In Palm Beach Gardens
the first question is not the code.
It is the development order.

Before a permit issues here, plans are reviewed for consistency with the Land Development Regulations and with the conditions of approval in the development order that governs your community — and only then do other departments approve issuance. It is a City that checks what was promised when the neighbourhood was approved before it checks how the wall is built. We work to that, as a licensed general contractor across Palm Beach, Broward and Miami-Dade.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll

Start here

Start with the address

Almost everything on this page turns on which development order governs your property and whether your scope engages the City's departmental approvals. Tell us the address and what you are hoping to do, and the first conversation is a useful one.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Recent projects

Recent Elbaz Construction work

Eight frames of completed work across South Florida — bathrooms, flooring and two accessory dwelling units. Tap any image to see it larger.

01

A completed primary bathroom with a barn door, trough vanity and freestanding tub.

02

A long primary bathroom with a light oak vanity and a freestanding tub.

03

Twin basins under a large round mirror with brass pendants.

04

Kitchen island seating looking out to a screened lanai.

05

The bathroom of a completed accessory dwelling unit, with a skylight.

06

Patterned encaustic-style floor tile running up to a navy vanity.

07

A frameless glass shower door with a brushed handle beside a tiled bench.

08

Timber stair treads and risers finished to match the floor.

All photographs are of real completed Elbaz Construction work. They come from several separate properties across South Florida and are shown as recent work. None of them was taken in Palm Beach Gardens, and none is captioned as though it were.

01 / 12

The journey

Six stages, from the development order to a closed permit.

Palm Beach Gardens is a city of planned communities, and it administers them that way. The consequence for a homeowner is specific and worth understanding early: your plans are checked against the Land Development Regulations and the conditions of approval in your community's development order before the building review matters, and a scope that satisfies the Florida Building Code perfectly can still be inconsistent with what was approved.

Use the stage markers to jump to the part you are stuck on. Nothing here is a promise about your address — the City decides that — and nothing here is a timeline we invented. Where the City publishes a rule, it is quoted, including its own qualifiers. Where it publishes nothing, this page says so.

Stage 01 · Order

What governs your property besides the building code

Four things shape a Palm Beach Gardens project before a drawing exists, and the first two are documents most owners have never read.

The development order

The City states that construction plans are reviewed for consistency with "the conditions of approval specified in applicable development orders". A development order is the approval under which a community was permitted, and its conditions can govern things a building code never mentions — elevations, materials, setbacks, landscaping, screening. It is property- and community-specific, so we will not tell you what yours says; we will tell you that it exists and that it is checked first.

  • Plans are reviewed for consistency with applicable development orders
  • A development order is community-specific, not citywide
  • Its conditions can cover matters the building code does not
  • We do not publish the content of any specific order — none was read
Illustration of a historic residential streetscape of three early twentieth-century houses (illustration)

Illustration, not a photograph: a drawn residential streetscape, used to show how an elevation reads from the street. It is not a Palm Beach Gardens street and is not presented as one.

And the Land Development Regulations

Alongside the development order, Development Compliance staff check plans for consistency with the Land Development Regulations. Between them, those two documents answer a different question from the building code: not "is it built correctly" but "is it what this place agreed to". A scope can be entirely code-compliant and still fail that test, which is why the conversation is worth having before drawings are finished rather than after a comment.

  • The LDRs are checked alongside the development order
  • They answer a different question from the building code
  • Consistency is determined BEFORE the departmental approvals
  • A code-compliant scope can still be inconsistent
Wide view of a primary bathroom with a barn door, trough vanity, freestanding tub and glazed walk-in shower

A wide view of a completed Elbaz Construction primary bathroom with a barn door, trough vanity and freestanding tub. A South Florida project, not a Palm Beach Gardens one.

Then up to eight departments

After consistency has been determined, the City states that representatives of Forestry, Finance, Fire, Police, Engineering, Code Enforcement, Public Works and Geographical Information Systems must approve the issuance of "all commercial, and certain residential" building permits and certificates of occupancy. That qualifier matters and we carry it exactly: not every house triggers eight departments. But some residential work does, and knowing early whether yours is in that category is worth more than any other single question here.

  • Forestry, Finance, Fire, Police, Engineering, Code Enforcement, Public Works, GIS
  • It applies to ALL commercial and CERTAIN residential permits
  • The qualifier is the City's own — not every house triggers it
  • Establish early whether your scope falls into that category
Twin basins under a large round mirror with brass pendants either side

Twin basins under a large round mirror with brass pendants either side, in a completed Elbaz Construction bathroom. A South Florida project.

One centralized department

The City describes its Building Department as "a centralized operation, housing all of the services relating to building and permitting activity". Requests are made through the online Open Permit Requests portal and, in the City's own words, "all requests are processed in the order in which they are received during normal business hours." That is a queue, stated plainly — which is more useful than a promised turnaround, because it tells you that submitting complete work early is the only lever you actually have.

  • A centralized building and permitting operation
  • Requests go through the online Open Permit Requests portal
  • Processed "in the order in which they are received"
  • During normal business hours — the queue does not run overnight
Timber stair treads and risers finished to match the floor at the landing

Timber stair treads and risers finished to match the floor at the landing, on a completed Elbaz Construction project in South Florida.

Stage 02 · Consistency

Consistency first, then the code

This ordering is the whole of what makes Palm Beach Gardens different, and it changes what a good submission looks like.

Anything the community can see

Development orders and Land Development Regulations tend to govern what a place looks like: elevations, materials, screening, landscaping, hard surfaces. So the parts of a remodel most likely to draw a consistency question are the parts outside the walls — a patio, a paved area, a change of external material, anything altering the elevation. Interior-only work is usually a simpler conversation, though it is still the City that decides.

  • External changes are where consistency questions concentrate
  • Elevations, materials, screening and hard surfaces are typical subjects
  • Interior-only scopes are usually simpler — but not automatically exempt
  • The City determines consistency; a contractor cannot
Warm-toned tumbled paver paving to a covered outdoor area

Warm-toned tumbled paver paving to a covered outdoor area, on a completed Elbaz Construction project in South Florida.

One application form now

The City adopted the Universal County-Wide / Municipal Building Permit Application Form, which it says replaces the residential, commercial, sub-permit and revision permit application forms used in the past. Four documents became one. It is a genuine simplification, and it is worth checking that whoever is filing for you is using the current form rather than an old City-specific one from a previous project.

  • One universal county-wide/municipal form
  • It replaced the residential, commercial, sub-permit and revision forms
  • Older City-specific forms are superseded
  • Check which form is being used if a contractor has old paperwork
Patterned encaustic-style floor tile running up to a navy vanity in a completed bathroom

Patterned encaustic-style floor tile running up to a navy vanity in a completed Elbaz Construction bathroom. A South Florida project.

A queue, not a turnaround

The City publishes that requests are processed in the order in which they are received during normal business hours. It publishes no review timeframe, and the two facts together are more honest than a promised turnaround would be. What they mean practically: a submission that draws comments goes back into the queue behind everything received since, so completeness on the first attempt is worth considerably more here than speed of filing.

  • Requests are processed in the order received
  • During normal business hours
  • The City publishes no review timeframe
  • A comment cycle means rejoining the queue, not holding your place
Walk-in shower interior with a tiled bench seat, herringbone mosaic floor and a linear drain behind frameless glass

A completed Elbaz Construction walk-in shower interior with a tiled bench seat and a herringbone mosaic floor. Not a Palm Beach Gardens property.

"Certain residential"

The eight-department approval applies to all commercial and "certain residential" permits. The City does not publish which residential work falls into that category, and we are not going to guess — but the practical approach is clear: ask the Building Department whether your scope does, at the outset. If it does, the programme has more approvals in it than a typical remodel; if it does not, the route is considerably shorter. Either way it is knowable before drawings are finished.

  • The City's wording is "all commercial, and certain residential"
  • It does not publish which residential work is included
  • Ask the Building Department at the outset rather than assuming
  • The answer materially changes the shape of the programme
Illustration of a closed document wallet beside a stack of rolled drawings (illustration)

Illustration, not a photograph: a drawn document wallet beside rolled drawings, used to show what an approvals file looks like. Not a photograph of any City record.

Every photograph in this section is real Elbaz Construction project photography from completed South Florida work. None of it was taken in Palm Beach Gardens and none of it is captioned as though it were. Drawn images are labelled as illustrations.

Stage 03 · Desks

Filing it: consistency, then the departments, then issuance

The City publishes its sequence clearly. Working with it means front-loading the questions that are not about construction at all.

Identified before anything is drawn

We establish which development order applies to the property and what the Land Development Regulations require of the scope. These are the documents consistency is measured against, and reading them first is the difference between designing to the approval and redesigning after a comment.

Asked at the outset

We ask the Building Department whether your scope is among the residential permits requiring the departmental approvals. The answer changes the number of parties involved, so it is worth knowing before a programme is written rather than after.

Drawn to the approval, not only to the code

The drawings have to satisfy the building code and be consistent with the development order and the LDRs. Those are different tests, and a set drawn only to the first will usually clear the second by luck rather than design.

One document now, not four

The Universal County-Wide / Municipal Building Permit Application Form is used, which the City says replaced the separate residential, commercial, sub-permit and revision forms.

Through the Open Permit Requests portal

Requests are made through the City's online portal, and the City states they are processed in the order received during normal business hours. Complete work submitted once is worth more than fast work submitted twice.

By Development Compliance staff

Development Compliance staff review the plans for consistency with the LDRs and the conditions of approval in the applicable development order. This happens before issuance, and it is the review that most often surprises an owner who came prepared for a code conversation.

Where they apply

Where the scope requires them, representatives of Forestry, Finance, Fire, Police, Engineering, Code Enforcement, Public Works and GIS approve issuance. Then the permit issues and the work can start.

This is the published sequence, not a promise about your project. What any specific address requires, whether your scope is among the "certain residential" permits needing departmental approvals, and whether plans are consistent with your development order are all decided by the City of Palm Beach Gardens — not by a contractor. We confirm what your address actually requires before anything is filed.

Stage 04 · Building

Building to what Palm Beach Gardens actually approved

On site the construction is ordinary; the discipline is not. In a city that measures plans against a development order, the thing that has to stay true throughout is the match between what was approved and what is being built.

Reading the approval on site

Before the first delivery

The approved drawings and any conditions carried from the development order are on site from day one, not filed in an office. In Palm Beach Gardens a departure that would be a minor site decision elsewhere can be an inconsistency with what the community was approved under, and those are resolved with the City rather than absorbed.

Quality check · Approved drawings and conditions available on site from day one

Illustration of a historic residential streetscape of three early twentieth-century houses (illustration)

Protection and access

Agreed in advance

Coverings, dust separation and the working route go in, and deliveries and parking are agreed before the first load — in a planned community that usually means agreeing them with more than one party.

Quality check · Route, containment and deliveries agreed before work starts

Timber stair treads and risers finished to match the floor at the landing

Opening up

And checking it against the record

The scope comes out and the fabric appears. Anything that does not match the permit record is photographed and raised with you before it is concealed, and anything that does not match the approved drawings is raised with the City rather than quietly reconciled.

Quality check · Everything uncovered photographed and raised before it is concealed

Bathroom stripped back during construction with the wall opening re-framed and tile backer board set

Structure

To the approved set

Load-bearing alterations are executed to the approved drawings. Where site conditions genuinely differ, that goes back through the portal as a revision — the City replaced its separate revision form with the universal one, but the process still exists and is still the right route.

Quality check · Nothing structural concealed before its inspection

Steel stair structure installed inside a building under construction with scaffolding alongside

The elevation

Where consistency is visible

Any change to the outside of the building is executed to what was approved, because this is the part a consistency review was actually about. Materials and finishes are checked against the approval before they are ordered, not after they arrive.

Quality check · External materials verified against the approval before ordering

Warm-toned tumbled paver paving to a covered outdoor area

Services, before they vanish

Each inspected on its own

Electrical, plumbing and mechanical rough-in are installed and set out against the finished setting out, and each discipline is inspected before anything is covered.

Quality check · Each discipline inspected before anything is closed

Black shower controls, handheld and grab bar against marble-look porcelain

Closing the walls

After the passes

Board and insulation go up once the rough-in inspections have passed. Reopening finished work is expensive everywhere; in a city with a queue processed in the order received, the administrative recovery is slow as well.

Quality check · Walls closed only against passed inspections

Linear drain set at the edge of a white hexagon mosaic shower floor

Waterproofing

Recorded as it is built

Tanking, backer board and falls go in beneath the tile and are photographed as they are built. It is the one layer no later inspection can examine.

Quality check · Falls and waterproofing recorded photographically before tiling

Low shower threshold with the linear drain running along the mosaic floor edge

Setting out and finishes

Walked with you first

Tile, stone and cabinetry are set out and confirmed with you before the field is fixed, then the visible work goes in.

Quality check · Setting out walked with you before the first full course

Level threshold between the bathroom floor and the shower floor with a black shower set beyond

Finals and the certificate

Where a CO applies

Each discipline is taken to its final, and where a Certificate of Occupancy is involved the same consistency and departmental approvals govern its issuance as governed the permit. Outstanding items are agreed in writing and the permit is closed.

Quality check · Every final passed and the permit closed

Shower in an accessory dwelling unit with a patterned tile feature wall and black fittings

Stage 05 · Choosing

The three decisions Palm Beach Gardens owners find hardest

Argued both ways. None of these has a universally right answer — it depends on your scope, your community and how much of the calendar you control.

Design to the approval

Read the order first

Illustration of a historic residential streetscape of three early twentieth-century houses (illustration)
What it is
Establishing what the development order and the LDRs require before the design is developed.
Benefits
The consistency review becomes a confirmation rather than a negotiation.
Why it matters here
Development Compliance checks consistency BEFORE issuance, so an inconsistent design does not reach the building conversation at all.
The cost
A slower start, spent reading rather than drawing.
Best for
Anything touching the elevation, the materials or the grounds.

Design, then check

Draw what you want

Long primary bathroom with a light oak vanity, freestanding tub and a glazed walk-in shower at the far end
What it is
Developing the design on its merits and testing consistency at submission.
Benefits
The design is not constrained before anyone knows whether it needed to be.
Why it matters here
A consistency comment sends the submission back into a queue processed in the order received.
The cost
Rework, and a place at the back of the queue.
Best for
Interior-only scopes with no external component at all.

Which oneFor anything visible from outside, design to the approval. The City checks consistency before issuance and processes work in the order received, so a design that fails that test does not merely get amended — it goes back to the end of a queue. Interior-only work can reasonably be designed first.

Ask at the outset

Find out what applies

Illustration of a closed document wallet beside a stack of rolled drawings (illustration)
What it is
Asking the Building Department early whether your scope is among the residential permits needing the departmental approvals.
Benefits
The programme is written against the real number of approvals rather than an assumed one.
The cost
A telephone call, before any design work.
What it avoids
Discovering mid-review that eight departments are involved.
Best for
Every project with any structural or external element.

Assume the short route

Most houses are not commercial

Twin basins under a large round mirror with brass pendants either side
What it is
Proceeding on the basis that residential work usually takes the simpler path.
Benefits
Often correct, and nothing waits on a call.
The cost
The City says "certain residential", and does not publish which — so the assumption is untested.
What it avoids
Nothing that a phone call does not avoid earlier.
Best for
A small interior scope on a property you have permitted here before.

Which oneAsk. The City published a qualifier — "all commercial, and certain residential" — without publishing which residential work it means, and that is precisely the shape of thing that should be resolved by a question rather than an assumption. It costs one call and it determines the shape of the programme.

Keep the elevation as approved

Consistency is straightforward

Warm-toned tumbled paver paving to a covered outdoor area
What it is
Confining the work to the interior, or matching external materials to what was approved.
Benefits
The consistency review has little to weigh, and the route is shorter.
Limits
You get the house you have, improved inside.
On resale
Nothing to explain, and nothing on the record to reconcile.
Best for
Owners whose priority is the inside of the house.

Change what the street sees

Make the case

Driveway under construction with string lines set out across the approach
What it is
Altering elevations, external materials or hard surfaces.
Benefits
The result you actually want, settled properly and documented.
Limits
It is the scope most likely to raise a consistency question against the development order.
On resale
A documented approval is an asset; an undocumented change is not.
Best for
Anyone whose real objection to the property is how it looks.

Which oneDo not avoid external work because the process is longer — do it with the development order open in front of you from the first sketch. The failure mode here is not being refused; it is designing in ignorance of a document that was always going to be consulted.

What moves the cost and the calendar in Palm Beach Gardens

Tick whatever applies. This will not produce a price — no honest one exists before someone has seen the property — but it will show which parts of your project are carrying the time and the risk.

What this points to

We do not publish figures, and we do not publish permit fees either: none was read from a City source, and we would rather say so than print a number we cannot stand behind. You get a real, itemised number from us in writing after a site visit.

Stage 06 · Issuing

The sequence the City publishes

Palm Beach Gardens publishes its review order plainly, including the qualifiers. Everything below is quoted from the City's own pages.

Consistency comes first

"Prior to the issuance of building permits and Certificates of Occupancy, construction plans are reviewed by Development Compliance staff for consistency with the LDRs and conditions of approval specified in applicable development orders."

Then the departments

"After consistency has been determined, representatives of the Forestry, Finance, Fire, Police, Engineering, Code Enforcement, Public Works, and Geographical Information Systems (GIS) must approve the issuance..."

And the City's own qualifier

"...of all commercial, and certain residential, building permits and certificates of occupancy." Not every house. The City does not publish which residential work is included.

One application form

The City "adopted the Universal County-Wide / Municipal Building Permit Application Form, which replaces the residential, commercial, sub-permit and revision permit application forms used in the past."

A centralized department

The Building Department is "a centralized operation, housing all of the services relating to building and permitting activity for the City of Palm Beach Gardens."

How requests are handled

Requests "must be made using the online Open Permit Requests portal, and all requests are processed in the order in which they are received during normal business hours."

The published contact

Building Department, (561) 799-4210.

What is NOT published

A plan-review timeframe, any fee we could verify, and which residential permits fall under "certain residential". Also note the City is pbgfl.gov — pbgfl.com resolves and will serve you an unrelated page under a plausible-looking Building URL.

What we will actually stand behind

Only claims that are either public record or visible in the work on this page. Nothing about awards, nothing about rankings, and no numbers we cannot show you.

Licensed, bonded and insured

Elbaz Construction is a licensed Florida general contractor, CBC1265280. Permits are pulled in the company's name, and the licence is verifiable at the Florida DBPR rather than on our say-so.

We read the approval before we draw

Development Compliance checks consistency with the LDRs and the development order before issuance. Designing against those documents rather than discovering them turns that review into a confirmation instead of a negotiation.

We ask about "certain residential" at the outset

The City published the qualifier without publishing the list. We resolve it with the Building Department before writing a programme, because the answer changes how many parties are involved in issuing your permit.

We submit complete work once

Requests are processed in the order received. That makes completeness worth more than speed here — a comment cycle does not hold your place in the queue.

We use the current form

The universal county-wide form replaced four older ones. A contractor working from a previous project's paperwork can easily file a superseded document, and that costs a cycle for no reason.

External materials verified before ordering

In a city that reviews plans for consistency with what a community was approved under, checking an external material against the approval before it is bought is not caution, it is arithmetic.

We do not quote a review time

The City publishes none, and publishes instead that work is processed in the order received. Anyone giving you a Palm Beach Gardens review time is giving you their own average.

Permits closed out

Every permit we pull is closed out at the end of the job. An open permit follows the property and reappears when it is sold.

Questions, by stage

Filter to the part of the job you are thinking about.

What is a development order and why does it affect my remodel?Development order

It is the approval under which your community was permitted, and the City reviews construction plans for consistency with "the conditions of approval specified in applicable development orders". Those conditions can govern elevations, materials, setbacks, screening and landscaping — things a building code does not address. It is community-specific, so the only reliable answer about yours comes from the City.

Where do I find the one that applies to my property?Development order

Through the City. Development orders are property- and community-specific documents, and we deliberately publish nothing about the contents of any particular one because none was read for this page. Establishing which applies to your address is the first thing we do on a Palm Beach Gardens project.

Can a project be code-compliant and still be refused?Development order

It can be found inconsistent, which is a different thing from being unsafe. The City checks consistency with the Land Development Regulations and the development order before issuance, so a design that satisfies the Florida Building Code perfectly can still fail to match what the community was approved under.

What does the consistency review actually look at?Consistency review

Consistency with the LDRs and with the conditions of approval in the applicable development order. In practice that concentrates on what a place looks like — elevations, external materials, hard surfaces, screening — which is why external work is where the question usually arises and interior-only scopes are usually simpler.

When does it happen?Consistency review

Before issuance. The City's wording is "prior to the issuance of building permits and Certificates of Occupancy", and the departmental approvals only follow "after consistency has been determined". So it is a gate rather than a parallel check.

What if my plans are found inconsistent?Consistency review

They are revised and resubmitted, and the submission rejoins a queue the City says is processed in the order received. That is the practical reason to design against the approval from the start: the cost of an inconsistency is not just the redraw, it is the place in the queue.

Do eight departments really review my bathroom?The departments

Almost certainly not, and it matters to say so. The City's wording is that Forestry, Finance, Fire, Police, Engineering, Code Enforcement, Public Works and GIS must approve issuance of "all commercial, and certain residential" permits. The qualifier is the City's. Most ordinary residential interior work will not engage that route — but the City does not publish which residential work does, so it is a question to ask rather than an assumption to make.

How do I find out whether my project is in that category?The departments

Ask the Building Department at the outset, on (561) 799-4210. We do this before writing a programme, because the answer changes how many approvals stand between a completed design and an issued permit.

Is the Building Department separate from Planning?The departments

The City describes its Building Department as "a centralized operation, housing all of the services relating to building and permitting activity". The consistency review is performed by Development Compliance staff, and the departmental approvals involve the departments named above — so several parts of the City touch a permit even though the building activity itself is centralized.

What happens if you find unpermitted work from a previous owner?On site

We stop and tell you, before it is covered up. There is an additional question here: earlier work may also be inconsistent with the development order, not merely unpermitted, and those are resolved with the City rather than quietly reconciled on site.

Can I live in the house while you work?On site

Often yes, and it changes the programme rather than the price alone. Containment, protection and phasing all cost days. The honest version of this conversation happens at the site visit, where we can look at where the work is relative to where you sleep and cook.

Can we change a material once work has started?On site

Not without checking. In a city that reviews plans for consistency with what the community was approved under, an external material substituted on site is a different kind of decision from a like-for-like swap. We verify against the approval before ordering, which is when it is still free to change.

Why won't you publish a price?Cost

Because for a remodel the same square footage can differ several-fold depending on what is behind the wall, and in this City also on how many approvals the scope engages. A published rate would be a guess. You get an itemised figure in writing after a site visit, and it says what happens if something is found during demolition.

What will the permit itself cost?Cost

We did not find a fee figure published by the City that we could verify, so this page carries none rather than repeating one from elsewhere. Ask the Building Department, and whatever it comes to appears itemised on your proposal.

How long does a permit take here?Cost

We do not publish a number, because the City does not publish one. What it does publish is more useful: requests are processed in the order in which they are received during normal business hours. That tells you the lever is completeness, not urgency.

How are inspections handled?Inspections

Against the issued permit, discipline by discipline, booked as the work reaches them. Where a Certificate of Occupancy is involved, the City applies the same consistency and departmental approval structure to its issuance as it does to the permit.

Can walls be closed before an inspection passes?Inspections

No, and we will not do it. Board goes up after the rough-in inspections have actually passed. Reopening finished work is expensive everywhere, and in a city with a queue processed in the order received the administrative recovery is slow as well.

What happens to the permit when the job is finished?Afterwards

It gets closed out. We do not leave permits open, because an open permit stays attached to the property and reappears at sale, when it is somebody else's leverage rather than an administrative detail.

What paperwork should I keep?Afterwards

The permit record, the approved drawings, anything confirming consistency with your development order, the product approval documentation for the envelope, and the closeout. In a community governed by a development order, the approval correspondence is worth as much at resale as the permit itself.

Do you work anywhere else in Palm Beach County?Afterwards

Yes — across Palm Beach, Broward and Miami-Dade, 104 municipalities in total. The routes differ genuinely between them: Palm Beach Gardens checks consistency with a development order before it looks at the code, most of its neighbours do not, and those differences are a working detail for us rather than a surprise.

Client experience

What clients say, in their own words

Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.

Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.

Next steps

Where to go from here

Grouped by what you are trying to do, not by category.

Where you are

The county and the neighbouring cities

Bigger moves

When the answer is more than a remodel

Read first

Before you commit to anything

Start here

Start with the address

Almost everything on this page turns on which development order governs your property and whether your scope engages the City's departmental approvals. Tell us the address and what you are hoping to do, and the first conversation is a useful one.

What happens next

  1. We read it properly and come back to you, usually the same or the next working day.
  2. A short call to understand the property, the scope and what is driving the timing.
  3. We establish which development order applies and ask the City whether your scope is among the "certain residential" permits, before we form a view.
  4. A site visit, because what is behind a South Florida wall cannot be judged from photographs.
  5. A written, itemised proposal, including what happens if something is found during demolition.
  6. If you go ahead, we design to the approval, file on the universal form through the Open Permit Requests portal and manage the consistency review.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Wide view of a primary bathroom with a barn door, trough vanity, freestanding tub and glazed walk-in shower

Read the approval, then design. Let's do it in that order.

Palm Beach Gardens checks plans against the Land Development Regulations and your community's development order before it considers issuance, and processes work in the order received. The value of a contractor here is designing to those documents from the first sketch, so the review confirms rather than negotiates.

Or see the rest of what we cover on the Palm Beach County page if your property is somewhere else in the county.