When does the price become firm in a design-build job?
Pricing firms up in stages as drawings do. A concept budget comes first, then updated numbers as engineering, product selections and site conditions are fixed. Once the permit set and selections are complete, the contract reflects them, with allowances called out clearly. We never present a single early number as final when the lot, flood elevation or glazing choices are still open.
Who owns the drawings if I decide not to build with you?
That is set in the design agreement before work begins. Typically the design phase is its own paid scope, and you receive the drawings for it, subject to the designer's copyright terms and the engineer's seal. We would rather you understand this at the start than discover it when a decision point arrives.
How do you coordinate the architect, engineer and surveyor?
We keep one drawing set and one issue log. The surveyor's elevations feed the architect, the engineer's loads feed the foundation and block design, and product approvals are checked against the opening schedule. When one consultant changes something, the others see it the same week, not after the permit comment letter.
Can I add a pool or outdoor kitchen later?
You can, but design it in now if you can. Pools need setbacks, equipment space, barrier requirements and electrical and gas capacity that are cheaper to plan for before the slab and utilities go in. Adding later often means reopening pavers, trenching and a second permit. We will price it as an option so you can decide.
What does the site team do that I will actually see?
A project manager runs the schedule and subcontractors, and a site supervisor is present most days. You will get progress photos, a short update on decisions due and an agenda before each site walk. Inspections are scheduled by us, and failed items are corrected and documented before the next trade starts.
Why do large windows and doors take so long to arrive?
Impact-rated glazing is made to order, and each opening must match a product approval for the zone, including Notice of Acceptance in HVHZ counties. Shop drawings, engineering review and glass production come before delivery. We order early from the permit set so windows are on site when the block shell is ready for them.
What happens if the lot has a surprise?
Buried debris, soft soils, a higher water table or a utility in the wrong place can all turn up. We investigate before pricing where we can, and the contract states how unforeseen conditions are documented and priced. You see the evidence and the proposed fix before any change is made, never an unexplained line afterward.
How are interior selections kept on schedule?
We give you a selection calendar tied to the construction one: tile, plumbing fixtures, cabinets, stone and lighting each get a decision date. Missing a date can delay an order and then an installer. Showroom visits and sample boards are arranged early, and each approved choice is signed off in writing.