The service

The building keeps
running while you work.

Common area work is not a remodel with more square footage. It is a live-occupancy project: residents still need to reach their doors, receive mail, use the elevator and get to the parking level, every day, while the space they do it in is a site.

That constraint drives everything — phasing, working hours, dust control, temporary routes and how the whole thing is communicated to people who did not choose to live next to a renovation.

  • Phased, not closed

    Work sequenced so access, mail and egress are maintained throughout rather than suspended.

  • Governed by the association

    Scope, allowances and change control are written for a board to approve and for residents to understand.

  • Durability over fashion

    Finishes chosen for traffic, cleaning and replacement cost, because a lobby is used more heavily than any home.

Talk through your common areas

Scope

What a common area renovation covers

The work behind a lobby that looks effortless — most of it invisible and much of it code-driven.

Package volume changed the brief

Mail rooms designed before parcel delivery became daily are the single most common undersized space in an older building. It is worth measuring actual volume before reproducing the original layout.

01

Circulation and access

  • Lobby, corridor, elevator lobby and stair finishes
  • Accessible route maintained through the work and improved on completion
  • Door hardware, closers and clearances reviewed against current requirements
  • Wayfinding and unit identification
02

Life safety

  • Fire alarm devices, emergency lighting and exit signage coordinated with finishes
  • Fire-rated assemblies maintained where corridors and shafts are opened
  • Sprinkler head relocation where ceilings change
  • Egress width and path preserved throughout construction
03

Systems and comfort

  • Corridor lighting design and controls, usually the single biggest visual change
  • HVAC and corridor pressurisation coordinated where ceilings are altered
  • Power for amenity equipment and access control
  • Acoustic treatment where corridors carry noise
04

Amenity and finish

  • Mail and package areas sized for how people actually receive deliveries now
  • Amenity rooms, fitness spaces and lounges
  • Durable wall protection, flooring and ceiling systems
  • Furniture, fixtures and equipment coordination
Empty commercial corridor with fluorescent ceiling lighting, before refurbishment
Empty commercial corridor with fluorescent ceiling lighting, before refurbishment.

Stills from the two completed units on this page. They illustrate the stages; they are not photographs of the stage named beside them.

How it runs

Six stages,
one contract

Common area work lives or dies on sequencing and communication, not on finish selection.

  1. 01

    Condition and use survey

    What the spaces are, how residents actually move through them, and what is failing — recorded before design.

  2. 02

    Design and board review

    Options priced and presented in a form a board can approve, with allowances made explicit.

  3. 03

    Permitting

    Drawings submitted to the authority having jurisdiction, with life-safety and accessibility review handled by us.

  4. 04

    Phasing plan

    Access, egress, mail and parking maintained through every stage, agreed with management before mobilisation.

  5. 05

    Construction

    Worked in agreed hours with containment, temporary routes, protection and daily reinstatement of access.

  6. 06

    Closeout

    Final inspections, commissioning of new systems, and handover documentation for the association’s records.

Approvals

Two approval tracks,
running at once.

Common area work is generally permitted like any commercial interior alteration, and accessibility and life safety are where review concentrates: egress width, accessible route, door clearances, alarm device placement and rated assemblies.

Running alongside that is the association’s own governance — board approval, and in many cases a membership vote where the work is a material alteration or is funded by assessment. That track has its own calendar and is often the longer of the two.

Buildings of three or more habitable storeys also sit within Florida’s milestone inspection framework under Fla. Stat. 553.899. That is a separate structural obligation from a cosmetic renovation, but it frequently surfaces at the same time and is worth establishing early.

INFILLED VEHICLE OPENINGBATHKITCHENLIVING / SLEEPINGENTRY

Simplified sketch, for explanation only. It is not a permit drawing and not a plan of either project shown on this page.

From first call to closeout

  • Document review

    Declaration, rules and any prior alteration approvals.

  • Condition survey

    Existing finishes, systems and accessibility recorded as built.

  • Design and pricing

    Scope and allowances written for board review.

  • Board approval

    And membership vote where the governing documents require one.

  • Permit drawings

    Prepared for the authority having jurisdiction.

  • Accessibility review

    Route, clearances and hardware assessed against requirements.

  • Life-safety coordination

    Alarm, emergency lighting and rated assemblies.

  • Phasing agreement

    Access and egress plan agreed with management.

  • Inspections

    At each required stage.

  • Closeout

    Commissioning and handover documentation.

Milestone inspection is a separate obligation

Fla. Stat. 553.899 requires milestone structural inspections for condominium and co-operative buildings of three or more habitable storeys, on a schedule tied to the building’s age. It is not triggered by a common area renovation, but it is often discovered during one.

Nothing here is legal advice, and no approval outcome or review duration is promised. Requirements vary by municipality and by property.

Cost and schedule

What moves the number

Common area budgets are decided by occupancy constraints and code triggers far more than by finish selection.

01

What moves the cost

  • Working hours

    Restricted or out-of-hours working is the single largest multiplier on a live building.

  • What the ceiling holds

    Opening a corridor ceiling usually means relocating sprinkler heads, alarm devices and lighting — three trades, not one.

  • Accessibility upgrades

    Where the existing route, clearances or hardware do not meet current requirements, the renovation is generally the moment they are corrected.

  • Rated assemblies

    Corridors and shafts are usually fire-rated. Penetrating them means restoring the rating, which is inspected.

  • Finish durability

    A specification that survives ten years of trolleys and cleaning costs more up front and far less over the life of the building.

  • Phasing

    More phases means more mobilisations, more protection and more temporary work.

02

What moves the schedule

  • Board and member approval

    Runs on the association’s meeting calendar, not the construction schedule.

  • Permit review

    Set by the authority having jurisdiction.

  • Long-lead items

    Lighting, flooring and mail systems are ordered against approval.

  • Phase handovers

    Each phase reinstated and reopened before the next begins.

  • Restricted hours

    Directly extends duration where quiet hours apply.

  • Inspections

    Life-safety inspections gate the finishes that cover them.

Illustrative diagram · not a photograph of a project

AS FOUND · GARAGEopen vehicle opening · bare slab · no envelopeCONVERTED · HABITABLEinfill wall · windows · entry · egress · insulated envelope · treated slab010203040506

What actually changes
in a corridor.

A corridor renovation looks like paint and carpet. Five of the six things that make it work are above the ceiling or inside the wall.

01

The rated assembly

Corridor walls and ceilings are usually fire-rated. Every penetration has to be restored and inspected.

02

Devices in the ceiling

Sprinklers, smoke detection, emergency lighting and exit signage all have required positions that finishes must work around.

03

The accessible route

Width, clearances at doors, hardware type and floor transitions — the parts of accessibility a resident feels daily.

04

Pressurisation

Corridors in many buildings are pressurised for smoke control. Ceiling changes can affect it.

05

Wall protection

Corner guards and impact-resistant surfaces at trolley height are what stop a new corridor looking old in a year.

06

Acoustics

Hard finishes look good and carry sound. Ceiling treatment is the usual remedy.

Empty commercial corridor with fluorescent ceiling lighting, before refurbishment
Reference image for this section.

What to expect

Residents live
through this.

Every decision on a live building is really a decision about how much disruption a resident absorbs on a Tuesday morning.

  • Access maintained

    Every unit reachable every day, by an agreed route.

  • Mail and deliveries

    Kept operating throughout, relocated temporarily if needed.

  • Working hours

    Agreed with management in advance and adhered to.

  • Dust and noise

    Containment, negative air where required, and notice before the loud work.

  • Egress

    Never compromised. Temporary routes are signed and lit.

  • Communication

    One point of contact for management, and resident notices before each phase.

  • Reinstatement

    Each phase cleaned and reopened before the next starts.

Questions

Ask the
awkward ones.

Six categories. Pick one and the answers change.

Not answered here?

(754) 236-0675

Sun-Fri 7am-7pm · Sat closed

No. Common area work is planned around continuous occupancy — access to every unit, mail and egress are maintained every day. That constraint shapes the phasing plan, which is agreed with management before anything starts.

Set by the association and by any local noise ordinance. Restricted hours are workable and they lengthen the programme, so they are priced in rather than discovered later.

Vacant modern commercial space with large windows and natural light
Vacant modern commercial space with large windows and natural light.

Why Elbaz

What we will actually
put our name to

  • Licensed general contractor

    Licensed, bonded and insured · CBC1265280.

  • Live-occupancy experience

    Phasing, temporary routes and protection planned before mobilisation rather than improvised.

  • Written for a board

    Scope, allowances and change control documented so a committee can approve and residents can understand.

  • Life safety taken seriously

    Rated assemblies, devices and egress coordinated and inspected, not worked around.

  • One point of contact

    Management deals with one person who holds the schedule and the trades.

  • Closeout for the records

    Commissioning and documentation handed to the association.

Every claim in this column is something we can evidence. We have deliberately left out award badges, membership logos and project counts.

Reviews

I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work!

Omri B

Genuine Google reviews of Elbaz Construction, shown as written. None of these reviewers describes a multi-family common area project specifically, so none is presented as one.

Read them on Google

Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended!

Adir Davidov

They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them!

Lee Morali

We hired them to renovate our investment property and they provided exceptional quality service for an affordable price!

Shir Partush

Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction.

Mia Zafrani

After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!!

carmit cohen

Project files

Shared spaces built to handle traffic.

Photos from a nail salon and spa that Elbaz Construction built out. Durable floors, lighting, seating areas and storage walls show how we finish a space that many people use every day, as a common area must.

2Projects shown
10Photos
PROJECT 01

Related interior: a long aisle and its floor

A nail salon, shown because a corridor and a salon aisle ask the same of a floor. A glossy marble-look tile runs the whole length under a drop ceiling, with pedicure chairs along one side and manicure tables along the other. Staff and customers are in the room, so the photos show the floor in use.

Scope of work

  • Large-format tile laid along the whole aisle
  • Drop ceiling with light panels
  • 3D wall panels along one side
  • Aisle kept clear for people walking
  • Gold-base seating placed against the tables
  • Polish wall finished behind the manicure side

Materials & finishes

Marble-look tileDrop ceiling tiles3D wall panelsGold-base chairsWhite shelving

What to look for in the photos

Follow the floor from the near end to the far end. A shared walkway shows every uneven joint, so how flat this tile reads is the point.

Elbaz Construction project photo · 3 photos

PROJECT 02

Related interior: a glass-top vanity with mirror tile

Another part of the same salon, shown for its restroom-type finishes. A vanity with light wood-grain drawers has a white glass top, and a mirrored hexagon tile backsplash runs behind it. An orchid and soap bottles sit on the counter.

Scope of work

  • Wood-grain vanity cabinet with drawers
  • White glass countertop fitted to the cabinet
  • Mirrored hexagon tile set as a backsplash
  • Faucet and sink plumbed to the vanity
  • Tile cut around the counter edge
  • Counter styled with soap and a plant

Materials & finishes

Wood-grain cabinetWhite glass topMirrored hexagon tileChrome faucetSoap bottles

What to look for in the photos

Check where the mirrored tile meets the glass top. In a shared restroom, that joint takes splashes all day.

Elbaz Construction project photo · 3 photos

Budget and schedule

Where common-area money goes.

A common-area renovation spends on shared surfaces and on the systems behind them. These typical shares and the typical sequence assume the building stays occupied.

Where a typical common-area renovation budget goes

100%OF BUDGET
  • Flooring and tile18%
  • Walls, paint and wall finish16%
  • Lighting and electrical18%
  • Doors, hardware and millwork12%
  • Accessibility and life-safety10%
  • Labor and resident protection18%
  • Permits and inspections8%

Typical shares only, and the scale of the building and the number of floors move them.

A typical common-area sequence, in weeks

Board review and finish selections
Permit drawings and approvals
Permit review
Tile, light and door orders
Long-lead orders
First zone: demolition and rough-in
Finishes, remaining zones
Finishes by zone
Inspections and board walk-through
Week 0Week 10Week 20

Floors or zones are released one at a time so residents always have a way in and out.

Drawn out

Three plans for a shared building.

A route, a schedule and a floor build-up explain most of what a common-area project changes.

36 in MIN. ROUTERAMP 1:12 MAXENTRYACCESSIBLE ROUTE: PARKING TO DOOR

Parking to the lobby

A level route with a gentle ramp and a door that opens easily connects the lot to the lobby, and it is checked before finishes are chosen.

TENANT IMPROVEMENT1LEASE+ SURVEY2DESIGN+ MEP3PERMIT4BUILD-OUT5INSPECT6C.O. +MOVE-IN

Board vote to turnover

The job runs from board approval and drawings through permit, construction and inspection to a final walk-through with the association.

TILE OVER SLABPorcelain / tileThinset (95% coverage)Crack-isolation membraneConcrete slabVapor barrier + soil

Tile in a high-traffic hall

A busy corridor floor needs a flat slab, a good bond layer and movement joints so tile does not crack or lift.

Scope planner

Rough out your common areas.

Pick the areas and finish level to see the trades involved and typical weeks on site.

Which areas are included?
What happens to the floors?
How is lighting handled?

Closer in

Surfaces a whole building touches.

Four details that stand in for the wear points of a shared space: seating, a splash zone, a polished wall and drawer fronts.

Gold-base chairs at tables
Mirror tile behind soap
Silver hex wall, white top
Wood-grain drawer fronts

More questions

Association rules and building codes.

What boards and managers ask about insurance, milestone reports, elevators and storm season.

Ask us directly
What does an association need from a contractor before work starts?

Most associations want a certificate of insurance naming them as an additional insured, proof of our license, a signed contract and a schedule. Many also ask for a deposit schedule and a list of subcontractors. Send us your rules early, and we will set up the paperwork so a manager is not chasing it during the project.

How does a renovation fit with milestone inspections and reserve studies?

Florida condominium rules require structural milestone inspections for older buildings of three stories or more, and reserve studies for structural items. A cosmetic common-area project should not cover up what an engineer needs to see. Ask the association engineer which walls, ceilings and slabs must stay accessible, and we will sequence around them.

Can the elevators stay in service during deliveries?

Usually, with planning. We reserve the service elevator for crews and materials, pad it, and keep one passenger car free for residents. Deliveries are scheduled in set windows and carried in off-peak where we can. If tile or large panels need the passenger car, we tell residents in advance.

Which floor materials survive wet entrances and salt?

Porcelain tile with a slip-resistant surface is the usual choice at entrances, because it handles rain, tracked-in sand and salt. Polished finishes like the one in the photos suit dry interior halls. At entrances, a recessed mat and good drainage matter as much as the tile, so we check both.

How should residents be told about the work?

With a written notice before each stage: what will happen, which areas are closed, the hours and who to call. We give the manager copy for posting and email, and update it if dates move. Residents accept disruption better when they know the end date, so we post it even when it is only approximate.

Can we see alternates before the board votes?

Yes. We can price the job in a base scope and add alternates for upgrades like better tile, extra lighting or a feature wall. The board then votes on a clear list rather than on a single number. Each alternate is described in plain terms, so owners can see what they are choosing.

Where do materials go during hurricane season?

We agree on a storage space with the association before delivery, typically a locked room or a covered area away from flood-prone garage levels. When a storm is forecast, we secure loose materials, remove debris from the common areas and confirm the plan with the manager. Nothing is left where wind or water can move it.

What documents do we keep after the renovation?

The association should keep the permit set, final inspection approvals, product data and warranties, a finish schedule with colors and tile codes, and maintenance instructions. We hand these over as one package. Boards change over the years, so a complete record saves time when a replacement tile or light fixture is needed.

Start here

Tell us about the building

What helps on the first call

Number of units and storeys, which common areas are in scope, roughly when the building was built, and where you are in the association’s approval process.

What happens next

We survey the spaces and the governing documents before scoping, because both constrain what is possible.

What you will not get

A corridor price per linear foot before anyone has looked above the ceiling.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Find out what your
common areas actually need.

One survey, one written scope a board can approve, one contract. We will tell you what the building requires before we tell you what it costs.

Renovated commercial interior with an exposed timber roof structure and open corridor