Opening a kitchen to the living space is the single biggest change you can make to how a house feels. It is also engineering: a beam, a permit, and load carried down to something that can take it.
Miami-Dade · Broward & Palm Beach Counties
ScrollRecent work
Islands, counter runs, cabinetry and finished kitchens opening onto living space. Select any frame to open it full size.
The service, defined
An open-concept kitchen remodel removes the wall between the kitchen and an adjoining living or dining space, replaces whatever load that wall carried, and rebuilds the kitchen to work in a room that is now visible from everywhere.
It serves owners of houses laid out for a different decade — where the cook is sealed off from everyone else — and condominium owners who want light to reach further into the plan. The kitchen design changes as much as the structure: everything is on show, so storage, mess and noise all have to be planned for.

Two local realities shape this. In concrete-frame condominiums the wall between kitchen and living is frequently structural or contains the building’s services, and the association will have a view on both. In single-family houses the load path matters more than usual, because wind design means walls are doing work beyond carrying floor above — and that has to be replaced properly, not just propped.
Scope index
Twelve items, four phases. The first three decide whether the wall can come out at all, and they happen before any kitchen is designed.

Whether the wall carries load, what it carries, and where that load goes once the wall is gone. Until this is answered, no layout is worth drawing.
What is inside the wall — supply, waste, vents, electrical, sometimes the building’s risers. Every one of them needs a new route before the wall can go.
A Florida-licensed engineer sizes the beam and designs the bearing at each end, including how load reaches the foundation. In this region that calculation includes lateral considerations, not just gravity.
The kitchen is now furniture in a living room. Island position, seating, sightlines from the sofa, and what is visible from the front door all become design problems that a closed kitchen never had.
An open kitchen sends cooking smells through the whole living space. Extraction has to be sized and sited for that, and it is much harder to add later.
Structural drawings and calculations plus the electrical, plumbing and mechanical scope. Association approval as well, where the property is a condominium.
The load is taken on temporary support before anything is cut, then the wall comes out. This is the stage where being wrong is expensive.
Beam set, bearings formed and connections made to the engineer’s detail, then inspected before it is concealed.
Everything that was in the wall re-run and inspected, which frequently means opening ceilings or floors nearby.
The ceiling closed across the old wall line and the floor made continuous. Done well, you cannot tell where the wall was — which is the entire point.
Cabinetry, island, counters, splashback, appliances and lighting installed into the new room.
Structural and services inspections through to final, then clean and handover of drawings, permits and warranties.
Island, counter run and cabinetry in a joined-up plan
A completed kitchen that reads as part of the living space rather than a room beside it — an island doing the work the old wall used to do, storage concealed behind full-height fronts, and lighting that suits cooking and sitting equally.
Select any frame to open it full size. All nine frames are the same kitchen.
Specification
Recorded from the photography only. Beam size, span, cost, schedule, address, client and appliance brands are not documented in the source material and are not stated.

Design and material language
The choices specific to a kitchen that is permanently on show, and what the alternatives change.


Flush or dropped
Used on these kitchens. A flush beam concealed within the ceiling depth gives an unbroken ceiling and is what most people picture when they imagine the wall gone.
Other options. A dropped beam is cheaper and simpler because it does not need to fit within the floor zone, but it leaves a permanent line across the ceiling. Concealing a beam costs more in structure and in make-good; it is usually worth it.
Doing the wall’s old job
Used on these kitchens. An island that defines where the kitchen ends without closing anything off, with seating on the living side and working surface on the kitchen side.
Other options. A peninsula costs less and suits narrower plans but reintroduces a barrier at one end. No island at all keeps the room largest but loses the boundary that stops the kitchen sprawling into the living space.
Now a living-room problem
Used on these kitchens. Extraction sized for the room rather than the hob, because there is no door to contain cooking. An island hob needs a ceiling or downdraft solution, which is a structural and ducting decision made early.
Other options. Recirculating extraction is often the only option in a condominium. It handles grease but not heat or moisture, so the room specification has to compensate.
Everything is visible now
Used on these kitchens. Full-height runs and concealed storage, so the kitchen presents as joinery. In an open plan, open shelving and glass fronts mean the room is only ever as tidy as its worst day.
Other options. Open shelving looks superb photographed and demands constant discipline in real use. It is a lifestyle decision more than a design one.
One surface across the join
Used on these kitchens. The floor carried across the old wall line without a threshold, which is what makes the two spaces read as one.
Other options. A material change at the old wall position saves money on make-good and permanently announces where the wall used to be.
On what is shown. Every photograph on this page is a real Elbaz Construction kitchen. The alternative options described are named for comparison only and are not claimed to be what is pictured.
Process
The structural sequence is fixed and cannot be compressed: assess, engineer, permit, support, remove, install, inspect. Everything about the kitchen itself waits behind it.
What the plan should become and how the room is used.
Whether the wall is load-bearing and what it carries.
What runs inside the wall and where it can go instead.
Beam sized, bearings and load path designed and sealed.
Kitchen layout for a room that is now visible from everywhere.
Structural plus MEP; association approval where it applies.
Load taken temporarily, then the wall comes out.
Beam set and inspected; services re-run and inspected.
Ceiling and floor closed across the old wall line.
Cabinetry, counters, appliances, lighting, then clean.
Technical brief
There is no version of a load-bearing removal that does not need an engineer, a permit and an inspection. Here is what the building department actually reviews.


Until an engineer says otherwise, treat the wall as load-bearing. Interior walls in South Florida houses frequently carry roof or floor load, and some carry lateral load, which is less obvious and just as important.
The beam, its bearings and the load path to foundation are designed, signed and sealed by a Florida-licensed engineer. That set is what the reviewer reads.
A beam moves load to its ends. Those ends need something beneath them capable of carrying it, which sometimes means work at a lower level or at the foundation.
In a high-wind region some interior walls contribute to how the building resists lateral load. Removing one can require compensating work elsewhere.
In a concrete-frame building the wall may be structural to the building rather than to your unit, and may contain risers serving other apartments. Some walls simply cannot be removed, and that answer comes from the association and its engineer.
Plumbing, electrical and vents inside the wall must be rerouted and inspected. This is often the item that dictates the sequence.
The beam and its connections are inspected before ceilings close. Nothing gets boarded over ahead of that.
Written approval, contractor insurance naming the association, working hours and elevator access — all before starting, and on their own timetable.
The permit closes on final inspection. Keep the sealed drawings: a future buyer’s inspector will ask about a beam, and having the paperwork ends the conversation.
Disclaimer. Requirements are set by your municipality and, in a condominium, by the association. Nothing here is a legal opinion or a structural opinion — only a licensed engineer can determine what your wall carries.
Assembly
An indicative section through an opening where a load-bearing wall was removed — the beam, its bearings, and where the load actually goes.
Sizing a beam is routine. What takes engineering judgement is where its load goes once it reaches the ends, and whether what is underneath can carry it.
Concealing the beam within the floor zone means working around joists or slab and usually more make-good. That cost buys an unbroken ceiling, which is the thing people actually wanted.
The load is picked up before anything is cut. This is the stage where shortcuts cause real damage, and it is not visible in any finished photograph.
Beam and connections are inspected with everything visible. Boarding ahead of that means taking it down again.
Performance and quality
No span, beam size or load figure is claimed on this page. Those come from the engineer who assesses your specific structure, and from nobody else.


Cost and timeline
We do not publish prices for this work. The structural half depends entirely on what the wall carries and where the load goes, and that is unknown until an engineer looks. Our proposals separate the structural scope from the kitchen so you can see both.


| # | Variable | Why it moves the number |
|---|---|---|
| 01 | Whether the wall is load-bearing | The single largest branch in the whole estimate. |
| 02 | Span and beam type | Longer openings need heavier beams and stronger bearings. |
| 03 | Flush or dropped | Concealing the beam costs more in structure and make-good. |
| 04 | Load path below | Whether the structure under the bearings needs work of its own. |
| 05 | Services in the wall | How much plumbing, electrical and ducting has to be rerouted, and how far. |
| 06 | Ceiling make-good | Closing and levelling the ceiling across the opening, and how far the repair extends. |
| 07 | Flooring make-good | Whether the existing floor can be matched across the line or the whole area is replaced. |
| 08 | Kitchen specification | Cabinetry, counters, island and appliances — an enormous range at identical footprint. |
| 09 | Island services | Water, waste, power or a hob in the island each add work under the floor. |
| 10 | Ventilation solution | Island extraction and ducting routes are meaningfully more complex than a wall hood. |
| 11 | Engineering and permit | Sealed drawings, municipal fees and the inspections. |
| 12 | Association requirements | Approval, insurance, hours and access in a condominium. |
| 13 | Occupancy | Working around occupants extends the programme and the cost. |
Question index
Fifteen questions across structure, permits, islands, ventilation, condominium rules, cost and schedule.
You do not, reliably, and neither does anyone without opening it up or reading the structural drawings. Rules of thumb — walls running perpendicular to joists, walls above a beam below — are indicators, not answers. An engineer assesses it. The one genuinely wrong approach is to guess and start cutting.
It is entirely normal and it does not stop the project. A beam replaces the wall, sized by an engineer, with posts at each end carrying the load down to something that can take it. It adds cost, engineering, a permit and an inspection — it very rarely makes the job impossible.
Usually, if there is enough depth in the floor structure above. A flush beam gives you an unbroken ceiling, which is what most people actually want. Where the depth is not available, the beam drops below the ceiling and reads as a line across the room — which some people accept happily and others do not.
In a high-wind region, some interior walls help the building resist sideways force as well as carrying weight. That is less visible than gravity load and is exactly why the assessment is done by an engineer rather than by eye.
Sometimes, and often not. In concrete-frame buildings the wall may be structural to the building itself, or may contain risers serving other units. The association and its engineer decide, and their answer is final regardless of what your own engineer says.
Written approval, drawings, proof of contractor licensing and insurance naming the association, and usually their own engineer’s review for structural work. Plus working hours, elevator booking and protection of common areas.
Not necessarily, but something usually has to define where the kitchen ends. Without a boundary an open kitchen tends to sprawl into the living space. An island gives you that edge plus preparation surface and seating. A peninsula does it more cheaply in a narrower room.
It looks superb and it means you face the room while cooking. It also means extraction from the ceiling or a downdraft, both more complex and more expensive than a wall hood, and it puts heat and spatter at the seating edge. Worth doing deliberately rather than by default.
Size the extraction for the room rather than the appliance, duct it outside if the building allows, and run it before you start cooking rather than after. In an open plan there is no door to contain anything, so under-specified extraction is felt everywhere.
Recirculating extraction with carbon filtration is the fallback and is common in condominiums. It handles grease and some odour but not heat or moisture, so it is worth compensating with a more capable unit and better conditioning.
They are rerouted, inspected and concealed elsewhere. This is frequently the item that governs the sequence, and occasionally it is the thing that makes a particular wall impractical to remove.
Not if the make-good is done properly. The two tells are a ceiling that is not level across the old line and a floor with a threshold or a patch. Both are avoidable and both are where a cheaper quote saves its money.
The physical work is a short and intense phase. The longer parts are engineering and permitting beforehand, and the inspection gate before concealment. We will not quote weeks here because permitting depends on your municipality.
Because two projects that look identical in a photograph can differ completely underneath. A non-structural stud wall coming out is modest work. A load-bearing wall with services in it, needing a flush beam and foundation work under the bearings, is a different project entirely.
Yes, and it is sometimes sensible for cash flow. The trade is that you pay twice for mobilisation and protection, and you live with make-good that has to be redone when the kitchen arrives. Where budget allows, doing both together is cheaper and cleaner.

These frames are real Elbaz Construction kitchens in South Florida. The catch-all folder in the source archive was excluded — it contains confirmed cross-client material from another market.
Credentials and delivery
Nothing here is an award or a membership we cannot substantiate. The licence number is public and checkable.

CBC1265280 — certified building contractor, bonded and insured, holding the structural permit rather than subcontracting around it.
The structural assessment comes first, so the layout is drawn against what is actually possible.
You can see what the opening costs and what the kitchen costs, instead of one number that hides both.
Everything from inside the wall re-run properly and inspected, not spliced and buried.
Ceiling and floor continuity across the old wall line is where this work is judged, and it is scoped rather than assumed.
Association engineering review, insurance, hours and access planned in from the start.
Google reviews
Reviews are quoted verbatim from the Elbaz Construction Google Business Profile. They describe the company as a whole — none refers specifically to the kitchen documented above.
★★★★★
“After I've been Looking for a good company to renovate my house, I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!!”
carmit cohen · Google review
★★★★★
Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !!
Adir Davidov
★★★★★
They renovated my whole house and the whole process was such a breeze. I highly recommend them!
Lee Morali
★★★★★
They are great at communicating and finding ways to streamline the work.
Omri B
★★★★★
Amazing job Did a total renovation of my house with them
Elie Elancry
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Knowledge library
Adjacent work Elbaz delivers under the same licence.
Start here
Tell us which wall you want gone. We will find out what it carries before anyone draws a kitchen around it.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.
Structural assessment, engineering, permitting, wall removal and the finished kitchen under one licensed general contractor across Miami-Dade, Broward and Palm Beach.