View all servicesRenovating a whole home is a scheduling problem before it is a design one. The trades have to arrive in the right order, the long-lead items have to be ordered before anything is demolished, and somebody has to own what happens between the rooms. We handle the design, the permits and every trade in-house across Miami-Dade, Broward and Palm Beach.
Miami-Dade · Broward & Palm Beach Counties
ScrollRecent projects
Twelve frames from six completed projects - three bathrooms and three kitchens. Tap any image to see it larger.
Bathroom project: a freestanding tub with twin floating basins.
Kitchen project: marble island against a teal herringbone backsplash.
A second bathroom: vessel basin, backlit mirror and walk-in shower.
A second kitchen: navy cabinetry with brass hardware.
Bathroom project: twin basins under a round mirror.
A third kitchen: contemporary open plan with a stone island.
A third bathroom: a navy vanity with a stone top.
Kitchen project: the perimeter run and farmhouse sink.
Bathroom project: the walk-in shower and vanity run.
A third kitchen: the view through to the living space.
A second bathroom: the shower and its recessed niche.
A second kitchen: the perimeter run and integrated appliances.
All photographs are of real completed Elbaz Construction work. They come from six separate projects on six different properties, and are shown as recent work rather than as one house.
The journey
Whole-house projects rarely fail on the finishes. They fail where two trades meet and neither one owns the join, or because a long-lead item was ordered after demolition rather than before it, and eleven people then wait five weeks for a cabinet. This page walks the sequence in the order it actually happens, starting with the part most people skip: deciding what the house genuinely needs.
Use the stage markers to jump straight to what you care about. Nothing here is a sales pitch - it is the sequence we actually follow.
Stage 01 · Scope
Four reasons, and they produce very different scopes. Which one is yours decides how much of the house gets opened and in what order.
The most common brief, and the one with the most freedom in it. Nothing is failing, so the scope is genuinely yours to set - which also means it is the scope most likely to grow quietly. Deciding early which rooms are in and which are explicitly out is what keeps a cosmetic renovation from becoming a structural one halfway through.

Completed Elbaz kitchen: a marble island against a teal herringbone backsplash.
When a system is failing, the renovation is being driven by the house rather than by you, and the order changes: the failing system is fixed first and the finishes follow it. The advantage is that walls are already coming open, so doing the rest of the work now is far cheaper than doing it in two years.

Completed Elbaz bathroom: the walk-in shower and its recessed niche.
Opening a kitchen to a living room, moving a bathroom, or turning three small rooms into two usable ones is a different project from replacing finishes. Walls, structure, services and often the permit scope are all in play, and the design work carries far more weight.

Completed Elbaz kitchen: the view through to the living space.
Renovating an empty house is the best version of this job and the one with the fewest compromises. Every trade can work at once, nothing needs phasing around a family, and the programme is materially shorter. The constraint is usually the calendar rather than the building.

Completed Elbaz bathroom: a freestanding tub with twin floating basins.
Stage 02 · Design
Everything else is selection. These four decide the programme, the cost and how much of your life the renovation takes up.
This decides more about the schedule than any other choice. An empty house lets trades overlap; an occupied one forces them to queue, because you need a working bathroom and somewhere to make food at every point in the job. Living in it is entirely doable and it does add time.

Completed Elbaz bathroom: a navy vanity with a stone top.
Doing everything in one programme is almost always cheaper per square foot, because setup, protection, permits and mobilisation happen once rather than twice. Phasing is a cashflow and disruption decision, not an efficiency one, and it is a legitimate choice - it just costs more in total.

Completed Elbaz kitchen: navy cabinetry with brass hardware.
Keeping the layout keeps the project predictable: the services stay roughly where they are and the permit scope stays modest. Changing it brings structure, drainage and engineering into play, and it is where the largest improvements usually come from. Both are valid; they are different projects.

Completed Elbaz kitchen: contemporary open plan with a stone island.
This is the most common avoidable delay on a whole-house job. Cabinetry, windows, tile and appliances can all run to long lead times, and a renovation stops dead waiting for any one of them. Selections are made and ordered before demolition begins, so the site never waits on a decision that could have been taken in week one.

Completed Elbaz bathroom: twin basins under a round mirror.
Every photograph in this section is real Elbaz work, from six different completed projects. Each caption says which; they are not one house.
Project gallery 01
Ten frames from six different projects - three bathrooms and three kitchens we designed and built. They are separate projects on separate properties, and each caption says which.
Project 01, guided tour










Bathroom one, wide
A freestanding tub set against a full-height tiled wall, with twin floating basins on a long vanity ledge opposite.
Six separate Elbaz projects - three bathrooms and three kitchens - photographed at completion. They are six different properties, presented as six projects rather than one house.
A freestanding tub with twin floating basins and brass pendants; a second with a hammered vessel basin, backlit mirror and frameless glazed shower; and a third with a navy vanity, stone top and patterned floor tile.
A marble island against a teal herringbone backsplash with a farmhouse sink on the perimeter; a navy kitchen with brass hardware and a white stone island; and a contemporary open-plan kitchen looking through to the living space.
A full-service renovation is exactly this: the same contractor delivering kitchens and bathrooms to the same standard, on one schedule, with the trades sequenced between them.
No cost, timeline, address, client or permit history appears anywhere on this page, and no photograph here is presented as being from the same property as any other.
Stage 03 · Permit
A whole-house renovation usually touches structural, electrical, plumbing and mechanical scope at once. Filing it as one coordinated set is materially faster than filing four times.
The house is surveyed properly before any scope is priced - what is behind the walls, what the panel can carry, where the drainage runs and what condition it is in.
Room by room, written down. The out-of-scope list is as important as the in-scope one, because it is what stops a renovation growing quietly through the build.
Layouts, elevations and the structural intent are settled before anyone picks a tile. Changing a layout on paper is free; changing it after rough-in is not.
Where walls are moving or openings are widening, the structure is designed by an engineer. In South Florida that includes the wind criteria, which are not a formality.
Electrical panel capacity, drainage condition and fall, and water supply are all confirmed against the new scope rather than assumed to be adequate.
Cabinetry, windows, doors, tile and appliances are selected and ordered before demolition, because a whole-house programme cannot absorb a five-week wait mid-build.
The drawings and trade information go in as one set to your municipality, or to the county where the property is unincorporated. Review comments are answered and resubmitted.
Condominium and HOA boards have their own rules, particularly on plumbing, flooring, impact windows and working hours, and they meet on their own schedule.
The trade sequence, the phasing if the house is occupied, and the inspection points are set out and agreed with you before demolition rather than discovered during it.
Older houses hide things. A whole-house renovation is planned with an allowance for what opening the walls reveals, and we tell you what we find as we find it.
Requirements, review times and inspection sequences are set by your local building department, and they differ across Miami-Dade, Broward and Palm Beach and between the municipalities inside them. Nothing here is a guaranteed timeline or an assurance of approval - we confirm what your address actually requires once we know it.
Stage 04 · Build
This order is not a preference. Almost every item below is gated by the one above it, and getting one out of sequence means undoing finished work.
Before anything comes out
Access routes protected, dust barriers up, and the areas you are still living in sealed off. On an occupied house this is a substantial piece of work in itself.
Quality check · Barriers up and routes protected before demolition

Back to what stays
Finishes, fittings and any walls in the scope come out. This is when the house tells you what it has been hiding, and where the contingency starts earning its place.
Quality check · What is found is reported as it is found

Openings and support
Any structural changes are made to the engineered design, with support in place before anything is removed. Nothing downstream can start until this is complete.
Quality check · Structural inspection before work continues

Plumbing, electrical, mechanical
Every service is run with the walls open - drainage and its fall, supply, circuits, and the mechanical system. This is the last moment anything can move without opening finished walls.
Quality check · Rough-in inspections with the walls still open

Where they are in scope
Impact-rated windows and doors are installed and their compliance documentation goes to the inspector. The house becomes weathertight before interior finishing starts.
Quality check · Building weathertight before finishes begin

Closing the walls
Insulation where it applies, then wallboard, taping and preparation. The house stops being a building site and starts being rooms again.
Quality check · Inspections passed before walls are closed

The continuous surfaces first
Floor finishes and wall tiling. Running flooring continuously through the house is what makes a whole-house renovation read as one project rather than several.
Quality check · Setting out agreed before tiling starts

The long-lead items land
Kitchen and bathroom cabinetry, wardrobes and joinery are set and levelled. Worktops are templated from the installed cabinetry, never from the drawing.
Quality check · Templates taken from the build, not the drawing

Making the rooms work
Worktops, sanitaryware, appliances, lighting, doors and trim, then the final plumbing and electrical connections across every room.
Quality check · Every fixing lands in blocking, not just board

Signed off, then walked
Final inspections across the trades, the permit closed out, then a full walkthrough with you room by room and a snagging list we actually finish.
Quality check · Permit closed out before handover

Stage 05 · Inspect
Balanced both ways. What is right depends on your house, your budget and how much disruption you can genuinely absorb.
No rent, longer programme

Shorter programme, pay for it

Which oneFor a kitchen and a bathroom, living in it is usually fine. For a genuine whole-house renovation, count the additional weeks against the rent honestly before deciding - the gap is frequently smaller than people expect, and the empty-house result at the interfaces is better.
Cheaper per square foot

Spread the cost and disruption

Which oneIf you can fund it, one programme is cheaper and finishes sooner. If you phase, plan both phases up front and put everything shared - flooring, electrics, drainage - into phase one, so phase two never reopens finished work.
Predictable scope

Where the real gain is

Which oneIf the house is arranged badly, change it now - the walls will not be open again for twenty years. If the arrangement is genuinely fine, keeping it puts the entire budget into quality rather than into concrete and engineering.
Tick whatever applies. This will not produce a price - a whole-house scope has too many variables and too much depends on what the walls turn out to be hiding - but it will show which parts carry the cost and the calendar.
We do not publish figures for this work, because the same scope can differ several-fold once the existing conditions are visible. You get a real, itemised number after a site visit, in writing.
Stage 06 · Live
Photographs from six completed Elbaz projects. A whole-house programme is the longest and most disruptive thing most people do to their home, so it is worth knowing what the months actually look like.
A genuine whole-house renovation runs in months, and an occupied one runs considerably longer than an empty one because the trades queue rather than overlap. We give you a real programme once the scope and the permit route are known.
Demolition and rough-in. Loud, dusty, and the period when the house looks least like it will ever be finished. It gets steadily better from insulation onwards.
You keep a working bathroom and somewhere to prepare food at every stage. That is planned, not improvised, and it is one of the first things we set out.
Barriers go up before demolition, not after. Whole-house work generates a lot of dust and containment is a real line in the programme.
Older houses hide things behind walls. When we find something, you hear about it the same day, with what it means for cost and programme - not at the end.
A whole-house scope carries inspections at several points, and each one gates the work after it. Someone needs to provide access, and we schedule around them.
The pace of your decisions sets the pace of the job more than most people expect. The big selections are made before demolition so the site never waits on one.
Snagging and final fittings always feel slower than the structural work, because the visible progress per day drops. It is normal, and it is when the quality is actually decided.
Only claims we can stand behind. Everything below is either a matter of public record or visible in the work shown on this page.
Elbaz Construction is a licensed general contractor, CBC1265280. Permits are pulled in the company name, not yours.
Structural, plumbing, electrical, tile, cabinetry and finishing are coordinated by the same company, so nobody is waiting on somebody else to come back next week.
The trade order is planned before demolition and held to. Most whole-house overruns are sequencing failures, not workmanship ones.
Hiring room by room means nobody owns what happens where two scopes meet. On a full-service project that is explicitly ours.
The drawings, the permit set and the construction are handled by the same people, so what is approved is what gets built.
Cabinetry, windows and appliances are ordered before demolition, because a whole-house programme cannot absorb a mid-build wait.
You speak to the same person from the first walkthrough to the snagging list.
The permit is signed off and closed. An open permit follows the property and surfaces when it is sold.
Filter to the part of the job you are thinking about.
That we handle the whole thing: the survey, the design, the permit set, every trade, the schedule and the handover. The alternative is hiring trades room by room and coordinating them yourself, which works on a single bathroom and stops working quickly beyond that.
One programme is almost always cheaper per square foot, because setup, protection, permits and mobilisation are paid for once instead of repeatedly. Phasing is a legitimate cashflow decision, not an efficiency one - just plan both phases before phase one starts.
Usually yes, and it lengthens the programme. The work is phased so you always have a working bathroom and somewhere to prepare food, which means some areas are set up, taken down and set up again. We will tell you honestly what that costs in weeks.
The big items - cabinetry, windows, doors, tile and appliances - before demolition, because they carry long lead times and the site cannot wait for them. Smaller selections can follow, but the sequence is set by whatever takes longest to arrive.
Often, and it is one of the most common requests. Whether the wall is load-bearing is established properly rather than assumed. Where it is, that means structural design, an engineer and a permit - and it is entirely routine work.
For layout changes and anything structural, you need proper drawings, and we coordinate the design and engineering as part of the service. For a like-for-like refit of the existing layout, the scope is usually more modest.
Almost always. Once you are into electrical, plumbing, mechanical, structural or window replacement, it is permitted work. Filing it as one coordinated set across the trades is faster than filing separately for each.
Associations frequently have their own rules on working hours, flooring assemblies, plumbing alterations and impact windows, and approval runs on the board calendar. It is worth starting alongside the permit rather than after it.
Tell us at the start rather than letting the plan reviewer find it. It is a solvable problem and it is much easier to solve before a permit application than during one.
Typically the structural work, the rough-in across plumbing, electrical and mechanical, and then finals for each trade. Each inspection gates the work after it, which is exactly why the sequence cannot be rearranged for convenience.
You hear about it the same day, with what it means for cost and programme. Older South Florida homes can carry original drainage, dated wiring or a panel at capacity, and a whole-house renovation is planned with a contingency for precisely that reason.
Demolition and rough-in are genuinely disruptive - loud, dusty, and the period when the house looks worst. From insulation onwards it improves steadily. Barriers, protected routes and containment are planned before any of it starts.
Because two houses of identical size can differ several-fold depending on how many bathrooms there are, whether walls are moving, whether the services are being replaced and what the walls turn out to be hiding. A number before a survey is a guess.
In rough order: moving wet rooms, structural changes, replacing services throughout, impact windows, phasing the work, and the number of bathrooms. Finish selections matter far less than people assume.
Yes. Every honest whole-house project carries one, because opening the walls of an existing house reveals things no survey can see. Deciding in advance how you want to be consulted on those is worth doing.
Final inspections pass, the permit is closed out, then we walk the house with you room by room and agree a snagging list. The list gets finished - that is the part that decides whether the job was any good.
Far less than before it, but not none. Sealed surfaces, silicone lines, and any mechanical equipment all have their own intervals, and we hand over what applies to your specific specification rather than a generic list.
Buildings settle and materials move slightly in the first year, particularly with the humidity swings here. Anything that is our work to put right, we put right.
Nothing in that stage yet — try “All”.
Client experience
Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.
Adir Davidov2022-12-27 Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended! Lee Morali2022-12-27 They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them! Shir Partush2022-12-27 We hired them to renovate our investment property and they provided exceptional quality service for an affordable price! Mia Zafrani2022-10-25 Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction. carmit cohen2022-10-25 After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!! Omri B2022-10-20 I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work! roni yonani2022-10-19 Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same! Itzick Manasherov2022-10-19 Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need. Sophie Brito2022-10-19 Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend Elie Elancry2022-10-19 Amazing job Did a total renovation of my house with themGoogle rating score: 5.0 of 5, based on 12 reviews
Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Next steps
Grouped by what you are trying to do, not by category.
The rooms a whole-house project touches most
Where a narrower scope may serve you better
Drawings, structure and approvals
Renovations with a particular brief
Longer reading before you commit
Start here
The more you can tell us about the house and what is driving the project, the more useful the first conversation is.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

What is behind the walls decides the scope, the sequence and most of the cost. Everything else follows from it.