a unit your own family will live in. It starts with what you are legally allowed to rent it as, for how long, and under what conditions in your specific city or county, because that is the part with the most direct financial consequence. After that it is durability, utilities that can be billed accurately, and real separation between the tenant's front door and yours.
A separate keyed entrance with genuine privacy from the main house's daily traffic, not a shared hallway.
Independent or sub-metered electric and water, so usage is charged accurately instead of absorbed into rent.
Luxury vinyl plank instead of hardwood, tougher paint sheens, easy-clean counters and cabinet fronts.
Wall and floor assemblies chosen to actually separate tenant and owner living space.
What your address may rent, and on what lease term, confirmed before you build a plan around an assumption.

Elbaz project photograph
Project 01
Completed and rental-ready
Every frame below is an Elbaz Construction photograph of one completed unit. Captions describe only what is visible in them: no address, no rent, and no claim about what it earns.






















One open living and kitchen volume with a sleeping loft over it, reached by a stair with the laundry built in underneath.
Full-height oak-look cabinetry, white subway tile, a floating timber shelf, and a full-size range and refrigerator rather than apartment-scale appliances.
Walk-in shower with a patterned feature wall, a recessed niche and matte black fittings.
Ducted and split conditioning, a stacked washer-dryer column under the stair, and a skylight bringing daylight to the middle of the plan.
How it runs
An ADU is a small building with a full building's worth of process behind it. Below is the order we run it in, and what actually happens at each point.
Photo sequence — entrance, living volume, kitchen, stair, bathroom and loft of completed Elbaz units
Before anything is drawn we confirm what your specific municipality permits: whether an ADU is allowed on that lot, at what size, and what it may be rented as.
We walk the lot, look at setbacks, existing structures, and where a private entrance can sensibly go.
Boundary and existing-conditions survey, so the buildable envelope is fact rather than estimate.
A plan sized to what the zoning allows and to how the unit will be let — entrance, privacy, and where the noisy rooms sit.
Whether the unit gets independent meters or sub-meters, and where the runs go. Decided now, not on site.
Structural design for tri-county wind load, and flood elevation where the lot requires it.
Submitted, tracked and corrected by us. Review durations are set by the building department, so we plan around them rather than promise a date.
Where an association has architectural review, that submission runs in parallel with the building permit.
Foundation, shell, envelope, rough-in, finishes. Site meetings and photographic progress records throughout.
Every required inspection scheduled in sequence, through to the final and the Certificate of Occupancy.
Any rental registration or certificate of use your jurisdiction requires, plus the warranty and appliance documentation you will hand to a tenant.
Municipal review and inspection timelines are set by each building department and vary by jurisdiction and workload. We do not quote a permit date we cannot control.
A studio is the harder plan to get right, because every decision is visible from every other part of the room. Here the vaulted ceiling and a skylight do the work that square footage cannot, the kitchenette runs along one wall rather than projecting into the space, and the bathroom is the only closed door in the unit. Its own entrance opens onto a paver terrace away from the main house.
Project 02
A different unit, a different plan
A separate completed Elbaz unit — not the same building as Project 01. Where that one goes up, this one spreads out: one vaulted room with the kitchen, living and sleeping zones read as separate without a wall between them.
Elbaz project photograph
Specification
These are decided once, before construction, because each of them is expensive to add later. Switch between the three questions to see the same decision from a different angle.

Its own keyed entry, reached without crossing the main house's private outdoor space.
Elbaz project photograph

A stacked washer-dryer column inside the unit, here built into the space under the stair.
Elbaz project photograph

Full-height cabinetry with a full-size range and refrigerator, not apartment-scale appliances.
Elbaz project photograph

Tiled walk-in shower with a recessed niche, and fittings chosen to survive turnover.
Elbaz project photograph

Skylights and a vaulted or double-height ceiling instead of extra floor area.
Elbaz project photograph

Wall and floor assemblies chosen to separate tenant and owner space, and to separate sleeping from living inside the unit.
Elbaz project photograph
Living with it
Hard-wearing paint sheens and plank flooring mean a turnover is a clean and a touch-up, not a refinish.
Check the shower niche and perimeter sealant annually; it is the cheapest maintenance on the building.
Filters cleared quarterly and condensate lines flushed before the wet season keep a tenant off the phone.
Read sub-meters on the same day each month so a bill is never an argument.
Showcase 03
Both completed units above are shown as finished rooms. This section is the part you cannot photograph — the sequence of approvals, connections and inspections that turns a building into a lettable address.

01
Whether an accessory dwelling is permitted on the lot at all, at what size, and with what parking and setback conditions. This is per-municipality and it is the first thing we check.
Elbaz project photograph

02
In unincorporated Miami-Dade an ADU may be rented but with a minimum one-month lease and no short-term or vacation rental of the unit. Broward and Palm Beach have no single county standard — the municipality sets it, and some have not addressed it at all.
Elbaz project photograph

03
Whether the unit takes independent meters or sub-meters, and where the runs go. Deciding this after the slab is poured is the expensive way.
Elbaz project photograph

04
Full building permit with the trade sub-permits behind it. Corrections are ours to answer; review duration belongs to the department.
Elbaz project photograph

05
Foundation, rough-in, framing, insulation, final. A missed call stalls every trade queued behind it, so they are scheduled rather than requested.
Elbaz project photograph

06
Then any rental registration or certificate of use your jurisdiction requires. A unit that is let without them is a different insurance conversation than one that is not.
Elbaz project photograph
Setbacks, separation and the tenant's own path to the street
Schematic. Setbacks, lot coverage and separation distances are set by your municipality and vary — this shows the relationships, not the dimensions.
Answers
It is set by your municipality, not by the county alone, and it varies more than people expect across the tri-county area. What is permitted, at what size, with what setbacks and what parking condition, all depend on your specific address. We look up the current rule for that address before we draw anything.
In unincorporated Miami-Dade an accessory dwelling unit may be rented, but the ordinance sets a minimum one-month lease term and prohibits short-term or vacation rental of the unit itself — which is a different rule from the county's separate short-term rental ordinance covering a whole property. Broward and Palm Beach have no single county-wide standard; individual municipalities set their own, and some have not addressed ADU rental specifically. This is the first thing to confirm, because it decides the whole model.
It does not always have to, but it should. Independent electric and water meters — or at minimum a sub-metering setup — let you bill actual usage rather than guess or absorb it into rent, and they give you a cleaner accounting picture. Retrofitting metering after construction is far more expensive than designing it in.
Whether the unit is detached, attached, or a conversion of existing space; how far services have to run from the main house; whether the lot needs fill to reach flood elevation; and the finish level. We will give you an itemised estimate against your actual lot rather than a per-square-foot rule of thumb.
A full building permit with the trade sub-permits behind it, plus any zoning approval your municipality requires first, and any HOA architectural review in parallel. We submit, track and answer corrections. Review durations are set by the building department.
It depends on size, on whether it is new construction or a conversion, and on how much site work the lot needs. We will give you a construction sequence with real durations once we have seen the lot — and municipal review sits on top of that and is outside anyone's control.
Yes, and not by finishing it worse. Luxury vinyl plank rather than hardwood, tougher paint sheens, easy-clean counters and cabinet fronts — materials chosen for a different use pattern and for turnover, not for a lower budget.
Some lenders will count projected ADU rental income toward qualification for the construction financing. Whether yours will, and on what evidence, is a question for your lender early in the process rather than late. We will not put a rent figure in writing for you — that is the appraiser's and the market's job.
That is a design decision made at plan stage: where the entrance sits, which windows face the main house, and what the separating wall and floor assemblies are. It is very hard to add afterwards, which is why it is on the drawings rather than left to landscaping.
Often, yes — a garage or an attached portion of the house can become a compliant unit, and it is usually the faster route because the shell already exists. Whether it works comes down to ceiling height, egress, separation and whether the resulting unit meets the size rules for your municipality.
Wind load and flood elevation drive the engineering, humidity and salt drive the material choices, and the ADU rules themselves vary municipality by municipality in a way they do not in many other markets. All of it is normal here; none of it is optional.
Verified
Reproduced exactly as published on the company's Google Business Profile. Read them on Google

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!
Shir Partush
Google review
They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them!
Lee Morali
Google review
Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same!
roni yonani
Google review
After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!!
carmit cohen
Google review
Amazing job Did a total renovation of my house with them
Elie Elancry
Google review
Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.
Mia Zafrani
Google review
Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need.
Itzick Manasherov
Google review
Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended!
Adir Davidov
Google review
I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work!
Omri B
Google review
Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend
Sophie Brito
Google review
Keep reading
GuideThe stage order a ground-up build follows, and where the waiting actually happens.
Read the guide
PricingThe inputs that move a South Florida build budget — most of them apply to a small building too.
Read the guide
CodeWhat wind-load and impact requirements change in the drawings and on site.
Read the guide
StrategyWhere standardising a plan helps and where it starts to cost you.
Read the guideAlso from us
A separate building, its own address.
Added to the house, separated properly.
The existing shell, made lettable.
The approvals, handled by us.
One room, planned properly.
When the rule does not quite fit the lot.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Start here
We will tell you what that lot is allowed to build and let — before you spend anything on drawings. A first conversation with a licensed general contractor, not a sales visit.
We look up the current rule for your municipality, then come back to you to arrange a site visit — usually within one working day.
The property address, the unit size you have in mind, and whether you are thinking detached, attached or a conversion.
What the zoning allows, what it may be rented as, where utilities can run, and a construction sequence you can plan a loan around.
Prefer to talk it through first?
(754) 236-0675Photo sequence — entrance, living volume, kitchen, stair, bathroom and loft of completed Elbaz units
Elbaz project photograph
Your details are with us. A licensed general contractor will come back to you to arrange a site walk. If it is urgent, call (754) 236-0675.