Plank flooring in a finished office interior

A room you can
close the door on,
and be heard in.

Working from home fails on three things: noise, power and light. A proper conversion solves all three inside the walls — before the desk arrives, not after you have spent a year apologising on calls.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll
A-00Architectural
SHEET A-00 / INTERIOR INDEX · 12 FRAMES

Recent work

Check out our interior conversions.

Finished rooms, circulation and workspace interiors from Elbaz residential fit-outs across South Florida. Select any frame to open it full size.

G-01General
SHEET G-01 / HOME OFFICE CONVERSION
01

The service, defined

The furniture is not the project. The wall is.

A home office conversion turns an existing room, garage bay, loft or under-used space into a dedicated workspace — with acoustic separation, adequate and correctly placed power and data, lighting designed for screen work, and climate control that copes with a room full of equipment.

It serves people who work from home permanently rather than occasionally, and households where two people take calls at once. Everything that makes the room work is inside the construction: insulation in the partition, circuits in the wall, a supply that reaches the room. None of it can be retrofitted cheaply.

Wide-plank flooring in a furnished double-height living room
REFFinished interior with new flooring in a South Florida home.

Two South Florida factors shape this work. First, conditioning: a closed room full of equipment on a west elevation gets hot, and the existing system was rarely designed for a door that stays shut all day. Second, the garage — the most commonly converted space here — is usually uninsulated, unconditioned and on a slab that carries moisture, so it needs envelope work before it needs decoration.

What is included

Scope
Survey, design, partition and door works, acoustic treatment, electrical and data, lighting, climate, joinery, finishes, inspections and handover
Delivered by
One licensed general contractor — CBC1265280
Region
Miami-Dade, Broward and Palm Beach counties
Common conversions
Spare bedroom · den or formal dining room · garage bay · loft or bonus room · a divided section of a larger space
Usually included
Solid-core door · insulated partition · dedicated circuits · structured data · layered lighting · dedicated conditioning
A-01Architectural
SHEET A-01 / SCOPE OF WORKS · 10 ITEMS
02

Scope index

Everything a conversion actually contains.

Ten items, four phases. Six of them are invisible once the room is finished, and those six are what make it usable.

Plank flooring running into a bright open room
REFFinished room with plank flooring and full-height glazing.
01 / Pre-design

Use and survey

How many people, how many screens, how many calls, and whether video matters. Then the room itself: existing walls, ceiling void, window orientation, and where the nearest electrical panel actually is.

A-02Architectural
SHEET A-02 / PROJECT 01 · 09 FRAMES
PROJECT 01

Interior Conversion

Finished workspace and adjoining rooms in a residential fit-out

Interiors from Elbaz residential work, including a finished office room. These frames show the outcome — level floors, clean junctions and rooms that read as deliberate — rather than the services behind the walls that made them work.

Select any frame to open it full size. These frames are drawn from Elbaz residential fit-outs rather than from one conversion project, and the page says so rather than implying a single job.

A-03Architectural
SHEET A-03 / SPECIFICATION · SCOPE PROFILE
03

Specification

A Typical Conversion Scope

This sheet describes the shape of a home office conversion rather than one documented property. Cost, schedule, address and client are not stated anywhere on this page.

Project type
Conversion of an existing room, garage bay or divided space into a dedicated workspace
Acoustic scope
Insulated partition where a space is divided · solid-core door with seals · ceiling treatment where sound travels through the void
Electrical
Dedicated circuits sized for equipment · outlets positioned to the desk rather than to the wall centre · surge protection
Data
Hardwired outlets where video calls or large transfers matter; access-point provision where they do not
Lighting
Layered and dimmable, positioned to avoid screen glare and to light the face rather than the back of the head
Climate
Assessment of whether the existing system serves a closed room, and a dedicated head or duct alteration where it does not
Finishes
Flooring carried through or changed deliberately · full decoration · built-in desk and storage where specified
Typically not required
Structural work, unless the conversion removes or forms a load-bearing opening
Plank flooring running through a corridor toward a bright room
REFCorridor running toward a bright finished room.
A-04Architectural
SHEET A-04 / MATERIAL AND DESIGN LANGUAGE
04

Design and material language

Five decisions that make the room work.

The choices that decide whether the finished room is genuinely usable for work, and what the alternatives change.

Timber stair treads and balustrade above a tiled landing
DETHallway leading to a converted room.
Plank flooring through a hallway with panelled doors
DETFinished interior with continuous plank flooring.
M-01

The door

The cheapest acoustic upgrade there is

Used on this kind of conversion. A solid-core door with perimeter seals and a drop seal at the threshold. Most of the sound leaving a room leaves through the door and the gap under it.

Other options. A hollow-core door costs less and undoes most of the partition work behind it. If only one thing in the specification is upgraded, this should be it.

M-02

Partition build-up

Mass, cavity and isolation

Used on this kind of conversion. Where a space is divided, an insulated partition — the insulation is for sound rather than heat in this context.

Other options. Adding a second layer of board, or resilient channel, buys meaningfully more isolation for modest cost while the wall is open. It is not retrofittable.

M-03

Circuits and outlets

Where, not just how many

Used on this kind of conversion. Dedicated circuits sized for the equipment, with outlets positioned where the desk will actually sit rather than at standard centres.

Other options. Relying on an existing bedroom circuit is the usual shortcut. It works until a heater, a monitor array and a printer share it.

M-04

Lighting position

Behind the screen, not behind you

Used on this kind of conversion. Layered, dimmable lighting placed so the face is lit and the screen is not. This is a first-fix decision because it is about where circuits run.

Other options. A single central ceiling fitting is what most rooms start with and is precisely wrong for video calls — it backlights you and reflects in the screen.

M-05

Conditioning

A closed room with equipment in it

Used on this kind of conversion. An assessment of whether the existing system reaches a room that stays shut all day, with a dedicated head where it does not.

Other options. Leaving the door open to get airflow defeats the acoustic work entirely. If the room needs to be closed, it needs its own conditioning.

On what is shown. Every photograph on this page is real Elbaz Construction residential work. The frames come from several fit-outs rather than one conversion, and are presented as such.

G-02General
SHEET G-02 / PROCESS · 9 STAGES
05

Process

Nine stages, in order.

Short by construction standards, and almost entirely front-loaded: the decisions that matter are made before anything is built. No stage carries a duration here — scope and whether a permit is needed decide that.

01
Consultation

How the room will be used, and by how many people.

02
Survey

The room, the ceiling void, the panel location and the orientation.

03
Design

Acoustic, electrical, data, lighting and climate resolved together.

04
Approvals

Permit where electrical or structural work requires it.

05
Strip and build

Partitions formed, envelope work on garage conversions.

06
First fix

Circuits, data and lighting run, then inspected.

07
Close-up

Insulation, board and a flat, true substrate.

08
Finishes

Flooring, decoration, joinery and the door.

09
Handover

Walk-through with circuits, controls and any built-in explained.

P-01Permitting
SHEET P-01 / APPROVALS AND CODE BRIEF
06

Technical brief

When a conversion needs a permit.

Painting a spare room is not permitted work. Adding circuits, forming partitions or converting a garage almost always is — and garage conversions carry the most conditions.

Plank flooring in a hallway leading to a bedroom
PRoom mid fit-out, before finishing.
Light plank flooring in a furnished sitting room
PFlooring being laid during a conversion.
A-01

Electrical work

Adding circuits, moving a panel or extending a supply is permitted, inspected work. A home office typically needs more capacity than the room was built with.

A-02

Forming a partition

Dividing a room with a new non-structural partition is often permitted work because it changes egress, light and ventilation for the resulting spaces.

A-03

Garage conversion — habitable space

Converting a garage to conditioned habitable space is a change of use. It brings requirements for insulation, ceiling height, egress, moisture control and sometimes for replacing the parking it removes.

A-04

Egress and light

A habitable room has requirements for a window or means of egress and for natural light and ventilation. A converted interior room without a window may not qualify as habitable, whatever it is used for.

A-05

Parking replacement

Some municipalities require the parking space removed by a garage conversion to be replaced elsewhere on the lot. This is checked before design, not after.

A-06

HOA and deed restrictions

Associations frequently restrict garage conversions specifically, because they change the street elevation. Approval is separate from any municipal permit.

A-07

Mechanical alteration

Extending or adding conditioning to a previously unconditioned space is permitted mechanical work with its own inspection.

A-08

Smoke and CO detection

A new habitable room brings detection requirements, and interconnection standards may apply to the whole dwelling rather than just the new room.

A-09

Closeout

Where permitted, the permit is closed on final inspection. A garage conversion in particular should be properly permitted — an unpermitted one is a recurring problem at resale.

Disclaimer. Requirements are set by your municipality and, in a condominium or HOA, by the association. Nothing here is a legal opinion. We confirm what applies at your address before work starts.

S-01Structural
SHEET S-01 / ACOUSTIC AND SERVICES SECTION
07

Assembly

Section through a workspace partition.

An indicative section through a divided workspace — the layers that stop sound, and the two places it escapes regardless of how good the wall is.

Indicative section through an acoustic partition and doorSection showing a partition with board either side of an insulated cavity, a solid-core door with perimeter and threshold seals, the ceiling void above where sound can flank over the wall, and an outlet box shown offset rather than back-to-back.010203040506flankingIndicative section — not a construction drawing

Key

01
Ceiling void — the flanking path
02
Board, room side
03
Board, opposite side
04
Outlet box, offset not back-to-back
05
Dedicated circuit to the desk position
06
Floor — the second flanking path
S-01

Sound goes over the wall

A partition that stops at the ceiling line lets sound travel through the void above it. Continuing the partition to the structure, or treating the void, is what closes that path.

S-02

Do not put outlets back-to-back

Two boxes in the same stud bay make a direct hole through the partition. Offsetting them by one bay costs nothing and preserves the wall.

S-03

The gap under the door

An undercut door is a deliberate ventilation path and an accidental acoustic one. If the room is conditioned separately, that gap can be sealed.

S-04

Decide circuits before board

Outlet position relative to the desk is a first-fix decision. Afterwards it means surface trunking or opening a finished wall.

Q-01Quality
SHEET Q-01 / PERFORMANCE AND QUALITY
08

Performance and quality

What we hold ourselves to.

No acoustic rating is claimed on this page. Sound isolation figures belong to tested assemblies; what we commit to is the construction detail, not a laboratory number.

Light plank flooring meeting white skirting in a finished room
QLiving space with vaulted ceiling and new flooring.
Wood-look plank flooring running down a hallway
QCirculation with continuous flooring.
Acoustic detailing
Partition, door and flanking paths treated as one system rather than as a wall with a door in it.
Circuit capacity
Load calculated for the equipment the room will actually carry, not assumed from bedroom provision.
Outlet position
Set out against the intended desk position before first fix.
Lighting position
Planned to avoid glare and backlighting, which is a circuit decision rather than a fitting decision.
Garage envelope
On garage conversions, insulation and slab moisture addressed before finishes go anywhere near them.
Climate provision
Assessed for a closed, occupied, equipment-loaded room.
Inspections
Electrical and any structural work inspected before close-up.
Handover
Circuits, controls and any built-in joinery explained rather than left to be discovered.
C-01Cost
SHEET C-01 / COST AND SCHEDULE VARIABLES · 11
09

Cost and timeline

The eleven things a real number is built from.

We do not publish conversion prices. A spare bedroom with a new door and two circuits and a full garage conversion are different projects by an order of magnitude. After a survey you get a written scope and a fixed proposal.

Refinished timber stair with turned balusters
CRefinished stair and landing in a residential fit-out.
Plank flooring in a hallway with a panelled door open
CCirculation between converted rooms.
#VariableWhy it moves the number
01Starting spaceA finished spare room is a light scope. A garage is a change of use with envelope work attached.
02Acoustic ambitionA solid door and an insulated partition, or a genuinely isolated room. The gap between them is large.
03Electrical scopeNumber of circuits, distance from the panel, and whether panel capacity is adequate.
04DataWhether hardwired outlets are run, and how far from the router.
05LightingNumber of circuits and whether dimming and separate switching are included.
06ClimateWhether a dedicated head or duct alteration is needed.
07Garage envelopeInsulation, slab treatment and the vehicle door opening.
08Egress or window workWhere a habitable room needs a window or egress it does not currently have.
09JoineryBuilt-in desk, shelving and storage against off-the-shelf furniture.
10FinishesFlooring, decoration and trim.
11Permit and inspectionsMunicipal fees plus any HOA approval process.
I-01Information
SHEET I-01 / QUESTION INDEX · 15
10

Question index

Straight answers about converting a room.

Fifteen questions across acoustics, power, garages, permits, climate, cost and resale.

01 / Acoustics

How do I stop noise getting in and out?

Start with the door — solid-core with perimeter seals — because that is where most sound moves. Then the partition: insulation in the cavity and, if it is worth doing properly, a second layer of board. Then the flanking paths, which are the ceiling void above the wall and the gap under the door. Doing the wall and ignoring the door is the most common wasted spend in this work.

A-06Architectural
SHEET A-06 / CONSTRUCTION STUDY
Construction study

Four things worth looking for.

Plank flooring in a finished office interior
STUDYA finished office interior with plank flooring throughout.

These frames are real Elbaz Construction residential interiors, drawn from several fit-outs rather than one conversion project. The page says so rather than presenting them as a single job.

Observations

01
The floor runs through
No threshold strip at the door. A converted room reads as part of the house rather than as an afterthought when the floor is continuous with the space outside it.
02
Daylight from the side
Windows to one side of the working position rather than behind it. That is a room-selection decision, and it is worth more than any lighting fitting.
03
Clean junctions at skirting and reveals
Consistent shadow lines where floor meets wall and where trim meets the opening. Small, and the difference between a converted room and a finished one.
04
No visible surface trunking
Cables are in the wall. Where you see trunking on a skirting, the electrical was decided after the wall closed.
G-03General
SHEET G-03 / DELIVERY AND CREDENTIALS
11

Credentials and delivery

Six verifiable reasons, and no badges.

Nothing here is an award or a membership we cannot substantiate. The licence number is public and checkable.

Wide-plank flooring in a furnished double-height living room
REFFinished residential interior with new flooring throughout.
01

Licensed general contractor

CBC1265280 — certified building contractor, bonded and insured, which matters most on garage conversions where the work is a change of use.

02

Services designed, not assumed

Electrical load, outlet position and lighting placement are designed against how you will use the room.

03

Acoustics treated as a system

Partition, door and flanking paths together — because doing one without the others wastes the spend.

04

Garage conversions permitted properly

Change of use, egress, insulation and parking replacement handled openly rather than quietly skipped.

05

One contract

Carpentry, electrical, mechanical and finishes under one responsibility rather than four numbers to reconcile.

06

Handover that explains itself

You leave knowing which circuit is which and how the controls work.

I-02Information
SHEET I-02 / CLIENT RECORD
12

Google reviews

In their words, unedited.

Reviews are quoted verbatim from the Elbaz Construction Google Business Profile. They describe the company as a whole — none refers specifically to a home office conversion.

★★★★★

“They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work!”

Omri B · Google review

★★★★★

From start to end — personal kind treatment, always respectful, every espect of the work was clear, and fair.

roni yonani

★★★★★

They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result.

Mia Zafrani

★★★★★

Their work was absolutely superb, they did a fantastic job with my house renovation!!

Sophie Brito

★★★★★

Great service - Great quality - very quick - very professional !!

Adir Davidov

G-04General
SHEET G-04 / ENQUIRY
13

Start here

Book the room survey.

Tell us which room and what you do in it all day. We will look at the space, the panel and the orientation before proposing anything.

Plank flooring running into a bright open room
REFFinished room with plank flooring and full-height glazing.

What happens next

01
We call or email within one business day, Sunday to Friday.
02
A survey: the room, the ceiling void, the electrical panel and the orientation.
03
A written scope covering acoustics, power, lighting and climate, with a fixed proposal.
Useful to have
What equipment goes in the room, how many people use it at once, and your HOA rules if a garage is involved.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

G-05General
SHEET G-05 / END OF SET

Build the room right.
Then furnish it.

Design, acoustics, electrical, climate and finishes under one licensed general contractor across Miami-Dade, Broward and Palm Beach.

Plank flooring in a finished office interior
ENDA finished office interior with plank flooring.