Remodeling in Hollywood
runs on a clock
the City publishes.

Hollywood tells you, in writing, which window it opens and when it closes: the hours the counter takes work, the evening cut-off that decides whether an inspection lands tomorrow or the day after, and the portal that changed on 4 August 2026. We build to that calendar, as a licensed general contractor working across Broward, Miami-Dade and Palm Beach.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll

Start here

Start with the address

Almost everything on this page turns on where the property actually is -- the district, the flood designation, the building type. Tell us the address and what you are hoping to do, and the first conversation is a useful one.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Recent projects

Recent Elbaz Construction work

Twelve frames of completed work across South Florida -- kitchens, bathrooms, islands and two accessory dwelling units. Tap any image to see it larger.

01

A completed contemporary kitchen with a stone island and full-height cabinetry.

02

A completed bathroom with a freestanding tub and twin floating basins.

03

A freestanding white waterfall island against navy perimeter cabinetry.

04

A completed kitchen in navy cabinetry with brass hardware and a stone island.

05

A completed bathroom with a hammered vessel basin and a glazed walk-in shower.

06

A kitchen island with a full-height waterfall end and seating for three.

07

A completed kitchen: marble island against a teal herringbone backsplash.

08

A completed bathroom with a navy vanity and a stone top.

09

The open living area of a completed accessory dwelling unit.

10

A two-level accessory dwelling unit, with the loft bedroom above.

11

A completed marble-topped island with seating for four.

12

A completed open-plan kitchen looking through to the living space.

All photographs are of real completed Elbaz Construction work. They come from several separate properties across South Florida and are shown as recent work. None of them was taken in Hollywood, and none is captioned as though it were.

01 / 12

The journey

Six stages, from your address to a closed permit.

Almost everything that surprises a Hollywood homeowner is published somewhere on hollywoodfl.org before the job starts. Which district the property is in. What no longer needs a permit and what still does whatever it costs. Which portal takes the application. What time an inspection request stops counting for tomorrow. This page walks those in order.

Use the stage markers to jump to the part you are actually stuck on. Nothing here is a promise about your address -- the Building Division decides that -- and nothing here is a timeline we invented. Where the City publishes a number, it is quoted. Where it does not, this page says so instead of guessing.

Stage 01 · Locate

Four Hollywoods, and your address is in at least two of them

A Hollywood property sits inside several overlapping maps at once, and each one can add a review, a document or a different desk. Work out which apply before anything is drawn.

A historic district

Hollywood adopted its Historic Preservation Ordinance in 1994 and names four districts on its own Historic Preservation page: the Historic Hollywood Business District, running along Hollywood Boulevard from 21st Avenue to Young Circle; the Harrison/Tyler Historic Districts; the Beach Historic District; and the Historic Hollywood Lakes Multiple Resource District. If a property is inside one, or is individually designated, a Certificate of Appropriateness enters the picture and the Historic Preservation Board becomes part of the route. The City takes those applications online through Accela alongside everything else.

  • Four districts are named on the City's own Historic Preservation page
  • The ordinance dates from 1994; designation is a property-level question
  • Certificates of Appropriateness are applied for through Accela
  • The Board's stated job includes compatibility of replaced structures in a district
Contemporary open-plan kitchen with a stone island and full-height cabinetry

A completed Elbaz Construction kitchen in South Florida. Not photographed in Hollywood; shown as an example of the work, not of a district.

The Community Redevelopment Area

Hollywood has a Community Redevelopment Agency, and for building work the clearest published consequence is narrow and worth knowing exactly: the City's own FAQ says a Paint Permit is required only for painting commercial property inside the CRA or inside any of the historic districts -- and is not required for single-family homes, regardless of location. That is a genuinely useful piece of trivia, because it is the sort of thing an owner assumes runs the other way round.

  • A paint permit applies to commercial property in the CRA or a historic district
  • It does not apply to single-family homes anywhere in the City
  • Whether an address falls inside the CRA is a boundary question -- confirm it
  • Commercial and residential are treated differently here; do not read across
Completed kitchen with a marble-topped island, seating and a teal herringbone backsplash

A completed Elbaz Construction kitchen: marble island against a teal herringbone backsplash. A South Florida project, not a Hollywood one.

A flood hazard area

Hollywood's published House Bill 803 guidance carves properties in flood hazard areas straight back out of the minor-work exemption: the under-$7,500 relief the statute created does not carry there. The City's second HB 803 exemption, for temporary flood and hurricane protection, is likewise written only for properties that are not in a Special Flood Hazard Area. Flood mapping is therefore not a background detail on a Hollywood job -- it is one of the switches that decides whether you file at all.

  • Flood hazard properties are excluded from the HB 803 minor-work exemption
  • The temporary flood-protection exemption applies only outside a Special Flood Hazard Area
  • That exemption also requires a contractor licensed under Florida law
  • Confirm the flood designation for the address before assuming any exemption
Completed bathroom with a freestanding tub and a pair of floating basins on a long vanity ledge

A completed Elbaz Construction bathroom with a freestanding tub and twin floating basins. A South Florida project.

Broward County, and the HVHZ

Hollywood is in Broward County, which sits inside the Florida Building Code's High-Velocity Hurricane Zone -- a designation that covers Miami-Dade and Broward and nowhere else in the state. In practice that governs the outside of the building: roofing, windows, doors, shutters and how they are attached. Broward's Board of Rules and Appeals administers the county amendments to the Code and certifies the municipal building departments inside the county, Hollywood's included, which is why a Broward inspection has a family resemblance across city lines even though the filing route does not.

  • The HVHZ covers Miami-Dade and Broward counties only
  • It bites hardest on the building envelope: roof, glazing, openings, fixings
  • Broward's Board of Rules and Appeals certifies the county's building departments
  • Product approval documentation is part of the submission, not an afterthought
Two-storey ground-up build under construction, structure and glazing in place, seen from the lot

Real Elbaz Construction work: a ground-up South Florida build with structure and glazing installed, photographed from the lot.

Stage 02 · Scope

What the City will ask for, and what it stopped asking for

House Bill 803 took effect on 1 July 2026 and Hollywood publishes its own reading of it. The exemption is narrower than the headline suggests, and the exclusions are the part worth reading twice.

Genuinely exempt

Hollywood's HB 803 page lists what minor residential work under $7,500 no longer needs a permit for, and the list is short and specific: repair or replacement of wood fence pickets and panels -- expressly excluding replacing the wood posts -- floor tiles, and gutters. That is the whole of it as the City publishes it. It is a real saving on genuinely small jobs and it is not a general licence to skip filing.

  • Wood fence pickets and panels: exempt. The posts: not exempt
  • Floor tiles and gutters appear on the City's exempt list
  • The threshold is $7,500 of total project value
  • Effective 1 July 2026, per the City's own page
Patterned encaustic-style floor tile running up to a navy vanity in a completed bathroom

A completed Elbaz Construction bathroom: patterned floor tile running up to a navy vanity.

Never exempt

The City lists what still needs a permit regardless of cost, and it is most of what people actually want to do: electrical, plumbing, mechanical and gas work; and structural work, which Hollywood spells out as railings, guards, pool barriers, fences, windows and doors, siding and soffits, roofing and elevated decks. Engineering and zoning permits -- the page gives driveways and pavers as the examples -- and landscape permits sit outside the exemption too, as do properties in flood hazard areas.

  • Electrical, plumbing, mechanical and gas: always permitted work
  • Windows, doors, roofing, siding and soffits are named as structural
  • Driveways and pavers are given as engineering / zoning permit examples
  • Landscape permits are listed as outside the exemption
Double-height interior under construction with full-height glazing and drywall going up

Real Elbaz Construction work: a double-height interior at the drywall stage, full-height glazing installed.

Valued as one project

The City states plainly that the exemption is based on the total value of the entire construction project, which closes the obvious loophole: a renovation cannot be sliced into a series of small exempt pieces to stay under the threshold. In practice that means the exemption almost never applies to a remodel -- it applies to a genuinely isolated small repair. Treating it as anything more is how an owner ends up with unpermitted work on a property record that follows the house to closing.

  • Valuation is of the entire project, not of each element
  • Splitting a scope to get under $7,500 does not work
  • A remodel with any electrical or plumbing is permitted work anyway
  • Unpermitted work surfaces at sale, not during the job
Completed kitchen with navy cabinetry, brass hardware and a white stone island

A completed Elbaz Construction kitchen with navy cabinetry, brass hardware and a white stone island.

The paint question

Painting is the clearest example of a Hollywood rule that applies to a place rather than to the whole City. The City's FAQ states that a Paint Permit is only required for painting commercial property located within the CRA or any of the historic districts, and that it is not required for single-family homes regardless of location. So the honest answer to “do I need a permit to paint?” in Hollywood is: almost certainly not, unless the building is commercial and in one of those two places.

  • Single-family homes: no paint permit, anywhere in the City
  • Commercial property in the CRA or a historic district: yes
  • This is a Planning question, not a Building one
  • It is an example of a rule that is area-bound, not citywide
Open-plan kitchen looking through to the living space beyond

A completed Elbaz Construction kitchen looking through to the living space beyond.

Every photograph in this section is real Elbaz Construction project photography from completed South Florida work. None of it was taken in Hollywood and none of it is captioned as though it were.

Stage 03 · File

Filing it: Accela since 4 August 2026

This is the part that changed most recently. The City moved new permit applications onto Accela Citizen Access on 4 August 2026; the old ePermits system now answers only for permits that already exist.

ACA for new, ePermits for old

Since 4 August 2026 the City takes all new permit applications through Accela Citizen Access. The legacy BCLA ePermits portal is now for existing permits only, and you can tell which system a permit belongs to from its number: ePermits numbers are one letter and the year, like B24-100000, while Accela numbers read like RES-MECH-24-000001.

Done before the application, not with it

Hollywood requires a contractor to be registered and current with the City before submitting, with insurance, workers' compensation and licence all verified. The City publishes a Licensed Contractor Search so anyone can check the status of a contractor on their own project.

The counter, or an appointment

The Building Division sits in the Development Services Hub on the second floor at 2600 Hollywood Boulevard. Counter hours run Monday to Thursday, 7:00 a.m. to 6:00 p.m., with anyone needing extensive assistance asked to be in line by 5:30 p.m.; consultation appointments with a permit representative or plan examiner run 7:30 to 9:30 a.m. on those same days, and arrivals are managed through the QLess virtual check-in system.

What is actually being applied for

The application has to describe a scope the City can review: what is being altered, which trades are involved, and which of them will need their own sub-permits under a master permit. Getting this right at the start is what keeps a review to one cycle instead of three.

Historic review, if it applies

If the property is in one of the four named historic districts or is individually designated, a Certificate of Appropriateness or other historic-district permit comes into play, and Hollywood takes those online through Accela as well. The City warns explicitly that applications in a historic district may be delayed because additional review may be required.

Everything, in one submission

Drawings, product approvals and the City's own checklists are uploaded to the portal against the application. In the HVHZ the product approval documentation for anything in the building envelope is part of the submission, not something produced later when an inspector asks.

Discipline by discipline

The application is reviewed by the disciplines it touches. Comments come back against the submission and are answered by revising and resubmitting through the same portal, which is also where the current status sits.

Estimated first, paid in the portal

The City publishes a Permit Cost Estimator so an applicant can get a figure before filing, and takes payment online through the portal. We do not publish permit figures here, because the City's own estimator is a better answer than anything we could print.

Then the notice of commencement

Once the permit issues, the job can start. On work above the statutory threshold a notice of commencement is recorded before the first inspection -- ordinary Florida practice rather than anything peculiar to Hollywood, but it is the step most often forgotten by owners running their own project.

Four residential types, one narrow window

For four residential permit types -- A/C replacement, water heater, reroof and electrical service change -- Hollywood runs an Express Permitting Service with same-day review. The submission window is 6 p.m. Tuesday to 9 a.m. Wednesday, it is stand-alone permits only rather than sub-permits to a master permit, up to ten submittals per applicant, and if approved payment has to be in by 3 p.m. that Wednesday for the permit to issue electronically.

This is the published sequence, not a promise about your project. What any specific address requires, how many disciplines it touches and whether a board review applies are all decided by the City of Hollywood Building Division and, where relevant, the Historic Preservation Board -- not by a contractor. We confirm what your address actually requires before anything is filed.

Stage 04 · Build

On site in Hollywood, in order

The construction sequence, with the check that closes each phase. In the HVHZ the envelope phases carry documentation as well as workmanship, and the inspection clock decides the rhythm of the whole job.

Protection

Before anything is opened up

Floors, finishes and the route in are protected, dust separation goes up, and where the property is in a community with its own rules the working hours and the parking are agreed before the first delivery rather than after the first complaint.

Quality check · Containment up before demolition starts

Double-height interior under construction with full-height glazing and drywall going up

Demolition

Back to what is actually there

The scope comes out and the structure becomes visible. This is where a South Florida house tells the truth about earlier work -- and where unpermitted alterations from a previous owner turn up, because they are invisible until something is opened.

Quality check · Everything uncovered is photographed before it is covered again

Scissor lift inside a double-height interior during the drywall stage of a ground-up build

Structural

Anything that carries load

Openings, headers, framing and any structural alteration are executed to the approved drawings. In Broward these are inspected against the county-amended Code, and nothing is closed up before that inspection has happened.

Quality check · No structural work is concealed before its inspection

Steel stair structure installed inside a building under construction with scaffolding alongside

Envelope

The HVHZ part

Windows, doors, roofing, fixings and anything else in the building envelope go in with the approved products and the approved attachment. The product approval paperwork is matched to what is physically installed, because in the HVHZ that pairing is what is being inspected.

Quality check · Installed product matched to its approval documentation

Two-storey ground-up build under construction, structure and glazing in place, seen from the lot

Rough-in

Services before they disappear

Electrical, plumbing and mechanical rough-in are set out and installed. Each discipline is inspected on its own, and each one is a separate booking against the same permit -- which is why the inspection cut-off matters so much on a multi-trade job.

Quality check · Each discipline inspected before anything is closed

Full-height cabinetry and integrated ovens in a contemporary kitchen

Close-up

Insulation, board, and the point of no return

Once the rough-in inspections have passed, the walls and ceilings close. After this point, opening anything back up costs real money, which is why the inspection sequence is not a formality to be worked around.

Quality check · Close-up only after every rough-in has passed

Double-height interior under construction with full-height glazing and drywall going up

Substrates

The layer nobody sees again

Waterproofing, backer board, levelling and the preparation under tile and stone. In a South Florida bathroom this is the single most common place a cheap job fails, and it is entirely invisible three days later.

Quality check · Waterproofing checked and recorded before tiling

Walk-in shower behind a frameless glass panel with a recessed niche in large-format tile

Finishes

Tile, stone, cabinetry, joinery

The visible work: tiling and stone, cabinetry set and scribed, worktops templated and fitted, joinery and trim. Setting out is agreed with you before the field is committed rather than explained afterwards.

Quality check · Setting out agreed with you before the field is laid

A single run of marble worktop across the length of a kitchen island

Second fix

Everything gets connected

Fittings, fixtures, sanitaryware, appliances, switches and lighting are installed and commissioned, and the final inspections for each discipline are booked against the permit.

Quality check · Every discipline tested, then booked for final

Seating side of a waterfall kitchen island, with three stools under a long stone overhang

Handover

Snag it, then close the permit

We walk the finished work with you and agree anything outstanding in writing. Then the permit is closed out rather than left open -- an open permit follows the property and reappears at sale.

Quality check · Permit closed out, not left open

Contemporary open-plan kitchen with a stone island and full-height cabinetry

Stage 05 · Decide

The three choices Hollywood owners find hardest

Argued both ways. None of these has a universally right answer -- it depends on your scope, your district and how much of the calendar you control.

Express Permitting

Same-day review, one window a week

Two-storey ground-up build under construction, structure and glazing in place, seen from the lot
What it is
Hollywood's electronic same-day review for four residential permit types: A/C replacement, water heater, reroof and electrical service change.
The window
Submissions are taken from 6 p.m. Tuesday until 9 a.m. Wednesday, and if approved, payment must be received by 3 p.m. that Wednesday for the permit to issue electronically.
The limits
Stand-alone permits only -- not sub-permits to a master permit -- and up to ten submittals per applicant. The contractor must already be registered with insurance, workers' compensation and licence verified.
The caveat
The City states that applications in a historic district may be delayed because additional review may be required.
Best for
A single-trade replacement that is genuinely stand-alone and can be ready before Tuesday evening.

Standard intake

Everything else, any day

Steel stair structure installed inside a building under construction with scaffolding alongside
What it is
The ordinary Accela Citizen Access route for new permit applications, in use for all new applications since 4 August 2026.
The window
No weekly window. The application goes in when it is ready and enters plan review by discipline.
The limits
It is a review, so it can return comments, and each comment cycle is a resubmission.
The caveat
Scope added after submission is the usual reason a straightforward job takes three cycles instead of one.
Best for
Anything multi-trade, anything structural, anything with a master permit, and anything in a historic district.

Which oneExpress is a genuine advantage on exactly four kinds of job, and only if the paperwork is ready before Tuesday evening. A remodel is never one of those four -- it is multi-trade by definition, so it goes standard, and the honest planning question becomes how few review cycles it can be got through in.

Repair in kind

Put back what was there

Walk-in shower behind a frameless glass panel with a recessed niche in large-format tile
What it is
Replacing an element with the equivalent of what is already there, rather than changing the specification.
Benefits
A narrower scope, fewer disciplines and usually a simpler review. In a historic district it is also far easier to argue as compatible.
Limits
It still needs a permit -- the City lists windows, doors, roofing, siding and soffits as structural work that is never exempt whatever it costs.
In the HVHZ
Even like-for-like envelope work is inspected against current product approval requirements. “The same as before” is not a specification.
Best for
A failed element on a property where the rest of the envelope is sound and current.

Upgrade the envelope

Change the specification

Two-storey ground-up build under construction, structure and glazing in place, seen from the lot
What it is
Taking the opportunity to improve openings, roofing or attachment beyond what was there before.
Benefits
The envelope is where the HVHZ actually bites, so this is where an upgrade has the most effect. Doing it once, with one permit and one set of inspections, is cheaper than doing it twice.
Limits
A larger scope, more product approval documentation, and in a historic district a harder compatibility argument to make.
In the HVHZ
Product approval and attachment detail are part of the submission, and the installed product is matched to its paperwork at inspection.
Best for
A property where more than one element is at the end of its life, or where the envelope has never been brought up to date.

Which oneIf one element has failed and the rest is current, repair in kind and keep the scope tight. If two or more are near the end, upgrade in one permit -- the second permit costs you a whole second sequence of reviews and inspections, and in Broward the envelope is the part it is worth being deliberate about.

One permit, one programme

Everything under a single filing

Completed kitchen with a marble-topped island, seating and a teal herringbone backsplash
What it is
The whole scope described in one application, with sub-permits for the trades under a master permit where that applies.
Benefits
One review cycle, one inspection sequence, one closeout. Trades follow each other properly instead of returning.
Limits
You live through the whole disruption at once, and the scope has to be settled before filing.
On valuation
It also matches how the City values a project -- the HB 803 exemption is based on the total value of the entire construction project, so splitting does not create exemptions.
Best for
Anyone who can be decisive early, and anyone who can be out of the affected rooms for a continuous run.

Phased over time

One room, then the next

Open living area of a studio accessory dwelling unit under a vaulted ceiling with an exposed beam
What it is
Separate scopes, filed and built in sequence, often a year or more apart.
Benefits
The disruption is bounded and the spend is spread. On a property that is occupied throughout, this is sometimes the only realistic route.
Limits
Every phase is its own application, its own review and its own inspection sequence, and shared services get touched more than once.
On valuation
Phasing to reduce disruption is legitimate. Phasing to get under an exemption threshold is not -- the City values the entire project.
Best for
Occupied homes, and owners who would rather protect the calendar than the total.

Which onePhase for a reason you would happily explain to the Building Division -- occupancy, budget, a child's school year. If you are phasing to stay under a threshold, the City has already answered that: the exemption is based on the total value of the entire project.

What moves the cost and the calendar in Hollywood

Tick whatever applies. This will not produce a price -- no honest one exists before someone has seen the property -- but it will show which parts of your project are carrying the time and the risk.

What this points to

We do not publish figures, and we do not publish permit fees either: the City of Hollywood runs its own Permit Cost Estimator, which is a better answer than anything we could print here. You get a real, itemised number from us in writing after a site visit.

Stage 06 · Close

The clock you are actually building to

Hollywood publishes its inspection timings, and they are worth knowing before you plan a week around them. Everything below is quoted from the City's own Schedule an Inspection page.

The evening cut-off

The City states that inspections scheduled Monday through Thursday prior to 8:00 p.m. will be scheduled for the next business day. That single sentence decides whether a trade returns tomorrow or waits.

Weekends

Inspections scheduled on Saturday or Sunday are scheduled on the second business day. A Friday finish is therefore not the same as a Thursday finish.

Cancelling

To cancel an inspection you must call the automated line before 5:00 a.m. on the day it is scheduled. After that it is a used slot.

The automated line

The City's automated inspection scheduling line runs 24 hours a day and wants the permit number. Results can also be looked up through the Building Permit Search.

After hours

After-hours inspections exist, need a request form approved, and carry an additional fee per discipline added to the permit.

The counter's day

The Building Division runs Monday to Thursday, 7:00 a.m. to 6:00 p.m., and asks anyone needing extensive assistance to be in line by 5:30 p.m. Friday is not a counter day.

Getting to a person

Consultation appointments with a permit representative or plan examiner run 7:30 to 9:30 a.m., Monday to Thursday, and arrivals are managed through QLess.

What this means on site

A four-day counter week and an 8:00 p.m. cut-off mean the difference between a job that flows and a job that idles is usually a booking made on time, not a trade working faster.

What we will actually stand behind

Only claims that are either public record or visible in the work on this page. Nothing about awards, nothing about rankings, and no numbers we cannot show you.

Licensed, bonded and insured

Elbaz Construction is a licensed Florida general contractor, CBC1265280. Permits are pulled in the company's name, and Hollywood publishes a Licensed Contractor Search so you can check that for yourself rather than take our word for it.

Registered before we file

Hollywood requires a contractor to be registered and current with the City -- insurance, workers' compensation and licence all verified -- before a submission is accepted. That is maintained continuously, not scrambled at the start of a job.

We file it ourselves

Design, the permit application and the construction are handled by one company, so a comment from a plan examiner does not sit waiting on a hand-off between two firms.

Built to the county-amended Code

Broward's Board of Rules and Appeals administers the county amendments and certifies the building departments inside the county. Working to that standard across Broward is routine here, not a special case.

Envelope documentation kept straight

In the HVHZ what is inspected is the pairing of installed product and approval paperwork. We keep them matched, because an envelope inspection that fails on documentation costs exactly as much as one that fails on workmanship.

Inspections booked to the published clock

The 8:00 p.m. cut-off and the four-day counter week are planned around rather than discovered. Most lost days on a South Florida job are booking days, not building days.

Permits closed out

Every permit we pull is closed out at the end of the job. An open permit follows the property and reappears when it is sold.

One point of contact

The same person from the first site visit to the walkthrough, across Broward, Miami-Dade and Palm Beach -- 104 municipalities, each with its own filing route.

Questions, by stage

Filter to the part of the job you are thinking about.

Is my Hollywood property in a historic district?Your address

That is an address-level question and only the City can answer it definitively, but Hollywood names four districts on its own Historic Preservation page: the Historic Hollywood Business District along Hollywood Boulevard from 21st Avenue to Young Circle, the Harrison/Tyler Historic Districts, the Beach Historic District and the Historic Hollywood Lakes Multiple Resource District. A property can also be individually designated without being in a district. We confirm the designation before anything is drawn, because it changes the route.

Does being in Broward County change how my project is built?Your address

Yes, on the outside of the building. Broward sits inside the Florida Building Code's High-Velocity Hurricane Zone, which covers Miami-Dade and Broward and nowhere else in Florida. In practice that governs roofing, windows, doors and how they are fixed, and it means product approval documentation is part of the submission rather than something produced later.

What is the CRA, and does it affect my house?Your address

Hollywood has a Community Redevelopment Agency with its own area. For building work the clearest published consequence is narrow: the City's FAQ says a paint permit is required for painting commercial property inside the CRA or a historic district, and is not required for single-family homes anywhere. If you own a house, the CRA is unlikely to change your permit route; if you own a commercial building, check whether the address is inside it.

Does flood zoning matter for a remodel?Your address

It can decide whether you file at all. Hollywood's published HB 803 guidance excludes properties in flood hazard areas from the minor-work exemption, and the separate exemption for temporary flood and hurricane protection is written only for properties outside a Special Flood Hazard Area. So flood designation is not a background detail here -- it is one of the switches.

Do I need a permit to remodel my kitchen or bathroom in Hollywood?Permit or not

In practice, yes. Hollywood lists electrical, plumbing, mechanical and gas work as always requiring a permit regardless of cost, and a kitchen or bathroom remodel touches at least two of those. The HB 803 exemption for minor work under $7,500 covers a short and specific list -- wood fence pickets and panels excluding posts, floor tiles and gutters -- and is based on the total value of the entire project.

What actually became exempt under House Bill 803 here?Permit or not

Hollywood's own page, effective 1 July 2026, lists repair or replacement of wood fence pickets and panels -- expressly excluding replacing the wood posts -- floor tiles, and gutters, for minor residential work under $7,500. It then lists what stays permitted whatever it costs: electrical, plumbing, mechanical and gas work, and structural work including railings, guards, pool barriers, fences, windows and doors, siding and soffits, roofing and elevated decks.

Can I split a big job into small ones to stay under $7,500?Permit or not

No, and the City closes this explicitly: the exemption is based on the total value of the entire construction project. Splitting a scope to get under the threshold does not create an exemption, and unpermitted work does not stay invisible -- it surfaces on the property record when the house is sold.

Do I need a permit to paint?Permit or not

Almost certainly not, if it is a house. The City's FAQ states that paint permits are only required for painting commercial property within the CRA or any of the historic districts, and are not required for single-family homes regardless of location. It is a good example of a Hollywood rule that is tied to an area and a building type rather than applying citywide.

What about a driveway or pavers?Permit or not

Hollywood's HB 803 page names engineering and zoning permits -- giving driveways and pavers as its examples -- as outside the minor-work exemption, along with landscape permits. So paving is not covered by the exemption, and what it does require depends on the scope and where it sits relative to the right of way.

Which system do I apply through now?Filing

Accela Citizen Access. The City states that effective 4 August 2026 it has transitioned to ACA for all new permit applications. The older BCLA ePermits portal now answers only for permits that already exist, and you can tell them apart by the number: ePermits numbers are a letter and the year, like B24-100000, while Accela numbers read like RES-MECH-24-000001.

How do I check a contractor is registered with the City?Filing

Hollywood publishes a Licensed Contractor Search on its own site. The City requires a contractor to be registered and up to date with verified insurance, workers' compensation and licence before a submission is accepted, so this is a check you can do yourself before signing anything, with anybody.

Can I just walk in and ask a question?Filing

There is a counter, and there are appointments. The Building Division is at the Development Services Hub, second floor, 2600 Hollywood Boulevard, open Monday to Thursday from 7:00 a.m. to 6:00 p.m., with anyone needing extensive assistance asked to be in line by 5:30 p.m. Consultation appointments with a permit representative or plan examiner run 7:30 to 9:30 a.m. on those days, and arrivals are managed through the QLess virtual check-in system.

What is Express Permitting and would my project qualify?Filing

It is Hollywood's same-day electronic review, and it covers four residential types only: A/C replacement, water heater, reroof and electrical service change. The submission window is 6 p.m. Tuesday to 9 a.m. Wednesday, it is stand-alone permits only rather than sub-permits to a master permit, it is capped at ten submittals per applicant, and payment has to be in by 3 p.m. that Wednesday for the permit to issue electronically. A remodel does not qualify -- it is multi-trade by definition.

How long does a permit take?Filing

We do not publish a number, because Hollywood does not publish one either except for the four express types, where it says same-day review. Anything else depends on the disciplines involved, whether a historic review applies and how many comment cycles the submission draws. What we can tell you honestly is which of those apply to your project, and what we do to keep the cycles down.

What is a Certificate of Appropriateness?Historic & CRA

It is the historic-district approval that sits alongside the building permit for designated properties. Hollywood takes Certificates of Appropriateness and other historic-district permits online through Accela, and the Historic Preservation Board's stated purpose includes assuring the compatibility of restored, rehabilitated or replaced structures within designated districts.

Will being in a historic district slow my project down?Historic & CRA

It can, and the City says so rather than leaving it implied: its Express Permitting page warns that applications in a historic district may be delayed as additional review may be required. That is not a reason to avoid the work -- it is a reason to know the designation before the calendar is set rather than after.

Can I replace windows in a historic district?Historic & CRA

Windows are named by the City as structural work that always needs a permit, and in a designated property the design also has to survive a compatibility review. The two questions -- does it meet the Code, and is it appropriate to the district -- are answered by different people, and both have to be satisfied. It is very doable; it is not a same-week decision.

What happens if you find unpermitted work from a previous owner?On site

We stop and tell you, before it is covered up. It is more common than people expect in South Florida, and it has to be resolved rather than built over -- both because an inspector will find it and because it becomes yours at the point you conceal it.

Can I live in the house while you work?On site

Often yes, and it changes the programme rather than the price alone. Containment, protection and phasing all cost days. The honest version of this conversation happens at the site visit, where we can look at where the work is relative to where you sleep and cook.

Do you do the work yourselves or subcontract it?On site

Design, permitting and construction are handled by the same company, which is the point: a plan examiner's comment comes back to the people who drew it. Specialist trades are run by us on our permit rather than left to coordinate themselves.

Why won't you publish a price?Cost

Because for a remodel the same square footage can differ several-fold depending on what is behind the wall, which disciplines are involved and what the district requires. A published rate would be a guess. You get an itemised figure in writing after a site visit, and it says what happens if something is found during demolition.

What will the permit itself cost?Cost

The City publishes a Permit Cost Estimator on its own site, which is a better answer than any number we could print here. Whatever it comes to appears itemised on your proposal rather than folded into a round figure.

When can I book an inspection?Inspections

The City's automated inspection line runs 24 hours a day and wants the permit number. What matters is the cut-off: Hollywood states that inspections scheduled Monday through Thursday prior to 8:00 p.m. will be scheduled for the next business day, and that inspections scheduled on Saturday or Sunday will be scheduled on the second business day.

What if I need to cancel one?Inspections

The City's rule is specific: to cancel an inspection you must call the automated inspection line before 5:00 a.m. for an inspection scheduled later that day. After that the slot has gone.

Can I get an inspection outside normal hours?Inspections

Hollywood does offer after-hours inspections, but they require an after-hours request form to be submitted and approved, and an additional fee per discipline is added to the permit. It is a real option for work that genuinely cannot happen in the day, not a routine shortcut.

What happens to the permit when the job is finished?Afterwards

It gets closed out. We do not leave permits open, because an open permit stays attached to the property and reappears at sale, when it is somebody else's leverage rather than an administrative detail.

What paperwork should I keep?Afterwards

The permit record, the approved drawings, the product approval documentation for anything in the envelope, and the closeout. In the HVHZ the envelope paperwork is the part a future buyer, insurer or inspector will actually ask for.

Do you work anywhere else in Broward?Afterwards

Yes -- across Broward, Miami-Dade and Palm Beach, 104 municipalities in total. The filing routes differ genuinely between them: Hollywood is on Accela since 4 August 2026, its neighbours are not all on the same system, and the differences are a working detail for us rather than a surprise.

Client experience

What clients say, in their own words

Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.

Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.

Next steps

Where to go from here

Grouped by what you are trying to do, not by category.

Start here

Start with the address

Almost everything on this page turns on where the property actually is -- the district, the flood designation, the building type. Tell us the address and what you are hoping to do, and the first conversation is a useful one.

What happens next

  1. We read it properly and come back to you, usually the same or the next working day.
  2. A short call to understand the property, the scope and what is driving the timing.
  3. We check the designation and permit history for the address before we form a view.
  4. A site visit, because what is behind a South Florida wall cannot be judged from photographs.
  5. A written, itemised proposal, including what happens if something is found during demolition.
  6. If you go ahead, we register the job, file it through Accela and manage the review.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Two-storey ground-up build under construction, structure and glazing in place, seen from the lot

The calendar is published. Let's build to it.

Hollywood tells you when its counter is open, when its inspection day is decided and which portal takes the application. The value of a contractor here is knowing that before the job starts, not after a week has gone.

Or see the rest of what we cover on the Broward County page if your property is somewhere else in the county.