10 service categories · 100 service pages · Miami-Dade, Broward & Palm Beach
View all services104 municipalities · Miami-Dade, Broward & Palm Beach
All service areasHollywood tells you, in writing, which window it opens and when it closes: the hours the counter takes work, the evening cut-off that decides whether an inspection lands tomorrow or the day after, and the portal that changed on 4 August 2026. We build to that calendar, as a licensed general contractor working across Broward, Miami-Dade and Palm Beach.
Miami-Dade · Broward & Palm Beach Counties
ScrollStart here
Almost everything on this page turns on where the property actually is -- the district, the flood designation, the building type. Tell us the address and what you are hoping to do, and the first conversation is a useful one.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.
Recent projects
Twelve frames of completed work across South Florida -- kitchens, bathrooms, islands and two accessory dwelling units. Tap any image to see it larger.
A completed contemporary kitchen with a stone island and full-height cabinetry.
A completed bathroom with a freestanding tub and twin floating basins.
A freestanding white waterfall island against navy perimeter cabinetry.
A completed kitchen in navy cabinetry with brass hardware and a stone island.
A completed bathroom with a hammered vessel basin and a glazed walk-in shower.
A kitchen island with a full-height waterfall end and seating for three.
A completed kitchen: marble island against a teal herringbone backsplash.
A completed bathroom with a navy vanity and a stone top.
The open living area of a completed accessory dwelling unit.
A two-level accessory dwelling unit, with the loft bedroom above.
A completed marble-topped island with seating for four.
A completed open-plan kitchen looking through to the living space.
All photographs are of real completed Elbaz Construction work. They come from several separate properties across South Florida and are shown as recent work. None of them was taken in Hollywood, and none is captioned as though it were.
The journey
Almost everything that surprises a Hollywood homeowner is published somewhere on hollywoodfl.org before the job starts. Which district the property is in. What no longer needs a permit and what still does whatever it costs. Which portal takes the application. What time an inspection request stops counting for tomorrow. This page walks those in order.
Use the stage markers to jump to the part you are actually stuck on. Nothing here is a promise about your address -- the Building Division decides that -- and nothing here is a timeline we invented. Where the City publishes a number, it is quoted. Where it does not, this page says so instead of guessing.
Stage 01 · Locate
A Hollywood property sits inside several overlapping maps at once, and each one can add a review, a document or a different desk. Work out which apply before anything is drawn.
Hollywood adopted its Historic Preservation Ordinance in 1994 and names four districts on its own Historic Preservation page: the Historic Hollywood Business District, running along Hollywood Boulevard from 21st Avenue to Young Circle; the Harrison/Tyler Historic Districts; the Beach Historic District; and the Historic Hollywood Lakes Multiple Resource District. If a property is inside one, or is individually designated, a Certificate of Appropriateness enters the picture and the Historic Preservation Board becomes part of the route. The City takes those applications online through Accela alongside everything else.

A completed Elbaz Construction kitchen in South Florida. Not photographed in Hollywood; shown as an example of the work, not of a district.
Hollywood has a Community Redevelopment Agency, and for building work the clearest published consequence is narrow and worth knowing exactly: the City's own FAQ says a Paint Permit is required only for painting commercial property inside the CRA or inside any of the historic districts -- and is not required for single-family homes, regardless of location. That is a genuinely useful piece of trivia, because it is the sort of thing an owner assumes runs the other way round.

A completed Elbaz Construction kitchen: marble island against a teal herringbone backsplash. A South Florida project, not a Hollywood one.
Hollywood's published House Bill 803 guidance carves properties in flood hazard areas straight back out of the minor-work exemption: the under-$7,500 relief the statute created does not carry there. The City's second HB 803 exemption, for temporary flood and hurricane protection, is likewise written only for properties that are not in a Special Flood Hazard Area. Flood mapping is therefore not a background detail on a Hollywood job -- it is one of the switches that decides whether you file at all.

A completed Elbaz Construction bathroom with a freestanding tub and twin floating basins. A South Florida project.
Hollywood is in Broward County, which sits inside the Florida Building Code's High-Velocity Hurricane Zone -- a designation that covers Miami-Dade and Broward and nowhere else in the state. In practice that governs the outside of the building: roofing, windows, doors, shutters and how they are attached. Broward's Board of Rules and Appeals administers the county amendments to the Code and certifies the municipal building departments inside the county, Hollywood's included, which is why a Broward inspection has a family resemblance across city lines even though the filing route does not.

Real Elbaz Construction work: a ground-up South Florida build with structure and glazing installed, photographed from the lot.
Stage 02 · Scope
House Bill 803 took effect on 1 July 2026 and Hollywood publishes its own reading of it. The exemption is narrower than the headline suggests, and the exclusions are the part worth reading twice.
Hollywood's HB 803 page lists what minor residential work under $7,500 no longer needs a permit for, and the list is short and specific: repair or replacement of wood fence pickets and panels -- expressly excluding replacing the wood posts -- floor tiles, and gutters. That is the whole of it as the City publishes it. It is a real saving on genuinely small jobs and it is not a general licence to skip filing.

A completed Elbaz Construction bathroom: patterned floor tile running up to a navy vanity.
The City lists what still needs a permit regardless of cost, and it is most of what people actually want to do: electrical, plumbing, mechanical and gas work; and structural work, which Hollywood spells out as railings, guards, pool barriers, fences, windows and doors, siding and soffits, roofing and elevated decks. Engineering and zoning permits -- the page gives driveways and pavers as the examples -- and landscape permits sit outside the exemption too, as do properties in flood hazard areas.

Real Elbaz Construction work: a double-height interior at the drywall stage, full-height glazing installed.
The City states plainly that the exemption is based on the total value of the entire construction project, which closes the obvious loophole: a renovation cannot be sliced into a series of small exempt pieces to stay under the threshold. In practice that means the exemption almost never applies to a remodel -- it applies to a genuinely isolated small repair. Treating it as anything more is how an owner ends up with unpermitted work on a property record that follows the house to closing.

A completed Elbaz Construction kitchen with navy cabinetry, brass hardware and a white stone island.
Painting is the clearest example of a Hollywood rule that applies to a place rather than to the whole City. The City's FAQ states that a Paint Permit is only required for painting commercial property located within the CRA or any of the historic districts, and that it is not required for single-family homes regardless of location. So the honest answer to “do I need a permit to paint?” in Hollywood is: almost certainly not, unless the building is commercial and in one of those two places.

A completed Elbaz Construction kitchen looking through to the living space beyond.
Every photograph in this section is real Elbaz Construction project photography from completed South Florida work. None of it was taken in Hollywood and none of it is captioned as though it were.
Project gallery 01
Ten frames of completed Elbaz Construction work across South Florida. Different properties, not one project, and not photographed in Hollywood -- each caption says what it actually is.
Project 01, guided tour










Kitchen, marble island
A completed kitchen with a marble-topped island, seating and a teal herringbone backsplash.
Ten frames from completed Elbaz Construction projects across South Florida, grouped by room rather than by property. Three separate kitchens, three separate bathrooms and two kitchen islands.
A city page is about a process, and a process is only worth reading if the company at the end of it builds. These are the finished result of the same six stages this page walks.
South Florida. None of them is claimed to be in Hollywood, because none was verified as being in Hollywood. Where a caption says “a completed project”, that is the whole of the claim.
No cost, no address, no client name and no permit history appears anywhere on this page.
Stage 03 · File
This is the part that changed most recently. The City moved new permit applications onto Accela Citizen Access on 4 August 2026; the old ePermits system now answers only for permits that already exist.
Since 4 August 2026 the City takes all new permit applications through Accela Citizen Access. The legacy BCLA ePermits portal is now for existing permits only, and you can tell which system a permit belongs to from its number: ePermits numbers are one letter and the year, like B24-100000, while Accela numbers read like RES-MECH-24-000001.
Hollywood requires a contractor to be registered and current with the City before submitting, with insurance, workers' compensation and licence all verified. The City publishes a Licensed Contractor Search so anyone can check the status of a contractor on their own project.
The Building Division sits in the Development Services Hub on the second floor at 2600 Hollywood Boulevard. Counter hours run Monday to Thursday, 7:00 a.m. to 6:00 p.m., with anyone needing extensive assistance asked to be in line by 5:30 p.m.; consultation appointments with a permit representative or plan examiner run 7:30 to 9:30 a.m. on those same days, and arrivals are managed through the QLess virtual check-in system.
The application has to describe a scope the City can review: what is being altered, which trades are involved, and which of them will need their own sub-permits under a master permit. Getting this right at the start is what keeps a review to one cycle instead of three.
If the property is in one of the four named historic districts or is individually designated, a Certificate of Appropriateness or other historic-district permit comes into play, and Hollywood takes those online through Accela as well. The City warns explicitly that applications in a historic district may be delayed because additional review may be required.
Drawings, product approvals and the City's own checklists are uploaded to the portal against the application. In the HVHZ the product approval documentation for anything in the building envelope is part of the submission, not something produced later when an inspector asks.
The application is reviewed by the disciplines it touches. Comments come back against the submission and are answered by revising and resubmitting through the same portal, which is also where the current status sits.
The City publishes a Permit Cost Estimator so an applicant can get a figure before filing, and takes payment online through the portal. We do not publish permit figures here, because the City's own estimator is a better answer than anything we could print.
Once the permit issues, the job can start. On work above the statutory threshold a notice of commencement is recorded before the first inspection -- ordinary Florida practice rather than anything peculiar to Hollywood, but it is the step most often forgotten by owners running their own project.
For four residential permit types -- A/C replacement, water heater, reroof and electrical service change -- Hollywood runs an Express Permitting Service with same-day review. The submission window is 6 p.m. Tuesday to 9 a.m. Wednesday, it is stand-alone permits only rather than sub-permits to a master permit, up to ten submittals per applicant, and if approved payment has to be in by 3 p.m. that Wednesday for the permit to issue electronically.
This is the published sequence, not a promise about your project. What any specific address requires, how many disciplines it touches and whether a board review applies are all decided by the City of Hollywood Building Division and, where relevant, the Historic Preservation Board -- not by a contractor. We confirm what your address actually requires before anything is filed.
Stage 04 · Build
The construction sequence, with the check that closes each phase. In the HVHZ the envelope phases carry documentation as well as workmanship, and the inspection clock decides the rhythm of the whole job.
Before anything is opened up
Floors, finishes and the route in are protected, dust separation goes up, and where the property is in a community with its own rules the working hours and the parking are agreed before the first delivery rather than after the first complaint.
Quality check · Containment up before demolition starts

Back to what is actually there
The scope comes out and the structure becomes visible. This is where a South Florida house tells the truth about earlier work -- and where unpermitted alterations from a previous owner turn up, because they are invisible until something is opened.
Quality check · Everything uncovered is photographed before it is covered again

Anything that carries load
Openings, headers, framing and any structural alteration are executed to the approved drawings. In Broward these are inspected against the county-amended Code, and nothing is closed up before that inspection has happened.
Quality check · No structural work is concealed before its inspection

The HVHZ part
Windows, doors, roofing, fixings and anything else in the building envelope go in with the approved products and the approved attachment. The product approval paperwork is matched to what is physically installed, because in the HVHZ that pairing is what is being inspected.
Quality check · Installed product matched to its approval documentation

Services before they disappear
Electrical, plumbing and mechanical rough-in are set out and installed. Each discipline is inspected on its own, and each one is a separate booking against the same permit -- which is why the inspection cut-off matters so much on a multi-trade job.
Quality check · Each discipline inspected before anything is closed

Insulation, board, and the point of no return
Once the rough-in inspections have passed, the walls and ceilings close. After this point, opening anything back up costs real money, which is why the inspection sequence is not a formality to be worked around.
Quality check · Close-up only after every rough-in has passed

The layer nobody sees again
Waterproofing, backer board, levelling and the preparation under tile and stone. In a South Florida bathroom this is the single most common place a cheap job fails, and it is entirely invisible three days later.
Quality check · Waterproofing checked and recorded before tiling

Tile, stone, cabinetry, joinery
The visible work: tiling and stone, cabinetry set and scribed, worktops templated and fitted, joinery and trim. Setting out is agreed with you before the field is committed rather than explained afterwards.
Quality check · Setting out agreed with you before the field is laid

Everything gets connected
Fittings, fixtures, sanitaryware, appliances, switches and lighting are installed and commissioned, and the final inspections for each discipline are booked against the permit.
Quality check · Every discipline tested, then booked for final

Snag it, then close the permit
We walk the finished work with you and agree anything outstanding in writing. Then the permit is closed out rather than left open -- an open permit follows the property and reappears at sale.
Quality check · Permit closed out, not left open

Project gallery 02
Four frames from a real Elbaz Construction ground-up South Florida project, taken while it was still a building site.
These are real photographs of Elbaz Construction work in progress, taken on a South Florida site. They are shown because the middle of a job is what an owner actually lives through, and it is the part nobody puts in a brochure. This project was not in Hollywood and is not presented as though it were.
Project 02, during and complete




Structure and glazing
The building from the lot: structure up, glazing installed and still protected, spoil trailer on site.
One real Elbaz Construction ground-up build in South Florida, photographed during construction rather than after it.
Because the six stages above are abstract until you have seen the middle of one. This is what “close-up” and “rough-in” look like from inside the room.
It is not a Hollywood project, it is not presented as one, and no address, client or cost appears anywhere.
Stage 05 · Decide
Argued both ways. None of these has a universally right answer -- it depends on your scope, your district and how much of the calendar you control.
Same-day review, one window a week

Everything else, any day

Which oneExpress is a genuine advantage on exactly four kinds of job, and only if the paperwork is ready before Tuesday evening. A remodel is never one of those four -- it is multi-trade by definition, so it goes standard, and the honest planning question becomes how few review cycles it can be got through in.
Put back what was there

Change the specification

Which oneIf one element has failed and the rest is current, repair in kind and keep the scope tight. If two or more are near the end, upgrade in one permit -- the second permit costs you a whole second sequence of reviews and inspections, and in Broward the envelope is the part it is worth being deliberate about.
Everything under a single filing

One room, then the next

Which onePhase for a reason you would happily explain to the Building Division -- occupancy, budget, a child's school year. If you are phasing to stay under a threshold, the City has already answered that: the exemption is based on the total value of the entire project.
Tick whatever applies. This will not produce a price -- no honest one exists before someone has seen the property -- but it will show which parts of your project are carrying the time and the risk.
We do not publish figures, and we do not publish permit fees either: the City of Hollywood runs its own Permit Cost Estimator, which is a better answer than anything we could print here. You get a real, itemised number from us in writing after a site visit.
Project gallery 03
Eight frames from two completed Elbaz Construction accessory dwelling units -- a single-level studio and a two-level loft unit.
Project 03, guided tour








Studio, open plan
The open living area of a completed studio accessory dwelling unit under a vaulted ceiling with an exposed beam.
Two completed Elbaz Construction accessory dwelling units: one single-level studio and one two-level loft unit, both photographed on completion.
A second dwelling is a permitted structure with its own services, its own envelope and its own inspection list. It is the clearest case of a job where the filing route decides the calendar.
South Florida. Neither unit is claimed to be in Hollywood.
Stage 06 · Close
Hollywood publishes its inspection timings, and they are worth knowing before you plan a week around them. Everything below is quoted from the City's own Schedule an Inspection page.
The City states that inspections scheduled Monday through Thursday prior to 8:00 p.m. will be scheduled for the next business day. That single sentence decides whether a trade returns tomorrow or waits.
Inspections scheduled on Saturday or Sunday are scheduled on the second business day. A Friday finish is therefore not the same as a Thursday finish.
To cancel an inspection you must call the automated line before 5:00 a.m. on the day it is scheduled. After that it is a used slot.
The City's automated inspection scheduling line runs 24 hours a day and wants the permit number. Results can also be looked up through the Building Permit Search.
After-hours inspections exist, need a request form approved, and carry an additional fee per discipline added to the permit.
The Building Division runs Monday to Thursday, 7:00 a.m. to 6:00 p.m., and asks anyone needing extensive assistance to be in line by 5:30 p.m. Friday is not a counter day.
Consultation appointments with a permit representative or plan examiner run 7:30 to 9:30 a.m., Monday to Thursday, and arrivals are managed through QLess.
A four-day counter week and an 8:00 p.m. cut-off mean the difference between a job that flows and a job that idles is usually a booking made on time, not a trade working faster.
Only claims that are either public record or visible in the work on this page. Nothing about awards, nothing about rankings, and no numbers we cannot show you.
Elbaz Construction is a licensed Florida general contractor, CBC1265280. Permits are pulled in the company's name, and Hollywood publishes a Licensed Contractor Search so you can check that for yourself rather than take our word for it.
Hollywood requires a contractor to be registered and current with the City -- insurance, workers' compensation and licence all verified -- before a submission is accepted. That is maintained continuously, not scrambled at the start of a job.
Design, the permit application and the construction are handled by one company, so a comment from a plan examiner does not sit waiting on a hand-off between two firms.
Broward's Board of Rules and Appeals administers the county amendments and certifies the building departments inside the county. Working to that standard across Broward is routine here, not a special case.
In the HVHZ what is inspected is the pairing of installed product and approval paperwork. We keep them matched, because an envelope inspection that fails on documentation costs exactly as much as one that fails on workmanship.
The 8:00 p.m. cut-off and the four-day counter week are planned around rather than discovered. Most lost days on a South Florida job are booking days, not building days.
Every permit we pull is closed out at the end of the job. An open permit follows the property and reappears when it is sold.
The same person from the first site visit to the walkthrough, across Broward, Miami-Dade and Palm Beach -- 104 municipalities, each with its own filing route.
Filter to the part of the job you are thinking about.
That is an address-level question and only the City can answer it definitively, but Hollywood names four districts on its own Historic Preservation page: the Historic Hollywood Business District along Hollywood Boulevard from 21st Avenue to Young Circle, the Harrison/Tyler Historic Districts, the Beach Historic District and the Historic Hollywood Lakes Multiple Resource District. A property can also be individually designated without being in a district. We confirm the designation before anything is drawn, because it changes the route.
Yes, on the outside of the building. Broward sits inside the Florida Building Code's High-Velocity Hurricane Zone, which covers Miami-Dade and Broward and nowhere else in Florida. In practice that governs roofing, windows, doors and how they are fixed, and it means product approval documentation is part of the submission rather than something produced later.
Hollywood has a Community Redevelopment Agency with its own area. For building work the clearest published consequence is narrow: the City's FAQ says a paint permit is required for painting commercial property inside the CRA or a historic district, and is not required for single-family homes anywhere. If you own a house, the CRA is unlikely to change your permit route; if you own a commercial building, check whether the address is inside it.
It can decide whether you file at all. Hollywood's published HB 803 guidance excludes properties in flood hazard areas from the minor-work exemption, and the separate exemption for temporary flood and hurricane protection is written only for properties outside a Special Flood Hazard Area. So flood designation is not a background detail here -- it is one of the switches.
In practice, yes. Hollywood lists electrical, plumbing, mechanical and gas work as always requiring a permit regardless of cost, and a kitchen or bathroom remodel touches at least two of those. The HB 803 exemption for minor work under $7,500 covers a short and specific list -- wood fence pickets and panels excluding posts, floor tiles and gutters -- and is based on the total value of the entire project.
Hollywood's own page, effective 1 July 2026, lists repair or replacement of wood fence pickets and panels -- expressly excluding replacing the wood posts -- floor tiles, and gutters, for minor residential work under $7,500. It then lists what stays permitted whatever it costs: electrical, plumbing, mechanical and gas work, and structural work including railings, guards, pool barriers, fences, windows and doors, siding and soffits, roofing and elevated decks.
No, and the City closes this explicitly: the exemption is based on the total value of the entire construction project. Splitting a scope to get under the threshold does not create an exemption, and unpermitted work does not stay invisible -- it surfaces on the property record when the house is sold.
Almost certainly not, if it is a house. The City's FAQ states that paint permits are only required for painting commercial property within the CRA or any of the historic districts, and are not required for single-family homes regardless of location. It is a good example of a Hollywood rule that is tied to an area and a building type rather than applying citywide.
Hollywood's HB 803 page names engineering and zoning permits -- giving driveways and pavers as its examples -- as outside the minor-work exemption, along with landscape permits. So paving is not covered by the exemption, and what it does require depends on the scope and where it sits relative to the right of way.
Accela Citizen Access. The City states that effective 4 August 2026 it has transitioned to ACA for all new permit applications. The older BCLA ePermits portal now answers only for permits that already exist, and you can tell them apart by the number: ePermits numbers are a letter and the year, like B24-100000, while Accela numbers read like RES-MECH-24-000001.
Hollywood publishes a Licensed Contractor Search on its own site. The City requires a contractor to be registered and up to date with verified insurance, workers' compensation and licence before a submission is accepted, so this is a check you can do yourself before signing anything, with anybody.
There is a counter, and there are appointments. The Building Division is at the Development Services Hub, second floor, 2600 Hollywood Boulevard, open Monday to Thursday from 7:00 a.m. to 6:00 p.m., with anyone needing extensive assistance asked to be in line by 5:30 p.m. Consultation appointments with a permit representative or plan examiner run 7:30 to 9:30 a.m. on those days, and arrivals are managed through the QLess virtual check-in system.
It is Hollywood's same-day electronic review, and it covers four residential types only: A/C replacement, water heater, reroof and electrical service change. The submission window is 6 p.m. Tuesday to 9 a.m. Wednesday, it is stand-alone permits only rather than sub-permits to a master permit, it is capped at ten submittals per applicant, and payment has to be in by 3 p.m. that Wednesday for the permit to issue electronically. A remodel does not qualify -- it is multi-trade by definition.
We do not publish a number, because Hollywood does not publish one either except for the four express types, where it says same-day review. Anything else depends on the disciplines involved, whether a historic review applies and how many comment cycles the submission draws. What we can tell you honestly is which of those apply to your project, and what we do to keep the cycles down.
It is the historic-district approval that sits alongside the building permit for designated properties. Hollywood takes Certificates of Appropriateness and other historic-district permits online through Accela, and the Historic Preservation Board's stated purpose includes assuring the compatibility of restored, rehabilitated or replaced structures within designated districts.
It can, and the City says so rather than leaving it implied: its Express Permitting page warns that applications in a historic district may be delayed as additional review may be required. That is not a reason to avoid the work -- it is a reason to know the designation before the calendar is set rather than after.
Windows are named by the City as structural work that always needs a permit, and in a designated property the design also has to survive a compatibility review. The two questions -- does it meet the Code, and is it appropriate to the district -- are answered by different people, and both have to be satisfied. It is very doable; it is not a same-week decision.
We stop and tell you, before it is covered up. It is more common than people expect in South Florida, and it has to be resolved rather than built over -- both because an inspector will find it and because it becomes yours at the point you conceal it.
Often yes, and it changes the programme rather than the price alone. Containment, protection and phasing all cost days. The honest version of this conversation happens at the site visit, where we can look at where the work is relative to where you sleep and cook.
Design, permitting and construction are handled by the same company, which is the point: a plan examiner's comment comes back to the people who drew it. Specialist trades are run by us on our permit rather than left to coordinate themselves.
Because for a remodel the same square footage can differ several-fold depending on what is behind the wall, which disciplines are involved and what the district requires. A published rate would be a guess. You get an itemised figure in writing after a site visit, and it says what happens if something is found during demolition.
The City publishes a Permit Cost Estimator on its own site, which is a better answer than any number we could print here. Whatever it comes to appears itemised on your proposal rather than folded into a round figure.
The City's automated inspection line runs 24 hours a day and wants the permit number. What matters is the cut-off: Hollywood states that inspections scheduled Monday through Thursday prior to 8:00 p.m. will be scheduled for the next business day, and that inspections scheduled on Saturday or Sunday will be scheduled on the second business day.
The City's rule is specific: to cancel an inspection you must call the automated inspection line before 5:00 a.m. for an inspection scheduled later that day. After that the slot has gone.
Hollywood does offer after-hours inspections, but they require an after-hours request form to be submitted and approved, and an additional fee per discipline is added to the permit. It is a real option for work that genuinely cannot happen in the day, not a routine shortcut.
It gets closed out. We do not leave permits open, because an open permit stays attached to the property and reappears at sale, when it is somebody else's leverage rather than an administrative detail.
The permit record, the approved drawings, the product approval documentation for anything in the envelope, and the closeout. In the HVHZ the envelope paperwork is the part a future buyer, insurer or inspector will actually ask for.
Yes -- across Broward, Miami-Dade and Palm Beach, 104 municipalities in total. The filing routes differ genuinely between them: Hollywood is on Accela since 4 August 2026, its neighbours are not all on the same system, and the differences are a working detail for us rather than a surprise.
Nothing in that stage yet — try “All”.
Client experience
Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.
Adir Davidov2022-12-27 Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended! Lee Morali2022-12-27 They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them! Shir Partush2022-12-27 We hired them to renovate our investment property and they provided exceptional quality service for an affordable price! Mia Zafrani2022-10-25 Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction. carmit cohen2022-10-25 After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!! Omri B2022-10-20 I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work! roni yonani2022-10-19 Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same! Itzick Manasherov2022-10-19 Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need. Sophie Brito2022-10-19 Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend Elie Elancry2022-10-19 Amazing job Did a total renovation of my house with themGoogle rating score: 5.0 of 5, based on 12 reviews
Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Next steps
Grouped by what you are trying to do, not by category.
The county and the neighbouring cities
The parts of this page we do as a service
What we most often build here
When the answer is more than a remodel
Start here
Almost everything on this page turns on where the property actually is -- the district, the flood designation, the building type. Tell us the address and what you are hoping to do, and the first conversation is a useful one.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Hollywood tells you when its counter is open, when its inspection day is decided and which portal takes the application. The value of a contractor here is knowing that before the job starts, not after a week has gone.
Or see the rest of what we cover on the Broward County page if your property is somewhere else in the county.