Plan the paperwork first.

Licensed general contracting, construction and remodeling in the Town of Glen Ridge — where the Town’s own advice is that almost anything you wish to do to your property will need a permit, and where Town Hall is open Monday to Thursday, 8 a.m. to 1 p.m.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

A-00Architectural
SHEET A-00 / SOUTH FLORIDA REFERENCE SET · 12 FRAMES

Recent work

Accessory space, and the rooms inside it.

Accessory dwellings, bathrooms and flooring built by Elbaz Construction across South Florida. None of the properties shown is in Glen Ridge, and none is offered as an example of what the Town’s 2025 ordinance permits. Select any frame to open it full size.

G-01General
SHEET G-01 / TOWN OF GLEN RIDGE
01

The town, defined

Small, candid, and open four mornings a week.

Glen Ridge does not publish a permitting portal, a fee estimator or a review timescale. What it publishes instead is advice, and the advice is unusually direct: more than likely, almost anything you wish to do to your property will need a permit, and it is better to call and find out than to forge ahead and end up with unpermitted work. That is a small town telling you plainly that the exemption you are hoping for probably is not there.

The second fact is the one that shapes a programme. Town Hall, and with it the Building Division, is open Monday to Thursday from eight in the morning until one in the afternoon. Twenty hours a week is the entire window for anything that needs a person. On a project of any size that is not an obstacle — it is simply a constraint to design around, in the same way a trade’s inspection day is.

What the Town does publish is a complete document set: an application and an application process, a permit checklist, an HVAC efficiency form, an owner builder disclosure statement, a current fee sheet, a permit renewal form and a notice of commencement. It also carries a 2025 ordinance on auxiliary dwelling units. We have not opened that ordinance and we will not summarise it — but its presence tells you accessory dwellings are a live subject here, and the Town is the authority on what it now permits.

Studio ADU interior with kitchenette, seating and sleeping area
REFStudio accessory dwelling interior with kitchenette, seating and sleeping area, South Florida project by Elbaz Construction.

We work across Miami-Dade, Broward and Palm Beach, so a small town with a short counter window is a scheduling problem we have solved before rather than a surprise.

What is included

Town Hall and Building Division
Monday to Thursday, 8 a.m. to 1 p.m.
The Town’s own guidance
Almost anything will need a permit
Published forms
Application, process, checklist, renewal
Also published
HVAC efficiency form, owner builder disclosure
Also published
Notice of commencement, current fee sheet
On the shelf
A 2025 ordinance on auxiliary dwelling units
A-01Architectural
SHEET A-01 / SCOPE OF WORKS · 10 ITEMS
02

Scope index

What we build here

The Town publishes no category list, so this is grouped by what its forms and its guidance imply rather than by a published classification. Whether any particular scope needs a permit is the Town’s determination, and the Town asks to be called.

ADU kitchenette with white shaker cabinets and dark tile splashback
REFAccessory kitchenette with white shaker cabinets and dark tile splashback, South Florida project by Elbaz Construction.
01 / A live local subject

Accessory dwelling units

The Town publishes a 2025 ordinance on auxiliary dwelling units on its own document shelf. We have not read it, so we describe nothing about what it allows — but if you are considering an accessory dwelling here, that ordinance is the first thing to ask the Town about.

A-02Architectural
SHEET A-02 / REFERENCE 01 · A SEPARATE SMALL BUILDING, ROOM BY ROOM · 09 FRAMES
REFERENCE 01 · A SEPARATE SMALL BUILDING, ROOM BY ROOM

What accessory space looks like when it is finished

Nine frames, separate South Florida projects

The Town’s own shelf points at auxiliary dwelling units, so this is what that kind of work looks like completed elsewhere in South Florida. None of it is offered as an example of what Glen Ridge permits.

These nine frames are separate South Florida projects by Elbaz Construction, not one project and not a Glen Ridge property. Select any frame to open it full size.

A-03Architectural
SHEET A-03 / WHAT THE TOWN PUBLISHES · TOWN OF GLEN RIDGE
03

Specification

The whole published record, and its limits

Read from the Town’s Building Division and Building Permit Information pages on 2026-08-16. The Town publishes no review timescale, no exemption list and no category table, and neither does this page.

The Building Division
Reachable during Town Hall hours, Monday to Thursday, 8 a.m. to 1 p.m., at 1501 Glen Rd.
The Town’s guidance
That almost anything you wish to do to your property will need a permit, and that calling to find out beats forging ahead into unpermitted work.
Permit Application, and Permit Application Process
The Town publishes both the form and a separate description of the process.
Permit Checklist
A published checklist of what a submission carries.
HVAC Efficiency Form
Published alongside the application, which tells you mechanical work is permitted work here.
Owner Builder Disclosure Statement
The owner-builder route exists and carries a signed disclosure.
Notice of Commencement, and Permit Fees Current
Both published. We have not opened the fee sheet, so no figure appears on this page.
Ordinance 2025-2, auxiliary dwelling units
Published on the Town’s shelf and NOT opened by us. Named here because knowing it exists is useful; anything beyond that is a question for the Town.
ADU bathroom with glazed shower enclosure and vanity
REFAccessory bathroom with a glazed shower enclosure and vanity, South Florida project by Elbaz Construction.
A-04Architectural
SHEET A-04 / MATERIAL AND DESIGN LANGUAGE
04

Design and material language

The decisions worth settling before you call

Five things that make the conversation with a small building division short and productive rather than open-ended.

ADU shower with patterned feature tile and matt black fittings
DETAccessory shower with patterned feature tile and matt black fittings, South Florida project by Elbaz Construction.
Completed bathroom remodel in a South Florida home
DETCompleted bathroom with a tiled enclosure, South Florida project by Elbaz Construction.
M-01

What the project actually is

The question the Town will ask

Worth settling early A clear scope gets a clear answer from a building division that has twenty hours a week to give.

Other options. Write the scope down before the call. "Some work in the kitchen" produces a longer conversation than a described project.

M-02

Whether habitable space is being added

The ADU question

Worth settling early The Town’s shelf carries a 2025 ordinance on auxiliary dwelling units, so this is the topic on which its rules are most recently settled.

Other options. If an accessory dwelling is even a possibility, raise it at the first call rather than the third.

M-03

Mechanical replacement

A published form

Worth settling early The HVAC Efficiency Form is part of the permit document set.

Other options. Have the equipment data before applying, not after the form is handed to you.

M-04

Who will hold the permit

Contractor or owner-builder

Worth settling early The Town publishes an Owner Builder Disclosure Statement, so the route exists and is documented.

Other options. Decide before filing. The disclosure is an acknowledgement of responsibility, not a formality.

M-05

How long the work will run

The renewal question

Worth settling early A Permit Renewal Form is published, which means permits here have a life and a route when they exceed it.

Other options. On a phased or seasonal project, plan for renewal rather than discovering it.

On what is shown. Nothing here is a determination. The Town decides what a scope requires, and it publishes no exemption list, no review timescale and no category table — so this page describes the decisions, not their outcomes.

G-02General
SHEET G-02 / PROCESS · 10 STAGES
05

Process

How we run a project here

Ten steps, built around a twenty-hour week: everything that needs a person is scheduled deliberately.

01
Consultation

The scope, the address, and what you actually want to change.

02
The call

We put the scope to the Building Division inside its window, because the Town asks to be called and because it is the fastest way to a reliable answer.

03
Category

We establish what the Town says the work requires before any design cost is committed.

04
Design

Drawn once the requirement is known, rather than drawn and then tested.

05
Forms

Application, checklist, HVAC efficiency and owner builder disclosure as applicable, completed before the counter visit.

06
Lodgement

Filed inside the Monday-to-Thursday window, complete.

07
Notice of commencement

Recorded as the Town’s document set requires.

08
Construction

Sequenced so inspections can be booked and taken inside the same window.

09
Renewal

Where the work will run long, the renewal form is filed before the permit lapses rather than after.

10
Completion

Final inspections, certification, and the documents handed over in a form you can produce again when the property is sold.

P-01Permitting
SHEET P-01 / PERMITTING · TOWN OF GLEN RIDGE
06

Technical brief

What the Town publishes, and what it says exactly

Eight references. This is a small town and its published record is short — so this sheet is short, and it stops where the record does.

ADU bedroom with dresser and mirror beside a window
PAccessory bedroom with dresser and mirror beside a window, South Florida project by Elbaz Construction.
Light plank flooring in a furnished sitting room
PLight plank flooring in a furnished sitting room, South Florida project by Elbaz Construction.
R-01

The Town’s own advice, quoted

"More than likely, almost anything you wish to do to your property will need a permit. Better to call and find out than to forge ahead and end up with unpermitted work."

R-02

The window

Town Hall and the Building Division are open "Mon-Thur 8 am to 1 pm" — twenty hours a week, at 1501 Glen Rd.

R-03

The application, and the process

The Town publishes both a Permit Application and a separate Permit Application Process document.

R-04

A published checklist

A Permit Checklist forms part of the Town’s document set for a building permit.

R-05

Mechanical work has its own form

An HVAC Efficiency Form is published alongside the permit application.

R-06

The owner-builder route is documented

An Owner Builder Disclosure Statement is published, so the route exists and carries a signed acknowledgement.

R-07

Commencement and renewal

A Notice of Commencement and a Permit Renewal Form are both published, together with a current permit fee sheet — which we have not opened, so no fee figure appears on this page.

R-08

A 2025 ordinance on auxiliary dwelling units

The Town’s shelf carries `ordinance 2025-2 – aux dwelling units`. We have not opened it and this page does not describe what it permits, requires or restricts. It is named because knowing it exists is genuinely useful if you are considering accessory space — and the Town is the authority on the rest.

Disclaimer. Nothing on this sheet is a determination about a specific property. The Town decides what a scope requires, and it asks to be called.

S-01Structural
SHEET S-01 / THE COUNTER WINDOW · INDICATIVE
07

Assembly

Twenty hours a week, drawn.

An indicative diagram of how a small-town programme is shaped by a short counter window, not a determination. The Town decides what a scope requires.

Indicative diagram of the Glen Ridge permit windowA scope of work is first put to the Town by telephone, because the Town advises that almost anything will need a permit. The submission is then assembled against the published checklist and forms, and lodged during the Town Hall window of Monday to Thursday, eight in the morning to one in the afternoon. Review, permit issue and inspections follow within the same window, and a renewal form exists where a permit runs on.Call the Townbefore anything elseAssemble to thepublished checklistLodge, review,permit issuedInspections andcompletionEverything needing a person happens Monday to Thursday,8 a.m. to 1 p.m. — twenty hours a week

Key

01
The Town called before design begins
02
Submission assembled to the published checklist
03
Forms completed — HVAC, owner builder, as applicable
04
Lodged inside the counter window
05
Notice of commencement recorded
06
Inspections scheduled inside the same window
07
Renewal filed if the permit runs on
N-01

The Town asked you to call. So call.

This is the rare case where a municipality has published the single most useful instruction it can give a homeowner. Treat it as the first step, not a fallback.

N-02

Twenty hours is the whole window

Monday to Thursday, 8 a.m. to 1 p.m. Anything needing a person — a question, a lodgement, an inspection booking — happens inside it.

N-03

Assume no exemption

The Town publishes no exemption list and says almost anything will need a permit. Scoping a job around an exemption you have not confirmed is how unpermitted work happens.

N-04

The renewal form exists for a reason

A permit that runs on has a published route. Knowing that before a project pauses is better than finding out after.

N-05

The ADU ordinance is the Town’s to explain

Ordinance 2025-2 on auxiliary dwelling units is published on the Town’s own shelf. We have not read it and will not characterise it. If accessory space is your project, that document is the conversation.

N-06

A thin published record is not a permissive one

Small towns publish less. That is a reason to ask more, not to assume less is required.

REFERENCE 02 · ACCESSORY SPACE, INSIDE AND OUT

The subject the Town’s own shelf points at

The Town publishes a 2025 ordinance on auxiliary dwelling units. These are South Florida projects by Elbaz Construction; neither property is in Glen Ridge, and neither is offered as an example of what that ordinance permits.

01A detached accessory dwelling with a canopy over the entry.
02An accessory bedroom with a vaulted ceiling and exposed beam.
Q-01Quality
SHEET Q-01 / PERFORMANCE AND QUALITY
08

Performance and quality

How we work

Seven commitments, each one a direct consequence of how this Town actually operates.

ADU bathroom with open shelving above the WC
QAccessory bathroom with open shelving above the WC, South Florida project by Elbaz Construction.
Timber stair treads and balustrade above a tiled landing
QTimber stair treads and balustrade above a tiled landing, South Florida project by Elbaz Construction.
We call first, as the Town asks
It is published advice from the authority that will decide, and it costs one phone call inside a twenty-hour week.
We assume a permit is required
The Town publishes no exemption list and says almost anything will need one. Assuming otherwise is how unpermitted work happens.
We schedule around the window
Monday to Thursday, 8 a.m. to 1 p.m. Lodgements, questions and inspection bookings are planned into it rather than attempted around it.
We file complete
In a small division a complete submission is not just polite, it is the difference between one visit and three.
We do not characterise documents we have not read
The ADU ordinance is named on this page and described nowhere on it. That is deliberate.
We plan for renewal on long jobs
The Town publishes a renewal form, which means permits here have a life worth tracking.
One licensed contract
Design coordination, Town submittals, permitting and construction under CBC1265280, so no approval falls between two parties.
C-01Cost
SHEET C-01 / COST AND SCHEDULE VARIABLES · 9
09

Cost and timeline

What moves the number

We publish no fee figures for this Town. A current permit fee sheet exists on its shelf and we have not opened it, and the figure that matters is current on the day you file. These are the variables that move a price.

Completed bathroom remodel in a South Florida home
CCompleted bathroom with a tiled shower and glass screen, South Florida project by Elbaz Construction.
Wide-plank wood-look flooring in a finished living room
CWide-plank wood-look flooring in a finished living room, South Florida project by Elbaz Construction.
#VariableWhy it moves the number
01Whether the work needs a permit at allAlmost certainly yes on the Town’s own guidance — but the answer comes from the Town, and it comes free.
02Whether habitable space is being addedAn accessory dwelling is a different proposition from a renovation, and the Town has a 2025 ordinance about it.
03How many trades are involvedEach brings its own scope, its own inspection and its own coordination inside a short counter week.
04How complete the submission isIn a small division, an incomplete package does not get queued — it waits for the next window.
05Whether the programme fits the windowTwenty hours a week is a scheduling constraint with a real cost on a fast-moving job.
06Structural interventionRemoving or altering structure brings engineering, and engineering brings its own review and inspection sequence.
07Existing conditionsWhat is behind the finishes on an older building is the largest genuine unknown on most renovation projects anywhere.
08Product approvalsRated assemblies for openings carry their own documentation and lead times across South Florida.
09Specification levelFinishes, joinery and fittings move a renovation budget more than square footage does, once the shell is settled.
I-01Information
SHEET I-01 / QUESTION INDEX · 10
10

Question index

Questions we are asked here

Answered from the Town’s own published material, which is short — so where the record stops, this page says so.

01 / Permits

Do I really need a permit for this?

The Town has answered that itself, and unusually plainly: "More than likely, almost anything you wish to do to your property will need a permit. Better to call and find out than to forge ahead and end up with unpermitted work." There is no published exemption list to work from, so the honest answer is to assume yes and confirm with the Building Division.

A-06Architectural
SHEET A-06 / CONSTRUCTION STUDY
Construction study

What to establish first

ADU bedroom with vaulted ceiling and exposed beam
STUDYAccessory bedroom with a vaulted ceiling and exposed beam, South Florida project by Elbaz Construction.

Four questions worth answering before a drawing is commissioned. All four are answered by the Town, not by a contractor — and the Town has asked to be called.

Observations

01
Whether the work needs a permit
On the Town’s guidance almost anything does, but the Town gives the answer and the call is free.
02
Whether an accessory dwelling is in scope
A 2025 ordinance addresses auxiliary dwelling units. If that is your project, it is the first conversation.
03
What the checklist asks for
The Town publishes it. Working to it is the difference between one counter visit and several.
04
How the programme fits twenty hours a week
Every lodgement, question and inspection booking happens Monday to Thursday morning.
G-03General
SHEET G-03 / DELIVERY AND CREDENTIALS
11

Credentials and delivery

Why Elbaz Construction

Six things that are verifiable rather than asserted.

Detached ADU exterior with canopy over the entry door
REFDetached accessory dwelling with a canopy over the entry door, South Florida project by Elbaz Construction.
01

Licensed general contractor

CBC1265280 — certified building contractor, bonded and insured. Verifiable in the Florida DBPR licence register.

02

We take the Town’s advice literally

It asked to be called before work is started. That is the first step on every Glen Ridge project we run.

03

We schedule around a twenty-hour week

Rather than treating a short counter window as an obstacle to complain about.

04

We read the Town’s own material

Every statement on this page was taken from an official Town page and is attributed to it.

05

We say what we do not know

The ADU ordinance, the fee sheet and the application process document are named here and described nowhere, because we have not opened them. On a town with a short record that restraint matters more, not less.

06

Honest photography

Every image here is a real Elbaz Construction project in South Florida, captioned for what it actually shows. None is claimed as a Glen Ridge property.

I-02Information
SHEET I-02 / CLIENT RECORD
12

Google reviews

In their words, unedited.

Reproduced verbatim from the connected Google Business Profile, including original spelling. No review schema is emitted from this page.

★★★★★

“Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.”

Mia Zafrani · Google review

★★★★★

Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze.

Lee Morali

★★★★★

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!

Shir Partush

★★★★★

From start to end- personal kind treatment, always respectful. Value for money 10/10.

roni yonani

★★★★★

Amazing job Did a total renovation of my house with them

Elie Elancry

G-04General
SHEET G-04 / ENQUIRY
13

Start here

Start a Glen Ridge project

Tell us the scope and the address. We will put it to the Building Division inside its window, come back with what the Town says it requires, and plan the programme around a twenty-hour week.

Studio ADU interior with kitchenette, seating and sleeping area
REFStudio accessory dwelling with kitchenette, seating and sleeping area, South Florida project by Elbaz Construction.

What happens next

01
We call or email within one business day, Sunday to Friday.
02
A call to the Building Division inside its window, to establish what the Town says the scope requires before any design cost is committed.
03
A site visit, then a written scope and a proposal against it — with the review path stated in it, not assumed.
Useful to have
Any previous Town permits for the property, a survey if you have one, and a written description of what you want to change.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

G-05General
SHEET G-05 / END OF SET

Call first.
Then build it properly.

Design coordination, Town submittals, permitting and construction under one licensed general contractor — in the Town of Glen Ridge and across Miami-Dade, Broward and Palm Beach counties.

ADU kitchenette with white shaker cabinets and dark tile splashback
ENDAccessory kitchenette with white shaker cabinets and dark tile splashback, South Florida project by Elbaz Construction.