West Park files on
the County's form —
and wants the notice recorded first.

The City publishes the Broward County Uniform Building Permit Application rather than one of its own, and sets out its process in three numbered steps. The part that catches people is the timing: the recorded Notice of Commencement is required before the permit is issued, not before the first inspection, and it needs two certified copies from the County. We build to that, as a licensed general contractor working across Broward, Miami-Dade and Palm Beach.

  • Licensed, bonded & insured · CBC1265280
  • 104 municipalities across 3 counties
  • Design-build: permitting & construction in-house

Miami-Dade · Broward & Palm Beach Counties

Scroll

Start here

Start with the address

Almost everything on this page turns on which permit type applies and whether your contract crosses $2,500. Tell us the address and what you are hoping to do, and the first conversation is a useful one.

Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Recent projects

Recent Elbaz Construction work

Eight frames of completed work across South Florida — bathrooms, showers, flooring and exterior concrete. Tap any image to see it larger.

01

A completed primary bathroom with a barn door, trough vanity and freestanding tub.

02

A wet-room bathroom with a freestanding tub and an open walk-in shower.

03

An emerald green tiled shower with a white hexagon mosaic bench.

04

A fluted oak vanity with a backlit mirror cabinet beside a window.

05

A recessed shower niche backed in scallop marble mosaic with a metal trim edge.

06

Dark wide-plank flooring in an open interior with material sample boards.

07

A corner shower bench in large-format tile above a hexagon mosaic floor.

08

A plain poured concrete driveway with a broom finish and cut control joints.

All photographs are of real completed Elbaz Construction work. They come from several separate properties across South Florida and are shown as recent work. None of them was taken in West Park, and none is captioned as though it were.

01 / 12

The journey

Six stages, from a document package to a closed permit.

West Park publishes a process rather than a rulebook: three numbered steps, a county application form, a notice that has to be recorded before anything is issued, and a portal you register for. Almost everything that goes wrong on a project here goes wrong in the assembly rather than in the building, which is why this page walks the documents in the order the City asks for them.

Use the stage markers to jump to the part you are stuck on. Nothing here is a promise about your address — the Building Department decides that — and nothing here is a figure we invented. Where the City publishes a rule, it is quoted. Where it does not, this page says so instead of guessing.

Stage 01 · Package

Whose form, whose office, whose recording

A West Park application is assembled from more than one place, and knowing which part comes from where is most of what makes the process straightforward.

The County's application

Every application package here has to include the Broward County Uniform Building Permit Application. The City adopted the county-wide form rather than maintaining its own, which is genuinely helpful — it is the same document used across much of Broward, so a contractor working across the county is filling in something familiar. What varies is what goes AROUND it, and that is where the City's own requirements live.

  • The Broward County Uniform Building Permit Application is required
  • It is a county-wide form, not a West Park one
  • What varies between municipalities is the supporting package
  • A Notice of Commencement goes with it in every package
Illustration of existing and proposed elevation drawings pinned side by side (illustration)

Illustration, not a photograph: existing and proposed elevation drawings pinned side by side, drawn to show what a submission set looks like. It is not a photograph of any West Park application.

Three numbered steps

The City sets out its process as three steps, and the ordering is deliberate. First, select and download the county application, the Notice of Commencement and any other forms your permit type needs. Second, assemble the additional information and documents that type requires. Third, register and create an account for the Online Building Permit Portal. The portal comes last, not first, which tells you the City expects the package to exist before the account does.

  • Step 1: the county form, the NOC and any type-specific forms
  • Step 2: the additional documents that permit type requires
  • Step 3: register for the Online Building Permit Portal
  • The portal is the last step, not the first
Wide view of a primary bathroom with a barn door, trough vanity, freestanding tub and glazed walk-in shower

A wide view of a completed Elbaz Construction primary bathroom with a barn door, trough vanity and freestanding tub. A South Florida project, not a West Park one.

Broward County, and the HVHZ

West Park is in Broward County, which sits inside the Florida Building Code's High-Velocity Hurricane Zone — covering Miami-Dade and Broward and nowhere else in the state. Broward's Board of Rules and Appeals administers the county amendments and certifies the municipal building departments inside the county. That is the same body behind the uniform application form, and it is why a Broward package has a family resemblance from one city to the next.

  • The HVHZ covers Miami-Dade and Broward counties only
  • It bites hardest on roof, glazing, openings and their fixings
  • Broward's Board of Rules and Appeals certifies the county's building departments
  • Product approval documentation belongs in the submission
Long primary bathroom with a light oak vanity, freestanding tub and a glazed walk-in shower at the far end

A completed Elbaz Construction long primary bathroom with a light oak vanity and a freestanding tub. A South Florida project.

A City Hall that takes payment in person

The City publishes that payments are brought or mailed to City Hall at 1965 S. State Road 7, and gives one telephone number for enquiries. Alongside an online portal for the application itself, that mix — digital submission, physical payment — is worth knowing in advance, because it is the sort of small step that adds a day when it is discovered rather than planned for.

  • City Hall, 1965 S. State Road 7, West Park
  • Payments are brought or mailed
  • One published telephone number, 954-989-2688
  • Applications go through the online portal; payment does not
Timber stair treads and risers finished to match the floor at the landing

Timber stair treads and risers finished to match the floor at the landing, on a completed Elbaz Construction project in South Florida.

Stage 02 · Value

The $2,500 question, and what it decides

One published figure separates two quite different paperwork paths here, and it sits earlier in the process than the equivalent figure does in most municipalities.

Under $2,500

Where the value of work is under $2,500, the City states that a Notice of Commencement is not required. That removes a genuine step — a trip to the County Recording office, two certified copies and a document that has to be back before the permit issues. It does not remove the permit itself: the value test here is about the notice, not about whether the work is permitted work.

  • Under $2,500 in value: no Notice of Commencement required
  • It does not exempt the work from needing a permit
  • The test is on the value of work, not on the type
  • Above it, the recording step enters the sequence
Emerald green tiled shower with a white hexagon mosaic bench and a recessed niche

An emerald green tiled shower with a white hexagon mosaic bench and a recessed niche, from a completed Elbaz Construction project in South Florida.

Over $2,500, and before issuance

Above the threshold, a recorded Notice of Commencement is required prior to permit issuance, recorded at the County Recording office with two certified copies secured. Read the timing carefully: many municipalities want the recorded NOC before the FIRST INSPECTION, which gives you the whole review period to sort it out. West Park wants it before the permit issues — so it sits on the critical path to starting rather than to being inspected.

  • Required PRIOR TO PERMIT ISSUANCE, not before the first inspection
  • Recorded at the County Recording office
  • Two certified copies secured
  • It is on the critical path to starting work
Walk-in shower interior with a tiled bench seat, herringbone mosaic floor and a linear drain behind frameless glass

A completed Elbaz Construction walk-in shower interior with a tiled bench seat and a herringbone mosaic floor. Not a West Park property.

And whatever your type needs

The City's second step is the additional information and documents that may be required for your particular permit type. It does not publish a single master list, because the answer depends on the type — and we are not going to reproduce another municipality's checklist and present it as West Park's. The practical approach is to establish the permit type first and ask what that type requires, before assembling anything.

  • Additional documents vary by permit type
  • The City publishes the requirement, not a single master list
  • Establish the permit type before assembling the package
  • A neighbouring city's checklist is not West Park's checklist
Low shower threshold with the linear drain running along the mosaic floor edge

A low shower threshold with the linear drain running along the mosaic, on a completed Elbaz Construction project in South Florida.

The portal, last

Step three is registering and creating an account for the Online Building Permit Portal. Putting it third is a small signal worth reading: the City expects you to arrive at the portal with a package rather than to use the portal to work out what the package should be. Getting the account set up early costs nothing, but it is not where the work is.

  • An account is required to access the Online Building Permit Portal
  • The City lists it as the third step, after assembling documents
  • Setting the account up early is free; it is not the hard part
  • The package is what determines whether a review runs smoothly
Linear drain set at the edge of a white hexagon mosaic shower floor

A linear drain set at the edge of a white hexagon mosaic shower floor, from completed Elbaz Construction work in South Florida.

Every photograph in this section is real Elbaz Construction project photography from completed South Florida work. None of it was taken in West Park and none of it is captioned as though it were. Drawn images are labelled as illustrations.

Stage 03 · Recorded

Assembling the package, in the City's own order

West Park publishes three steps and we follow them, because the ordering is the useful part: the documents come before the account, and the recorded notice comes before the permit.

Established before anything is downloaded

The City's second step is "the additional documents your permit type requires", which means the type has to be settled first. We establish it with the Building Department rather than inferring it, because the type determines the whole package.

County application, NOC, type-specific

The Broward County Uniform Building Permit Application, a Notice of Commencement and whatever additional forms the type requires are downloaded and completed. The county form is the same one used across much of Broward, which makes it familiar rather than novel.

Whatever the type requires

The supporting information is assembled — drawings and, for anything in the building envelope, the product approval documentation the HVHZ requires. This is the step where a package either becomes reviewable or becomes a comment cycle.

Above or below $2,500

We establish whether the value of work crosses $2,500, because that decides whether a Notice of Commencement is required at all — and if it is, it has to be recorded and back in hand before the permit can issue.

At the County, two certified copies

Where required, the Notice of Commencement is recorded at the County Recording office and two certified copies are secured. This is on the critical path to STARTING here, not to being inspected, which is earlier than most municipalities put it.

Register, then submit

An account is created on the Online Building Permit Portal and the package is submitted. Ours exists already, so this is not where a project waits.

Digital submission, physical payment

The application is reviewed and comments come back. The City publishes no review timeframe, so we do not quote one. Payment is brought or mailed to City Hall rather than taken in the portal — a small step that is worth planning rather than discovering.

This is the published sequence, not a promise about your project. What any specific address requires, and which additional documents your permit type needs, are decided by the City of West Park Building Department — not by a contractor. We confirm what your address actually requires before anything is filed.

Stage 04 · Assembly

A West Park job where the paperwork leads the programme

Because the recorded notice is required before the permit issues rather than before the first inspection, the administrative work here front-loads onto the start date. These phases are ordered by that reality rather than by the trades.

Nothing starts without the notice

It gates issuance, not inspection

Where the value of work is over $2,500, the recorded Notice of Commencement and its two certified copies have to be in hand before the permit issues. In West Park that means the recording trip sits between you and a start date, not between you and an inspection — so it is booked as a task with a date rather than left as an errand.

Quality check · Recorded NOC and two certified copies secured before issuance is sought

Illustration of existing and proposed elevation drawings pinned side by side (illustration)

Protection and the route in

Agreed before delivery

Coverings, dust separation and the working route go in, and deliveries and parking are settled in advance with anyone they affect.

Quality check · Route, containment and deliveries agreed before work starts

Timber stair treads and risers finished to match the floor at the landing

Stripping out

And reading the record against it

The scope comes out and the fabric appears. Anything that does not match the permit record is photographed and raised with you before it goes back behind a wall.

Quality check · Everything uncovered photographed and raised before it is concealed

Bathroom stripped back during construction with the wall opening re-framed and tile backer board set

Structure

To the drawings in the package

Load-bearing alterations are executed to the drawings that were submitted and reviewed. Where site conditions genuinely differ, that is a revision through the portal rather than a decision taken on site and recorded nowhere.

Quality check · Nothing structural concealed before its inspection

Walk-in shower interior with a tiled bench seat, herringbone mosaic floor and a linear drain behind frameless glass

The envelope

County-amended, and documented

Windows, doors, roofing and their fixings go in to the approved products and the approved attachment, and the product approval documentation is matched to what is physically installed. Broward's Board of Rules and Appeals administers the amendments that govern this, across every city in the county.

Quality check · Installed products matched to their approval documents

Low shower threshold with the linear drain running along the mosaic floor edge

Services before they vanish

Each inspected on its own

Electrical, plumbing and mechanical rough-in are installed and set out against the finished setting out rather than against the demolition, and each discipline is inspected before anything is covered.

Quality check · Each discipline inspected before anything is closed

Two stainless grab bars fitted either side of a walk-in shower with a handheld shower on a slide bar

Closing the walls

After the passes

Board and insulation go up once the rough-in inspections have passed. Opening finished work later costs several times what waiting costs, and there is no version of that arithmetic where closing early wins.

Quality check · Walls closed only against passed inspections

Recessed shower niche backed in hexagon mosaic within large-format wall tile

Waterproofing

Photographed as it is built

Tanking, backer board and falls go in beneath the tile and are recorded as they are built. No later inspection can examine this layer.

Quality check · Falls and waterproofing recorded photographically before tiling

Shower walls part-tiled in vertical stacked plank tile with layout marks still visible on the floor

Setting out and finishes

Walked with you first

Tile, stone and cabinetry are set out and confirmed with you before the field is fixed, then the visible work goes in.

Quality check · Setting out walked with you before the first full course

Level threshold between the bathroom floor and the shower floor with a black shower set beyond

Finals and closeout

Every discipline, then the record

Each discipline is taken to its final, outstanding items are agreed in writing, and the permit is closed rather than left open. In West Park the paperwork opened the job, and it closes it too.

Quality check · Every final passed and the permit closed

Wet-room bathroom with a freestanding tub and an open walk-in shower sharing one tiled floor

Stage 05 · Weighing

The three decisions West Park owners find hardest

Argued both ways. None of these has a universally right answer — it depends on your scope, your contract value and how much of the calendar you control.

Record it early

Off the critical path

Illustration of existing and proposed elevation drawings pinned side by side (illustration)
What it is
Recording the Notice of Commencement at the County and securing the two certified copies while the review is still running.
Benefits
The permit can issue the moment the review clears, instead of waiting on a recording trip.
Why it matters here
West Park requires it prior to permit ISSUANCE, not before the first inspection — so it gates the start date.
The cost
One County trip, made a week or two earlier than it strictly had to be.
Best for
Any contract over $2,500, which is most projects.

Wait until issuance is close

Do it when you know

White shaker vanity with a quartz top, undermount basin and brushed nickel tap
What it is
Recording the notice once the review is nearly through and the scope is settled.
Benefits
If the scope changes materially during review, you have not recorded against the wrong figures.
Why it matters here
It still has to be in hand before the permit issues, so the timing is tight rather than flexible.
The cost
Any delay at the County is a delay to your start date.
Best for
A scope genuinely likely to change during review.

Which oneRecord it early unless the scope is genuinely unsettled. West Park puts this document before issuance rather than before the first inspection, which means an ordinary administrative errand sits directly between you and a start date — and that is the wrong place for it to be discovered.

Scope it properly

Whatever the value comes to

Wide view of a primary bathroom with a barn door, trough vanity, freestanding tub and glazed walk-in shower
What it is
Pricing the work honestly and accepting the notice requirement if the value crosses $2,500.
Benefits
The package is right, the permit issues cleanly and nothing is discovered late.
The paperwork
A County recording and two certified copies, once.
At sale
A clean permit record that matches the work actually done.
Best for
Any real remodel. The threshold is about the notice, not about whether a permit is needed.

Split it to stay under

Avoid the recording

Recessed shower niche backed in hexagon mosaic within large-format wall tile
What it is
Dividing work so that no single contract crosses $2,500.
Benefits
Avoids the recording step on each piece.
The paperwork
More applications, more reviews, more inspection sequences.
At sale
A fragmented record that is harder to explain than a single clean one.
Best for
Nothing we would recommend. The saving is one errand; the cost is a multiplied process.

Which oneScope it properly. The $2,500 line decides whether a notice is recorded, not whether the work needs permitting — so splitting a job to stay under it buys you one avoided trip to the County and costs you several extra applications, reviews and inspection sequences.

Confirm the type first

Then assemble once

Low shower threshold with the linear drain running along the mosaic floor edge
What it is
Establishing the permit type with the Building Department before downloading or assembling anything.
Benefits
The additional documents West Park asks for depend on the type, so knowing it first means assembling the package once.
Why it matters here
The City publishes the requirement without a single master list, precisely because it varies.
The cost
A telephone call, before any work.
Best for
Every project, and especially anything touching the exterior.

Assemble what you expect

Adjust after comments

Light wide-plank flooring running uninterrupted across a large open room
What it is
Putting together a standard package and letting review comments tell you what is missing.
Benefits
Nothing waits on a call, and on a familiar scope it is often complete.
Why it matters here
A missing type-specific document is a comment cycle, and comment cycles are the main variable in a timeline nobody publishes.
The cost
At least one avoidable round trip.
Best for
A scope you have permitted in this City before, recently.

Which oneConfirm the type first. The City structured its own instructions that way — type, then documents, then portal — and a package assembled against the wrong type is not a small error here, because the additional-documents requirement is exactly the part that varies.

What moves the cost and the calendar in West Park

Tick whatever applies. This will not produce a price — no honest one exists before someone has seen the property — but it will show which parts of your project are carrying the time and the risk.

What this points to

We do not publish figures, and we do not publish permit fees either: none was read from a City source, and we would rather say so than print a number we cannot stand behind. You get a real, itemised number from us in writing after a site visit.

Stage 06 · Handover

What West Park publishes, in order

This City publishes a process rather than a rulebook. Everything below is taken from its own Building Department material, and where it publishes nothing, this page says so.

The county's form

Every application package must include the Broward County Uniform Building Permit Application and a Notice of Commencement, plus the forms applicable to the permit type.

Step one

Select and download the county application, the Notice of Commencement and the other forms needed for your application.

Step two

Assemble the additional information and documents that may be required for your permit type.

Step three

Register and create an account to gain access to the Online Building Permit Portal.

The recording rule

A recorded Notice of Commencement is required prior to permit issuance, recorded at the County Recording office with 2 certified copies secured.

The exception

It is not required if the value of work is under $2,500.

Where to pay

Payments are brought or mailed to City Hall, 1965 S. State Road 7. The published number for enquiries is 954-989-2688.

What is NOT published

A plan-review timeframe, any fee we could verify, and a single master list of the additional documents each permit type requires — the City states that this varies. Where a number is missing from this page it is missing because West Park does not state it.

What we will actually stand behind

Only claims that are either public record or visible in the work on this page. Nothing about awards, nothing about rankings, and no numbers we cannot show you.

Licensed, bonded and insured

Elbaz Construction is a licensed Florida general contractor, CBC1265280. Permits are pulled in the company's name, and the licence is verifiable at the Florida DBPR rather than on our say-so.

We record the notice early

West Park requires the recorded Notice of Commencement before the permit issues rather than before the first inspection. We treat the County recording as a dated task on the programme, because otherwise an errand sits between you and a start date.

We confirm the permit type before assembling

The additional documents this City asks for depend on the type, and it publishes no single master list because it genuinely varies. Establishing the type first means assembling the package once.

We use the County's form properly

The Broward County Uniform Building Permit Application is used across much of the county, which makes it familiar — and familiarity is exactly where careless completion creeps in. It gets the same attention as anything else in the package.

Built to the county-amended Code

Broward's Board of Rules and Appeals administers the county amendments and certifies the building departments inside the county. Working to that standard across Broward is routine here, not a special case.

Envelope documentation kept straight

In the HVHZ what is inspected is the pairing of installed product and approval paperwork. We keep them matched, because an envelope inspection that fails on documentation costs exactly as much as one that fails on workmanship.

We do not quote a review time

The City publishes none. Anyone giving you a West Park review time is giving you their own average, not the City's.

Permits closed out

Every permit we pull is closed out at the end of the job. An open permit follows the property and reappears when it is sold.

Questions, by stage

Filter to the part of the job you are thinking about.

Which application form does West Park use?The package

The Broward County Uniform Building Permit Application. The City adopted the county-wide form rather than maintaining its own, so it is the same document used across much of Broward. Every package must also include a Notice of Commencement and the forms applicable to your particular permit type.

What are the three steps the City publishes?The package

First, select and download the county application, the Notice of Commencement and any other forms your application needs. Second, assemble the additional information and documents that may be required for your permit type. Third, register and create an account for the Online Building Permit Portal. The portal is deliberately last.

What additional documents will I need?The package

It depends on the permit type, and the City says so rather than publishing one master list. That is why we establish the type with the Building Department before assembling anything — and why we will not reproduce another municipality's checklist and present it as West Park's.

What does the $2,500 figure actually decide?The $2,500 line

Whether a Notice of Commencement is required. The City states the NOC is not required if the value of work is under $2,500. It does not decide whether you need a permit — that is a separate question about the work itself.

Can I split the job to stay under $2,500?The $2,500 line

You would be avoiding one trip to the County Recording office and buying several extra applications, reviews and inspection sequences. It is not a saving, and a fragmented permit record is harder to explain at sale than a single clean one. We would not advise it.

Do I still need a permit for work under $2,500?The $2,500 line

The $2,500 test in West Park is about the Notice of Commencement, not about whether the work is permitted work. Whether your specific scope needs a permit is a question for the Building Department, and it is worth asking before starting rather than after.

When is the Notice of Commencement due?Notice of Commencement

Before the permit is issued — which is earlier than most municipalities, where it is due before the first inspection. It has to be recorded at the County Recording office, with two certified copies secured. In practice that means an administrative errand sits directly between you and a start date.

Why does the timing matter so much?Notice of Commencement

Because a document due before the first inspection can be sorted out during the whole review period, while a document due before issuance cannot. If the review clears and the notice is not recorded, the permit does not issue and the job does not start. It is the single most useful timing fact about building in West Park.

Who records it?Notice of Commencement

It is recorded at the County Recording office and two certified copies are secured. We manage that as a dated task on the programme, but it needs signatures — so it is the step most sensitive to an owner being away or slow to sign.

What happens if you find unpermitted work from a previous owner?On site

We stop and tell you, before it is covered up. It is more common than people expect in South Florida, and it has to be resolved rather than built over — both because an inspector will find it and because it becomes yours at the point you conceal it.

Can I live in the house while you work?On site

Often yes, and it changes the programme rather than the price alone. Containment, protection and phasing all cost days. The honest version of this conversation happens at the site visit, where we can look at where the work is relative to where you sleep and cook.

Does Broward County change how my project is built?On site

Yes, on the outside of the building. Broward sits inside the Florida Building Code's High-Velocity Hurricane Zone, which covers Miami-Dade and Broward and nowhere else in Florida. Broward's Board of Rules and Appeals administers the county amendments and certifies the municipal building departments, which is also why the application form is a county one.

Why won't you publish a price?Cost

Because for a remodel the same square footage can differ several-fold depending on what is behind the wall and which disciplines are involved. A published rate would be a guess. You get an itemised figure in writing after a site visit, and it says what happens if something is found during demolition.

What will the permit itself cost?Cost

We did not find a fee figure published by the City that we could verify, so this page carries none rather than repeating one from elsewhere. Ask the Building Department, and note that payments are brought or mailed to City Hall rather than taken in the portal.

How are inspections handled?Inspections

Against the issued permit, discipline by discipline, with each booked as the work reaches it. The City publishes no inspection cut-off time, so we do not print one — we confirm the current arrangement when we book rather than assuming last year's.

Can walls be closed before an inspection passes?Inspections

No, and we will not do it. Board goes up after the rough-in inspections have actually passed. Opening finished work later costs several times what waiting costs.

How long does a permit take in West Park?Inspections

We do not publish a number, because the City does not publish one. What we can tell you honestly is what is outstanding at any moment and what each item is waiting on. Anyone quoting you a West Park review time is quoting their own average.

What happens to the permit when the job is finished?Afterwards

It gets closed out. We do not leave permits open, because an open permit stays attached to the property and reappears at sale, when it is somebody else's leverage rather than an administrative detail.

What paperwork should I keep?Afterwards

The permit record, the approved drawings, the recorded Notice of Commencement and its certified copy, the product approval documentation for anything in the envelope, and the closeout. In the HVHZ the envelope paperwork is the part a future buyer, insurer or inspector will actually ask for.

Do you work anywhere else in Broward?Afterwards

Yes — across Broward, Miami-Dade and Palm Beach, 104 municipalities in total. The filing routes differ genuinely between them even where the application form does not: West Park wants the recorded notice before issuance, its neighbours generally want it before the first inspection, and those differences are a working detail for us rather than a surprise.

Client experience

What clients say, in their own words

Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.

Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.

Next steps

Where to go from here

Grouped by what you are trying to do, not by category.

Where you are

The county and the neighbouring cities

Bigger moves

When the answer is more than a remodel

Read first

Before you commit to anything

Start here

Start with the address

Almost everything on this page turns on which permit type applies and whether your contract crosses $2,500. Tell us the address and what you are hoping to do, and the first conversation is a useful one.

What happens next

  1. We read it properly and come back to you, usually the same or the next working day.
  2. A short call to understand the property, the scope and what is driving the timing.
  3. We confirm the permit type with the Building Department and establish whether the recording step applies, before we form a view.
  4. A site visit, because what is behind a South Florida wall cannot be judged from photographs.
  5. A written, itemised proposal, including what happens if something is found during demolition.
  6. If you go ahead, we assemble the county package, record the notice in time for issuance and submit through the City's portal.
Preferred contact method

We use your details only to respond to this enquiry. No lists, no resale.

Thanks — that came through.

Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

Wide view of a primary bathroom with a barn door, trough vanity, freestanding tub and glazed walk-in shower

The paperwork opens the job here. Let's get it right first.

West Park publishes three steps, uses the County's form and wants the notice recorded before the permit issues. None of it is difficult — it is simply front-loaded, and unforgiving of being discovered in the wrong order. The value of a contractor here is having the package right before the portal is even opened.

Or see the rest of what we cover on the Broward County page if your property is somewhere else in the county.