Hallandale Beach.
Fifteen inspections a day.
Book yours early.

Licensed general contracting and renovation in Hallandale Beach — where the Building Division works a four-day week, publishes a hard daily cap on inspections, and puts Florida’s construction lien law on its permit page rather than a fee schedule.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll
Start here

Tell us the scope
and the address.

We will tell you how this City’s week and its inspection cap shape the programme — before we talk about anything else.

Why the calendar is the first question

A four-day week and fifteen slots a day is a real constraint, not a detail.

City Hall closes on Fridays and the Building Division runs Monday to Thursday. Inspection requests close at 4 p.m. the day before, and the City publishes that only fifteen inspections are scheduled per day, first come first served. A trade that finishes late on Thursday is not inspected until Monday at the earliest, and only if the request went in on time. Sequencing around that is free; discovering it is not.

Prefer to talk now(754) 236-0675

Sun–Fri 7am–7pm · Saturday closed. Licensed, bonded and insured · CBC1265280.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Hallandale Beach · Broward County

A short week,
a capped day,
and a lien warning.

Most municipalities use their permit page to tell you what to submit. This one uses it to tell you what can go wrong: that people who work on your property and are not paid can enforce a claim against it even if you have paid your contractor in full. That single emphasis tells you more about how to hire here than any checklist would.

Completed loft apartment by Elbaz Construction with a blue sofa, a timber-fronted kitchen along the back wall and a black steel stair rising to the mezzanine
What we build

Interiors, conversions and whole-home work, run by one licensed contractor

Kitchens, bathrooms, layout changes and the electrical, plumbing and mechanical work behind them — sequenced so each trade is ready on a day the City is inspecting, and paid so that nothing gets attached to your title later.

Start your project
The cap, in the City’s words

Fifteen per day, first come first served

The Building Division publishes it plainly: the maximum number of inspections scheduled is 15 per day on a first-come, first-serve basis. Requests go in by phone or through the portal, and they close at 4 p.m. the day before the inspection day.

The week

Monday to Thursday, and closed Fridays

The Building Division answers Monday through Thursday, 7:30 a.m. to 5:00 p.m., holidays excluded, and City Hall is closed on Fridays. The City also notes that inspectors normally leave the office by 8 a.m., so the window for site access starts early.

Everything through the portal

Email will not be processed

Permit documents are submitted through the City’s HB-ePermitting portal — its Citizen Self Service system — and the City states that documents sent to its building-permit support address by email will not be processed. The portal’s search works without logging in, by inspection number, parcel number or address.

Where the risk actually sits

Florida’s construction lien law

The City sets it out on the permit page itself: people who work on your property or supply materials and are not paid in full can enforce a claim against your property even if you have paid your contractor in full — and a property can be sold against the owner’s will to satisfy it.

How the process actually runs

What the City asks,
and what it warns
you about.

Five things about building in Hallandale Beach that are not true of the city next door.

01 · The rule that catches owner-builders

You must appear in person, and be there for every inspection.

An owner who owns and occupies a one- or two-family house may act as their own contractor under state statute. The City spells out what that means here: if you do not do all the work yourself you must supervise it and hire licensed trade subcontractors for electrical, plumbing, air conditioning and roofing; you are required to personally appear for all permitting; you must provide proof that the property is properly insured; and you must be present for all inspections. On a four-day week with an early start, that is a real diary commitment.

02 · The threshold, and its exception

Notice of Commencement

A Notice of Commencement is required when the total contract price is greater than $5,000, with a recorded copy submitted with the application or available on site before your first inspection. The exception is specific and worth knowing: it is not required for repair or replacement of an existing heating or air-conditioning system under $15,000.

03 · Broward, not Miami-Dade

A different county code

For hurricane-zone regulation the City points to the Florida Building Code and to Broward County Administrative Code Chapter 1. Products and connection details approved for a job across the county line are not automatically the answer here, and the review that matters is Broward’s.

04 · How the City defines the work

Structure, device, facility

Rather than list projects, the City defines terms. A structure includes a driveway, patio deck, walkway, fence, retaining wall, shed, gazebo, trellis, fountain, spa or pool. A device includes an electrical switch, hard-wired smoke detector, GFCI outlet, sink, tub, toilet, exhaust fan or kitchen hood. A facility includes a shower, kitchen, laundry room, bathroom or any portion of a building. Read that last phrase slowly.

05 · What you give when you book

Five things, every time

An inspection request carries the permit number, inspection type, job site address, a return phone number and access instructions. The access line matters more than it looks: an inspector who cannot get in has still used one of the fifteen slots.

06 · Fire is a separate request

And it is not the City

Fire-related inspections are not booked through the Building Division. The City directs those requests by email to Broward Sheriff’s Office Fire, which is a second queue with its own timing — worth knowing before a certificate depends on it.

What an inspector actually sees

The stages
a booking
is made for.

Work in progress on an Elbaz Construction project — the same building at the stages inspections are called for, before any of it was covered up.

Why we show this

Inspections happen before the pretty photographs

Every finished room on this page passed through these stages first, and each one was a scheduled slot in somebody’s fifteen. Framing, services, boarding and a stair get inspected when they are open and visible — which is exactly why a missed 4 p.m. cut-off costs a week rather than a day.

A double-height room at drywall stage, with the window wall glazed and the joints taped ready for inspection

The window wall glazed, with the boards taped and ready.

The same room looking up at the ceiling soffit, with services run and boarding complete before finishes

The ceiling soffit, with the services run before boarding closed it.

A steel stair installed inside a stairwell at drywall stage, with the treads in place and the glazing beyond

The steel stair, set and fixed at drywall stage.

A corridor at drywall stage, with openings framed and the boards jointed but not yet finished

A corridor with its openings framed, before finishes.

The lien law, plainly

Paid in full
is not the same
as protected.

The City puts this on its permit page, and it is the most useful thing an owner here can understand before signing anything.

Florida Statute 713, Part 1

A claim can attach to your property even after you have paid

In the City’s own words: those who work on your property or provide materials and are not paid in full have a right to enforce their claim against your property. If your contractor fails to pay subcontractors or material suppliers, the people who are owed money may look to your property for payment, even if you have paid your contractor in full — and if a lien is filed, the property could be sold against your will to pay for that labour or those materials. The City points owners to the Florida Lien Law Pamphlet for the detail.

What it means for hiring

Ask who is being paid, not just what it costs

The risk is not the headline price; it is whether the subcontractors and suppliers behind it are actually being paid. That is a question worth asking before a contract is signed rather than after a claim appears.

The document that starts the clock

Notice of Commencement

Recorded above the $5,000 threshold and available on site before the first inspection. It is the public record of who is doing the work, and it is part of how the statute’s protections operate.

What we do about it

Releases, as we go

We work as one general contractor with our own trades and suppliers, and we provide lien releases as the job proceeds rather than at the end. It is ordinary practice, and it is exactly what the City’s warning is about.

What we will not do

Give you legal advice

This page states what the City publishes and what the statute is called. It is not advice on your contract or your position, and anyone with a live payment dispute should be talking to a Florida construction attorney, not reading a contractor’s website.

Owner’s guide

Five things worth
settling first.

Specific to this city, and in the order they actually bite.

01

Build the programme around a four-day week

Nothing is inspected on a Friday, and the request has to be in by 4 p.m. the day before. Work that is ready on Thursday afternoon is a Monday inspection.

02

Book early in the day, not late

Fifteen inspections a day, first come first served. The cap is published, so the race is real.

03

Put access instructions in the request

The City asks for them explicitly. An inspector who cannot get in has still used a slot, and you wait for the next one.

04

Decide about owner-builder honestly

It means appearing in person for all permitting, proving the property is insured, supervising the work, hiring licensed trades and being present at every inspection.

05

Understand the lien exposure before you sign

Paying your contractor in full does not, by itself, protect the property from a claim by someone the contractor did not pay.

And one caution

We do not publish fees or durations

The City charges a processing fee and publishes no schedule on the pages read here, so this page quotes no fee at all. The only two money figures on it are rules rather than prices: the $5,000 Notice of Commencement threshold and the $15,000 heating and air-conditioning exception. Review and inspection durations we do not publish either — with a capped day and a four-day week, anyone quoting you a timeline for Hallandale Beach without seeing your drawings is guessing.

Common questions

Before you book.

What owners in Hallandale Beach ask first, answered from the Building Division’s own published guidance rather than from what is usually true elsewhere in Broward.

That depends on getting in early, because the City publishes a hard cap: the maximum number of inspections scheduled is 15 per day on a first-come, first-serve basis. Requests go in by phone to the Building Division or online through the Citizen Self Service portal, and they must be made before 4:00 p.m. the day before the inspection day. The City also notes that inspectors normally leave the office to perform inspections by 8 a.m.

Yes. The City states that the Building Division can be contacted Monday through Thursday from 7:30 a.m. to 5:00 p.m., excluding holidays, and that City Hall is closed on Fridays. It is the single biggest scheduling fact about building here: work that becomes ready late on Thursday is realistically a Monday inspection, and only if the request was made before Thursday afternoon’s cut-off.

The City asks for five things: the permit number, inspection type, job site address, a return phone number and access instructions. The access instructions are worth taking seriously — an inspector who arrives and cannot get into the property has still used one of the day’s fifteen slots.

No. All permit-related documents must be submitted through the City’s HB-ePermitting portal — its Citizen Self Service system — and the City states that documents sent to its building-permit support email address will not be processed. The portal’s search does work without logging in: an inspection number, parcel number or address will return permits, plans and inspections.

The City answers by citing the Florida Building Code and Florida Statute 553.79(1), then defines the terms with examples. A structure includes a driveway, patio deck, walkway, fence, retaining wall, shed, gazebo, trellis, fountain, spa or pool. A device includes an electrical switch, a hard-wired smoke detector, a GFCI outlet, a sink, tub, toilet, exhaust fan or kitchen hood. A facility includes a shower, kitchen, laundry room, bathroom or any portion of a building. On that definition very little of a real remodel sits outside the permit requirement.

When the total contract price is greater than $5,000. A recorded copy can be submitted with the permit application or made available on the job site before your first inspection. There is one specific exception the City publishes: a Notice of Commencement is not required for the repair or replacement of an existing heating or air-conditioning system in an amount less than $15,000.

Not automatically, and the City warns about exactly this on its permit page. Under Florida’s construction lien law, people who work on your property or supply materials and are not paid in full can enforce a claim against the property — even if you have paid your contractor in full — and if a lien is filed the property could be sold against your will to pay for that labour or those materials. The City points owners to the Florida Lien Law Pamphlet. We work as one general contractor with our own trades and provide releases as the job proceeds; if you already have a payment dispute, that is a question for a Florida construction attorney rather than for us.

Possibly, if you own and occupy a one- or two-family house, under state statute. The City is clear about what comes with it: if you do not do all the work yourself you must supervise the work and hire licensed trade subcontractors for electrical, plumbing, air conditioning and roofing; you must personally appear for all permitting; you must provide proof that the property is properly insured; and you must be present for all inspections. On a four-day week with an 8 a.m. start, that is a significant diary commitment. The requirements are set out on the City’s Owner-Builder Affidavit.

No — this is Broward. For hurricane-zone regulation the City points to the Florida Building Code and to Broward County Administrative Code Chapter 1. Both counties sit in the High-Velocity Hurricane Zone, but the approvals and the reviewing authority are not interchangeable, and a specification assembled for a job in Miami-Dade should not be assumed to carry across the county line.

Not the Building Division. The City directs fire-related inspection requests by email to Broward Sheriff’s Office Fire, which is a separate queue with its own timing. If a certificate depends on a fire inspection, it is worth establishing that route early rather than assuming it sits in the same fifteen-a-day pipeline.

Through the Citizen Self Service portal, which the City runs on Energov. You do not have to log in to use its search: entering an inspection number, a parcel number or an address returns permits, plans, inspections, addresses and parcels. For anything else the Building Division answers Monday to Thursday, 7:30 a.m. to 5:00 p.m., with separate options for inspections and for building permits.

Not from a page. We do not publish permit fees for Hallandale Beach, and we will not quote a programme without drawings — on a four-day week with a capped inspection day, a schedule built on assumptions is worth very little. What we can do first is map your scope onto the City’s inspection calendar, tell you which trades gate which stages, and price against drawings.

Google reviews

What clients say.

4.8 across 343 Google reviews. Text reproduced verbatim, including original spelling.

Licensed and accountable

CBC1265280

Florida certified building contractor. Licensed, bonded and insured, working across Miami-Dade, Broward and Palm Beach.

Start your project
“We had a good time dealing with Asher and the crew, he went over and above all our expectations and made every effort to ensure that the end result was up to their high standards. Thank you !!”
Emmett Giffin · Google
“Asher was knowledgeable and gave us cool ideas that we didn’t even know before. Nice beautiful color and design. We appreciate the price !”
Sierra Bernabeo · Google
“Elbaz Construction provided excellent service and outstanding craftsmanship. The team was professional and attentive to our needs. We’re extremely satisfied with the results!”
Damian Nunez · Google

No review schema is emitted from this page. Aggregate ratings marked up on a business’s own service pages are self-serving under Google’s structured-data policy, so the rating above is presented as visible content only.

Start your project

Tell us what you
are planning.

Send the scope and the address. We will come back with how the City’s week and its inspection cap shape the programme.

What happens next

Three steps, and no showroom appointment

  • 01We call you back, go through the scope and map it onto the City’s inspection calendar
  • 02We walk the property and work out which trades need which inspections, and in what order
  • 03You get a written scope priced against drawings, not against a description
What to expect

A straight read, including about the programme

If the four-day week and the daily cap mean your job takes longer than you have been told elsewhere, we would rather say so on the first call than let you find out at the third inspection.

Prefer to talk now(754) 236-0675

Sun–Fri 7am–7pm · Saturday closed. Licensed, bonded and insured · CBC1265280.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Start your Hallandale Beach project

Ready when you are

Let us build the programme around the City’s calendar.

Send us the scope and the address. We will tell you which inspections your job needs, how they sequence against a four-day week and a capped day, and what the submittal has to carry. Licensed, bonded and insured, CBC1265280.