Corner glazing and sliding door assembly at a canal-front elevation

North Bay Village
has already written down
what your permit needs.

Licensed general contracting, construction and remodeling in North Bay Village — where the Village publishes a 131-page schedule of what every permit type must contain, and says plainly which two departments it does not speak for.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

A-00Architectural
SHEET A-00 / SOUTH FLORIDA REFERENCE SET · 12 FRAMES

Recent work

The trades this Village permits separately.

Kitchens, bathrooms, flooring, an accessory dwelling and a ground-up house, built by Elbaz Construction across South Florida. Between them they cover most of the permit types North Bay Village names on its separate-permit list. None of the properties shown is in North Bay Village. Select any frame to open it full size.

G-01General
SHEET G-01 / NORTH BAY VILLAGE
01

The village, defined

The answer is published. The work is reading it properly.

Most owners start a project by asking a contractor what the city will want. In North Bay Village that question already has a written answer. The Village publishes a document called Plan Review and Inspection Requirements which runs to 131 pages and is organised by permit type — roughly 160 of them — and for each type it lists the drawings the submission must include and the supporting documents that travel with them. A residential fence is not a paragraph in that document. It is a list.

What that list contains is the surprise. A fence asks for a signed and sealed topographic survey no more than a year old, carrying base flood elevation and grade in NAVD values under Section 114-1 of the Village code; structural plans; structural calculations; a site plan giving the height of the fence and gates and the lineal feet per section, front, rear and sides; and a plan key naming the proposed material, finishes and colour. A driveway adds a landscape plan, a tree survey, a tree protection plan and, where they apply, a drainage calculations report and a percolation test.

The honest other half is the sentence the Village puts at the top of that document: zoning and public works requirements are not part of it, and specific questions about either go to those departments directly. So the schedule is exhaustive about the building permit and silent about two things that can still stop a project. Knowing exactly where a published answer ends is worth as much as the answer.

Two-storey new home elevation with cantilevered upper floor
REFTwo-storey new home elevation with a cantilevered upper floor, South Florida project by Elbaz Construction.

We work across Miami-Dade, Broward and Palm Beach, which means reading a municipality’s published requirements before drawing to them is the normal first step of a job rather than something learned on yours.

What is included

Published requirements
131 pages, by permit type
Permit types covered
Approximately 160
Explicitly not covered
Zoning and Public Works
Upfront processing fee
$125.00 minimum, per application
Digitally sealed plans
Required at a job value of $25,000+
Application shelf life
180 days from approval, then destroyed
A-01Architectural
SHEET A-01 / SCOPE OF WORKS · 12 ITEMS
02

Scope index

What we build here

Grouped by how the Village’s own published material treats each category. Which permit type a particular scope falls under, and what its submission must contain, is the Building and Zoning Department’s determination — this is the structure, not a determination.

Herringbone floor at the foot of a stair in a double-height entry
REFHerringbone flooring at the foot of a stair in a double-height entry, South Florida project by Elbaz Construction.
01 / Separate permits per trade

Kitchen renovation

The Village states that a separate permit must be obtained for electrical, mechanical and plumbing among others. A kitchen touches all three, and its trade applications are submitted together with the master permit rather than after it — which is also why the $125 minimum upfront fee is charged per application.

A-02Architectural
SHEET A-02 / REFERENCE 01 · ONE HOUSE, SEVERAL PERMIT TYPES · 09 FRAMES
REFERENCE 01 · ONE HOUSE, SEVERAL PERMIT TYPES

What a renovation looks like when it is split by trade

Nine frames, separate South Florida projects

The Village issues a separate permit for electrical, mechanical, plumbing, roofing, windows, shutters and more, and inspects several of them on different days. These frames show the kind of work each of those permits ends up covering.

These nine frames are separate South Florida projects by Elbaz Construction, not one project and not a North Bay Village property. Select any frame to open it full size.

A-03Architectural
SHEET A-03 / REQUIRED SUBMITTAL · NORTH BAY VILLAGE
03

Specification

What a complete package carries

Taken from the Village’s own Permit Package Requirements sheet and Building Department page, read on 2026-08-16. The Village publishes no review timeframe and neither does this page.

A completed, notarised application
Notarisation may be by physical presence or by online notarization — the Village’s own form offers both.
Every trade application, with the master
Where more than one trade is involved, all trade permit applications are submitted together with the master permit rather than following it.
Proof of ownership
A Property Appraiser printout or deed. Where the owner is an entity, the articles of incorporation with its registered agents and a valid ID for the agent who signed the application.
One set of plans
Digitally signed and sealed once the job value reaches $25,000. The per-type schedule adds that electronic review takes one set and in-person review takes two.
An executed Construction Cost Affidavit
The declared value is a document in its own right here, not a line on the application.
A Condominium Approval Letter, where it applies
Required if the work is in a common area — the Village names windows, doors, shutters and balconies. It is the association’s decision, not the Village’s.
An Owner/Builder Affidavit, if you are the owner-builder
The Village limits this to an owner’s primary residence and states it is not available for condominium units.
The upfront processing fee
$125.00 minimum, collected at submittal, per application. Read against the rule that every trade files with the master, that is a per-trade figure on a multi-trade job.
Great room at drywall stage with full-height sliding glass installed
REFGreat room at drywall stage with full-height sliding glass installed, South Florida project by Elbaz Construction.
A-04Architectural
SHEET A-04 / MATERIAL AND DESIGN LANGUAGE
04

Design and material language

The decisions the schedule asks you to make early

Five choices that appear as required items in the Village’s own published requirements rather than as matters of taste.

Completed kitchen remodel in a South Florida home
DETUndermount sink and gooseneck tap at a window in a white shaker kitchen, South Florida project by Elbaz Construction.
Completed bathroom remodel in a South Florida home
DETBlue vanity and patterned cement floor tile seen from the doorway, South Florida project by Elbaz Construction.
M-01

Material, finish and colour

A required plan key

Named in the published requirements For a residential fence the Village asks for a plan key stating the proposed material, finishes and colour as part of the submission. It is an item on a checklist, not a later conversation.

Other options. Settle the palette while the drawings are being made. Changing it afterwards changes a submitted document, not just a purchase order.

M-02

Paving material and permeability

A required calculation

Named in the published requirements Walkways and driveways require front yard coverage calculations and perviousness specifications for the proposed materials. The material choice is therefore also a drainage argument.

Other options. Choose the paving and the drainage strategy together, and get the survey levels in front of the designer before either is fixed.

M-03

Openings, and who owns them

A condominium question

Named in the published requirements Windows, doors and shutters are the Village’s own examples of common-area work needing a Condominium Approval Letter. Whether an opening is yours or the association’s decides what the package must contain.

Other options. Establish the ownership line before specifying. An association’s approval runs on its own timetable and is the item most likely to hold a submission.

M-04

Declared construction cost

An executed affidavit

Named in the published requirements The Village requires an executed Construction Cost Affidavit, and the same figure decides whether the plans must be digitally signed and sealed — the threshold is a job value of $25,000.

Other options. Have the scope priced properly before filing. The value is a sworn document here and it changes what the drawings have to be.

M-05

Structure behind the finish

Plans and calculations

Named in the published requirements Even a fence draws structural plans and structural calculations in this Village. Anything carrying load, resisting wind or spanning an opening will ask the same.

Other options. Engage the engineer at design stage rather than after a comment. In the HVHZ the calculation usually shapes the detail, not the other way round.

On what is shown. Nothing here is a determination. The Village decides which permit type a scope falls under and what its submission must contain, and it publishes no review timeframe — so this page describes the decisions, not their outcomes.

G-02General
SHEET G-02 / PROCESS · 11 STAGES
05

Process

How we run a project here

Eleven steps. The order follows the Village’s own: identify the permit type first, because that is what tells you everything else the submission needs.

01
Consultation

The scope, the address, and whether the property is a condominium or a single-family lot.

02
Permit type

We match the work to the types in the Village’s published schedule, because that is where the required drawings and documents are listed.

03
Survey check

We confirm the survey is signed, sealed, within a year, and carries BFE and grade in NAVD values as Section 114-1 requires.

04
Association

Where any part of the work reaches a common area, the Condominium Approval Letter is started early — it is required with the package and it is not in the Village’s gift.

05
Design

Drawings developed to the items the schedule names, with material, finishes and colour settled rather than deferred.

06
Engineering

Structural plans and calculations where the type calls for them, and drainage or percolation work where paving does.

07
Zoning and Public Works

Asked separately, because the Village states they are not covered by the schedule.

08
County

DERM or the asbestos process where the work requires it, on Miami-Dade’s own timetable.

09
Submission

One coordinated digital package, with every trade application filed alongside the master permit.

10
Construction

Sequenced around the days each trade can actually be inspected, inside permitted construction hours.

11
Completion

Final inspections, certification, and the documents handed over in a form you can produce again when the property is sold.

P-01Permitting
SHEET P-01 / PERMITTING AND INSPECTION · NORTH BAY VILLAGE
06

Technical brief

What the Village publishes, and what it says exactly

Thirteen references, each read off an official Village source on 2026-08-16. Where the Village’s own material disagrees with itself, both versions are here.

Living area with floor-to-ceiling glazing installed before finishes
PLiving area with floor-to-ceiling glazing installed before finishes, South Florida project by Elbaz Construction.
Herringbone flooring across an open-plan kitchen and living space
PHerringbone flooring laid across an open-plan kitchen and living space, South Florida project by Elbaz Construction.
R-01

The 131-page schedule, and its stated limit

The Village publishes Plan Review and Inspection Requirements to help applicants "navigate through the required plan reviews and inspections according to each permit type", across roughly 160 named types. It then states: "Zoning and Public works requirements are not part of this document. Please contact Zoning or Public Works with specific questions about your project."

R-02

One set electronically, two in person

"Electronic Review requires 1 Set of Digitally or Electronically signed and sealed drawings; In-person Review requires 2 Sets of signed and sealed drawings."

R-03

The survey, and Section 114-1

A residential fence requires a "Signed & sealed topographic/boundary survey. Electronic version of original signed & sealed, dated no more than one year from date of submittal. Survey must provide: BFE, and grade elevation in NAVD values, per Section 114-1 of the City Code."

R-04

What a fence actually asks for

Beyond the survey: structural plans; electrical plans if the gates are automated or lit; a site plan with property lines, grade elevation, "height of fence and gates, and lineal feet per section, i.e., front, rear, sides"; structural calculations; product approval for prefabricated fences; a Public Works right of way permit if applicable; and a "Plan key with proposed material, finishes and color".

R-05

What a driveway adds

A residential driveway or approach adds a landscape plan, a Tree Protection Plan, a tree survey and tree disposition, an approved tree permit where applicable, and — where applicable — a Drainage Calculations Report and a Percolation Test Report.

R-06

Front yard coverage and perviousness

Separately, the Building Department states: "For permits involving new, replaced, or repaired walkways and driveways, front yard coverage calculations must be submitted, as well as perviousness specifications of proposed materials."

R-07

The package, item by item

A completed and notarized permit application; all trade permit applications submitted together with the master permit where more than one trade is involved; proof of ownership; one set of plans, digitally signed and sealed if the job value is $25,000 or more; an executed Construction Cost Affidavit; a Condominium Approval Letter where work is in a common area such as windows, doors, shutters or a balcony; and an upfront processing fee of $125.00 minimum, collected at submittal, per application.

R-08

Owner-builder limits

The Owner/Builder Affidavit is "Only applicable if subject property is owner’s primary residence. Not available for condominium units."

R-09

A separate permit for each of these

The Village states that "A separate permit must be obtained for ELECTRICAL, MECHANICAL, PLUMBING, SIGNS, WELLS, POOLS, ROOFING, SHUTTERS, WINDOWS, FURNACES, BOILERS, HEATERS, TANKS, and AIR CONDITIONERS, etc."

R-10

Inspection days are set by trade

Building inspections Monday to Friday. Roofing Tuesday to Friday. Electrical, mechanical and plumbing "every Tuesday and Thursday". Large residential projects of more than 10 units and commercial projects of more than 200 occupants are inspected Monday through Friday during allowed work times. Requests go to the Building Clerk by email.

R-11

Construction hours, and a form to extend them

"Construction is allowed in North Bay Village Monday thru Friday, 8:00 am - 5:00 pm, excluding observed holidays." The Village also publishes a Request For Extended Construction Hours form, so the hours are a default rather than an absolute.

R-12

The application is destroyed after 180 days

Printed on the Village’s own permit application: "THIS APPLICATION IS VALID FOR 180 DAYS FROM DATE APPROVED. APPLICATION AND ALL ATTACHEMENTS WILL BE DESTROYED AFTER THAT DATE IF PERMIT IS NOT ISSUED." Spelling as published.

R-13

Where the Village’s own material disagrees

On filing method. The Building Department states that "effective April 1st, 2022, the Building Department will only be accepting applications digitally", PDFs only, emailed to the Building Clerk. The permit application it publishes is still headed "(Blue or Black Ink Only)". Both are current on the Village’s own material; confirm the method before you file. Separately, and unambiguously, the Village states that the "Florida Building Code EIGHTH (2023) Edition became effective on December 31, 2023."

Disclaimer. Nothing on this sheet is a determination about a specific property. The Village decides which permit type applies and what its submission must contain.

S-01Structural
SHEET S-01 / SUBMITTAL ROUTE · INDICATIVE
07

Assembly

Where the published schedule stops.

An indicative diagram of the Village’s published structure, not a determination. The point it makes is the boundary: the 131-page schedule answers the building permit exhaustively and says plainly that zoning and public works are outside it, while Miami-Dade County runs its own review in parallel.

Indicative diagram of the North Bay Village submittal routeA scope of work is matched to a permit type in the Village’s published Plan Review and Inspection Requirements, which lists the drawings and supporting documents that type needs. The package is assembled with every trade application travelling with the master permit, and filed digitally. Zoning and Public Works sit outside that document and are asked separately, and Miami-Dade County reviews new building, addition, remodeling, roofing and demolition work on its own track. Permit, inspections and certification follow.Scope matched toa permit typeDrawings and documentsthe schedule listsPackage fileddigitally, trades togetherPermit, inspections,certificationZoning and Public Works:outside the document, ask separatelyMiami-Dade County DERM or asbestosreview, where the work requires it

Key

01
Permit type identified in the published schedule
02
Drawings and supporting documents assembled to that type
03
Survey confirmed current — within one year, BFE and NAVD
04
Zoning and Public Works asked separately
05
Miami-Dade County review where the work requires it
06
Trades filed with the master, digitally
07
Inspections on the day that trade is available
N-01

The schedule is the starting point, not the whole of it

The Village states at the top of its own document that zoning and public works requirements are not part of it. Treat the 131 pages as authoritative on the building permit and those two departments as the authority on themselves.

N-02

The survey has a shelf life

A residential fence asks for a signed and sealed topographic or boundary survey dated no more than one year from the date of submittal, giving BFE and grade elevation in NAVD values per Section 114-1. An old survey is a re-survey.

N-03

Colour is a submitted item

The fence requirements end with a plan key naming the proposed material, finishes and colour. That is a decision made at drawing stage, not on site.

N-04

A driveway is a drainage question

Front yard coverage calculations and perviousness specifications are required for new, replaced or repaired walkways and driveways, with drainage calculations and a percolation test where they apply.

N-05

The application has a shelf life too

The Village’s form states that it is valid for 180 days from the date approved and that the application and all attachments will be destroyed after that date if the permit is not issued. Not dormant — destroyed.

N-06

Filing is digital, and the form still says otherwise

The Building Department states that since 1 April 2022 it accepts applications digitally only, PDFs by email. The permit application it publishes is still headed "Blue or Black Ink Only". Both are current on the Village’s own material; confirm the current method before you file.

REFERENCE 02 · THE TRADES THAT EACH NEED THEIR OWN PERMIT

Where one renovation becomes several applications

Electrical, mechanical and plumbing are named by the Village as needing separate permits, and every trade application is filed with the master. South Florida projects by Elbaz Construction; neither property is in North Bay Village.

01A completed kitchen: electrical, mechanical and plumbing in one room.
02A completed bathroom, where plumbing and electrical meet again.
Q-01Quality
SHEET Q-01 / PERFORMANCE AND QUALITY
08

Performance and quality

How we work

Eight commitments, each one a direct consequence of something this Village publishes.

ADU interior looking through to the kitchen and living area
QADU interior looking through to the kitchen and living area, South Florida project by Elbaz Construction.
Herringbone wood flooring laid through an open living area
QHerringbone wood flooring laid through an open living area, South Florida project by Elbaz Construction.
We read the schedule before we draw
The Village has published what each permit type needs. Designing first and discovering the list afterwards is the avoidable version of this job.
The survey is checked for age, not just existence
Within one year of submittal, signed and sealed, carrying BFE and NAVD grade. An out-of-date survey is found at submission or it is found by us first.
Trades are filed with the master
Every trade application goes in alongside the master permit, as the Village requires, rather than trailing it by a week each.
We budget the fee per application
$125.00 minimum is charged at submittal per application. On a multi-trade job that is a number worth knowing at estimate stage.
The association letter is started early
Where any part of the work is in a common area it is required with the package, and the association sets its own pace.
We ask Zoning and Public Works ourselves
The Village states they sit outside the published schedule. We treat that as an instruction to go and ask, not as an absence of requirements.
The programme is built around inspection days
Roofing Tuesday to Friday, and electrical, mechanical and plumbing on Tuesdays and Thursdays. Sequencing around that is the difference between a smooth week and a lost one.
One licensed contract
Design coordination, Village submittals, permitting and construction under CBC1265280, so no approval falls between two parties.
C-01Cost
SHEET C-01 / COST AND SCHEDULE VARIABLES · 13
09

Cost and timeline

What moves the number

The only fee we publish for this Village is the one it publishes plainly — the $125.00 minimum upfront processing fee, per application. The rest of the schedule was not opened, and the figure that matters is current on the day you file. These are the variables that actually move a price.

Completed kitchen remodel in a South Florida home
CStainless undermount sink set into a white quartz worktop below a shuttered window, South Florida project by Elbaz Construction.
Completed bathroom remodel in a South Florida home
CMarble vanity top with an undermount basin and a blue vessel, South Florida project by Elbaz Construction.
#VariableWhy it moves the number
01How many trades are in itEach named trade is its own permit, its own application and its own $125 minimum at submittal — and its own inspection day.
02Whether the property is a condominiumCommon-area work needs the association’s approval letter, the owner-builder route is closed, and the association’s own rules on access, hours and protection apply on top of the Village’s.
03Job value against the $25,000 lineAt or above it the plans must be digitally signed and sealed, which changes who has to produce them.
04How current the survey isWithin a year, signed and sealed, with BFE and NAVD grade. Commissioning a fresh survey is a real line item and a real lead time.
05Whether paving is involvedFront yard coverage and perviousness calculations, and potentially drainage calculations, a percolation test and tree documentation, turn a driveway into a small engineering package.
06Whether Miami-Dade County is in the pathDERM or the asbestos process for the work types the Village routes there, on the County’s timetable rather than the Village’s.
07Which inspection days your trades needA trade limited to Tuesdays and Thursdays sets the rhythm of the whole programme.
08Structural interventionStructural plans and calculations are required for far more here than most owners expect — a fence draws both.
09Existing conditionsWhat is behind the finishes on an older building is the largest genuine unknown on most renovation projects anywhere.
10Product approvalsRated assemblies for openings carry their own documentation and their own lead times in the High-Velocity Hurricane Zone.
11Specification levelFinishes, joinery and fittings move a renovation budget more than square footage does, once the shell is settled.
12Whether the package is complete first timeThe Village has published what each type needs. A package that satisfies it on the first upload is simply cheaper than one that does not.
13Whether the application is left to expireAn approved application is destroyed after 180 days if the permit is not issued. Starting again is the most expensive way to save money.
I-01Information
SHEET I-01 / QUESTION INDEX · 15
10

Question index

Questions we are asked here

Answered from the Village’s own published material. Where the Village publishes two different answers, both are given.

01 / The schedule

How do I find out what my permit actually needs?

The Village has already published it. Its Plan Review and Inspection Requirements document runs to 131 pages, is organised by permit type across roughly 160 types, and sets out for each one the drawings the submission must include and the supporting documents that go with them. It is the single most useful thing to read before commissioning any design work here, and it is the first thing we work from.

A-06Architectural
SHEET A-06 / CONSTRUCTION STUDY
Construction study

What to establish first

Completed bathroom remodel in a South Florida home
STUDYCompleted bathroom with a blue vanity and patterned cement floor tile, South Florida project by Elbaz Construction.

Four questions worth answering before a drawing is commissioned. All four are answered by the Village, the County or your association — not by a contractor.

Observations

01
Which permit type the work falls under
Everything else follows from it, because the Village’s published schedule is organised that way and lists the required drawings and documents per type.
02
Whether the survey is current
Signed, sealed, within one year of submittal, and carrying BFE and grade in NAVD values under Section 114-1. This is the item most likely to add weeks if it is discovered late.
03
Whether any part of the work is in a common area
If it is, the association’s approval letter is required with the package and the owner-builder route is not available.
04
Whether Miami-Dade County has to review it
DERM for new building, additions, remodeling and commercial roofing; the asbestos process for demolitions, interior renovations and roofing. Both are separate submissions on separate timetables.
G-03General
SHEET G-03 / DELIVERY AND CREDENTIALS
11

Credentials and delivery

Why Elbaz Construction

Six things that are verifiable rather than asserted.

Two-storey new home elevation with cantilevered upper floor
REFTwo-storey new home elevation with a cantilevered upper floor, South Florida project by Elbaz Construction.
01

Licensed general contractor

CBC1265280 — certified building contractor, bonded and insured. Verifiable in the Florida DBPR licence register.

02

We work from the Village’s own schedule

The 131-page document is the starting point for the drawings, not a thing to be discovered after a rejection.

03

We read the source, and attribute it

Every regulatory statement on this page was taken from an official Village page or PDF and is attributed to it, including the place where the Village contradicts itself on how to file.

04

We say what we do not know

No Notice of Commencement threshold, no fee schedule beyond the published $125 minimum, no staff names and no review timeframes appear here, because we did not establish them from a primary source.

05

Honest photography

Every image here is a real Elbaz Construction project in South Florida, captioned for what it actually shows. None is claimed as a North Bay Village property.

06

Across three counties

Miami-Dade, Broward and Palm Beach — so one village’s particular submittal requirements are a normal part of the work rather than an exception to it.

I-02Information
SHEET I-02 / CLIENT RECORD
12

Google reviews

In their words, unedited.

Reproduced verbatim from the connected Google Business Profile, including original spelling. No review schema is emitted from this page.

★★★★★

“Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.”

Mia Zafrani · Google review

★★★★★

Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze.

Lee Morali

★★★★★

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!

Shir Partush

★★★★★

From start to end- personal kind treatment, always respectful. Value for money 10/10.

roni yonani

★★★★★

Amazing job Did a total renovation of my house with them

Elie Elancry

G-04General
SHEET G-04 / ENQUIRY
13

Start here

Start a North Bay Village project

Tell us the scope and the address. We will identify the permit type, tell you what the Village’s published schedule requires for it, and flag what sits outside that document.

Herringbone floor at the foot of a stair in a double-height entry
REFHerringbone flooring at the foot of a stair in a double-height entry, South Florida project by Elbaz Construction.

What happens next

01
We call or email within one business day, Sunday to Friday.
02
A permit-type check: which type the work falls under, what the Village’s published schedule requires for it, and what sits outside that document.
03
A site visit, then a written scope and a proposal against it — with the review path stated in it, not assumed.
Useful to have
Your survey and its date, any association rules if the property is a condominium, and photographs of the area to be worked on.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

G-05General
SHEET G-05 / END OF SET

Find the permit type.
The rest is already written down.

Design coordination, Village submittals, permitting and construction under one licensed general contractor — in North Bay Village and across Miami-Dade, Broward and Palm Beach counties.

Corner glazing and sliding door assembly at a canal-front elevation
ENDCorner glazing and sliding door assembly at a canal-front elevation, South Florida project by Elbaz Construction.