10 service categories · 100 service pages · Miami-Dade, Broward & Palm Beach
View all services104 municipalities · Miami-Dade, Broward & Palm Beach
All service areasThe City publishes the Broward County Uniform Building Permit Application rather than one of its own, and sets out its process in three numbered steps. The part that catches people is the timing: the recorded Notice of Commencement is required before the permit is issued, not before the first inspection, and it needs two certified copies from the County. We build to that, as a licensed general contractor working across Broward, Miami-Dade and Palm Beach.
Miami-Dade · Broward & Palm Beach Counties
ScrollStart here
Almost everything on this page turns on which permit type applies and whether your contract crosses $2,500. Tell us the address and what you are hoping to do, and the first conversation is a useful one.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.
Recent projects
Eight frames of completed work across South Florida — bathrooms, showers, flooring and exterior concrete. Tap any image to see it larger.
A completed primary bathroom with a barn door, trough vanity and freestanding tub.
A wet-room bathroom with a freestanding tub and an open walk-in shower.
An emerald green tiled shower with a white hexagon mosaic bench.
A fluted oak vanity with a backlit mirror cabinet beside a window.
A recessed shower niche backed in scallop marble mosaic with a metal trim edge.
Dark wide-plank flooring in an open interior with material sample boards.
A corner shower bench in large-format tile above a hexagon mosaic floor.
A plain poured concrete driveway with a broom finish and cut control joints.
All photographs are of real completed Elbaz Construction work. They come from several separate properties across South Florida and are shown as recent work. None of them was taken in West Park, and none is captioned as though it were.
The journey
West Park publishes a process rather than a rulebook: three numbered steps, a county application form, a notice that has to be recorded before anything is issued, and a portal you register for. Almost everything that goes wrong on a project here goes wrong in the assembly rather than in the building, which is why this page walks the documents in the order the City asks for them.
Use the stage markers to jump to the part you are stuck on. Nothing here is a promise about your address — the Building Department decides that — and nothing here is a figure we invented. Where the City publishes a rule, it is quoted. Where it does not, this page says so instead of guessing.
Stage 01 · Package
A West Park application is assembled from more than one place, and knowing which part comes from where is most of what makes the process straightforward.
Every application package here has to include the Broward County Uniform Building Permit Application. The City adopted the county-wide form rather than maintaining its own, which is genuinely helpful — it is the same document used across much of Broward, so a contractor working across the county is filling in something familiar. What varies is what goes AROUND it, and that is where the City's own requirements live.

Illustration, not a photograph: existing and proposed elevation drawings pinned side by side, drawn to show what a submission set looks like. It is not a photograph of any West Park application.
The City sets out its process as three steps, and the ordering is deliberate. First, select and download the county application, the Notice of Commencement and any other forms your permit type needs. Second, assemble the additional information and documents that type requires. Third, register and create an account for the Online Building Permit Portal. The portal comes last, not first, which tells you the City expects the package to exist before the account does.

A wide view of a completed Elbaz Construction primary bathroom with a barn door, trough vanity and freestanding tub. A South Florida project, not a West Park one.
West Park is in Broward County, which sits inside the Florida Building Code's High-Velocity Hurricane Zone — covering Miami-Dade and Broward and nowhere else in the state. Broward's Board of Rules and Appeals administers the county amendments and certifies the municipal building departments inside the county. That is the same body behind the uniform application form, and it is why a Broward package has a family resemblance from one city to the next.

A completed Elbaz Construction long primary bathroom with a light oak vanity and a freestanding tub. A South Florida project.
The City publishes that payments are brought or mailed to City Hall at 1965 S. State Road 7, and gives one telephone number for enquiries. Alongside an online portal for the application itself, that mix — digital submission, physical payment — is worth knowing in advance, because it is the sort of small step that adds a day when it is discovered rather than planned for.

Timber stair treads and risers finished to match the floor at the landing, on a completed Elbaz Construction project in South Florida.
Stage 02 · Value
One published figure separates two quite different paperwork paths here, and it sits earlier in the process than the equivalent figure does in most municipalities.
Where the value of work is under $2,500, the City states that a Notice of Commencement is not required. That removes a genuine step — a trip to the County Recording office, two certified copies and a document that has to be back before the permit issues. It does not remove the permit itself: the value test here is about the notice, not about whether the work is permitted work.

An emerald green tiled shower with a white hexagon mosaic bench and a recessed niche, from a completed Elbaz Construction project in South Florida.
Above the threshold, a recorded Notice of Commencement is required prior to permit issuance, recorded at the County Recording office with two certified copies secured. Read the timing carefully: many municipalities want the recorded NOC before the FIRST INSPECTION, which gives you the whole review period to sort it out. West Park wants it before the permit issues — so it sits on the critical path to starting rather than to being inspected.

A completed Elbaz Construction walk-in shower interior with a tiled bench seat and a herringbone mosaic floor. Not a West Park property.
The City's second step is the additional information and documents that may be required for your particular permit type. It does not publish a single master list, because the answer depends on the type — and we are not going to reproduce another municipality's checklist and present it as West Park's. The practical approach is to establish the permit type first and ask what that type requires, before assembling anything.

A low shower threshold with the linear drain running along the mosaic, on a completed Elbaz Construction project in South Florida.
Step three is registering and creating an account for the Online Building Permit Portal. Putting it third is a small signal worth reading: the City expects you to arrive at the portal with a package rather than to use the portal to work out what the package should be. Getting the account set up early costs nothing, but it is not where the work is.

A linear drain set at the edge of a white hexagon mosaic shower floor, from completed Elbaz Construction work in South Florida.
Every photograph in this section is real Elbaz Construction project photography from completed South Florida work. None of it was taken in West Park and none of it is captioned as though it were. Drawn images are labelled as illustrations.
Project gallery 01
Six frames of completed Elbaz Construction work across South Florida. Different properties, not one project, and not photographed in West Park — each caption says what it actually is.
Project 01, guided tour






Micro-cement, wide
A completed primary bathroom with a barn door, trough vanity, freestanding tub and glazed shower.
Six frames from completed Elbaz Construction projects across South Florida, grouped by room rather than by property.
A city page is about a process, and a process is only worth reading if the company at the end of it builds. These are the finished result of the same six stages this page walks.
South Florida. None is claimed to be in West Park, because none was verified as being in West Park.
No cost, no address, no client name and no permit history appears anywhere on this page.
Stage 03 · Recorded
West Park publishes three steps and we follow them, because the ordering is the useful part: the documents come before the account, and the recorded notice comes before the permit.
The City's second step is "the additional documents your permit type requires", which means the type has to be settled first. We establish it with the Building Department rather than inferring it, because the type determines the whole package.
The Broward County Uniform Building Permit Application, a Notice of Commencement and whatever additional forms the type requires are downloaded and completed. The county form is the same one used across much of Broward, which makes it familiar rather than novel.
The supporting information is assembled — drawings and, for anything in the building envelope, the product approval documentation the HVHZ requires. This is the step where a package either becomes reviewable or becomes a comment cycle.
We establish whether the value of work crosses $2,500, because that decides whether a Notice of Commencement is required at all — and if it is, it has to be recorded and back in hand before the permit can issue.
Where required, the Notice of Commencement is recorded at the County Recording office and two certified copies are secured. This is on the critical path to STARTING here, not to being inspected, which is earlier than most municipalities put it.
An account is created on the Online Building Permit Portal and the package is submitted. Ours exists already, so this is not where a project waits.
The application is reviewed and comments come back. The City publishes no review timeframe, so we do not quote one. Payment is brought or mailed to City Hall rather than taken in the portal — a small step that is worth planning rather than discovering.
This is the published sequence, not a promise about your project. What any specific address requires, and which additional documents your permit type needs, are decided by the City of West Park Building Department — not by a contractor. We confirm what your address actually requires before anything is filed.
Stage 04 · Assembly
Because the recorded notice is required before the permit issues rather than before the first inspection, the administrative work here front-loads onto the start date. These phases are ordered by that reality rather than by the trades.
It gates issuance, not inspection
Where the value of work is over $2,500, the recorded Notice of Commencement and its two certified copies have to be in hand before the permit issues. In West Park that means the recording trip sits between you and a start date, not between you and an inspection — so it is booked as a task with a date rather than left as an errand.
Quality check · Recorded NOC and two certified copies secured before issuance is sought

Agreed before delivery
Coverings, dust separation and the working route go in, and deliveries and parking are settled in advance with anyone they affect.
Quality check · Route, containment and deliveries agreed before work starts

And reading the record against it
The scope comes out and the fabric appears. Anything that does not match the permit record is photographed and raised with you before it goes back behind a wall.
Quality check · Everything uncovered photographed and raised before it is concealed

To the drawings in the package
Load-bearing alterations are executed to the drawings that were submitted and reviewed. Where site conditions genuinely differ, that is a revision through the portal rather than a decision taken on site and recorded nowhere.
Quality check · Nothing structural concealed before its inspection

County-amended, and documented
Windows, doors, roofing and their fixings go in to the approved products and the approved attachment, and the product approval documentation is matched to what is physically installed. Broward's Board of Rules and Appeals administers the amendments that govern this, across every city in the county.
Quality check · Installed products matched to their approval documents

Each inspected on its own
Electrical, plumbing and mechanical rough-in are installed and set out against the finished setting out rather than against the demolition, and each discipline is inspected before anything is covered.
Quality check · Each discipline inspected before anything is closed

After the passes
Board and insulation go up once the rough-in inspections have passed. Opening finished work later costs several times what waiting costs, and there is no version of that arithmetic where closing early wins.
Quality check · Walls closed only against passed inspections

Photographed as it is built
Tanking, backer board and falls go in beneath the tile and are recorded as they are built. No later inspection can examine this layer.
Quality check · Falls and waterproofing recorded photographically before tiling

Walked with you first
Tile, stone and cabinetry are set out and confirmed with you before the field is fixed, then the visible work goes in.
Quality check · Setting out walked with you before the first full course

Every discipline, then the record
Each discipline is taken to its final, outstanding items are agreed in writing, and the permit is closed rather than left open. In West Park the paperwork opened the job, and it closes it too.
Quality check · Every final passed and the permit closed

Project gallery 02
Three frames from real Elbaz Construction work in South Florida — the same kind of room at three points in its life.
These are real photographs of Elbaz Construction work on South Florida projects. The first two are the middle of the job, which is the part an owner actually lives through and the part nobody puts in a brochure. None of this work was in West Park and none of it is presented as though it were.
Project 02, during and complete



During: back to the opening
A bathroom stripped back during construction with the wall opening re-framed and tile backer going up.
Real Elbaz Construction work in South Florida, photographed during construction and again on completion.
Because the difference between a job that passes its inspections and one that does not is visible in the first two frames and invisible in the third.
It is not a West Park project, it is not presented as one, and no address, client or cost appears anywhere.
Stage 05 · Weighing
Argued both ways. None of these has a universally right answer — it depends on your scope, your contract value and how much of the calendar you control.
Off the critical path

Do it when you know

Which oneRecord it early unless the scope is genuinely unsettled. West Park puts this document before issuance rather than before the first inspection, which means an ordinary administrative errand sits directly between you and a start date — and that is the wrong place for it to be discovered.
Whatever the value comes to

Avoid the recording

Which oneScope it properly. The $2,500 line decides whether a notice is recorded, not whether the work needs permitting — so splitting a job to stay under it buys you one avoided trip to the County and costs you several extra applications, reviews and inspection sequences.
Then assemble once

Adjust after comments

Which oneConfirm the type first. The City structured its own instructions that way — type, then documents, then portal — and a package assembled against the wrong type is not a small error here, because the additional-documents requirement is exactly the part that varies.
Tick whatever applies. This will not produce a price — no honest one exists before someone has seen the property — but it will show which parts of your project are carrying the time and the risk.
We do not publish figures, and we do not publish permit fees either: none was read from a City source, and we would rather say so than print a number we cannot stand behind. You get a real, itemised number from us in writing after a site visit.
Project gallery 03
Four frames from completed Elbaz Construction work in South Florida — flooring, drainage detail and a driveway, the scopes that most often widen a package.
Project 03, guided tour




Wide-plank, with samples
Dark wide-plank flooring in an open interior with material sample boards on display stands.
Completed Elbaz Construction flooring, drainage detail and exterior concrete in South Florida.
Because these are the scopes where the permit type — and therefore the additional documents West Park asks for — is most likely to differ from what an owner assumed at the start.
South Florida. None of these is claimed to be in West Park.
Stage 06 · Handover
This City publishes a process rather than a rulebook. Everything below is taken from its own Building Department material, and where it publishes nothing, this page says so.
Every application package must include the Broward County Uniform Building Permit Application and a Notice of Commencement, plus the forms applicable to the permit type.
Select and download the county application, the Notice of Commencement and the other forms needed for your application.
Assemble the additional information and documents that may be required for your permit type.
Register and create an account to gain access to the Online Building Permit Portal.
A recorded Notice of Commencement is required prior to permit issuance, recorded at the County Recording office with 2 certified copies secured.
It is not required if the value of work is under $2,500.
Payments are brought or mailed to City Hall, 1965 S. State Road 7. The published number for enquiries is 954-989-2688.
A plan-review timeframe, any fee we could verify, and a single master list of the additional documents each permit type requires — the City states that this varies. Where a number is missing from this page it is missing because West Park does not state it.
Only claims that are either public record or visible in the work on this page. Nothing about awards, nothing about rankings, and no numbers we cannot show you.
Elbaz Construction is a licensed Florida general contractor, CBC1265280. Permits are pulled in the company's name, and the licence is verifiable at the Florida DBPR rather than on our say-so.
West Park requires the recorded Notice of Commencement before the permit issues rather than before the first inspection. We treat the County recording as a dated task on the programme, because otherwise an errand sits between you and a start date.
The additional documents this City asks for depend on the type, and it publishes no single master list because it genuinely varies. Establishing the type first means assembling the package once.
The Broward County Uniform Building Permit Application is used across much of the county, which makes it familiar — and familiarity is exactly where careless completion creeps in. It gets the same attention as anything else in the package.
Broward's Board of Rules and Appeals administers the county amendments and certifies the building departments inside the county. Working to that standard across Broward is routine here, not a special case.
In the HVHZ what is inspected is the pairing of installed product and approval paperwork. We keep them matched, because an envelope inspection that fails on documentation costs exactly as much as one that fails on workmanship.
The City publishes none. Anyone giving you a West Park review time is giving you their own average, not the City's.
Every permit we pull is closed out at the end of the job. An open permit follows the property and reappears when it is sold.
Filter to the part of the job you are thinking about.
The Broward County Uniform Building Permit Application. The City adopted the county-wide form rather than maintaining its own, so it is the same document used across much of Broward. Every package must also include a Notice of Commencement and the forms applicable to your particular permit type.
First, select and download the county application, the Notice of Commencement and any other forms your application needs. Second, assemble the additional information and documents that may be required for your permit type. Third, register and create an account for the Online Building Permit Portal. The portal is deliberately last.
It depends on the permit type, and the City says so rather than publishing one master list. That is why we establish the type with the Building Department before assembling anything — and why we will not reproduce another municipality's checklist and present it as West Park's.
Whether a Notice of Commencement is required. The City states the NOC is not required if the value of work is under $2,500. It does not decide whether you need a permit — that is a separate question about the work itself.
You would be avoiding one trip to the County Recording office and buying several extra applications, reviews and inspection sequences. It is not a saving, and a fragmented permit record is harder to explain at sale than a single clean one. We would not advise it.
The $2,500 test in West Park is about the Notice of Commencement, not about whether the work is permitted work. Whether your specific scope needs a permit is a question for the Building Department, and it is worth asking before starting rather than after.
Before the permit is issued — which is earlier than most municipalities, where it is due before the first inspection. It has to be recorded at the County Recording office, with two certified copies secured. In practice that means an administrative errand sits directly between you and a start date.
Because a document due before the first inspection can be sorted out during the whole review period, while a document due before issuance cannot. If the review clears and the notice is not recorded, the permit does not issue and the job does not start. It is the single most useful timing fact about building in West Park.
It is recorded at the County Recording office and two certified copies are secured. We manage that as a dated task on the programme, but it needs signatures — so it is the step most sensitive to an owner being away or slow to sign.
We stop and tell you, before it is covered up. It is more common than people expect in South Florida, and it has to be resolved rather than built over — both because an inspector will find it and because it becomes yours at the point you conceal it.
Often yes, and it changes the programme rather than the price alone. Containment, protection and phasing all cost days. The honest version of this conversation happens at the site visit, where we can look at where the work is relative to where you sleep and cook.
Yes, on the outside of the building. Broward sits inside the Florida Building Code's High-Velocity Hurricane Zone, which covers Miami-Dade and Broward and nowhere else in Florida. Broward's Board of Rules and Appeals administers the county amendments and certifies the municipal building departments, which is also why the application form is a county one.
Because for a remodel the same square footage can differ several-fold depending on what is behind the wall and which disciplines are involved. A published rate would be a guess. You get an itemised figure in writing after a site visit, and it says what happens if something is found during demolition.
We did not find a fee figure published by the City that we could verify, so this page carries none rather than repeating one from elsewhere. Ask the Building Department, and note that payments are brought or mailed to City Hall rather than taken in the portal.
Against the issued permit, discipline by discipline, with each booked as the work reaches it. The City publishes no inspection cut-off time, so we do not print one — we confirm the current arrangement when we book rather than assuming last year's.
No, and we will not do it. Board goes up after the rough-in inspections have actually passed. Opening finished work later costs several times what waiting costs.
We do not publish a number, because the City does not publish one. What we can tell you honestly is what is outstanding at any moment and what each item is waiting on. Anyone quoting you a West Park review time is quoting their own average.
It gets closed out. We do not leave permits open, because an open permit stays attached to the property and reappears at sale, when it is somebody else's leverage rather than an administrative detail.
The permit record, the approved drawings, the recorded Notice of Commencement and its certified copy, the product approval documentation for anything in the envelope, and the closeout. In the HVHZ the envelope paperwork is the part a future buyer, insurer or inspector will actually ask for.
Yes — across Broward, Miami-Dade and Palm Beach, 104 municipalities in total. The filing routes differ genuinely between them even where the application form does not: West Park wants the recorded notice before issuance, its neighbours generally want it before the first inspection, and those differences are a working detail for us rather than a surprise.
Nothing in that stage yet — try “All”.
Client experience
Live Google reviews for Elbaz Construction, pulled straight from our Google Business Profile — not retyped, not edited and not selected by us.
Adir Davidov2022-12-27 Redid my whole bathroom and kitchen. Great service - Great quality - very quick - very professional !! Highly recommended! Lee Morali2022-12-27 They are amazing! Very professional. Met my exact requests with so much patience and knowledge. They renovated my whole house and the whole process was such a breeze. I highly recommend them! Shir Partush2022-12-27 We hired them to renovate our investment property and they provided exceptional quality service for an affordable price! Mia Zafrani2022-10-25 Amazing experience with the entire company! They did a great job in my house for some work that needed to be completed, and I am extremely happy with the result. Super professional & great service. I highly recommend Elbaz Construction. carmit cohen2022-10-25 After I've been Looking for a good company to renovate my house , I found those guys! These people are super professional super honest super Fast !! Don't hesitate to Rent their service! They are number one!! Omri B2022-10-20 I highly recommend them for home improvement. They renovated my master bathroom and a few upgrades for other guest bathrooms. They are very professional, courteous and transparent. They are great at communicating and finding ways to streamline the work. Sean has impeccable project management and customer relationship management skills. Very pleased with the work! roni yonani2022-10-19 Very professional! From start to end- personal kind treatment, always respectful every espect of the work was clear, and fair. Value for money 10/10. Thank you guys, see you at our next project, hope others will be smart and do the same! Itzick Manasherov2022-10-19 Needed remodeling of my master bathroom in my house. After calling around and dealing with a bunch of unexperienced companies I found Elbaz construction and gave them a call. Just from the ease of communication and friendly talk I've had with the owner I knew this was going to be the company I was going to hire. They came 2 days later and started remodeling my bathroom and knocked it out in a timely manner. Great service, great communication, and amazing work. Will definelty refer and reuse this company for any future remodeling I might need. Sophie Brito2022-10-19 Their work was absolutely superb, they did a fantastic job with my house renovation!! Definitely recommend Elie Elancry2022-10-19 Amazing job Did a total renovation of my house with themGoogle rating score: 5.0 of 5, based on 12 reviews
Reviews are served live by the site's own Google Reviews plugin and update as new ones are posted. Nothing here is retyped, shortened or re-attributed.
Proudly serving homeowners across Miami-Dade, Broward and Palm Beach
104 municipalities across three counties — and we hold the licence to build in all of them. Not sure about your address? Ask us.
Next steps
Grouped by what you are trying to do, not by category.
The county and the neighbouring cities
The parts of this page we do as a service
What we most often build here
When the answer is more than a remodel
Start here
Almost everything on this page turns on which permit type applies and whether your contract crosses $2,500. Tell us the address and what you are hoping to do, and the first conversation is a useful one.
Your details are with the Elbaz Construction team and we will come back to you, usually the same or next working day. If it is urgent, call (754) 236-0675.

West Park publishes three steps, uses the County's form and wants the notice recorded before the permit issues. None of it is difficult — it is simply front-loaded, and unforgiving of being discovered in the wrong order. The value of a contractor here is having the package right before the portal is even opened.
Or see the rest of what we cover on the Broward County page if your property is somewhere else in the county.