10 service categories · 100 service pages · Miami-Dade, Broward & Palm Beach
View all services104 municipalities · Miami-Dade, Broward & Palm Beach
All service areasBefore a permit issues here, plans are reviewed for consistency with the Land Development Regulations and with the conditions of approval in the development order that governs your community — and only then do other departments approve issuance. It is a City that checks what was promised when the neighbourhood was approved before it checks how the wall is built. We work to that, as a licensed general contractor across Palm Beach, Broward and Miami-Dade.
Miami-Dade · Broward & Palm Beach Counties
ScrollStart here
Almost everything on this page turns on which development order governs your property and whether your scope engages the City's departmental approvals. Tell us the address and what you are hoping to do, and the first conversation is a useful one.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.
Recent projects
Eight frames of completed work across South Florida — bathrooms, flooring and two accessory dwelling units. Tap any image to see it larger.
A completed primary bathroom with a barn door, trough vanity and freestanding tub.
A long primary bathroom with a light oak vanity and a freestanding tub.
Twin basins under a large round mirror with brass pendants.
Kitchen island seating looking out to a screened lanai.
The bathroom of a completed accessory dwelling unit, with a skylight.
Patterned encaustic-style floor tile running up to a navy vanity.
A frameless glass shower door with a brushed handle beside a tiled bench.
Timber stair treads and risers finished to match the floor.
All photographs are of real completed Elbaz Construction work. They come from several separate properties across South Florida and are shown as recent work. None of them was taken in Palm Beach Gardens, and none is captioned as though it were.
The journey
Palm Beach Gardens is a city of planned communities, and it administers them that way. The consequence for a homeowner is specific and worth understanding early: your plans are checked against the Land Development Regulations and the conditions of approval in your community's development order before the building review matters, and a scope that satisfies the Florida Building Code perfectly can still be inconsistent with what was approved.
Use the stage markers to jump to the part you are stuck on. Nothing here is a promise about your address — the City decides that — and nothing here is a timeline we invented. Where the City publishes a rule, it is quoted, including its own qualifiers. Where it publishes nothing, this page says so.
Stage 01 · Order
Four things shape a Palm Beach Gardens project before a drawing exists, and the first two are documents most owners have never read.
The City states that construction plans are reviewed for consistency with "the conditions of approval specified in applicable development orders". A development order is the approval under which a community was permitted, and its conditions can govern things a building code never mentions — elevations, materials, setbacks, landscaping, screening. It is property- and community-specific, so we will not tell you what yours says; we will tell you that it exists and that it is checked first.

Illustration, not a photograph: a drawn residential streetscape, used to show how an elevation reads from the street. It is not a Palm Beach Gardens street and is not presented as one.
Alongside the development order, Development Compliance staff check plans for consistency with the Land Development Regulations. Between them, those two documents answer a different question from the building code: not "is it built correctly" but "is it what this place agreed to". A scope can be entirely code-compliant and still fail that test, which is why the conversation is worth having before drawings are finished rather than after a comment.

A wide view of a completed Elbaz Construction primary bathroom with a barn door, trough vanity and freestanding tub. A South Florida project, not a Palm Beach Gardens one.
After consistency has been determined, the City states that representatives of Forestry, Finance, Fire, Police, Engineering, Code Enforcement, Public Works and Geographical Information Systems must approve the issuance of "all commercial, and certain residential" building permits and certificates of occupancy. That qualifier matters and we carry it exactly: not every house triggers eight departments. But some residential work does, and knowing early whether yours is in that category is worth more than any other single question here.

Twin basins under a large round mirror with brass pendants either side, in a completed Elbaz Construction bathroom. A South Florida project.
The City describes its Building Department as "a centralized operation, housing all of the services relating to building and permitting activity". Requests are made through the online Open Permit Requests portal and, in the City's own words, "all requests are processed in the order in which they are received during normal business hours." That is a queue, stated plainly — which is more useful than a promised turnaround, because it tells you that submitting complete work early is the only lever you actually have.

Timber stair treads and risers finished to match the floor at the landing, on a completed Elbaz Construction project in South Florida.
Stage 02 · Consistency
This ordering is the whole of what makes Palm Beach Gardens different, and it changes what a good submission looks like.
Development orders and Land Development Regulations tend to govern what a place looks like: elevations, materials, screening, landscaping, hard surfaces. So the parts of a remodel most likely to draw a consistency question are the parts outside the walls — a patio, a paved area, a change of external material, anything altering the elevation. Interior-only work is usually a simpler conversation, though it is still the City that decides.

Warm-toned tumbled paver paving to a covered outdoor area, on a completed Elbaz Construction project in South Florida.
The City adopted the Universal County-Wide / Municipal Building Permit Application Form, which it says replaces the residential, commercial, sub-permit and revision permit application forms used in the past. Four documents became one. It is a genuine simplification, and it is worth checking that whoever is filing for you is using the current form rather than an old City-specific one from a previous project.

Patterned encaustic-style floor tile running up to a navy vanity in a completed Elbaz Construction bathroom. A South Florida project.
The City publishes that requests are processed in the order in which they are received during normal business hours. It publishes no review timeframe, and the two facts together are more honest than a promised turnaround would be. What they mean practically: a submission that draws comments goes back into the queue behind everything received since, so completeness on the first attempt is worth considerably more here than speed of filing.

A completed Elbaz Construction walk-in shower interior with a tiled bench seat and a herringbone mosaic floor. Not a Palm Beach Gardens property.
The eight-department approval applies to all commercial and "certain residential" permits. The City does not publish which residential work falls into that category, and we are not going to guess — but the practical approach is clear: ask the Building Department whether your scope does, at the outset. If it does, the programme has more approvals in it than a typical remodel; if it does not, the route is considerably shorter. Either way it is knowable before drawings are finished.

Illustration, not a photograph: a drawn document wallet beside rolled drawings, used to show what an approvals file looks like. Not a photograph of any City record.
Every photograph in this section is real Elbaz Construction project photography from completed South Florida work. None of it was taken in Palm Beach Gardens and none of it is captioned as though it were. Drawn images are labelled as illustrations.
Project gallery 01
Six frames of completed Elbaz Construction work across South Florida. Different properties, not one project, and not photographed in Palm Beach Gardens — each caption says what it actually is.
Project 01, guided tour






Micro-cement, wide
A completed primary bathroom with a barn door, trough vanity, freestanding tub and glazed shower.
Six frames from completed Elbaz Construction projects across South Florida, grouped by room rather than by property.
A city page is about a process, and a process is only worth reading if the company at the end of it builds. These are the finished result of the same six stages this page walks.
South Florida. None is claimed to be in Palm Beach Gardens, because none was verified as being in Palm Beach Gardens.
No cost, no address, no client name and no permit history appears anywhere on this page.
Stage 03 · Desks
The City publishes its sequence clearly. Working with it means front-loading the questions that are not about construction at all.
We establish which development order applies to the property and what the Land Development Regulations require of the scope. These are the documents consistency is measured against, and reading them first is the difference between designing to the approval and redesigning after a comment.
We ask the Building Department whether your scope is among the residential permits requiring the departmental approvals. The answer changes the number of parties involved, so it is worth knowing before a programme is written rather than after.
The drawings have to satisfy the building code and be consistent with the development order and the LDRs. Those are different tests, and a set drawn only to the first will usually clear the second by luck rather than design.
The Universal County-Wide / Municipal Building Permit Application Form is used, which the City says replaced the separate residential, commercial, sub-permit and revision forms.
Requests are made through the City's online portal, and the City states they are processed in the order received during normal business hours. Complete work submitted once is worth more than fast work submitted twice.
Development Compliance staff review the plans for consistency with the LDRs and the conditions of approval in the applicable development order. This happens before issuance, and it is the review that most often surprises an owner who came prepared for a code conversation.
Where the scope requires them, representatives of Forestry, Finance, Fire, Police, Engineering, Code Enforcement, Public Works and GIS approve issuance. Then the permit issues and the work can start.
This is the published sequence, not a promise about your project. What any specific address requires, whether your scope is among the "certain residential" permits needing departmental approvals, and whether plans are consistent with your development order are all decided by the City of Palm Beach Gardens — not by a contractor. We confirm what your address actually requires before anything is filed.
Stage 04 · Building
On site the construction is ordinary; the discipline is not. In a city that measures plans against a development order, the thing that has to stay true throughout is the match between what was approved and what is being built.
Before the first delivery
The approved drawings and any conditions carried from the development order are on site from day one, not filed in an office. In Palm Beach Gardens a departure that would be a minor site decision elsewhere can be an inconsistency with what the community was approved under, and those are resolved with the City rather than absorbed.
Quality check · Approved drawings and conditions available on site from day one

Agreed in advance
Coverings, dust separation and the working route go in, and deliveries and parking are agreed before the first load — in a planned community that usually means agreeing them with more than one party.
Quality check · Route, containment and deliveries agreed before work starts

And checking it against the record
The scope comes out and the fabric appears. Anything that does not match the permit record is photographed and raised with you before it is concealed, and anything that does not match the approved drawings is raised with the City rather than quietly reconciled.
Quality check · Everything uncovered photographed and raised before it is concealed

To the approved set
Load-bearing alterations are executed to the approved drawings. Where site conditions genuinely differ, that goes back through the portal as a revision — the City replaced its separate revision form with the universal one, but the process still exists and is still the right route.
Quality check · Nothing structural concealed before its inspection

Where consistency is visible
Any change to the outside of the building is executed to what was approved, because this is the part a consistency review was actually about. Materials and finishes are checked against the approval before they are ordered, not after they arrive.
Quality check · External materials verified against the approval before ordering

Each inspected on its own
Electrical, plumbing and mechanical rough-in are installed and set out against the finished setting out, and each discipline is inspected before anything is covered.
Quality check · Each discipline inspected before anything is closed

After the passes
Board and insulation go up once the rough-in inspections have passed. Reopening finished work is expensive everywhere; in a city with a queue processed in the order received, the administrative recovery is slow as well.
Quality check · Walls closed only against passed inspections

Recorded as it is built
Tanking, backer board and falls go in beneath the tile and are photographed as they are built. It is the one layer no later inspection can examine.
Quality check · Falls and waterproofing recorded photographically before tiling

Walked with you first
Tile, stone and cabinetry are set out and confirmed with you before the field is fixed, then the visible work goes in.
Quality check · Setting out walked with you before the first full course

Where a CO applies
Each discipline is taken to its final, and where a Certificate of Occupancy is involved the same consistency and departmental approvals govern its issuance as governed the permit. Outstanding items are agreed in writing and the permit is closed.
Quality check · Every final passed and the permit closed

Project gallery 02
Three frames from real Elbaz Construction work in South Florida — one during construction, two after it.
These are real photographs of Elbaz Construction work on South Florida projects. The first is the middle of the job, which is the part an owner actually lives through and the part nobody puts in a brochure. None of this work was in Palm Beach Gardens and none of it is presented as though it were.
Project 02, during and complete



During: back to the opening
A bathroom stripped back during construction with the wall opening re-framed and tile backer going up.
Real Elbaz Construction work in South Florida, photographed during construction and again on completion.
Because a level threshold is decided in the substrate, long before it is visible — the same relationship a development order has to a finished elevation.
It is not a Palm Beach Gardens project, it is not presented as one, and no address, client or cost appears anywhere.
Stage 05 · Choosing
Argued both ways. None of these has a universally right answer — it depends on your scope, your community and how much of the calendar you control.
Read the order first

Draw what you want

Which oneFor anything visible from outside, design to the approval. The City checks consistency before issuance and processes work in the order received, so a design that fails that test does not merely get amended — it goes back to the end of a queue. Interior-only work can reasonably be designed first.
Find out what applies

Most houses are not commercial

Which oneAsk. The City published a qualifier — "all commercial, and certain residential" — without publishing which residential work it means, and that is precisely the shape of thing that should be resolved by a question rather than an assumption. It costs one call and it determines the shape of the programme.
Consistency is straightforward

Make the case

Which oneDo not avoid external work because the process is longer — do it with the development order open in front of you from the first sketch. The failure mode here is not being refused; it is designing in ignorance of a document that was always going to be consulted.
Tick whatever applies. This will not produce a price — no honest one exists before someone has seen the property — but it will show which parts of your project are carrying the time and the risk.
We do not publish figures, and we do not publish permit fees either: none was read from a City source, and we would rather say so than print a number we cannot stand behind. You get a real, itemised number from us in writing after a site visit.
Project gallery 03
Four frames from completed Elbaz Construction accessory dwelling units and one South Florida build photographed during construction.
Project 03, guided tour




Studio bathroom
The bathroom of a completed studio accessory dwelling unit, with a glass shower enclosure, vanity and skylight.
Completed Elbaz Construction accessory dwelling units in South Florida, and work photographed while it was still a site.
A new or enlarged structure is exactly the kind of scope most likely to raise a consistency question against a development order, and most likely to fall among the "certain residential" permits the City routes through its departmental approvals.
South Florida. None of these is claimed to be in Palm Beach Gardens.
Stage 06 · Issuing
Palm Beach Gardens publishes its review order plainly, including the qualifiers. Everything below is quoted from the City's own pages.
"Prior to the issuance of building permits and Certificates of Occupancy, construction plans are reviewed by Development Compliance staff for consistency with the LDRs and conditions of approval specified in applicable development orders."
"After consistency has been determined, representatives of the Forestry, Finance, Fire, Police, Engineering, Code Enforcement, Public Works, and Geographical Information Systems (GIS) must approve the issuance..."
"...of all commercial, and certain residential, building permits and certificates of occupancy." Not every house. The City does not publish which residential work is included.
The City "adopted the Universal County-Wide / Municipal Building Permit Application Form, which replaces the residential, commercial, sub-permit and revision permit application forms used in the past."
The Building Department is "a centralized operation, housing all of the services relating to building and permitting activity for the City of Palm Beach Gardens."
Requests "must be made using the online Open Permit Requests portal, and all requests are processed in the order in which they are received during normal business hours."
Building Department, (561) 799-4210.
A plan-review timeframe, any fee we could verify, and which residential permits fall under "certain residential". Also note the City is pbgfl.gov — pbgfl.com resolves and will serve you an unrelated page under a plausible-looking Building URL.
Only claims that are either public record or visible in the work on this page. Nothing about awards, nothing about rankings, and no numbers we cannot show you.
Elbaz Construction is a licensed Florida general contractor, CBC1265280. Permits are pulled in the company's name, and the licence is verifiable at the Florida DBPR rather than on our say-so.
Development Compliance checks consistency with the LDRs and the development order before issuance. Designing against those documents rather than discovering them turns that review into a confirmation instead of a negotiation.
The City published the qualifier without publishing the list. We resolve it with the Building Department before writing a programme, because the answer changes how many parties are involved in issuing your permit.
Requests are processed in the order received. That makes completeness worth more than speed here — a comment cycle does not hold your place in the queue.
The universal county-wide form replaced four older ones. A contractor working from a previous project's paperwork can easily file a superseded document, and that costs a cycle for no reason.
In a city that reviews plans for consistency with what a community was approved under, checking an external material against the approval before it is bought is not caution, it is arithmetic.
The City publishes none, and publishes instead that work is processed in the order received. Anyone giving you a Palm Beach Gardens review time is giving you their own average.
Every permit we pull is closed out at the end of the job. An open permit follows the property and reappears when it is sold.
Filter to the part of the job you are thinking about.
It is the approval under which your community was permitted, and the City reviews construction plans for consistency with "the conditions of approval specified in applicable development orders". Those conditions can govern elevations, materials, setbacks, screening and landscaping — things a building code does not address. It is community-specific, so the only reliable answer about yours comes from the City.
Through the City. Development orders are property- and community-specific documents, and we deliberately publish nothing about the contents of any particular one because none was read for this page. Establishing which applies to your address is the first thing we do on a Palm Beach Gardens project.
It can be found inconsistent, which is a different thing from being unsafe. The City checks consistency with the Land Development Regulations and the development order before issuance, so a design that satisfies the Florida Building Code perfectly can still fail to match what the community was approved under.
Consistency with the LDRs and with the conditions of approval in the applicable development order. In practice that concentrates on what a place looks like — elevations, external materials, hard surfaces, screening — which is why external work is where the question usually arises and interior-only scopes are usually simpler.
Before issuance. The City's wording is "prior to the issuance of building permits and Certificates of Occupancy", and the departmental approvals only follow "after consistency has been determined". So it is a gate rather than a parallel check.
They are revised and resubmitted, and the submission rejoins a queue the City says is processed in the order received. That is the practical reason to design against the approval from the start: the cost of an inconsistency is not just the redraw, it is the place in the queue.
Almost certainly not, and it matters to say so. The City's wording is that Forestry, Finance, Fire, Police, Engineering, Code Enforcement, Public Works and GIS must approve issuance of "all commercial, and certain residential" permits. The qualifier is the City's. Most ordinary residential interior work will not engage that route — but the City does not publish which residential work does, so it is a question to ask rather than an assumption to make.
Ask the Building Department at the outset, on (561) 799-4210. We do this before writing a programme, because the answer changes how many approvals stand between a completed design and an issued permit.
The City describes its Building Department as "a centralized operation, housing all of the services relating to building and permitting activity". The consistency review is performed by Development Compliance staff, and the departmental approvals involve the departments named above — so several parts of the City touch a permit even though the building activity itself is centralized.
We stop and tell you, before it is covered up. There is an additional question here: earlier work may also be inconsistent with the development order, not merely unpermitted, and those are resolved with the City rather than quietly reconciled on site.
Often yes, and it changes the programme rather than the price alone. Containment, protection and phasing all cost days. The honest version of this conversation happens at the site visit, where we can look at where the work is relative to where you sleep and cook.
Not without checking. In a city that reviews plans for consistency with what the community was approved under, an external material substituted on site is a different kind of decision from a like-for-like swap. We verify against the approval before ordering, which is when it is still free to change.
Because for a remodel the same square footage can differ several-fold depending on what is behind the wall, and in this City also on how many approvals the scope engages. A published rate would be a guess. You get an itemised figure in writing after a site visit, and it says what happens if something is found during demolition.
We did not find a fee figure published by the City that we could verify, so this page carries none rather than repeating one from elsewhere. Ask the Building Department, and whatever it comes to appears itemised on your proposal.
We do not publish a number, because the City does not publish one. What it does publish is more useful: requests are processed in the order in which they are received during normal business hours. That tells you the lever is completeness, not urgency.
Against the issued permit, discipline by discipline, booked as the work reaches them. Where a Certificate of Occupancy is involved, the City applies the same consistency and departmental approval structure to its issuance as it does to the permit.
No, and we will not do it. Board goes up after the rough-in inspections have actually passed. Reopening finished work is expensive everywhere, and in a city with a queue processed in the order received the administrative recovery is slow as well.
It gets closed out. We do not leave permits open, because an open permit stays attached to the property and reappears at sale, when it is somebody else's leverage rather than an administrative detail.
The permit record, the approved drawings, anything confirming consistency with your development order, the product approval documentation for the envelope, and the closeout. In a community governed by a development order, the approval correspondence is worth as much at resale as the permit itself.
Yes — across Palm Beach, Broward and Miami-Dade, 104 municipalities in total. The routes differ genuinely between them: Palm Beach Gardens checks consistency with a development order before it looks at the code, most of its neighbours do not, and those differences are a working detail for us rather than a surprise.
Nothing in that stage yet — try “All”.
Client experience
Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.
Adir Davidov2022-12-27 Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended! Lee Morali2022-12-27 They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them! Shir Partush2022-12-27 We hired them to renovate our investment property and they provided exceptional quality service for an affordable price! Mia Zafrani2022-10-25 Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction. carmit cohen2022-10-25 After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!! Omri B2022-10-20 I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work! roni yonani2022-10-19 Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same! Itzick Manasherov2022-10-19 Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need. Sophie Brito2022-10-19 Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend Elie Elancry2022-10-19 Amazing job Did a total renovation of my house with themGoogle rating score: 5.0 of 5, based on 12 reviews
Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Next steps
Grouped by what you are trying to do, not by category.
The county and the neighbouring cities
The parts of this page we do as a service
What we most often build here
When the answer is more than a remodel
Start here
Almost everything on this page turns on which development order governs your property and whether your scope engages the City's departmental approvals. Tell us the address and what you are hoping to do, and the first conversation is a useful one.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Palm Beach Gardens checks plans against the Land Development Regulations and your community's development order before it considers issuance, and processes work in the order received. The value of a contractor here is designing to those documents from the first sketch, so the review confirms rather than negotiates.
Or see the rest of what we cover on the Palm Beach County page if your property is somewhere else in the county.