Primary/Master Bath Suite Remodel
A primary suite remodel is defined by scale and by who’s using the room: usually the largest bathroom in the house, built for two people at once, and often connected directly to the primary bedroom and closet. That changes the design math from a single-user hall bath into something closer to a small, coordinated multi-zone space — vanity zone, wet zone, and often a separated water closet.
Because a primary suite frequently borders the primary closet, a lot of these remodels turn into a two-room project even when only the bathroom was the original ask — moving a shower wall a few feet can change closet layout on the other side of it. That interconnection is worth planning for at the outset rather than discovering mid-project.
Elbaz Construction scopes primary suite remodels around how the room will actually be used by two people simultaneously getting ready — which is a different design problem than a guest bath, even when the finish budget is similar.
Get a real assessment, not a sales pitch. Call 754-236-0675 | Get A Free Estimate
Designing for two people at once.
Dual vanities need enough center-to-center spacing that two people can use them without bumping elbows — most primary suites target at least 30″ of counter width per person plus separation between bowls. Beyond the vanity, thinking in zones (wet area, vanity area, and toilet area) rather than one open room lets both people use the space at the same time without crossing paths.

Questions about your specific project? Ask a licensed GC. Call 754-236-0675 | Get A Free Estimate
The separated water closet question.
A fully enclosed toilet room adds privacy and is common in larger primary suites, but it still has to meet the same Florida code minimums as any other bathroom — at least 15 inches from the toilet’s center to any side wall or fixture, and 21 inches of clear space in front of it. Adding the room usually means adding its own door, and often its own light and exhaust routing, which is worth budgeting as its own line item rather than assuming it’s included in the general remodel cost.

Questions about your specific project? Ask a licensed GC. Call 754-236-0675 | Get A Free Estimate
Where the closet and bathroom meet.
A large share of primary suite remodels expand into the adjacent closet, or at minimum need the two spaces designed together, since moving a shower or vanity wall a few feet can reclaim (or eat into) closet square footage. Coordinating both rooms in one design phase avoids the common outcome of a beautifully remodeled bathroom that leaves the closet layout awkward.

Questions about your specific project? Ask a licensed GC. Call 754-236-0675 | Get A Free Estimate
Layout changes run into slab reality.
Wanting to move the shower to catch better natural light, or relocate the tub to a different wall, is common in primary suite remodels — but on South Florida’s slab-on-grade homes, that means cutting concrete to move the drain, not just reframing a wall. We flag which layout wishes require slab work during design, before a homeowner falls in love with a configuration that adds meaningful cost.

Questions about your specific project? Ask a licensed GC. Call 754-236-0675 | Get A Free Estimate
Materials
Option 1
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Dual vanity cabinetry with adequate center-to-center spacing between bowls
Option 2
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Quartz or large-format porcelain countertop (non-porous, no resealing required)
Option 3
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Freestanding or built-in soaking tub, separate from the shower where space allows
Option 4
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Enclosed water closet partition/door, meeting FBC’s 15″/21″ clearance minimums
Option 5
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Large-format porcelain tile for floors and shower walls
Option 6
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Independent exhaust routing for a separated water closet, in addition to the main bathroom fan
Not sure which option fits your home? We’ll walk the trade-offs on-site. Call 754-236-0675 | Get A Free Estimate
What Drives The Cost
- Overall size — More square footage means more tile, cabinetry, and fixtures across the board.
- Layout/plumbing relocation — Moving the shower or tub to a new wall requires slab cutting on most South Florida homes.
- Dual vanity plumbing — Two full sets of supply and drain lines cost more than a single-vanity layout, especially if the sinks sit on opposite walls.
- Fixture count — A separate soaking tub plus shower plus dual vanity plus enclosed water closet adds plumbing and electrical scope beyond a simpler layout.
- Tile square footage — Larger rooms and full-height wall tile both scale cost with area.
- Closet integration — If the project expands into the adjacent closet, that’s additional square footage, cabinetry, and often electrical scope.
Get a real, itemized estimate — no surprise change orders. Call 754-236-0675 | Get A Free Estimate
Our Process
Space Planning
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Layout & Plumbing Feasibility
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Permitting
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Demo & Rough-In
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Finish-Out & Final Inspection
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Evaluate the bathroom and adjacent closet together if the scope may cross into both rooms.
Determine which desired changes require moving drain lines (and therefore cutting the slab) versus what can be done within existing plumbing.
Pull building, plumbing, and electrical permits based on final scope.
Open walls and, where needed, cut and repour slab sections for relocated fixtures; complete plumbing and electrical rough-in.
Install cabinetry, tile, fixtures, and closet integration (if applicable), then pass final inspection.
One point of contact, start to finish — us. Call 754-236-0675 | Get A Free Estimate
Recent Bathroom Remodeling Work
See something close to your project? Let’s talk specifics. Call 754-236-0675 | Get A Free Estimate
See How We Work
Real Elbaz bathroom project — tub and shower with handheld shower head
Real Elbaz bathroom project — finished shower niche shelf
Want a real walkthrough before you commit to anything? Call 754-236-0675 | Get A Free Estimate
Primary/Master Bath Suite Remodel Questions, Answered
1 Is it worth combining a bathroom and closet remodel into one project?
If the two rooms share a wall that might move, yes — designing them together avoids a scenario where the finished bathroom leaves the closet layout compromised, and it's typically more efficient than two separate projects months apart.
2 How big should a primary suite bathroom actually be?
There's no strict minimum beyond standard fixture clearances, but most primary suites that feel comfortable for two people run 100+ square feet, with dual vanities, a separate shower, and often a soaking tub or separated water closet.
3 Can we add a second sink without a major project?
It depends on where the existing plumbing runs. Adding a second bowl next to the existing vanity plumbing is straightforward; putting the second sink on an opposite wall means new supply and drain lines, which is a bigger scope.
4 Do we need a separate, fully enclosed toilet room?
It's a preference, not a requirement — plenty of well-designed primary suites keep the toilet in the open room, often with a partial wall for visual privacy instead of a full enclosed room with its own door.
5 How long does a primary suite remodel take compared to a hall bath?
Longer, mainly due to size and complexity — where a hall bath might run four to six weeks, a full primary suite remodel with layout changes often runs six to ten weeks, more if it extends into the closet.
6 Why does a primary suite cost more than a similarly finished hall bath?
Scale (more tile, more cabinetry, more fixtures) and complexity (dual plumbing runs, possibly a separated water closet) both add cost beyond what the size difference alone would suggest.
7 Can we keep the tub/shower in its current location to save money?
Yes — keeping fixtures on their existing plumbing walls avoids slab cutting entirely, which is one of the more effective ways to control cost on a primary suite remodel without compromising the finish quality.
8 What's the most common regret homeowners have after a primary suite remodel?
Not planning storage (linen, towels, toiletries) as its own design category — it tends to get treated as an afterthought once the vanity and shower are decided, then feels tight once the room is finished.
Still have questions? Talk to a licensed contractor, not a call center. Call 754-236-0675 | Get A Free Estimate
What South Florida Homeowners Say
Adir Davidov2022-12-27 Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended! Lee Morali2022-12-27 They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them! Shir Partush2022-12-27 We hired them to renovate our investment property and they provided exceptional quality service for an affordable price! Mia Zafrani2022-10-25 Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction. carmit cohen2022-10-25 After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!! Omri B2022-10-20 I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work! roni yonani2022-10-19 Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same! Itzick Manasherov2022-10-19 Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need. Sophie Brito2022-10-19 Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend Elie Elancry2022-10-19 Amazing job Did a total renovation of my house with themGoogle rating score: 5.0 of 5, based on 12 reviews
Join our verified homeowners. Call 754-236-0675 | Get A Free Estimate
Why Homeowners Choose Elbaz Construction
Licensed General Contractor
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Real Regional Expertise
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
One Point Of Contact
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Real Reviews, Real Reputation
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Real license. Real permits. Real accountability. Call 754-236-0675 | Get A Free Estimate
From The Blog
How to Design a Bathroom Renovation
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
How Long Does a Bathroom Remodel Take?
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Steps to Remodel a Bathroom
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
More guides at our Resource Center. Call 754-236-0675 | Get A Free Estimate
More From The Field
Every photo here is real Elbaz bathroom remodeling work. Call 754-236-0675 | Get A Free Estimate
Explore Related Services
Kitchen Remodeling
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Flooring
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Residential Remodeling
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
Planning & Permitting
Quisque placerat vitae lacus ut scelerisque. Fusce luctus odio ac nibh luctus, in porttitor theo lacus egestas. Dummy text generator.
One contractor for the whole project — start to finish. Call 754-236-0675 | Get A Free Estimate
Financing
Find out if you're eligible for financing and turn your construction dream into a reality with the necessary funding.
Get Financing Today
Financing Solutions for Your Home
Finding the right financing solution for your home can be a challenge, but with the right approach, you can secure the funding you need to make your dream home a reality.Â
Mosaic offers financing options to help you bring your vision to life. To find out if you qualify, simply click the button to apply and one of our representatives will be in touch.
During this consultation, we'll discuss your project's details, funding needs, and the best financing options to meet your goals. Don't wait any longer to bring your construction project to life – start exploring your financing options with Mosaic today.
0% and low-interest financing options available — ask us how. Call 754-236-0675 | Get A Free Estimate
We serve Broward County and the following cities:
We serve Miami-Dade County and the following cities:
We serve Palm Beach County and the following cities:
We’re local — Miami-Dade, Broward & Palm Beach, every day. Call 754-236-0675 | Get A Free Estimate