Interior volume at drywall stage with a scissor lift in place

In Westlake the stamped plans
are on site,
or the inspection does not happen.

Licensed general contracting, construction and remodeling in the City of Westlake — where the City publishes a plain directive that approved plans and their supporting documents must be on the job site for the inspector, with no exceptions.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

A-00Architectural
SHEET A-00 / SOUTH FLORIDA REFERENCE SET · 12 FRAMES

Recent work

From framing to final inspection.

Construction stages, kitchens, bathrooms, accessory space and flooring built by Elbaz Construction across South Florida. None of the properties shown is in Westlake. Select any frame to open it full size.

G-01General
SHEET G-01 / CITY OF WESTLAKE
01

The city, defined

A directive, not a preference.

Every building department would rather find the approved drawings on site. Westlake has gone further and published what happens when they are not there. Its Notice to Contractors requires the City’s approved plans on site for the inspector, together with all applicable supporting documents and specifications necessary for the scheduled inspection, and then states that there will be no exceptions to the directive: if the City stamped plans are not present, the inspection will not take place and will have to be rescheduled.

That single sentence reorganises how a job is run. An inspection is not a visit that might go well; it is an appointment with a documentary precondition. A crew that turns up with the work perfectly ready and the plan set in a van across the county has lost the slot. On a sequenced build that is not an inconvenience, it is a week.

The rest of what the City publishes has the same character. It describes its role as fundamentally regulatory and says it depends on knowledgeable owners, contractors, engineers and architects — which is a polite way of saying the department expects the professionals it deals with to arrive prepared. It also publishes contractor verification guidance, including how to check a licence and how to file a complaint, alongside its permit resources.

New home under construction on a canal lot, full elevation
REFNew home under construction on a canal lot, full elevation, South Florida project by Elbaz Construction.

We work across Miami-Dade, Broward and Palm Beach, so keeping a stamped set and its supporting documents on every active site is standard practice for us rather than a Westlake adaptation.

What is included

On site for every inspection
City stamped approved plans
Also required
Supporting documents and specifications
If they are absent
The inspection does not take place
The City’s wording
There will be no exceptions
Permitting platform
The City View portal
Also published
Private provider instructions
A-01Architectural
SHEET A-01 / SCOPE OF WORKS · 9 ITEMS
02

Scope index

What we build here

The City publishes a "When Do I Need a Permit?" resource which we have not opened, so this list is grouped by ordinary practice rather than by a City classification. What a particular scope requires is the Building Official’s determination.

Plank flooring in a hallway leading to a bedroom
REFPlank flooring in a hallway leading to a bedroom, South Florida project by Elbaz Construction.
01 / Permit, and several inspections

Kitchen renovation

A kitchen brings electrical, plumbing and mechanical work, which means several scheduled inspections — and on each of them the stamped set has to be on site.

A-02Architectural
SHEET A-02 / REFERENCE 01 · THE MOMENTS AN INSPECTOR ARRIVES FOR · 09 FRAMES
REFERENCE 01 · THE MOMENTS AN INSPECTOR ARRIVES FOR

Construction at the stages that have to be seen

Nine frames, separate South Florida projects

Every one of these stages is an inspection point somewhere in a programme, and in Westlake each of them needs the stamped set and its supporting documents on site before the visit counts.

These nine frames are separate South Florida projects by Elbaz Construction, not one project and not a Westlake property. Select any frame to open it full size.

A-03Architectural
SHEET A-03 / THE INSPECTION PRECONDITION · CITY OF WESTLAKE
03

Specification

What has to be on site, and what the City publishes

Read from the City’s Building Department page on 2026-08-16. Several of the City’s resources are named here and deliberately not described, because they were not opened.

City of Westlake approved plans
On site, for the inspector, on every scheduled inspection. The City’s wording is "must".
Supporting documents and specifications
All applicable ones necessary for the scheduled inspection — not just the drawings.
The consequence of absence
The inspection will not take place and will have to be rescheduled. The City states there will be no exceptions to the directive.
The City View portal
The City’s permitting platform, with published instructions for using it.
Digital submission guidelines
Published by the City. We have not opened them, so this page does not describe what they require — ask the Building Department before preparing a submission.
Private provider instructions
Published, so the s. 553.791 route exists here. The City’s specific instructions were not read and are not summarised on this page.
Contractor verification guidance
The City publishes how to verify a contractor licence, how to spot fraudulent contractors and how to file a complaint against one.
A hurricane season notice for contractors
Published on the same shelf, which is a reasonable prompt to ask what site obligations attach during the season.
Two-storey new home elevation with cantilevered upper floor
REFTwo-storey new home elevation with a cantilevered upper floor, South Florida project by Elbaz Construction.
A-04Architectural
SHEET A-04 / MATERIAL AND DESIGN LANGUAGE
04

Design and material language

The decisions that keep an inspection on the calendar

Five choices that determine whether the documentation is ready when the inspector is.

Completed kitchen remodel in a South Florida home
DETWhite shaker cabinetry with a drawer bank and a stainless range beyond, South Florida project by Elbaz Construction.
Completed bathroom remodel in a South Florida home
DETBlue vanity and patterned cement floor tile seen from the doorway, South Florida project by Elbaz Construction.
M-01

Product approvals for rated assemblies

Part of the on-site set

Shaped by the City’s directive The directive covers supporting documents and specifications, which for openings and roofing means the approval documentation.

Other options. Collect approvals at order stage and file them into the site set immediately, not when an inspector asks.

M-02

Substitutions

A documentation event

Shaped by the City’s directive Changing a product changes the specification that has to be on site and match the stamped drawings.

Other options. Avoid late substitution where possible; where it is unavoidable, update the site set before the next inspection rather than after it.

M-03

Engineering documents

Part of the set on structural work

Shaped by the City’s directive Where structure is altered, the calculations and details are among the documents an inspection may require.

Other options. Keep them with the stamped drawings, not in an engineer’s inbox.

M-04

Who holds the set

A named responsibility

Shaped by the City’s directive The directive is absolute, so the answer to "who is bringing the plans" cannot be "someone".

Other options. Name one person responsible for the site set from permit issue to final inspection.

M-05

Specification level

More detail, more documents

Shaped by the City’s directive A richer specification is a longer document trail, and every part of it that an inspection needs has to be present.

Other options. Settle the specification before the set is stamped, so the on-site documents and the approved drawings describe the same building.

On what is shown. Nothing here is a determination. The Building Official decides what a scope requires and which documents a given inspection needs, and several of the City’s own guidance documents were not opened — so this page describes the decisions, not their outcomes.

G-02General
SHEET G-02 / PROCESS · 10 STAGES
05

Process

How we run a project here

Ten steps, organised around one rule: never lose an inspection to a missing document.

01
Consultation

The scope, the address, and what the property already has approved.

02
Requirements

We work from the City’s published permit requirements and submission guidelines rather than from assumption.

03
Design

Drawn as one coordinated set intended to be stamped and then lived with on site.

04
Submission

Through the City View portal, prepared to the City’s digital submission requirements.

05
Permit

Issued, and the stamped set collected and duplicated for the site.

06
Site set

The stamped plans, product approvals, specifications and engineering documents delivered to the job and made one person’s responsibility.

07
Programme

Inspection points identified across the whole build, each with the documents it will need listed against it.

08
Inspections

Booked only when both the work and the documents are ready — because the City will not proceed without the second.

09
Construction

Sequenced so each trade is genuinely ready for its inspection, with the set updated whenever anything changes.

10
Completion

Final inspections, certification, and the documents handed over in a form you can produce again when the property is sold.

P-01Permitting
SHEET P-01 / PERMITTING AND INSPECTION · CITY OF WESTLAKE
06

Technical brief

What the City publishes, and what it says exactly

Nine references, each read off the City’s own Building Department page on 2026-08-16. Where a City resource was named but not opened, this sheet says so rather than describing it.

Plank flooring in a room mid fit-out with furniture staged
PPlank flooring in a room mid fit-out with furniture staged, South Florida project by Elbaz Construction.
Completed kitchen remodel in a South Florida home
PCompleted white shaker kitchen with quartz worktops, South Florida project by Elbaz Construction.
R-01

The Notice to Contractors, quoted in full

"All contractors working within the City of Westlake must have the City of Westlake approved plans on site for the inspector. This also includes all applicable supporting documents & specifications that are necessary for a scheduled inspection. There will be no exceptions to this directive; if the City stamped plans are not present on the job site, an inspection will not take place and will have to be rescheduled."

R-02

What that covers beyond the drawings

The directive names "all applicable supporting documents & specifications that are necessary for a scheduled inspection" — so product approvals, specifications and, where relevant, engineering documents are inside it, not adjacent to it.

R-03

The City’s statement of its own role

"Our involvement in the construction process is fundamentally regulatory. Using the City Ordinances, Building Codes and statutory regulations, we partner with construction stakeholders."

R-04

And what it expects from the people it deals with

"We depend on knowledgeable property owners, contractors, engineers, and architects to execute construction in a safe and efficient manner."

R-05

The mission, in the City’s words

"The primary mission of the Westlake Building Department is to safeguard life, health, property and public welfare, while providing expedited quality customer service to the community."

R-06

The permitting platform

The City publishes a City View Portal together with City View Instructions for using it.

R-07

Resources published and NOT opened by us

"When Do I need a Permit?", "Building Permit Application Requirements" and the City’s digital submission guidelines are all published. We have not opened them, so this page does not describe what they require. Ask the Building Department, and work from the City’s own documents rather than from a contractor’s summary — including ours.

R-08

A private provider route exists

The City publishes Private Provider Instructions, so the alternative plans review and inspection route under Florida law is available here. Its specific instructions were not read and are not summarised on this page.

R-09

Guidance on contractors, and on storm season

The City publishes "Be Aware of Fraudulent Contractors", "How to File a Complaint Against a Contractor" and "Verify a Contractor License", together with a Contractor NOTICE for hurricane season and a "Contractor Red Flags" resource. Verifying a licence before signing is free and the City has made it easy.

Disclaimer. Nothing on this sheet is a determination about a specific property. The Building Official decides what a scope requires.

S-01Structural
SHEET S-01 / INSPECTION PRECONDITION · INDICATIVE
07

Assembly

The check that happens before the check.

An indicative diagram of the City’s published directive, not a determination. The Building Official decides what a scope requires and what documents an inspection needs.

Indicative diagram of the Westlake inspection preconditionWork reaches a stage requiring inspection and an inspection is scheduled. Before the work itself is examined, the inspector requires the City stamped approved plans and all applicable supporting documents and specifications to be present on the job site. If they are present the inspection proceeds and the next phase follows. If they are not, the City states the inspection will not take place and must be rescheduled, regardless of whether the work is ready.Work ready,inspection bookedAre the stamped plansand documents on site?Yes: inspectionproceedsNo: inspection doesnot take placeNext phase ofconstructionrescheduled — the City states there are no exceptions

Key

01
Permit issued and stamped set received
02
Stamped set and documents delivered to site
03
Work brought to an inspectable stage
04
Inspection scheduled
05
Documents confirmed present before the visit
06
Inspection passed
07
Next phase begins
N-01

The precondition is documentary, not technical

The work can be perfect. If the stamped plans are not on site, the City states the inspection will not take place.

N-02

"All applicable supporting documents & specifications"

The directive is not limited to the drawings. Product approvals, specifications and anything else necessary for that particular inspection are covered by it.

N-03

A rescheduled inspection is a lost sequence position

On a job where trades follow one another, losing a slot costs more than the day it occupies.

N-04

One controlled set, kept on site

The practical answer is a single complete stamped set that lives on the job for the duration, with a named person responsible for it.

N-05

The City says it partners, and expects preparation

It describes its role as fundamentally regulatory and says it depends on knowledgeable owners, contractors, engineers and architects. Read the directive in that light.

N-06

Its guidance on contractors is published too

How to verify a licence, how to recognise a fraudulent contractor and how to file a complaint are all on the same shelf — useful before you sign, not after.

REFERENCE 02 · THE STAGES AN INSPECTOR ARRIVES FOR

Work at the moment it has to be seen

Each of these stages is an inspection point, and each one needs the stamped set on site. South Florida projects by Elbaz Construction; neither property is in Westlake.

01An interior volume at drywall stage with a scissor lift in place.
02A two-storey elevation with the cantilevered upper floor formed.
Q-01Quality
SHEET Q-01 / PERFORMANCE AND QUALITY
08

Performance and quality

How we work

Seven commitments, each one a direct consequence of what this City publishes.

Studio ADU interior showing kitchen, living and sleeping zones
QStudio accessory dwelling showing the kitchen, living and sleeping zones, South Florida project by Elbaz Construction.
Timber stair treads and balustrade above a tiled landing
QTimber stair treads and balustrade above a tiled landing, South Florida project by Elbaz Construction.
The stamped set lives on the job
From permit issue to final inspection, with one named person responsible for it. That is the whole answer to the City’s directive.
Documents are listed against each inspection
Every inspection point in the programme has its required documents identified in advance, so nothing is discovered on the morning.
We book when both are ready
The work and the paperwork. Booking on the work alone is how a slot is lost in this City.
Approvals are filed at order stage
Product documentation goes into the site set when it is ordered, not when an inspector asks for it.
Substitutions update the set
If a product changes, the specification on site changes with it, before the next inspection rather than after.
We work from the City’s documents
Its permit requirements and submission guidelines are published, and we use those rather than assumptions carried in from another municipality.
One licensed contract
Design coordination, City submittals, permitting and construction under CBC1265280, so no approval falls between two parties.
C-01Cost
SHEET C-01 / COST AND SCHEDULE VARIABLES · 9
09

Cost and timeline

What moves the number

We publish no fee figures for this City — the fee schedule was not opened, and the figure that matters is current on the day you file. These are the variables that move a price and a programme.

Completed bathroom remodel in a South Florida home
CMarble vanity top with an undermount basin and a blue vessel, South Florida project by Elbaz Construction.
ADU interior with skylight and vaulted ceiling
CAccessory dwelling interior with a skylight and vaulted ceiling, South Florida project by Elbaz Construction.
#VariableWhy it moves the number
01How many inspection points the job hasEach one is a scheduled appointment with a documentary precondition, and each one is a place a programme can slip.
02Whether the site set is properly controlledA rescheduled inspection costs a sequence position, and on a trade-dependent programme that is worth more than the day itself.
03How much product documentation the specification generatesRated assemblies and engineered elements each bring paperwork that has to be present when they are inspected.
04Late substitutionsThey change the specification, the site set and sometimes the approved drawings.
05Whether a private provider is usedThe City publishes instructions for the route; whether it suits a given project is a cost and programme calculation.
06Structural interventionRemoving or altering structure brings engineering, and engineering brings its own documents and inspections.
07Existing conditionsWhat is behind the finishes on an existing building is the largest genuine unknown on most renovation projects anywhere.
08Access and storm seasonThe City publishes a hurricane season notice for contractors, and site obligations during the season are worth establishing before they apply.
09Specification levelFinishes, joinery and fittings move a renovation budget more than square footage does, once the shell is settled.
I-01Information
SHEET I-01 / QUESTION INDEX · 9
10

Question index

Questions we are asked here

Answered from the City’s own published material. Where the City publishes a resource we have not opened, this page says so rather than guessing.

01 / Inspections

What happens if the plans are not on site?

The inspection does not happen. The City’s Notice to Contractors is unambiguous: contractors must have the City of Westlake approved plans on site for the inspector, including all applicable supporting documents and specifications necessary for that inspection, and "There will be no exceptions to this directive; if the City stamped plans are not present on the job site, an inspection will not take place and will have to be rescheduled." The state of the work is not the question.

A-06Architectural
SHEET A-06 / CONSTRUCTION STUDY
Construction study

What to establish first

New home under construction on a canal lot, full elevation
STUDYNew home under construction on a canal lot, South Florida project by Elbaz Construction.

Four questions worth answering before a drawing is commissioned. All four are answered by the City, not by a contractor.

Observations

01
What the City’s permit requirements actually say
They are published, and working from them beats working from a summary — including this one.
02
How the submission has to be prepared
The City publishes digital submission guidelines. Preparing to them the first time avoids a resubmission.
03
Which inspections your scope will need
Each is an appointment with a documentary precondition, so the list shapes the programme.
04
Whether the private provider route suits the project
The City publishes instructions for it; whether it is worth using is a cost and programme decision.
G-03General
SHEET G-03 / DELIVERY AND CREDENTIALS
11

Credentials and delivery

Why Elbaz Construction

Six things that are verifiable rather than asserted.

Interior volume at drywall stage with a scissor lift in place
REFInterior volume at drywall stage with a scissor lift in place, South Florida project by Elbaz Construction.
01

Licensed general contractor

CBC1265280 — certified building contractor, bonded and insured, and verifiable in the Florida DBPR register the City itself links to.

02

The stamped set never leaves the site

One controlled set, one named custodian, from permit issue to final inspection.

03

We book inspections on documents as well as work

Because in this City the second one is a precondition, not a courtesy.

04

We read the City’s own material

Every regulatory statement on this page was taken from the City’s own Building Department page and is attributed to it.

05

We say what we have not read

The City’s permit requirements, submission guidelines and private provider instructions are named on this page and described nowhere on it, because we did not open them.

06

Honest photography

Every image here is a real Elbaz Construction project in South Florida, captioned for what it actually shows. None is claimed as a Westlake property.

I-02Information
SHEET I-02 / CLIENT RECORD
12

Google reviews

In their words, unedited.

Reproduced verbatim from the connected Google Business Profile, including original spelling. No review schema is emitted from this page.

★★★★★

“Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.”

Mia Zafrani · Google review

★★★★★

Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze.

Lee Morali

★★★★★

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!

Shir Partush

★★★★★

From start to end- personal kind treatment, always respectful. Value for money 10/10.

roni yonani

★★★★★

Amazing job Did a total renovation of my house with them

Elie Elancry

G-04General
SHEET G-04 / ENQUIRY
13

Start here

Start a Westlake project

Tell us the scope and the address. We will work from the City’s own published requirements, map the inspection points and the documents each one needs, and keep the stamped set on site from the first day.

Two-storey new home elevation with cantilevered upper floor
REFTwo-storey new home elevation with a cantilevered upper floor, South Florida project by Elbaz Construction.

What happens next

01
We call or email within one business day, Sunday to Friday.
02
A requirements check: what the City’s published permit requirements and submission guidelines ask for, and which inspections the scope will attract.
03
A site visit, then a written scope and a proposal against it — with the review path stated in it, not assumed.
Useful to have
Any previous City permits for the property, product information for anything already specified, and a clear description of what is being changed.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

G-05General
SHEET G-05 / END OF SET

Bring the plans.
Then the inspection happens.

Design coordination, City submittals, permitting and construction under one licensed general contractor — in the City of Westlake and across Miami-Dade, Broward and Palm Beach counties.

Completed kitchen remodel in a South Florida home
ENDCompleted white shaker kitchen with quartz worktops, South Florida project by Elbaz Construction.