Surfside · Miami-Dade County

A small town that carries a large building's obligations.

Surfside sits on a barrier island and much of its stock is multi-storey and no longer young. The Town's Building Department is organised around that, and two of its programmes decide how a project here is reviewed at all.

The first is the 40-Year Recertification Programme, which the department administers. Separately, Florida law requires a milestone inspection - a structural inspection of load-bearing elements and primary structural systems - for buildings of three habitable storeys or more under the condominium or cooperative form of ownership, by the end of the year the building turns 30 and every ten years after, with the local enforcement agency able to set 25 years where local circumstances such as proximity to salt water warrant it. Where a building is in or near either cycle, what an individual unit renovation may touch can change.

The second is the Private Provider Programme, which changes who performs plan review and inspection. That is a route decision taken at the start of a project, not a fallback reached for when a file stalls, and it belongs in the first conversation.

The mechanics are straightforward. Permits run through the Town's Customer Self Service portal, with documents supplied digitally and attached for system review - site plans, construction details, equipment rating sheets and Notices of Acceptance or Florida Product Approvals - and a final physical copy of drawings required prior to issuance. The Building and Zoning counter at Town Hall is open for personal service from 9 a.m. until 5 p.m., Monday through Friday.

CBC1265280Florida certified building contractor. Licensed, bonded and insured.
Miami-Dade + 2All of miami-dade, and broward and palm beach.
4.8 / 343Average rating across Google reviews.
Two programmes40-Year Recertification and Private Provider both shape the route.

Renovating in Surfside? Start with the building's position, not the kitchen.

What a Surfside address changes

Six things that are true here and not everywhere.

Town · association · county · state

01

Recertification is a live programme, not background

The Town administers a 40-Year Recertification Programme. Where a building is in or approaching that cycle, or is carrying out structural or envelope work of its own, an individual renovation can be constrained or resequenced. The building will know its position; a listing will not.

02

Taller buildings carry a milestone inspection duty

Florida law requires a milestone inspection of load-bearing elements and primary structural systems for buildings of three habitable storeys or more under the condominium or cooperative form of ownership - at 30 years, and every ten years after, with 25 available to the local enforcement agency where circumstances such as proximity to salt water warrant it.

03

Who reviews your plans is a choice

The Town operates a Private Provider Programme, which changes who performs plan review and inspection. It is a route decision taken before drawings issue, and it has consequences for sequencing either way.

04

The submission is digital, the issue is not

Documents must be supplied digitally and attached for system review - site plans, construction details, equipment rating sheets and Notices of Acceptance or Florida Product Approvals - with a final physical copy of drawings required prior to issuance of permits.

05

The Town wants to be named on your insurance

Among the contractor requirements the Town publishes is a Certificate of Insurance with the Town of Surfside as the certificate holder, alongside a current Florida licence, workers' compensation and liability coverage and Miami-Dade contractor registration.

06

Salt air is a specification, not a mood

Miami-Dade sits inside the HVHZ, so glazing and doors need product approval accepted for that use - and on the island the fixings, hardware and finishes that sit outboard of the waterproofing line are what actually determine how the work ages.

Town, association, county, state - we work out which of them your project meets.

One open plan · 01

An interior rebuilt inside a fixed shell

8 images · one South Florida interior remodel by Elbaz Construction · the municipality is not documented, so none is claimed

Portrait view of a veined porcelain island and stool run under a high ceiling, on an Elbaz Construction interior remodel
Open-plan kitchen and living remodel by Elbaz Construction in South Florida, a veined porcelain island running out towards a seating area beyond
Handleless cabinetry, walnut wall units and a porcelain splashback carried up behind the hob, on an Elbaz Construction kitchen
Kitchen island looking through to the screened lanai and rear glazing
Plinth-lit base units and a walnut tall run seen past the island edge, on an Elbaz Construction kitchen remodel
Completed kitchen: waterfall island in marble-look porcelain slab with handleless cabinetry beyond
Island with four upholstered stools facing a screened terrace and hedge, on an open-plan remodel by Elbaz Construction
Kitchen remodel by Elbaz Construction opening onto a screened terrace, with a stacked oven tower and concealed plinth lighting

Full ceiling height, read vertically. In a building where the slab-to-slab dimension is fixed forever, height is the one thing worth protecting.

1 / 8

This is what an interior looks like once the shell has been worked with.

What the photographs show

Inside a fixed shell, the services drawing is the design

The remodel above is an open-plan kitchen and living room, photographed once the joinery, the porcelain and the lighting were in. It opens on the vertical view, because in a building whose slab-to-slab dimension was set decades ago, ceiling height is the resource you protect rather than the one you buy.

What is possible in a shell like this is decided by the stack, the structure and the ceiling void, all of which belong to the building rather than to the unit. That is why the survey and the association's rules come before the layout, and why a design drawn without them tends to get drawn twice.

On a barrier island, the building's own programme outranks yours - and it is knowable before you start.

About the photographs: this is our own portfolio, and it is not evidence about any building in Surfside. The set carries no address, no client and no dates, so we do not say which of these are units and which are houses, and we make no claim about any of them being on or near the island.

Observed specification
RoomOpen-plan kitchen and living, single aspect onto a screened terrace
KitchenHandleless fronts with walnut wall and tall units
WorktopsVeined porcelain, mitred island edge, splashback in the same material
LightingRecessed downlights with concealed plinth lighting to base units
BathroomsWhite large-format tile, matt black brassware, lit recessed niches
Not documentedMunicipality, address, client, contract value, dates and area

Described only from what is visible in the photography, plus the general requirements that govern work of this kind in Miami-Dade County. The photography is shared with other municipality pages because it is one contractor's portfolio; no municipality is claimed for any frame.

Send us the building and the unit, and we will read the position for you.

Detail

An island renovation, component by component

Photography: Elbaz Construction projects in South Florida

Portrait view of a veined porcelain island and stool run under a high ceiling, on an Elbaz Construction interior remodel

The building

Its programme outranks yours

Recertification position, milestone inspection duty and any structural or envelope work the building is already doing. All of it is knowable before you commit, and all of it can change what a unit renovation may touch.

Bathroom remodel by Elbaz Construction with a navy shaker double vanity, marble top and full-width mirror, the bedroom visible through the open door

The wet wall

What can move, and what cannot

Drainage runs to a stack that is a common element. Whether a bathroom or kitchen can move at all is answered by the structure and the association before it is answered by the plan.

Handleless cabinetry, walnut wall units and a porcelain splashback carried up behind the hob, on an Elbaz Construction kitchen

The envelope

Approved, and usually standardised

HVHZ product approval narrows the choice, and a building will normally require one approved system across the whole elevation so it reads consistently.

Close detail of a lit recessed niche set into white large-format wall tile, on an Elbaz Construction bathroom

Waterproofing

Somebody else's ceiling

Behind a niche, under a tray, up a wall. In a stacked building a wet-area failure is not confined to your flat, which is why it is inspected rather than assumed.

Plinth-lit base units and a walnut tall run seen past the island edge, on an Elbaz Construction kitchen remodel

Product approvals

Collected early

Notices of Acceptance and Florida Product Approvals are attached for system review. Late collection is a common reason a package cannot be filed.

Kitchen remodel by Elbaz Construction opening onto a screened terrace, with a stacked oven tower and concealed plinth lighting

Access

Part of the specification

Delivery windows, staging space, lift bookings and waste routes are set by the building and the street, not by the programme you would prefer.

Building, wet wall, envelope, waterproofing - in that order.

Decided before the drawing

Surfside: recertification, review, provider

On the island the useful questions come early - who reviews the work, and what the building is already committed to. These answers come from what the Town publishes; anything specific to a building is a matter for its own record.

With the Town of Surfside Building Department at 9293 Harding Avenue. Permits run through the Town's Customer Self Service portal, with documents supplied digitally and attached for system review - site plans, construction details, equipment rating sheets and Notices of Acceptance or Florida Product Approvals - and a final physical copy of drawings required prior to issuance. The Building and Zoning counter is open for personal service from 9 a.m. until 5 p.m., Monday through Friday.

The Town administers a 40-Year Recertification Programme. It is the building's obligation rather than an individual owner's, but where a building is in or approaching that cycle it can affect what a unit renovation is permitted to touch, and when. Ask the association for your building's position.

No, they are separate. Florida law requires a milestone inspection - a structural inspection of load-bearing elements and primary structural systems - for buildings of three habitable storeys or more under the condominium or cooperative form of ownership, at 30 years and every ten years after, with the local enforcement agency able to set 25 years where local circumstances such as proximity to salt water warrant it.

It is a route the Town operates that changes who performs plan review and inspection. Whether it suits a particular project is a decision taken before drawings issue, because it shapes the package and the inspection sequence.

In a condominium, yes, and in practice it comes first. The association decides what may be altered, which trades may enter, when work may happen and how materials move through the common parts.

Miami-Dade is inside the High-Velocity Hurricane Zone, so glazing, doors and shutters need product approval accepted for HVHZ use. On the island the fixings and hardware outboard of the waterproofing line matter as much as the glass for how the work ages.

We do not publish review durations or fee figures, because both are set by the authority and change. What we can do is tell you which route and which approvals your scope needs, which is the part that actually moves the date.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Wet rooms · 02

Where a stacked building is least forgiving

6 images · bathrooms from the same interior programme · Elbaz Construction project photography · select to enlarge

Wet rooms are where a stacked building is least forgiving.

How the work runs here

From the building to the final inspection

10 stages · route decided before drawings issue

01

The building, first

Recertification position, milestone inspection duty, any live structural or envelope programme, declaration and house rules.

02

The review route

Town review or private provider, decided at the start because it shapes the package and the inspection sequence.

03

Survey and existing services

Measured survey, and an honest look at what is behind the walls rather than what the original drawings say.

04

Scope against what the building allows

What you want, tested against the stack, the structure, the acoustic requirement and the alteration rules.

05

Association submission

Drawings, specifications, contractor licence and insurance in the form the building asks for.

06

Product approvals assembled

Notices of Acceptance and Florida Product Approvals collected before filing, not chased afterwards.

07

The permit package

Filed through the Town's CSS portal with documents attached digitally, and the final physical copy of drawings provided prior to issuance.

08

Strip out and first fix

Demolition to the extent permitted, then drainage, power and structural work, inspected as the route requires.

09

Waterproofing, then finishes

Wet areas tanked and tested before anything covers them; then joinery, stone and porcelain, brassware and lighting.

10

Inspection and handover

Inspections as required, the association's own sign-off, snagging and the record set for your file.

Which approvals a project needs depends on the building, its age and form of ownership, and the scope. We confirm them for your address. We do not publish review durations or fees.

One licensed contractor from the route decision to the final inspection.

Before you buy, or before you renovate

Six checks that decide what is possible here

Owner’s guide · Surfside

01

The building's recertification position

Where a building sits in the 40-Year Recertification Programme, and whether a milestone inspection applies to it, can change what a unit renovation may touch and when. Ask the association or the Town rather than inferring it.

02

Whether the building has its own programme running

Structural or envelope work by the building itself will take precedence over an individual renovation, and can pause one mid-way. It is knowable in advance.

03

Which review route you are taking

Town review or private provider. Deciding at the start shapes the drawing package and the inspection sequence; deciding late wastes both.

04

What the declaration and house rules permit

Wet-area moves, flooring build-ups, glazing systems, working hours and how materials reach the unit are usually set by the building rather than by you.

05

Product approvals, assembled early

Notices of Acceptance and Florida Product Approvals are part of the submission here, attached for system review. Collecting them late is a common cause of a package that cannot be filed.

06

Access and the working day

On the island, delivery, staging and waste routes are constrained by the building and the street. They belong in the programme rather than in a conversation on the first morning.

Which of these apply, and what each requires, is set by the building, its age and form of ownership, the declaration and the scope of work. We verify them for the specific address rather than working from a general rule, and we do not publish review durations, fees, or any conclusion about whether a given building is due recertification.

Six checks, and we run all six before you commit to a unit.

Budget

What moves a Surfside number

Relative impact · not a quotation

01

The building's own position

Recertification, milestone obligations and any structural or envelope programme the building is running. It can constrain, resequence or pause an individual renovation.

Highest impact
02

Whether wet areas move

Relocating a kitchen or bathroom reaches the stack and the structure, both of which are common elements.

High impact
03

What the association requires

Acoustic build-ups, approved glazing systems, insurance levels, restricted hours and lift bookings all carry cost and are set by the building.

High impact
04

Access and logistics

Island delivery, staging and waste routes lengthen a programme more reliably than the construction does.

Moderate impact
05

Envelope and exposure

HVHZ-approved glazing and doors, and the fixings and finishes that have to survive salt air.

Moderate impact
06

Specification of finishes

Real, but the most controllable line in the budget and the last one that should be used to fix a number.

Lower impact

These weights are about sequence as much as spend. On a barrier island the two items that reorder the whole list are decided before anyone draws: where the building sits in its recertification cycle, and whether review and inspection run through the Town or through a private provider. No figure here is a fee or a quotation.

For a number specific to your unit, we need to look at it.

Google reviews

What clients said on Google

4.8 Based on 343 Google reviews

★★★★★
Elbaz Construction provided excellent service and outstanding craftsmanship. The team was professional and attentive to our needs. We’re extremely satisfied with the results!
Damian Nunez · Google
★★★★★
We had a good time dealing with Asher and the crew, he went over and above all our expectations and made every effort to ensure that the end result was up to their high standards. Thank you !!
Emmett Giffin · Google
★★★★★
I give them a five star rating not only for their excellent roofing skills and timelines, but also for their competitive pricing and the honesty and professionalism of the team !! We are very pleased with the outcome
Zachary Gugliotta · Google
★★★★★
If you are planning to remodel your kitchen or bathroom or do any other construction project, call Sean from Elbaz Construction . He has a lot of experience and will recommend the best options/ suggestions to your project. He did high quality job !
Kameron Allison · Google
★★★★★
Asher has a lot of experience . We replaced our windows to energy efficient windows. He got down to business right away and did high quality work. His team is very professional! Thanks again
jessica berliner · Google
★★★★★
Asher was knowledgeable and gave us cool ideas that we didn't even know before. Nice beautiful color and design. We appreciate the price !
Sierra Bernabeo · Google

Review text is reproduced verbatim from the connected Google Business Profile, including its original spelling. Nothing is rewritten, shortened or combined, and no review schema is emitted on this page.

Join owners across Miami-Dade, Broward and Palm Beach.

Schedule a Consultation (754) 236-0675
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Next step

Bring us the building, not just the unit

We will establish where the building sits on recertification, which review route suits the work, and what the association allows - before anyone draws anything.