10 service categories · 100 service pages · Miami-Dade, Broward & Palm Beach
View all services104 municipalities · Miami-Dade, Broward & Palm Beach
All service areas
Licensed general contracting, construction and remodeling in the City of Westlake — where the City publishes a plain directive that approved plans and their supporting documents must be on the job site for the inspector, with no exceptions.
Miami-Dade · Broward & Palm Beach Counties
ScrollYour details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.
Recent work
Construction stages, kitchens, bathrooms, accessory space and flooring built by Elbaz Construction across South Florida. None of the properties shown is in Westlake. Select any frame to open it full size.
The city, defined
Every building department would rather find the approved drawings on site. Westlake has gone further and published what happens when they are not there. Its Notice to Contractors requires the City’s approved plans on site for the inspector, together with all applicable supporting documents and specifications necessary for the scheduled inspection, and then states that there will be no exceptions to the directive: if the City stamped plans are not present, the inspection will not take place and will have to be rescheduled.
That single sentence reorganises how a job is run. An inspection is not a visit that might go well; it is an appointment with a documentary precondition. A crew that turns up with the work perfectly ready and the plan set in a van across the county has lost the slot. On a sequenced build that is not an inconvenience, it is a week.
The rest of what the City publishes has the same character. It describes its role as fundamentally regulatory and says it depends on knowledgeable owners, contractors, engineers and architects — which is a polite way of saying the department expects the professionals it deals with to arrive prepared. It also publishes contractor verification guidance, including how to check a licence and how to file a complaint, alongside its permit resources.

We work across Miami-Dade, Broward and Palm Beach, so keeping a stamped set and its supporting documents on every active site is standard practice for us rather than a Westlake adaptation.
Scope index
The City publishes a "When Do I Need a Permit?" resource which we have not opened, so this list is grouped by ordinary practice rather than by a City classification. What a particular scope requires is the Building Official’s determination.

A kitchen brings electrical, plumbing and mechanical work, which means several scheduled inspections — and on each of them the stamped set has to be on site.
Plumbing and electrical rough-in is the classic case of work that cannot be closed up before it is inspected, which makes the documentation rule bite hardest here.
Substrate and threshold work is building work, and it is usually the trade waiting on everything else to be signed off.
The specifications the City asks to be on site for an inspection include the product documentation for rated assemblies.
Roofing is inspected during the work rather than only at the end, so the stamped set and the product approvals live on site for the duration.
Adding habitable space brings structure, services and egress together — and therefore more supporting documents that have to be present at each inspection.
More phases mean more scheduled inspections, and each of them carries the same precondition.
Where structure is altered, the engineering documents are part of the set an inspector expects to find on site.
This is where a documentary discipline pays for itself. One controlled, complete stamped set kept on site through the whole programme is worth more here than anywhere else on this matrix.
Nine frames, separate South Florida projects
Every one of these stages is an inspection point somewhere in a programme, and in Westlake each of them needs the stamped set and its supporting documents on site before the visit counts.
These nine frames are separate South Florida projects by Elbaz Construction, not one project and not a Westlake property. Select any frame to open it full size.
Specification
Read from the City’s Building Department page on 2026-08-16. Several of the City’s resources are named here and deliberately not described, because they were not opened.

Design and material language
Five choices that determine whether the documentation is ready when the inspector is.


Part of the on-site set
Shaped by the City’s directive The directive covers supporting documents and specifications, which for openings and roofing means the approval documentation.
Other options. Collect approvals at order stage and file them into the site set immediately, not when an inspector asks.
A documentation event
Shaped by the City’s directive Changing a product changes the specification that has to be on site and match the stamped drawings.
Other options. Avoid late substitution where possible; where it is unavoidable, update the site set before the next inspection rather than after it.
Part of the set on structural work
Shaped by the City’s directive Where structure is altered, the calculations and details are among the documents an inspection may require.
Other options. Keep them with the stamped drawings, not in an engineer’s inbox.
A named responsibility
Shaped by the City’s directive The directive is absolute, so the answer to "who is bringing the plans" cannot be "someone".
Other options. Name one person responsible for the site set from permit issue to final inspection.
More detail, more documents
Shaped by the City’s directive A richer specification is a longer document trail, and every part of it that an inspection needs has to be present.
Other options. Settle the specification before the set is stamped, so the on-site documents and the approved drawings describe the same building.
On what is shown. Nothing here is a determination. The Building Official decides what a scope requires and which documents a given inspection needs, and several of the City’s own guidance documents were not opened — so this page describes the decisions, not their outcomes.
Process
Ten steps, organised around one rule: never lose an inspection to a missing document.
The scope, the address, and what the property already has approved.
We work from the City’s published permit requirements and submission guidelines rather than from assumption.
Drawn as one coordinated set intended to be stamped and then lived with on site.
Through the City View portal, prepared to the City’s digital submission requirements.
Issued, and the stamped set collected and duplicated for the site.
The stamped plans, product approvals, specifications and engineering documents delivered to the job and made one person’s responsibility.
Inspection points identified across the whole build, each with the documents it will need listed against it.
Booked only when both the work and the documents are ready — because the City will not proceed without the second.
Sequenced so each trade is genuinely ready for its inspection, with the set updated whenever anything changes.
Final inspections, certification, and the documents handed over in a form you can produce again when the property is sold.
Technical brief
Nine references, each read off the City’s own Building Department page on 2026-08-16. Where a City resource was named but not opened, this sheet says so rather than describing it.


"All contractors working within the City of Westlake must have the City of Westlake approved plans on site for the inspector. This also includes all applicable supporting documents & specifications that are necessary for a scheduled inspection. There will be no exceptions to this directive; if the City stamped plans are not present on the job site, an inspection will not take place and will have to be rescheduled."
The directive names "all applicable supporting documents & specifications that are necessary for a scheduled inspection" — so product approvals, specifications and, where relevant, engineering documents are inside it, not adjacent to it.
"Our involvement in the construction process is fundamentally regulatory. Using the City Ordinances, Building Codes and statutory regulations, we partner with construction stakeholders."
"We depend on knowledgeable property owners, contractors, engineers, and architects to execute construction in a safe and efficient manner."
"The primary mission of the Westlake Building Department is to safeguard life, health, property and public welfare, while providing expedited quality customer service to the community."
The City publishes a City View Portal together with City View Instructions for using it.
"When Do I need a Permit?", "Building Permit Application Requirements" and the City’s digital submission guidelines are all published. We have not opened them, so this page does not describe what they require. Ask the Building Department, and work from the City’s own documents rather than from a contractor’s summary — including ours.
The City publishes Private Provider Instructions, so the alternative plans review and inspection route under Florida law is available here. Its specific instructions were not read and are not summarised on this page.
The City publishes "Be Aware of Fraudulent Contractors", "How to File a Complaint Against a Contractor" and "Verify a Contractor License", together with a Contractor NOTICE for hurricane season and a "Contractor Red Flags" resource. Verifying a licence before signing is free and the City has made it easy.
Disclaimer. Nothing on this sheet is a determination about a specific property. The Building Official decides what a scope requires.
Assembly
An indicative diagram of the City’s published directive, not a determination. The Building Official decides what a scope requires and what documents an inspection needs.
The work can be perfect. If the stamped plans are not on site, the City states the inspection will not take place.
The directive is not limited to the drawings. Product approvals, specifications and anything else necessary for that particular inspection are covered by it.
On a job where trades follow one another, losing a slot costs more than the day it occupies.
The practical answer is a single complete stamped set that lives on the job for the duration, with a named person responsible for it.
It describes its role as fundamentally regulatory and says it depends on knowledgeable owners, contractors, engineers and architects. Read the directive in that light.
How to verify a licence, how to recognise a fraudulent contractor and how to file a complaint are all on the same shelf — useful before you sign, not after.
Each of these stages is an inspection point, and each one needs the stamped set on site. South Florida projects by Elbaz Construction; neither property is in Westlake.
Performance and quality
Seven commitments, each one a direct consequence of what this City publishes.


Cost and timeline
We publish no fee figures for this City — the fee schedule was not opened, and the figure that matters is current on the day you file. These are the variables that move a price and a programme.


| # | Variable | Why it moves the number |
|---|---|---|
| 01 | How many inspection points the job has | Each one is a scheduled appointment with a documentary precondition, and each one is a place a programme can slip. |
| 02 | Whether the site set is properly controlled | A rescheduled inspection costs a sequence position, and on a trade-dependent programme that is worth more than the day itself. |
| 03 | How much product documentation the specification generates | Rated assemblies and engineered elements each bring paperwork that has to be present when they are inspected. |
| 04 | Late substitutions | They change the specification, the site set and sometimes the approved drawings. |
| 05 | Whether a private provider is used | The City publishes instructions for the route; whether it suits a given project is a cost and programme calculation. |
| 06 | Structural intervention | Removing or altering structure brings engineering, and engineering brings its own documents and inspections. |
| 07 | Existing conditions | What is behind the finishes on an existing building is the largest genuine unknown on most renovation projects anywhere. |
| 08 | Access and storm season | The City publishes a hurricane season notice for contractors, and site obligations during the season are worth establishing before they apply. |
| 09 | Specification level | Finishes, joinery and fittings move a renovation budget more than square footage does, once the shell is settled. |
Question index
Answered from the City’s own published material. Where the City publishes a resource we have not opened, this page says so rather than guessing.
The inspection does not happen. The City’s Notice to Contractors is unambiguous: contractors must have the City of Westlake approved plans on site for the inspector, including all applicable supporting documents and specifications necessary for that inspection, and "There will be no exceptions to this directive; if the City stamped plans are not present on the job site, an inspection will not take place and will have to be rescheduled." The state of the work is not the question.
Yes. The directive names "all applicable supporting documents & specifications that are necessary for a scheduled inspection". In practice that means product approvals for rated assemblies, the specifications the drawings rely on, and on structural work the engineering documents — all present, not retrievable.
One complete stamped set that lives on the job from permit issue to final inspection, one named person responsible for it, and every inspection point in the programme listed in advance with the documents it will require. It is not complicated; it just has to be somebody’s job rather than everybody’s assumption.
Through the City View portal, for which the City publishes instructions, and to the City’s own Building Permit Application Requirements and digital submission guidelines. We have not opened those documents, so we are not going to summarise them — work from the City’s versions, and ask the Building Department where anything is unclear.
The City publishes a "When Do I Need a Permit?" resource. We have not read it, so the honest answer is that the City has already written the answer down and you should get it from them rather than from us. What we can say is that assuming an exemption you have not confirmed is the most common way a project goes wrong anywhere in South Florida.
The City publishes Private Provider Instructions, so the alternative plans review and inspection route under Florida law is available. Its specific terms in Westlake were not read by us and are not described on this page — ask the Building Department for the instructions before deciding, because the conditions differ from municipality to municipality.
The City has made this straightforward and publishes the guidance itself: how to verify a contractor licence, how to be aware of fraudulent contractors, a "Contractor Red Flags" resource, and how to file a complaint against a contractor. Verifying a licence costs nothing and takes minutes. Ours is CBC1265280 and it is verifiable in the Florida DBPR register.
It says so in its own mission statement: its involvement is "fundamentally regulatory", and it depends on "knowledgeable property owners, contractors, engineers, and architects to execute construction in a safe and efficient manner". Read alongside the inspection directive, that is a department that expects the people it deals with to arrive prepared — and rewards it with what it calls expedited quality customer service.
The photographs on this page are South Florida projects by Elbaz Construction and none of them is claimed as a Westlake property — we label our work honestly rather than implying a local address. What we bring is a licensed general contractor working across Miami-Dade, Broward and Palm Beach, who reads a city’s published requirements before designing to them.

Four questions worth answering before a drawing is commissioned. All four are answered by the City, not by a contractor.
Credentials and delivery
Six things that are verifiable rather than asserted.

CBC1265280 — certified building contractor, bonded and insured, and verifiable in the Florida DBPR register the City itself links to.
One controlled set, one named custodian, from permit issue to final inspection.
Because in this City the second one is a precondition, not a courtesy.
Every regulatory statement on this page was taken from the City’s own Building Department page and is attributed to it.
The City’s permit requirements, submission guidelines and private provider instructions are named on this page and described nowhere on it, because we did not open them.
Every image here is a real Elbaz Construction project in South Florida, captioned for what it actually shows. None is claimed as a Westlake property.
Google reviews
Reproduced verbatim from the connected Google Business Profile, including original spelling. No review schema is emitted from this page.
★★★★★
“Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.”
Mia Zafrani · Google review
★★★★★
Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze.
Lee Morali
★★★★★
We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!
Shir Partush
★★★★★
From start to end- personal kind treatment, always respectful. Value for money 10/10.
roni yonani
★★★★★
Amazing job Did a total renovation of my house with them
Elie Elancry
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Knowledge library
Where to go next, depending on which part of the project you are trying to pin down.
Start here
Tell us the scope and the address. We will work from the City’s own published requirements, map the inspection points and the documents each one needs, and keep the stamped set on site from the first day.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.
Design coordination, City submittals, permitting and construction under one licensed general contractor — in the City of Westlake and across Miami-Dade, Broward and Palm Beach counties.
