The room you
start and end
every day in.

Elbaz Construction remodels primary bath suites across Miami-Dade, Broward and Palm Beach — the whole room, not a fixture swap. Layout, waterproofing, ventilation, lighting and stone, planned together and built by one licensed general contractor.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Waterproofing and ventilation done properly

Miami-Dade · Broward & Palm Beach Counties

Scroll

Step one

Start with the room you have.

Tell us what is there now and what is not working. A licensed general contractor reads it — not a showroom.

  • Licensed, bonded and insured · CBC1265280
  • One contractor for demolition through final inspection
  • 104 municipalities across three counties

What to have ready

Rough dimensions if you have them, whether you want to keep the current layout, and any images of the look you are after.

What happens next

We come back to arrange a site visit and measure properly. Nothing is quoted from a photograph.

What the consultation covers

Whether the layout can move, what the plumbing and structure will allow, ventilation, lighting, and where the budget actually goes.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with us. A licensed general contractor will come back to you to arrange a site walk. If it is urgent, call (754) 236-0675.

Photo sequence — completed Elbaz primary suites, vanity to shower

What we build

A suite is a system, not a set of fittings.

Most primary bath suites disappoint for one of three reasons: the layout was inherited rather than chosen, the waterproofing was treated as a step instead of a system, or the ventilation and lighting were decided last. We plan those three first. Everything a visitor notices — the stone, the tapware, the frameless glass — sits on top of decisions that were made before a single tile was ordered.

  • 01

    The layout is a decision

    Where the tub, shower and vanity sit is worth more than any single fitting. We establish what can move before anything is specified.

  • 02

    Waterproofing as a system

    Pan, membrane, corners, niches and the drain treated as one continuous detail rather than a sequence of separate steps.

  • 03

    Ventilation sized for Florida

    Extraction sized to the room and ducted to outside — the single most common omission in a humid climate, and the cause of most tile failures we are called to look at.

  • 04

    Layered light

    Task light at the mirror, general light for the room and something low for the evening. One ceiling fitting cannot do all three.

  • 05

    One contractor, one permit

    Demolition, plumbing, electrical, tiling and glass under one licence and one point of contact.

See a suite, frame by frame

Recessed shower niche lined in hexagonal mosaic
Recessed niche lined in hexagonal mosaic, set into the wet wall

Elbaz project photograph

Project 01

Light oak, stacked tile, freestanding tub

Completed primary suite

Every frame below is an Elbaz Construction photograph of one completed suite, shot in a single session. Captions describe what is visible in the frame and nothing else.

Primary bath suite seen through its sliding barn door, with the double vanity beyond
Entry. The suite seen through its sliding barn door. Sliding the door rather than swinging it is what lets the vanity sit where it does.
Long view down the primary suite from the vanity to the walk-in shower
The room. The full length of the suite: vanity on the left, tub on axis, shower at the far end under the vault.
Double vanity in light oak beside a freestanding tub under a clerestory window
Vanity and tub. The double vanity beside the freestanding tub, with a clerestory window bringing daylight in above the tile line.
Twin mirrors and wall sconces over a double vanity with matte black tapware
Vanity. Twin mirrors with wall sconces between them rather than above — the light that actually works for a face.
Vanity elevation: light oak drawers, stone top and undermount basins
Joinery. Light oak drawer fronts, a stone top and undermount basins, with matte black tapware.
The tub on axis with the suite, seen from the entry door
Tub. The tub seen from the entry, on axis with the room.
Freestanding tub and shower controls in matte black against stacked wall tile
Fittings. Floor-mounted bath filler and the shower controls beyond, in matte black against stacked wall tile.
Freestanding tub with a floor-mounted filler, the glazed walk-in shower behind it
Shower. The glazed walk-in shower behind the tub, with a teak ladder between them.
Built-in shower bench and niche in the walk-in shower
Bench. A built-in bench and niche inside the shower — both formed in the build, not added afterwards.
Recessed shower niche lined in hexagonal mosaic
Niche. The niche lined in hexagonal mosaic, so the shelf reads as part of the wall rather than a hole in it.
Rain head and hand shower in matte black on the tiled wet wall
Wet wall. Rain head and hand shower on the wet wall, both in matte black.
Shower floor in hexagonal mosaic with a linear drain at the threshold
Drainage. Hexagonal mosaic to the shower floor and a linear drain at the threshold — the fall is built into the pan, not into the tile.
Detail of the same frame: Primary bath suite seen through its sliding barn door, with the double vanity beyond
Detail of the same frame: Long view down the primary suite from the vanity to the walk-in shower
Detail of the same frame: Double vanity in light oak beside a freestanding tub under a clerestory window
Detail of the same frame: Twin mirrors and wall sconces over a double vanity with matte black tapware
Detail of the same frame: Vanity elevation: light oak drawers, stone top and undermount basins
Detail of the same frame: The tub on axis with the suite, seen from the entry door
Detail of the same frame: Freestanding tub and shower controls in matte black against stacked wall tile
Detail of the same frame: Freestanding tub with a floor-mounted filler, the glazed walk-in shower behind it
Detail of the same frame: Built-in shower bench and niche in the walk-in shower
Detail of the same frame: Recessed shower niche lined in hexagonal mosaic
Detail of the same frame: Rain head and hand shower in matte black on the tiled wet wall
Detail of the same frame: Shower floor in hexagonal mosaic with a linear drain at the threshold
Detail


Plan

A single long room entered through a sliding barn door, with the vanity on one side, the tub on axis and the shower at the far end.

Surfaces

Stacked wall tile to full height in the wet areas, large-format floor tile, and hexagonal mosaic in the shower floor and niche.

Joinery

Light oak vanity with a stone top and undermount basins, twin mirrors and wall-mounted sconces between them.

Fittings

Matte black throughout: floor-mounted bath filler, rain head and hand shower, and a linear drain at the shower threshold.

How it runs

Eleven stages, one contractor.

A bath suite is the most services-dense room in a house. Below is the order we run it in, and what actually happens at each point.

Photo sequence — entry, vanity, tub and shower of completed Elbaz suites

  1. Consultation

    We look at the room you have, what is not working, and what you want the finished suite to do.

  2. Measure & survey

    Proper dimensions, plus what is behind the walls: stack positions, joist direction, and where services can and cannot move.

  3. Layout

    Whether the tub, shower and vanity stay where they are. This is the decision everything else follows from.

  4. Selections

    Tile, stone, joinery, glass and fittings chosen together, and locked before ordering so lead times are known.

  5. Permitting

    Where the scope requires it, submitted and tracked by us. Review durations belong to the building department.

  6. Demolition

    Back to the substrate, with the existing conditions photographed before anything is closed up again.

  7. Rough-in

    Plumbing and electrical moved to the new layout, then inspected before anything covers them.

  8. Waterproofing

    Pan, membrane, corners and niches as one system. This is the stage that decides whether the room lasts.

  9. Tiling & stone

    Setting out from the sightline that matters, so cuts land where nobody looks.

  10. Joinery, glass & fittings

    Vanity, mirrors, frameless glass and tapware, in that order.

  11. Snag & hand-over

    Final inspection where applicable, a written snag list worked through, and the maintenance notes for the surfaces you now own.

Where a permit is required, review and inspection timelines are set by your building department and vary by jurisdiction and workload.

Where Project 01 is warm and stacked, this suite is monolithic. The walls are a continuous plaster finish rather than tile, so there is almost no grout line in the room; the floor is a black-and-white penny-round mosaic that runs unbroken from the door through the shower; and the vanity is a floating console on a black steel frame rather than a cabinet. The shower has no door threshold to step over and its bench is formed in the same material as the walls.

Project 02

Plaster walls, penny round, floating console

A different suite, a different language

A separate completed Elbaz suite — a different house and a deliberately different material palette from Project 01. Shown here because the two rooms answer the same brief in opposite ways.

Elbaz project photograph

Specification

The decisions that outlast the trend.

Six choices that decide how the room looks on day one and how it is holding up in year ten. Switch between the three questions to see the same decision from a different angle.

Shower floor in hexagonal mosaic with a linear drain at the threshold

Waterproofing and drainage

A formed pan with a bonded membrane carried up the walls and through the corners and niches, and a drain — linear or point — set to the fall.

Elbaz project photograph

Floating console vanity on a black steel frame above a penny-round mosaic floor

Vanity: cabinet or console

A floor-standing cabinet with drawers, or a floating console that leaves the floor visible beneath it.

Elbaz project photograph

Recessed shower niche lined in hexagonal mosaic

Niches, benches and shelves

Recesses and seats formed in the build rather than bought and stuck on afterwards.

Elbaz project photograph

Twin mirrors and wall sconces over a double vanity with matte black tapware

Lighting layers

Sconces beside the mirror for the face, general light for the room, and something low for the evening.

Elbaz project photograph

Frameless glazed shower with a concrete bench and recessed niches

Glass

Frameless panels and doors, or a walk-in screen with no door at all.

Elbaz project photograph

Freestanding tub against a plaster-finish wall beside the vanity run

Wall finish: tile or plaster

Tile to full height, or a continuous applied plaster finish with almost no joints.

Elbaz project photograph

Living with it

Grout and sealant

Check the perimeter sealant annually — the joint between the pan and the wall works hardest and fails first.

Stone tops

Wipe spills rather than leave them; ask us which of your surfaces needs sealing and which genuinely does not.

Plaster finishes

A soft cloth and water. No abrasives, and no bleach on the wall finish.

Ventilation

Run the extraction for fifteen minutes after a shower and clean the grille twice a year. This is what protects everything else in the room.

Showcase 03

What is behind the tile.

Both suites above are shown finished. This is the part that decides whether they stay that way — the wet-area build-up, in the order it goes on, illustrated with frames from the two projects.

Primary bath suite seen through its sliding barn door, with the double vanity beyond

01

Back to substrate

Demolition to the structure, with existing conditions recorded before anything is covered again. Surprises are found here or they are found later at four times the cost.

Elbaz project photograph

Long view down the primary suite from the vanity to the walk-in shower

02

Services to the new layout

Plumbing and electrical moved to where the drawing puts them, then inspected before a single board goes back on.

Elbaz project photograph

Shower floor in hexagonal mosaic with a linear drain at the threshold

03

Backing board and falls

Cement backer to the wet walls and a formed pan with the fall built into it. Tile does not create a fall; it follows one.

Elbaz project photograph

Built-in shower bench and niche in the walk-in shower

04

The membrane

Bonded waterproofing carried up the walls, through every corner, around every penetration and into the niches and bench as one continuous system.

Elbaz project photograph

Inside the walk-in shower: rain head, bench and penny-round floor

05

Set-out and tiling

Set out from the sightline that matters so cut tiles land where nobody looks, then tiled, grouted and left to cure properly.

Elbaz project photograph

Frameless glazed shower with a concrete bench and recessed niches

06

Glass, joinery and fittings

Frameless glass measured off the finished opening, then vanity, mirrors and tapware. Anything measured earlier than this is measured twice.

Elbaz project photograph

Wet-wall build-up at a niche

Why a niche is a waterproofing detail before it is a shelf

Schematic section through a shower wall at a recessed niche From the room outward: tile and adhesive, a bonded waterproof membrane that turns into and lines the whole niche including its sill, cement backer board, the stud or block wall behind, and a sloped sill at the niche so water runs back out into the shower. 1 TILE AND ADHESIVE 2 BONDED WATERPROOF MEMBRANE 3 CEMENT BACKER BOARD 4 WALL STRUCTURE BEHIND 5 MEMBRANE CARRIED INTO THE NICHE 6 SILL FALLS BACK TO THE SHOWER 7 NICHE LINED AFTER THE MEMBRANE, NEVER BEFORE 1324 56

Schematic. Not a construction detail and not to scale — the manufacturer's system requirements govern on any given project.

Answers

Bath suite questions.

It depends on the size of the room, whether the layout moves, and how much of the structure has to change. We will give you a stage-by-stage sequence with real durations once we have measured the room. What we will not do is quote a number before seeing it — the honest answer to "how long" always starts with "what is behind the wall".

Verified

What clients wrote on Google.

Reproduced exactly as published on the company's Google Business Profile. Read them on Google

Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need.

Itzick Manasherov

Google review

I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work!

Omri B

Google review

Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended!

Adir Davidov

Google review

Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.

Mia Zafrani

Google review

Amazing job Did a total renovation of my house with them

Elie Elancry

Google review

They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them!

Lee Morali

Google review

After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!!

carmit cohen

Google review

Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same!

roni yonani

Google review

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!

Shir Partush

Google review

Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend

Sophie Brito

Google review

Schedule a Consultation (754) 236-0675

Start here

Send us the room.

A first conversation with a licensed general contractor, not a showroom visit. If the layout you want will not work in the space you have, we will tell you at the survey rather than at demolition.

What happens after you send this

We read it and come back to arrange a site visit — usually within one working day.

What to have ready

Rough dimensions, whether the layout should change, and any reference images you have collected.

What we will cover

What can move, what the services will allow, ventilation and lighting, and where the budget actually goes in a room this size.

Prefer to talk it through first?

(754) 236-0675
  • Licensed, bonded and insured · CBC1265280
  • Demolition through final inspection, in-house
  • Sun–Fri 7am–7pm · Sat closed

Photo sequence — entry, vanity, tub and shower of completed Elbaz suites

Elbaz project photograph

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with us. A licensed general contractor will come back to you to arrange a site walk. If it is urgent, call (754) 236-0675.