At height, the hard part
is getting there.

A kitchen on the twentieth floor is the same kitchen. What changes is everything around it — how the material arrives, which hours you are allowed to work, what the City wants filed before anyone lifts a tool, and who else has to agree. Sunny Isles Beach publishes most of that. We plan a remodel around it.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Interior remodelling: permits and coordination handled

Miami-Dade · Broward & Palm Beach Counties

Scroll

Start here

Tell us the building and the rooms

The building matters as much as the room. Send us both and we will tell you what the City will want filed and what we would need from the association before anything is priced.

  • Florida-licensed general contractor, licence No. CBC1265280
  • Permits filed through the City portal by us, not by you
  • One point of contact from first call to closeout

The address and floor

Access and staging change with height, and so does the programme.

Which rooms move

Whether anything wet or structural changes is the question that sets the drawing set.

Your building contact

Managers hold the rules we are not allowed to guess at.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team. We will call you back to arrange a look at the unit and the access route, and to talk through what the work would involve. If it is urgent, call (754) 236-0675.

Completed bathroom, shown as a moving sequence of project photographs

The reality

Design decides the room. Logistics decides the calendar.

Two identical bathrooms, one in a house and one on the eighteenth floor, do not take the same time and do not cost the same. The difference is almost never the tiling. It is a service lift that other trades also need, a delivery that has to reach a kerb on Collins Avenue, a City ordinance that says when tools may run, and a permit that must be filed digitally before any of it starts. None of that is visible in a drawing, and all of it is plannable — which is the whole argument of this page.

  • 01

    Access before aesthetics

    How material reaches the unit is designed first, because it constrains everything after it.

  • 02

    Filed the way the City files

    Sunny Isles Beach has been fully digital since 2 January 2024. There is no paper route.

  • 03

    Hours that are published

    The City sets construction hours by ordinance, and they differ between standard and daylight time.

  • 04

    The building gets asked, not assumed

    Association rules vary building to building. We ask yours; we never guess.

  • 05

    Inspections booked against ready work

    A request is not a booking. The City states its dates are not guaranteed.

See a completed project

Mitred slab edge on the island worktop, with the integrated sink and tap set into the stone
Mitred slab edge and integrated sink on a completed island.

Elbaz project photograph

Project 01

A handleless kitchen, built to be lived in

Completed by Elbaz Construction in South Florida

Photographed on one completed Elbaz Construction project. It is not in Sunny Isles Beach and it is not in a high-rise — we show what we build, and we say where it is. Every frame below is the same kitchen.

Handleless kitchen with a pale slab-topped island, walnut upper bank and integrated seating, open to the living space
The island. A stone waterfall island with integrated seating, open to the living space beyond.
Kitchen island and run seen towards the glazing, with a wall oven stack and induction hob set into the worktop
Towards the glazing. The run seen back towards the garden, with the oven stack and hob in one line.
Built-in double oven stack in the walnut tall run, beside the hob and the extract
The oven stack. Double ovens built into the walnut tall run beside the hob and extract.
Mitred slab edge on the island worktop, with the integrated sink and tap set into the stone
The slab edge. A mitred edge on the island worktop, with the sink and tap set into the stone.
Tall storage bank and integrated refrigeration at the end of the kitchen run, with an undercounter wine cabinet in the island
Tall storage. The storage bank and integrated refrigeration closing the end of the run.
Cove lighting under the walnut upper cabinets, washing the slab splashback above the hob
Cove lighting. Light under the walnut wall units, washing the slab splashback above the hob.
Open shelving niche lit from within, between the walnut tall run and the integrated refrigeration
The lit niche. Open shelving lit from within, between the tall run and the refrigeration.
The island from the far end, with the worktop running towards the window and the veining carried across the waterfall
Along the island. The worktop running towards the window, veining carried across the waterfall.
Worktop detail: the hob set flush, the pot filler on the splashback and the handleless drawer line beneath
Worktop detail. The hob set flush, the pot filler on the splashback and the handleless drawer line beneath.
The kitchen island seen towards the lanai glazing, dishwasher integrated into the island run
Towards the lanai. The island seen towards the glazing, with the dishwasher integrated into the run.
Detail of the same frame: Handleless kitchen with a pale slab-topped island, walnut upper bank and integrated seating, open to the living space
Detail of the same frame: Kitchen island and run seen towards the glazing, with a wall oven stack and induction hob set into the worktop
Detail of the same frame: Built-in double oven stack in the walnut tall run, beside the hob and the extract
Detail of the same frame: Mitred slab edge on the island worktop, with the integrated sink and tap set into the stone
Detail of the same frame: Tall storage bank and integrated refrigeration at the end of the kitchen run, with an undercounter wine cabinet in the island
Detail of the same frame: Cove lighting under the walnut upper cabinets, washing the slab splashback above the hob
Detail of the same frame: Open shelving niche lit from within, between the walnut tall run and the integrated refrigeration
Detail of the same frame: The island from the far end, with the worktop running towards the window and the veining carried across the waterfall
Detail of the same frame: Worktop detail: the hob set flush, the pot filler on the splashback and the handleless drawer line beneath
Detail of the same frame: The kitchen island seen towards the lanai glazing, dishwasher integrated into the island run
Detail


One room, one contract

Design, cabinetry, stone, services and finishes under a single point of responsibility.

Handleless throughout

A continuous rail line means the door gaps are the detail, so the setting-out has to be right first time.

Stone that continues

The island worktop, waterfall and splashback are cut so the veining runs through rather than restarting.

Light designed in

Cove lighting under the wall units is wired at first fix, not added afterwards.

How it runs

Eleven stages, and the ones that are about access

How Elbaz Construction runs an interior remodel in a Sunny Isles Beach building, from the first look at the unit to a closed-out permit.

Finished detail, shown as a moving sequence of project photographs

  1. Look at the unit and the route

    We measure the room and we walk the route material has to take: kerb, entrance, lift, corridor, door. The route is a constraint, not an afterthought.

  2. Ask the building for its rules

    Every building sets its own. We ask the association or manager for theirs in writing rather than assuming a norm — they differ, and they are not ours to invent.

  3. Design against the constraints

    Layout, cabinetry and stone are drawn knowing what can physically arrive and be turned into the space.

  4. Specify products that suit the exposure

    Sunny Isles Beach is coastal and Miami-Dade sits inside the High-Velocity Hurricane Zone, so anything in the envelope is specified accordingly.

  5. Decide the filing route

    A standard application through the City portal, or the City’s Specialized Permitting Service for interior remodelling, which it prices publicly.

  6. File digitally

    The City has been fully digital since 2 January 2024, and states all applications must be submitted online through your portal account.

  7. Answer plan review in the portal

    Review, comments, issuance, inspections and closeout all live in the same account, so nothing is tracked by email.

  8. Plan the work to the City’s hours

    The construction-hours ordinance sets when tools may run, differs between standard and daylight saving time, and names six holidays when nothing happens.

  9. Book access and, if needed, the street

    Lifts and deliveries are scheduled with the building. Where a delivery needs the kerb, the City publishes lane closure and beach access closure applications.

  10. Call inspections against finished work

    Requests go in through the portal with a phone number in the comments. The City states date and time are not guaranteed and confirms by email.

  11. Close the permit out

    Final inspections and permit closeout in the same portal account, with the documentation handed over.

Nothing above is a Sunny Isles Beach requirement unless it says the City states it. Building-specific rules belong to your building, and we ask for them rather than publishing a version of them here.

In a wet room the thing you look at and the thing that has to work are the same surface. The pan is built to drain, the niches are set out to the tile joints, and the waterproofing behind all of it is inspected before a single piece is stuck down. In a condominium that sequence matters more, not less: what is beneath you belongs to somebody else.

Project 02

A bathroom where the drainage is the design

Completed by Elbaz Construction in South Florida

One completed bathroom, photographed on an Elbaz Construction project in South Florida. Not photographed in Sunny Isles Beach and not in a high-rise. The copper hex mosaic is laid to a fall, which is decided long before anyone chooses a tile.

Elbaz project photograph

Specification

What we specify for a coastal building, and why

Read each one three ways: what it is, why it suits a high-rise on the coast, and what drives its cost. Nothing here is a Sunny Isles Beach requirement unless the City says so.

Handleless kitchen with a pale slab-topped island, walnut upper bank and integrated seating, open to the living space

Handleless cabinetry

A continuous rail or J-profile instead of handles, so the door line is uninterrupted across the run.

Elbaz project photograph

The island from the far end, with the worktop running towards the window and the veining carried across the waterfall

Slab worktops and waterfalls

Large-format stone or porcelain cut so the veining continues across the mitre rather than restarting.

Elbaz project photograph

The full length of the shower, copper hex mosaic floor falling to a central drain

Waterproofing and falls

A bonded waterproofing system under the whole wet area, with the fall built into the bedding rather than the tile.

Elbaz project photograph

The two recessed shower niches in copper hex mosaic, set into the large-format wall tile

Mosaic and small-format tile

Hex or penny mosaic on sheets, cut around drains and set out to the joints of the surrounding large-format tile.

Elbaz project photograph

Cove lighting under the walnut upper cabinets, washing the slab splashback above the hob

Integrated lighting

Cove and niche lighting wired at first fix, driven from a location that can actually be reached again.

Elbaz project photograph

Shower wall with a rain head, a textured feature panel and two recessed niches lined in copper hex mosaic

Concealed valves and fixings

Thermostatic valves, rain heads and grab fixings set into blocking behind the finished wall.

Elbaz project photograph

Living with it

Coastal air is relentless

Anything metal within reach of a balcony door earns its finish. Specify for salt, then for looks.

Silicone is a consumable

Wet-area joints are maintenance, not permanent. Plan to renew them.

Keep the paperwork

A closed-out permit and its documentation are what prove the work was done properly when a unit is sold or a building is recertified.

Tell your building what changed

Managers keep records of unit alterations. Handing yours over is how the next owner avoids arguing about it.

Sunny Isles Beach

What the City publishes, in order

Every item below is stated by the City of Sunny Isles Beach on its own website, re-read on 12 August 2026. Where the City is inconsistent with itself, this page says so rather than choosing for you.

Kitchen island and run seen towards the glazing, with a wall oven stack and induction hob set into the worktop

01

There is one filing route, and it is digital

The City states it has been fully digital since 2 January 2024, and that all permit applications must be submitted online through your portal account — which also carries plan review, comments, issuance, inspections and closeout.

Elbaz project photograph

Dark shaker double vanity with stone top, framed mirror above and open shelving to the side

02

There is a service built for interior remodelling

The City publishes Specialized Permitting Services for Interior Remodeling Permits: a pre-construction meeting with the Building Official, counter service by appointment, expedited plan review, help setting up the portal account, and concierge service through to inspection. It prices it at $1,000 or 1% of the total job cost, whichever is higher.

Elbaz project photograph

Tall storage bank and integrated refrigeration at the end of the kitchen run, with an undercounter wine cabinet in the island

03

The counter closes its queue before it closes

The Building Department is open Monday to Friday, 7:30 am to 3:30 pm, on the third floor of the Government Center at 18070 Collins Avenue — and walk-in customers must obtain a number by 3 pm in order to be served.

Elbaz project photograph

Completed bathroom from the doorway: glazed walk-in shower, WC and vanity in one room, with a window to the left

04

Construction hours are an ordinance, not a house rule

Standard time: 7:00 a.m. to 6:30 p.m. Monday to Thursday, 7:00 a.m. to 5:00 p.m. Friday, 9:00 a.m. to 5:00 p.m. Saturday. Daylight saving time runs to 7:00 p.m. Monday to Thursday. No construction on Sunday, or on New Year’s Day, the Fourth of July, Labor Day, Yom Kippur, Thanksgiving or Christmas Day. The City publishes an Extended Construction Hour Application for the exceptions.

Elbaz project photograph

The kitchen island seen towards the lanai glazing, dishwasher integrated into the island run

05

The street is a permit too

Among its specialty permits the City publishes lane closure applications and beach access closure applications. On a barrier island whose spine is Collins Avenue, a delivery that needs the kerb is a City matter, not just a building one.

Elbaz project photograph

The shower floor from above, hex mosaic laid to fall towards the square drain

06

Two cut-offs, and the City publishes both

Its Inspections page says requests called in before 3:00 pm are typically performed the following business day. Its Building Permits FAQ says requests before 3:30 PM will be scheduled for the next business day, provided there are no pending fees and licences are current. Both were live on 12 August 2026. Confirm the current cut-off with the Building Department before you schedule; we plan to the earlier of the two.

Elbaz project photograph

Where the time actually goes

A schematic of an interior remodel in a coastal tower

How an interior remodel in a coastal tower is sequenced Five stacked bands. Survey and building rules feed design and specification, which feeds the digital permit application, which feeds construction inside the City published hours, which feeds inspections and permit closeout. Access and delivery runs alongside every band. SURVEY THE UNIT AND THE ROUTE Kerb, entrance, lift, corridor, door — and the building's own rules, in writing DESIGN AND SPECIFICATION Drawn against what can physically arrive, and specified for coastal exposure PERMIT, FILED DIGITALLY Portal account: application, plan review, comments, issuance CONSTRUCTION, WITHIN THE HOURS City ordinance hours; six named holidays when nothing runs INSPECTIONS AND CLOSEOUT Requested in the portal; dates not guaranteed; permit closed out ACCESS AND DELIVERY Runs alongside every band, and is booked with the building — and with the City where the kerb is involved.

Illustrative only. Durations are deliberately absent: the City publishes no review time and we will not invent one.

Answers

Sunny Isles Beach questions

Online. The City states it has been fully digital since 2 January 2024 and that all permit applications must be submitted online through your portal account. That account carries the whole process — plan review, comments, issuance of the permit, inspections, and closeout once the job is complete.

Verified

What clients wrote on Google.

Reproduced exactly as published on the company's Google Business Profile. Read them on Google

Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended!

Adir Davidov

Google review

Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.

Mia Zafrani

Google review

They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them!

Lee Morali

Google review

Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same!

roni yonani

Google review

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!

Shir Partush

Google review

Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend

Sophie Brito

Google review

After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!!

carmit cohen

Google review

Amazing job Did a total renovation of my house with them

Elie Elancry

Google review

I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work!

Omri B

Google review

Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need.

Itzick Manasherov

Google review

Schedule a Consultation (754) 236-0675

Next step

Send us the details

Tell us the building, the floor and the rooms. We will come back with what the City is likely to want filed, what we would need from your association, and what we would want to see before pricing it.

We read it and come back

To arrange a look at the unit and the access route.

We ask your building for its rules

In writing, so nothing is assumed.

You get a drawn scope

And a written specification to price against.

Or call (754) 236-0675

(754) 236-0675
  • Florida-licensed general contractor, licence No. CBC1265280
  • Permits filed through the City portal by us
  • Permits closed out, with the documentation handed over

Finished detail, shown as a moving sequence of project photographs

Elbaz project photograph

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team. We will call you back to arrange a look at the unit and the access route, and to talk through what the work would involve. If it is urgent, call (754) 236-0675.