Custom home construction

The house is decided by the lot, long before it is drawn.

Setbacks, height limits, coverage, flood elevation, exposure and what the ground will carry — these are the real brief. A design that ignores any of them is a redesign waiting to happen.

In South Florida the constraints stack. Zoning fixes the envelope you may build inside. The flood map fixes how high the finished floor has to sit, and whether you want to build higher still. The wind provisions fix the structure and every opening in it. On a waterfront parcel, the seawall and the dock add a second set of agencies.

Get those established first and the design work is productive from day one. Get them late and you pay for the same drawings twice — which is the single most common way a custom home budget slips before a shovel has moved.

The photographs here are one of our builds on a canal lot, at the stage where the shell, the stucco and the impact glazing are in and the interior is being drywalled. That stage is a good test of whether the front-end work was done: by then, everything the permit assumed is either right or expensive.

CBC1265280Florida certified building contractor. Licensed, bonded and insured.
3 countiesMiami-Dade, Broward and Palm Beach — 104 municipalities.
4.8 / 343Average rating across Google reviews.
One contractorSite, permitting, structure, envelope and finishes under one licence.

Own a lot, or looking at one? Start with what it allows.

How we work

Six things settled before design starts.

Lot · code · envelope

01

What the parcel permits

Zoning district, setbacks, height, lot coverage and any overlay. The buildable envelope is a fact about your land, and it is established from the record, not estimated.

02

Flood elevation

The flood zone and base flood elevation set the finished floor. Building above the minimum is a decision with cost and insurance consequences, and it is taken early.

03

Wind and exposure

Design pressures follow from location, height and exposure. They decide the structure and every opening, so they cannot be an afterthought at window-selection stage.

04

Ground and fill

What the soil will carry, how much fill the site needs and how it is compacted. This is where a foundation design either becomes routine or becomes engineered.

05

Waterfront agencies

Seawall, dock and shoreline work bring their own approvals on canal and coastal parcels, on their own timelines, alongside the building permit.

06

Utilities and access

Water, sewer or septic, power, and how heavy plant reaches the lot. Cheap to plan, disproportionately expensive to discover.

Six constraints, settled before the first drawing.

On site · 01

A canal-front house at shell and envelope stage

8 images · one Elbaz build in progress

Custom home construction by Elbaz Construction on a South Florida canal lot: a two-storey house at the stucco and glazing stage, with the waterfront lot and dock behind it
Custom home construction by Elbaz Construction on a South Florida canal lot: a two-storey house at the stucco and glazing stage, with the waterfront lot and dock behind it
Custom home construction by Elbaz Construction on a South Florida canal lot: a two-storey house at the stucco and glazing stage, with the waterfront lot and dock behind it
Custom home construction by Elbaz Construction on a South Florida canal lot: a two-storey house at the stucco and glazing stage, with the waterfront lot and dock behind it
Custom home construction by Elbaz Construction on a South Florida canal lot: a two-storey house at the stucco and glazing stage, with the waterfront lot and dock behind it
Custom home construction by Elbaz Construction on a South Florida canal lot: a two-storey house at the stucco and glazing stage, with the waterfront lot and dock behind it
New concrete seawall cap and composite dock decking along the canal frontage of the custom home lot
Custom home construction by Elbaz Construction on a South Florida canal lot: a two-storey house at the stucco and glazing stage, with the waterfront lot and dock behind it

The front elevation with the glazing installed and still filmed, and the stucco finished around it.

1 / 8

This is what the front-end work looks like once it is built.

What the photographs show

Why this stage is the honest one

The build above is at the point where the structure is up, the stucco is on and the impact glazing is installed and still carrying its protective film. Inside, the drywall is hung and the steel stair is going in. Nothing is hidden yet.

This is the stage that tells you whether the early decisions were right. The openings either match the approvals that were permitted, or they do not. The floor either sits where the flood elevation required, or it does not. The structure either carries the double-height volume the drawings promised, or the volume quietly shrinks.

By the time the glazing is in, everything the permit assumed is either right or expensive.

It is also the stage at which a custom home stops being a drawing. The lot photograph in the same set — canal frontage with a dock — is the other half of the story: it is what set the elevation, the exposure and the agencies involved, before a single line was drawn.

Observed specification
SiteA canal-front parcel with a dock, on filled ground
StructureTwo storeys, with a cantilevered upper floor over the entrance
EnvelopeStucco finish with impact-rated glazing to large openings
Interior stageDrywall hung and taped; steel stair under installation
GlazingFull-height and double-height openings, filmed and awaiting inspection
Not documentedAddress, client, contract value, dates and floor area

Described only from what is visible in the photography, plus the general requirements that govern ground-up work in South Florida. No cost, schedule, address, client or permit outcome for this specific project is stated, because none of it is documented in the image set.

The glazing stage is where good early decisions show.

Detail

Six things a custom home lives or dies on

Photography: an Elbaz build in progress

Custom home construction by Elbaz Construction on a South Florida canal lot: a two-storey house at the stucco and glazing stage, with the waterfront lot and dock behind it

The lot

Everything starts here

A parcel is not a blank sheet. Its zoning fixes the envelope, its flood zone fixes the floor level, its exposure fixes the wind loads, and on the water its seawall and dock bring agencies that have nothing to do with the building department. A custom home that begins with a plan rather than a parcel gets redrawn — usually more than once, and always at the owner's cost.

Custom home construction by Elbaz Construction on a South Florida canal lot: a two-storey house at the stucco and glazing stage, with the waterfront lot and dock behind it

Massing

Within the envelope

Height, setbacks and coverage decide the shape before anyone chooses a style. Good design here is working the envelope hard, not fighting it.

Interior of a custom home under construction by Elbaz Construction in South Florida: double-height glazing, a steel stair under installation and drywall at taping stage

Structure

What the volume costs

Double-height spaces, long spans and cantilevers are structural decisions taken at design stage. They are not finishes that can be added later.

Custom home construction by Elbaz Construction on a South Florida canal lot: a two-storey house at the stucco and glazing stage, with the waterfront lot and dock behind it

Envelope

Stucco and glazing

The wall and every opening in it are approved as a system. Substitutions on site change what was permitted.

Interior of a custom home under construction by Elbaz Construction in South Florida: double-height glazing, a steel stair under installation and drywall at taping stage

Openings to the water

View versus load

The widest openings usually face the exposure that generates the highest pressures. That trade-off is priced early or it is discovered late.

Interior of a custom home under construction by Elbaz Construction in South Florida: double-height glazing, a steel stair under installation and drywall at taping stage

Sequence

Dry before finished

Envelope closed and tested before finishes start. Getting impatient here is how a new house acquires an old house's problems.

Parcel, massing, structure, envelope — in that order.

Common questions

Custom home questions

What owners ask before committing to a ground-up build in South Florida.

Design and permitting usually take a substantial share of the total, and on a complex or waterfront parcel they can rival construction. We give a programme once the parcel and scope are known, rather than a headline duration that ignores approvals.

Both routes work. We work with your architect, or we coordinate design and engineering ourselves as a design-build. What matters is that the parcel constraints reach the drawing board before the drawings do.

The High-Velocity Hurricane Zone provisions apply in Miami-Dade and Broward, and they are the most demanding wind requirements in the country. Palm Beach sits outside the HVHZ but still carries high design pressures.

By the flood zone and the base flood elevation for the parcel, plus any local requirement and any freeboard you choose to add. It drives fill, driveway gradients and how the house meets the ground.

Yes, and it is common. Demolition, disconnection, disposal and sometimes an environmental item come first, and they belong in the budget from the start.

Protected trees are regulated locally. Removal or relocation is a permit item, sometimes with mitigation attached, and it is resolved before site work.

Waterfront structures involve agencies beyond the building department and run on their own timeline. We coordinate them alongside the build rather than treating them as a separate project that surprises the programme.

By pricing the parcel-driven items early — fill, foundations, structure and envelope — because those are the ones that move most. Finishes are the part that can be tuned later without redesigning anything.

Yes, with the honest caveat that a change is cheap on paper, more expensive in first fix, and most expensive after something is closed up. We tell you which of the three you are in.

Every new home has to meet the Florida energy code. Going further — envelope, glazing specification, mechanical selection — is a decision taken at design stage, where it is cheapest to act on.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Inside · 02

Structure, glazing and the volume it buys

6 images · interiors during construction · select to enlarge

Volume like this is a structural decision, taken early.

How the work runs

From parcel to certificate of occupancy

10 stages · constraints-first

01

Parcel due diligence

Zoning, envelope, flood zone, trees, utilities and — on the water — the seawall and dock.

02

Feasibility and budget

What can be built, and what the parcel-driven items cost before any finish is chosen.

03

Design

Architecture within the buildable envelope, with the flood elevation and wind loads treated as inputs.

04

Engineering

Structural, and the coordination of mechanical, electrical and plumbing with the structure rather than after it.

05

Permitting

Building permit, plus the separate agency approvals a waterfront or tree-affected parcel triggers.

06

Site work and foundations

Clearing, fill, compaction and the foundation system the ground actually needs.

07

Structure

Frame, floors and roof, inspected at each milestone.

08

Envelope

Roofing, stucco, impact glazing and doors — the point at which the building becomes weather-tight.

09

Interiors

Second fix, drywall, joinery, tiling and finishes.

10

Inspections and handover

Final inspections, certificate of occupancy, snagging and handover.

Which approvals a build needs, and which agencies are involved, depends on the parcel, the municipality and the flood zone. We confirm them for your address rather than working from a general rule, and we do not publish review durations.

One licensed contractor from due diligence to certificate of occupancy.

Before you buy the lot

Six checks that decide whether a parcel is worth it

Lot due diligence

01

Zoning and the buildable envelope

Setbacks, height and coverage together define the largest house the parcel can hold. That number is often smaller than the lot size suggests, and it is knowable in advance.

02

Flood zone and required elevation

The zone and the base flood elevation determine how high the floor must be. On a low parcel this drives fill, stem walls, driveway gradients and how the house meets the ground.

03

Existing structures and demolition

A lot with a house on it carries demolition, disconnection and disposal, and sometimes an environmental item. It is not a blank site.

04

Trees and vegetation

Protected trees are common and are regulated locally. Removal, relocation and mitigation are permit items with cost and programme attached.

05

Utilities at the boundary

Whether water and sewer are actually available at the parcel, or whether you are paying for an extension or a septic system.

06

Waterfront condition

On a canal lot, the seawall's condition and the dock's permit history matter as much as the buildable area, and they are separate approvals.

These are the checks we run on a parcel before design. Which apply, and what they require, is set by your municipality, your flood zone and the agencies with jurisdiction over your shoreline — we verify them for the specific address rather than working from a general rule.

Checking the lot first is the cheapest work on the whole project.

Budget

What moves a custom home number

Relative impact · not a quotation

01

Size and complexity

Floor area, storeys, spans and how many corners the plan has. Complexity costs more per square foot than area does.

Highest impact
02

The parcel itself

Flood elevation, fill, soil, demolition, trees and access. Two identical houses on two different lots are not two identical projects.

High impact
03

Structure and envelope

Long spans, cantilevers, large glazed openings and the pressures they have to be rated for. Decided at design stage, paid for throughout.

High impact
04

Finish specification

Joinery, stone, tile, brassware and appliances. The most visible line and the most adjustable one.

Moderate, and yours to control
05

Design, engineering and permits

Architecture, structural engineering, permit fees and agency approvals. Small against the build, decisive for the programme.

Moderate, and on the critical path
06

Site and external works

Driveway, drainage, landscaping, pool surround and the seawall or dock where there is one. Routinely underestimated at the outset.

Lower, and often forgotten

The bars show the relative weight these factors typically carry against one another on ground-up residential work. They are not prices, percentages of a budget, or a quotation, and the order changes with the parcel.

For a number specific to your parcel, we need to assess it.

Google reviews

What clients said on Google

4.8 Based on 343 Google reviews

★★★★★
Elbaz Construction provided excellent service and outstanding craftsmanship. The team was professional and attentive to our needs. We’re extremely satisfied with the results!
Damian Nunez · Google
★★★★★
We had a good time dealing with Asher and the crew, he went over and above all our expectations and made every effort to ensure that the end result was up to their high standards. Thank you !!
Emmett Giffin · Google
★★★★★
I give them a five star rating not only for their excellent roofing skills and timelines, but also for their competitive pricing and the honesty and professionalism of the team !! We are very pleased with the outcome
Zachary Gugliotta · Google
★★★★★
If you are planning to remodel your kitchen or bathroom or do any other construction project, call Sean from Elbaz Construction . He has a lot of experience and will recommend the best options/ suggestions to your project. He did high quality job !
Kameron Allison · Google
★★★★★
Asher has a lot of experience . We replaced our windows to energy efficient windows. He got down to business right away and did high quality work. His team is very professional! Thanks again
jessica berliner · Google
★★★★★
Asher was knowledgeable and gave us cool ideas that we didn't even know before. Nice beautiful color and design. We appreciate the price !
Sierra Bernabeo · Google

Review text is reproduced verbatim from the connected Google Business Profile, including its original spelling. Nothing is rewritten, shortened or combined. No review schema is emitted on this page.

Join the owners across Miami-Dade, Broward and Palm Beach.

Schedule a Consultation (754) 236-0675
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Next step

Bring us the parcel, not the plan

We will tell you what can be built on it, what the flood elevation and wind requirements will cost you, and what the approvals path looks like.