10 service categories · 100 service pages · Miami-Dade, Broward & Palm Beach
View all services104 municipalities · Miami-Dade, Broward & Palm Beach
All service areasThe City describes its own job as assuring that construction complies with City, County and Florida Building Code — three layers, in that order. In a small city ringed by unincorporated Miami-Dade, that is not boilerplate: it is the reason a question answered correctly for a neighbouring address can still be wrong for yours. We build to all three, as a licensed general contractor working across Miami-Dade, Broward and Palm Beach.
Miami-Dade · Broward & Palm Beach Counties
ScrollStart here
Almost everything on this page turns on which authority actually governs your property, and which of the three code layers your plans would engage. Tell us the address and what you are hoping to do, and the first conversation is a useful one.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.
Recent projects
Eight frames of completed work across South Florida — bathrooms, kitchens, flooring and two accessory dwelling units. Tap any image to see it larger.
A completed primary bathroom with a barn door, trough vanity and freestanding tub.
A long primary bathroom with a light oak vanity and a freestanding tub.
Twin basins under a large round mirror with brass pendants.
Kitchen island seating looking out to a screened lanai.
The shower of a two-level accessory dwelling unit.
Patterned encaustic-style floor tile running up to a navy vanity.
A level threshold between the bathroom floor and the shower floor.
Timber stair treads and risers finished to match the floor.
All photographs are of real completed Elbaz Construction work. They come from several separate properties across South Florida and are shown as recent work. None of them was taken in West Miami, and none is captioned as though it were.
The journey
West Miami is small, and it is surrounded. That combination produces the single most common mistake made on projects here: applying an answer that is true a few streets away and false at your own address, because a few streets away is a different jurisdiction. This page walks the order the three codes actually reach you, and what the City itself publishes about each stage.
Use the stage markers to jump to the part you are stuck on. Nothing here is a promise about your address — the Building Department decides that — and nothing here is a figure we invented. Where the City publishes something, it is quoted. Where it publishes nothing, this page says so rather than borrowing a neighbour's number.
Stage 01 · Layers
Four things shape a West Miami project before a drawing exists. The first is the City's own description of what it enforces; the rest follow from where the City actually is.
The City states that its Building Department assures construction complies with "City, County and Florida Building Code". Three layers, and the City lists its own first. That ordering is worth taking literally: the Florida Building Code sets the floor, Miami-Dade adds to it, and West Miami adds again. A scope that satisfies the state and the county can still meet a City requirement it did not anticipate, and that is a conversation to have before drawings rather than after a comment.

Patterned encaustic-style floor tile running up to a navy vanity in a completed Elbaz Construction bathroom. A South Florida project, not a West Miami one.
West Miami is a compact municipality with unincorporated Miami-Dade close on its edges, which produces a very practical hazard: advice, contractors and even permit histories from a property a short distance away may have been produced under a different authority entirely. The fix is unglamorous and reliable — confirm the jurisdiction for the specific address before accepting any rule of thumb about it, including one from a neighbour who has just finished a similar job.

A completed Elbaz Construction kitchen island with seating, looking out to a screened lanai and planting beyond. Not photographed in West Miami.
The Building Department sits at 901 SW 62 Avenue and publishes its hours as Monday to Friday, 8:30 a.m. to 3:00 p.m., except legal holidays. Six and a half hours is a full week of availability — five days rather than four — but it finishes early, which matters on a site that runs later than that. Questions get asked in the morning here, not at the end of the day.

Timber stair treads and risers finished to match the floor at the landing, on a completed Elbaz Construction project in South Florida.
The County layer is not an abstraction. Miami-Dade sits inside the Florida Building Code's High-Velocity Hurricane Zone, which covers Miami-Dade and Broward and nowhere else in the state, and it governs the outside of the building: roofing, windows, doors and their attachment. Product approval documentation belongs in the submission rather than being produced later, and that requirement reaches West Miami through the county layer regardless of what the City adds on top.

Real Elbaz Construction work: a steel stair structure installed inside a building under construction. A South Florida site, not a West Miami one.
Stage 02 · List
West Miami publishes the list of what it issues rather than a list of what is exempt. Read it as a checklist against your own scope — and note the phrase it ends on.
The City lists what it issues to residents, property owners and contractors: building permits, electrical permits, mechanical permits, windows and doors, air-conditioning permits, roofing permits "and other disciplines". Windows and doors get their own line, separate from building — which is a useful signal in a High-Velocity Hurricane Zone city, because it is exactly the work where product approval and attachment detail are inspected together.

Twin basins under a large round mirror with brass pendants either side, in a completed Elbaz Construction bathroom. A South Florida project.
The City states that permits are issued to "City Residents/property owners & contractors". Owner-builder routes exist across Florida and this City names the possibility on its own page. That is worth knowing, and it is also worth being honest about: pulling your own permit makes you responsible for the work, the inspections and anything found later, and it removes the party a future buyer would otherwise be able to point at.

A wide view of a completed Elbaz Construction primary bathroom with a barn door, trough vanity and freestanding tub. Not a West Miami property.
Several neighbouring municipalities publish an HB 803 exemption reading, a Notice of Commencement threshold or a plan-review timeframe. We did not find those published by West Miami, so this page carries none of them. Borrowing a neighbour's figure would be the single easiest mistake to make here, given how close the boundary is — and it would be wrong in exactly the way this City's three-layer sentence warns about.

A completed Elbaz Construction walk-in shower interior with a tiled bench seat and a herringbone mosaic floor. A South Florida project.
Applications are submitted online through the City's permit portal, which requires an account. That is a small thing that reliably costs a day at the start of a project, because the account is set up by whoever will file — and if that is a contractor who has not worked in West Miami before, it happens after you have already agreed a start date rather than before.

A low shower threshold with the linear drain running along the mosaic, on a completed Elbaz Construction project in South Florida.
Every photograph in this section is real Elbaz Construction project photography from completed South Florida work. None of it was taken in West Miami and none of it is captioned as though it were.
Project gallery 01
Six frames of completed Elbaz Construction work across South Florida. Different properties, not one project, and not photographed in West Miami — each caption says what it actually is.
Project 01, guided tour






Micro-cement, wide
A completed primary bathroom with a barn door, trough vanity, freestanding tub and glazed shower.
Six frames from completed Elbaz Construction projects across South Florida, grouped by room rather than by property.
A city page is about a process, and a process is only worth reading if the company at the end of it builds. These are the finished result of the same six stages this page walks.
South Florida. None is claimed to be in West Miami, because none was verified as being in West Miami.
No cost, no address, no client name and no permit history appears anywhere on this page.
Stage 03 · Account
West Miami takes applications online and answers questions in person until three o'clock. The sequence below uses both, because on a small department the conversation is usually faster than the comment.
The first check is that the property really is in West Miami rather than in unincorporated Miami-Dade nearby. It sounds elementary and it is the single most common source of wrong advice here, because the boundary is close and a neighbour's experience may have been with a different authority altogether.
The City's permit portal requires an account. Ours is established, so filing is not delayed by administration at the point when everything else is ready.
The scope is checked against the City's own requirements, then the county layer including the HVHZ, then the Florida Building Code. Working in that order is deliberate: the City's layer is the one least likely to have been considered by anyone who has not built here.
The submission carries the drawings and, for anything in the building envelope, the product approval documentation the HVHZ requires. Windows and doors are their own permit type here, so that paperwork is not an afterthought.
Where anything is genuinely ambiguous we ask the Building Department at 901 SW 62 Avenue rather than filing and finding out. The department is open Monday to Friday, 8:30 a.m. to 3:00 p.m., which is a full week but an early finish.
The application is reviewed and comments come back. The City publishes no review timeframe, so we do not quote one — what we can tell you is what is outstanding and what it is waiting on.
Once the permit issues the job can start. On work above the statutory threshold a notice of commencement is recorded before the first inspection — ordinary Florida practice, and the step most often forgotten by owners running their own project.
This is the published sequence, not a promise about your project. What any specific address requires, and which of the three code layers adds a requirement to it, are decided by the City of West Miami Building Department — not by a contractor. We confirm what your address actually requires before anything is filed.
Stage 04 · Works
The physical work in West Miami is not unusual; the checking is. At almost every phase there are three possible sources of a requirement, and the City's own is the one most often missed. These phases are ordered by when that matters.
Before a single order is placed
The jurisdiction is confirmed for the specific address. In West Miami this is a real first step rather than a formality, because the City boundary is close and material ordered against the wrong authority's requirement is material ordered twice.
Quality check · Jurisdiction confirmed for the address before anything is ordered

On a compact lot
Coverings, dust separation and the working route go in, and deliveries are planned around a street pattern that does not have much room to spare.
Quality check · Route and containment in place before any demolition

And reading what is behind it
The scope comes out and the fabric appears. Anything that does not match the permit record is recorded and raised with you before it is concealed again — and here there is an extra question, because earlier work may have been permitted under a different authority than the one now looking at it.
Quality check · Everything uncovered photographed and raised before it is concealed

To the drawings that were approved
Load-bearing alterations are executed to the approved drawings, and nothing is closed before that work has been inspected.
Quality check · Nothing structural concealed before its inspection

Their own permit type here
West Miami names windows and doors as a permit type in its own right, and in the HVHZ this is the work where the installed product and its approval documentation are inspected together. Ordering to a specification that satisfies all three code layers is decided before anything is bought, not after it arrives.
Quality check · Installed openings matched to their approval documents

Its own line on the City's list
The City lists air-conditioning permits separately from mechanical generally, so any work on the system is treated on its own terms and inspected on its own.
Quality check · Air-conditioning work permitted and inspected in its own right

Set out against the finish
Electrical and plumbing rough-in are installed and set out against the finished setting out rather than against the demolition, and inspected before anything is covered.
Quality check · Each discipline inspected before anything is closed

Photographed as it is built
Tanking, backer board and falls go in under the tile and are recorded as they are built. No later inspection can examine this layer, under any of the three codes.
Quality check · Falls and waterproofing recorded photographically before tiling

Walked with you first
Tile, stone and cabinetry are set out and confirmed with you before the field is fixed, then the visible work goes in.
Quality check · Setting out walked with you before the first full course

With the City, in the morning
Finals are booked and passed, outstanding items are agreed in writing, and the permit is closed. The department closes at three, so the last administrative steps of a West Miami job are morning work.
Quality check · Permit closed out and the record left clean

Project gallery 02
Three frames from real Elbaz Construction work in South Florida — one during construction, two after it.
These are real photographs of Elbaz Construction work on South Florida projects. The first is the middle of the job, which is the part an owner actually lives through. None of this work was in West Miami and none of it is presented as though it were.
Project 02, during and complete



During: back to the opening
A bathroom stripped back during construction with the wall opening re-framed and tile backer going up.
Real Elbaz Construction work in South Florida, photographed during construction and again on completion.
Because a level threshold is the clearest example of something that has to be right in the substrate long before it is visible. That fall was set before the first tile.
It is not a West Miami project, it is not presented as one, and no address, client or cost appears anywhere.
Stage 05 · Choices
Argued both ways. None of these has a universally right answer — it depends on your scope, your address and how much of the calendar you control.
Ask the authority that governs you

It was fine for them

Which oneCheck it. This is the least balanced comparison on the page and deliberately so: in a small city with a close boundary and three named code layers, second-hand certainty is the most expensive thing on a project. One morning call settles it.
One permit, one inspection

Openings another year

Which oneIf more than one opening is failing, do them together — the specification work and the inspection are per-project, not per-window, and the interior making-good is the part you would otherwise pay for twice. If the envelope is sound, keep the scope interior with a clear conscience.
Someone else carries it

The City names the option

Which oneThe City names the owner-builder route and it is real, but it transfers responsibility rather than removing it. On anything multi-trade in a city with three code layers, the coordination is the work — and it is the part that is invisible until it has not been done.
Tick whatever applies. This will not produce a price — no honest one exists before someone has seen the property — but it will show which parts of your project are carrying the time and the risk.
We do not publish figures, and we do not publish permit fees either: the City's forms and fees shelf is a set of documents we did not open, and we would rather say that than print a number we cannot stand behind. You get a real, itemised number from us in writing after a site visit.
Project gallery 03
Four frames from completed Elbaz Construction accessory dwelling units and one South Florida build photographed during construction.
Project 03, guided tour




Studio bathroom
The bathroom of a completed studio accessory dwelling unit, with a glass shower enclosure, vanity and skylight.
Completed Elbaz Construction accessory dwelling units in South Florida, and work photographed while it was still a site.
A second dwelling reaches almost every permit type West Miami names — building, electrical, mechanical, air conditioning, windows and doors — so it is the clearest case of a project where all three code layers are live at once.
South Florida. None of these is claimed to be in West Miami.
Stage 06 · Closing
West Miami publishes a short set of facts about its Building Department. Everything below is quoted from the City's own pages, and where it publishes nothing this page says so.
The department provides "review, processing, issuance and inspection of building permits and assurance that construction in the City of West Miami complies with the provisions of City, County and Florida Building Code."
That ordering is the City's, not ours, and it is the most useful sentence on its site.
"City Residents/property owners & contractors" — the owner-builder route is named on the City's own page.
Building, electrical, mechanical, windows and doors, air-conditioning, roofing "and other disciplines".
901 SW 62 Avenue, West Miami, FL 33144.
Monday to Friday, 8:30 a.m. to 3:00 p.m., except legal holidays. Five days, ending early.
Online, through a permit portal that requires an account.
No plan-review timeframe, no HB 803 exemption reading and no Notice of Commencement threshold were found on the City's site. Where a number is missing from this page, it is missing because West Miami does not state it — and a neighbouring municipality's figure is not a substitute.
Only claims that are either public record or visible in the work on this page. Nothing about awards, nothing about rankings, and no numbers we cannot show you.
Elbaz Construction is a licensed Florida general contractor, CBC1265280. Permits are pulled in the company's name, and the licence is verifiable at the Florida DBPR rather than on our say-so.
In a small city with a close boundary, confirming that an address really is in West Miami is the first thing we do. It is elementary, it is free, and it is where most bad advice about this area starts.
The City names its own requirements ahead of the county and the state. That is the layer least likely to have been considered by anyone who has not built here, so it is the one we check first rather than last.
Design, the permit application and the construction are handled by one company, so a reviewer's comment does not sit waiting on a hand-off between two firms.
The City files online and the portal needs an account. Ours is established, so the start of a project is not spent on administration that could have been done weeks earlier.
Where West Miami publishes no threshold, no timeframe and no exemption reading, this page carries none. Filling those gaps from an adjacent municipality would be plausible and wrong.
Windows and doors are a permit type of their own here, and in the HVHZ what is inspected is the pairing of installed product and approval paperwork. We keep them matched.
Every permit we pull is closed out at the end of the job. An open permit follows the property and reappears when it is sold.
Filter to the part of the job you are thinking about.
It means three sets of requirements can apply to the same piece of work, and the City lists its own first. The Florida Building Code sets the baseline, Miami-Dade adds to it — including the High-Velocity Hurricane Zone rules for the envelope — and West Miami adds again. A scope that satisfies the state and the county can still meet a City requirement nobody anticipated.
Possibly because your neighbour is not in the same jurisdiction. West Miami is compact and unincorporated Miami-Dade is close by, so a property a short distance away may have been permitted by a different authority entirely. Confirm the jurisdiction for your own address before accepting any rule of thumb about it.
Yes, through the county layer. Miami-Dade sits inside the Florida Building Code's High-Velocity Hurricane Zone, which covers Miami-Dade and Broward and nowhere else in the state. It governs roofing, windows, doors and how they are fixed, and product approval documentation belongs in the submission.
The City lists building permits, electrical permits, mechanical permits, windows and doors, air-conditioning permits, roofing permits "and other disciplines". Windows and doors, and air conditioning, are each named in their own right — which is a useful signal about what gets looked at closely here.
In practice, yes. A kitchen or bathroom remodel involves electrical and plumbing at minimum, and the City issues permits for those disciplines by name. We confirm exactly what your scope triggers with the Building Department before filing rather than assuming it.
The City names permits as issued to "City Residents/property owners & contractors", so the owner-builder route exists. It transfers the responsibility for the work, the inspections and anything found later to you, and it removes the licensed party a future buyer would otherwise be able to point at. On a multi-trade job the coordination is the real work.
Online, through the City's permit portal, which requires an account. Setting the account up is a first-day task rather than a filing-day one — it is a small thing that reliably costs a day if it is left until everything else is ready.
We do not publish a number, because the City does not publish one. What we can tell you honestly is which of the three code layers your scope engages, what is outstanding at any moment and what each item is waiting on. Anyone quoting you a West Miami review time is quoting their own average.
Yes, and it is often the fastest route. The Building Department is at 901 SW 62 Avenue, open Monday to Friday from 8:30 a.m. to 3:00 p.m. except legal holidays. Note the early finish: questions here are morning business.
We stop and tell you, before it is covered up. There is an extra question here, because earlier work may have been permitted under a different authority than the one now looking at it — so "there is a permit for it" is worth checking rather than assuming.
Often yes, and it changes the programme rather than the price alone. Containment, protection and phasing all cost days. The honest version of this conversation happens at the site visit, where we can look at where the work is relative to where you sleep and cook.
West Miami lists them as their own permit type, and in the High-Velocity Hurricane Zone they are the work where the installed product and its approval documentation are inspected together. Specification is decided before anything is ordered, because a product that does not satisfy all three layers is a product delivered twice.
Because for a remodel the same square footage can differ several-fold depending on what is behind the wall and which of the three code layers adds a requirement. A published rate would be a guess. You get an itemised figure in writing after a site visit, and it says what happens if something is found during demolition.
The City publishes a forms and fees shelf which we did not open, so we do not reprint figures from it. Ask the Building Department directly, and whatever it comes to appears itemised on your proposal rather than folded into a round figure.
Against the issued permit, discipline by discipline, with each booked as the work reaches it. The City publishes no inspection cut-off time, so we do not print one — and we plan around the department's 3:00 p.m. close rather than discovering it.
No, and we will not do it. Board goes up after the rough-in inspections have actually passed. Opening finished work later costs several times what waiting costs.
It gets closed out. We do not leave permits open, because an open permit stays attached to the property and reappears at sale, when it is somebody else's leverage rather than an administrative detail.
The permit record, the approved drawings, the product approval documentation for anything in the envelope — especially windows and doors — and the closeout. In the HVHZ the envelope paperwork is the part a future buyer, insurer or inspector will actually ask for.
Yes — across Miami-Dade, Broward and Palm Beach, 104 municipalities in total. The filing routes differ genuinely between them, and West Miami is a good example of why that matters: three named code layers and a boundary close enough that a neighbour's experience may not be yours.
Nothing in that stage yet — try “All”.
Client experience
Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.
Adir Davidov2022-12-27 Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended! Lee Morali2022-12-27 They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them! Shir Partush2022-12-27 We hired them to renovate our investment property and they provided exceptional quality service for an affordable price! Mia Zafrani2022-10-25 Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction. carmit cohen2022-10-25 After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!! Omri B2022-10-20 I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work! roni yonani2022-10-19 Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same! Itzick Manasherov2022-10-19 Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need. Sophie Brito2022-10-19 Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend Elie Elancry2022-10-19 Amazing job Did a total renovation of my house with themGoogle rating score: 5.0 of 5, based on 12 reviews
Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Next steps
Grouped by what you are trying to do, not by category.
The county and the neighbouring cities
The parts of this page we do as a service
What we most often build here
When the answer is more than a remodel
Start here
Almost everything on this page turns on which authority actually governs your property, and which of the three code layers your plans would engage. Tell us the address and what you are hoping to do, and the first conversation is a useful one.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

West Miami tells you that it enforces City, County and Florida Building Code, and lists its own first. The value of a contractor here is knowing which layer your project actually engages before material is ordered — and confirming the jurisdiction before any of it.
Or see the rest of what we cover on the Miami-Dade County page if your property is somewhere else in the county.