Exterior work meets a board. Interior work does not.
That single distinction sets the sequence, the paperwork and most of the programme in this village. It costs nothing to establish and a great deal to discover late.
10 service categories · 100 service pages · Miami-Dade, Broward & Palm Beach
View all services104 municipalities · Miami-Dade, Broward & Palm Beach
All service areasLicensed general contracting and renovation in Bal Harbour Village — where exterior work needs Architectural Review Board approval before the Building Department opens the file, and interior-only work does not.
Miami-Dade · Broward & Palm Beach Counties
ScrollWe will tell you which of Bal Harbour’s two permit paths your project is on before we talk about anything else.
That single distinction sets the sequence, the paperwork and most of the programme in this village. It costs nothing to establish and a great deal to discover late.
Sun–Fri 7am–7pm · Saturday closed. Licensed, bonded and insured · CBC1265280.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.
Bal Harbour asks a single thing before anything else: does the work affect the exterior of the structure? If it does, the Architectural Review Board sees it before the Building Department does. If it does not, the application goes straight to the Building Department. Almost every planning decision here follows from that split.

Demolition, framing changes, mechanical, electrical and plumbing rough-in, finishes, joinery and stone — run by one general contractor so no trade is waiting on another trade’s inspection. Interior-only scopes are the ones that go directly to the Building Department here.
Start your projectThe Village lists awnings, driveways, fences, paint, signs, windows, doors, additions and new construction as work affecting the exterior. All of it requires review and approval by the Architectural Review Board before the Building Department reviews it.
For interior work only, the permit application is submitted directly to the Building Department for code-compliance review — mechanical, electrical, plumbing, structural, zoning, public works and other Village departments among them.
On approval, the Board issues a Certificate of Appropriateness to the owner, and the Certificate together with the Architectural Review Board Application is forwarded to the Building Official. It is the hinge between the two halves of the process.
The Village states that permit applications can only be submitted in person at the Building Department, at Village Hall, 655 96th Street. Status is then tracked through the Online Permit Center using an access code issued by Building Department staff.
Six things about building in Bal Harbour that are not true of the city next door.
Not “is it big” and not “is it structural”. A repaint and a new front door are exterior work. A complete interior gut, with new services throughout, is not. The scope you write on day one decides which queue you join, so it is worth writing carefully.
Since 23 August 2021 the Village Building Department performs concurrent plan reviews with Miami-Dade County. Applications needing any county approval submit the Village application, the Miami-Dade County Municipal Permit Application, one paper set of drawings and one electronic set on CD or USB in the county’s required file-naming format.
Under the schedule effective 6 June 2022, Building, Roofing, Electrical, Mechanical and Plumbing plan reviews and inspections run Monday to Thursday; Public Works and Utilities on Tuesdays and Thursdays; Zoning on Tuesdays and Thursdays. A programme that ignores that calendar loses days it did not need to.
Where county approval is involved the Village asks for both a printed set and an electronic set, named the county’s way. Getting the file names wrong is a resubmittal, not a comment.
Inspections for permits issued after 1 February 2017 are scheduled through the Online Permit Center. The required inspections for your job are listed on the permit card, and the permit holder is responsible for requesting each one.
On approval of all inspections and submittal of the additional documents required — a final survey among them — the permit status changes to Final, and a Certificate of Occupancy is issued under the Florida Building Code where applicable.
A South Florida interior renovation by Elbaz Construction. The image set records the rooms, not the building — so this page does not say what kind of building it is in, or which municipality it stands in.

The open-plan kitchen and living space, finished.

The island run, with the worktop returning as a full-height splashback.

Tall cabinetry taken to the ceiling line rather than stopped below it.

The working side of the run, with appliances built in flush.

Where the kitchen meets the living space, with no change in floor level.

Joinery detail: shadow gaps in place of handles.

The lighting layout, set out before the ceiling was closed.

The room read end to end, once the furniture was in.
Windows, doors and anything else on the outside face of the building are named by the Village as exterior work. Below are impact glazing and entry-door installations from Elbaz Construction projects — five different properties, shown as individual installations of the systems described, never as one project.
Miami-Dade sits inside the High-Velocity Hurricane Zone, so glazing and doors carry product approval accepted for HVHZ use. In Bal Harbour they also have to satisfy a design review before the Building Department opens the file. Choosing a product that meets one test and fails the other is the expensive way to find that out.

Elbaz installation: full-height impact glazing on a modern two-storey home overlooking a pool deck

Elbaz installation: dark-framed multi-slide impact door opening onto a tiled terrace

Elbaz installation: arched impact entry door set into a stucco surround

Elbaz installation: impact window run and glazed french doors under a covered entry

Elbaz installation: glazed impact entry doors in a dark bronze finish
Bal Harbour is dominated by oceanfront condominium buildings, with a small number of single-family homes. That changes who has to say yes, and in what order.
Association rules, work-hour windows, lift and loading-dock booking, protection of common areas and insurance requirements are set by the building, not by the Village, and they vary from tower to tower. We ask for the building’s own requirements at the start, because they shape the programme as much as the permit does.
Florida law requires a milestone inspection of condominium and cooperative buildings three habitable storeys or more by 31 December of the year the building turns 30, and every ten years after that. A local enforcement agency may require it at 25 years where local circumstances warrant — that is discretionary, not automatic. The association arranges it; it is not a unit-owner permit item.
Service-lift dimensions, protection requirements and delivery windows decide what can be brought in whole and what has to be assembled in the unit. Slab sizes and long joinery runs are the usual casualties, and they are cheaper to design around than to discover.
A second South Florida bathroom renovation by Elbaz Construction, and a different property from Project 01. The two are not presented as one job because they are not one job.

A completed bathroom on a different property.

The vanity run, with the mirror set into the tiled face.

The shower, tiled to the ceiling rather than to a band.

Niche and bench, formed rather than added afterwards.

Brassware and glass, once the waterproofing was signed off.

The floor, laid to fall without a visible slope.
Specific to this village, and in the order they actually bite.
Because the exterior/interior line decides the path, an ambiguous scope is an expensive one. If any part of the work reaches the outside face of the building, plan for Board review at the front.
Rules, hours, lift booking and insurance certificates. They are not a Village requirement, and they still stop work if they are missing.
If any Miami-Dade approval applies, the submittal changes: two applications, a paper set and an electronic set named the county’s way, reviewed concurrently.
The Village publishes a “Do I Need a Permit?” document. Its own guidance is that if your project is not listed on it, a permit is required.
Disciplines are reviewed and inspected on set days. Sequencing to that calendar is free; ignoring it is not.
Review durations depend on the submittal, the scope and the queue. Anyone quoting you a number for Bal Harbour without seeing your drawings is guessing. Confirm current requirements with the Village before filing.
Filter by what you are trying to work out. Every answer stays on the page.
It depends on whether the work affects the exterior of the structure. The Village names awnings, driveways, fences, paint, signs, windows, doors, additions and new construction as examples of exterior work, and requires Board review and approval before the Building Department reviews it. Interior-only work goes directly to the Building Department.
The document the Architectural Review Board issues to the owner on approval. The Certificate, with the Architectural Review Board Application, is forwarded to the Building Official — which is what allows the building permit review to proceed on an exterior scope.
The Village states that permit applications can only be submitted in person at the Building Department, at Village Hall, 655 96th Street. After submitting, you can track status through the Online Permit Center using an access code provided by Building Department staff.
It can be. Since August 2021 the Village performs concurrent plan reviews with Miami-Dade County. Where any county approval applies, the submittal includes the Village application, the Miami-Dade County Municipal Permit Application, one paper set of drawings and one electronic set in the county’s required file-naming format.
Under the Village’s published schedule, Building, Roofing, Electrical, Mechanical and Plumbing reviews and inspections run Monday to Thursday, with Public Works and Utilities and with Zoning on Tuesdays and Thursdays. Inspections for permits issued after 1 February 2017 are scheduled through the Online Permit Center.
A building permit is required for most types of construction work in the Village, and the Village publishes a “Do I Need a Permit?” list of the projects that do not. Its own guidance is that if your project is not on that list, a permit is required. Your association’s approval is separate from, and additional to, the Village’s.
Miami-Dade County is inside the High-Velocity Hurricane Zone, so glazing, doors and roofing carry product approval accepted for HVHZ use. In Bal Harbour those same elements are exterior work, so they are also a design-review question, not only a code one.
Florida law requires a milestone inspection of condominium and cooperative buildings of three habitable storeys or more by 31 December of the year the building reaches 30 years, and every ten years after. A local enforcement agency may require it at 25 years where local circumstances warrant, which is discretionary rather than automatic. The association arranges and pays for it — it is not part of a unit renovation permit.
With all inspections approved and the additional required documents submitted — a final survey among them — the permit status changes to Final, and a Certificate of Occupancy is issued under the Florida Building Code where applicable.
Not from a page. What we can do is tell you which path your scope is on, what the submittal has to carry, and what the association is likely to ask for — then price against drawings rather than against a description. We do not publish review durations for Bal Harbour.
No questions in that topic yet.
4.8 across 343 Google reviews. Text reproduced verbatim, including original spelling.
Florida certified building contractor. Licensed, bonded and insured, working across Miami-Dade, Broward and Palm Beach.
Start your project“Elbaz Construction provided excellent service and outstanding craftsmanship. The team was professional and attentive to our needs. We’re extremely satisfied with the results!”Damian Nunez · Google
“We had a good time dealing with Asher and the crew, he went over and above all our expectations and made every effort to ensure that the end result was up to their high standards. Thank you !!”Emmett Giffin · Google
“Asher has a lot of experience . We replaced our windows to energy efficient windows. He got down to business right away and did high quality work. His team is very professional! Thanks again”jessica berliner · Google
No review schema is emitted from this page. Aggregate ratings marked up on a business’s own service pages are self-serving under Google’s structured-data policy, so the rating above is presented as visible content only.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Where to go next, depending on which part you are trying to pin down.
Send the scope and the address. We will tell you which of the two Bal Harbour paths it is on before anything else.
If your scope would be better split, resequenced, or taken to the Board as a smaller first application, we will say so on the first call.
Sun–Fri 7am–7pm · Saturday closed. Licensed, bonded and insured · CBC1265280.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.
One question decides most of your programme in this village. Send us the scope and the address and we will answer it, along with what the submittal has to carry and what your building is likely to ask for.